You are on page 1of 8

`

CHAPTER I

PREFACE

I.1 BACKGROUND

The development of technologies in the world is increasing rapidlyyyyy. To survive in this


technology era, undergraduate students need to have certain skills, such as
professionalism in finding alternative solutions for any futuristic problems which rapidly
occurred in the real industries, especially in geothermal industries. It is necessary to build
and develop this character of professionalism in preparing a perfect, well-prepared, and
competent engineer.

Furthermore, an undergraduate student should improve his/her skills and has a good
social interaction and communication with others so that he/she can be a good
workmate or partner for others. Social, cultural, environment, and lifestyle of
professional workers must be understood because things that we learned in university
sometimes are not the same with the reality well find in the field.

However, to create professionalism soul, a student must have not only theoretical
knowledge of petroleum obtained from the university, but also applications of those
theoretical knowledge in the field.
According to that reason, Petroleum Engineering Department in Bandung Institute of
Technology (PE ITB) agreed to make the Practical Training Program as an obligation
taken by students for better, higher quality, and well-prepared fresh graduate students.

In the other hand, for company, practical training could be a good event in searching for
new human resources and evaluating the quality of undergraduate students.

I.2 PURPOSES

The objectives of a practical training are:

1. To fulfill a requirement to graduate from Petroleum Engineering Department or


University.

2. To get chances in observing, comparing, and applying theories obtained from


university in the real condition in geothermal industries.

3. To understand and get used to in working environment.

4. To get experiences and more knowledge about processes occurred in geothermal


industry.
CHAPTER II

ACTIVITY DESCRIPTION

II.1 PLACE OF PRACTICAL TRAINING

The practical training will be held in PT. Pertamina Geothermal Energy Area Kamojang

II.2 TIME OF JOB TRAINING

I apply for the practical training program that will be held from June to August 2016 and
for company consideration, I enclose my schedule in this second semester of 2015 -2016.

18th January until 19thMay 2015 : Regular lecture time

2st May until 13th August 2015 : Holiday time (allocated for practical training
program)
II.3. CONTENTS

The contents of practical training program are decided by PT. Pertamina Geothermal
Energy and Lecturer of Petroleum Engineering Department of Bandung Institute of
Technology. The practical training program needs to be related to the major of
Petroleum Engineering;

1. Reservoir engineering

2. Drilling engineering, and

3. Production system of oil field.

Specifically, I prefer to take a part of drilling engineering division because this part is the
most related part between petroleum and geothermal engineering. I would like to know
the real system, condition, and total procedure of having part in geothermal industry. The
guidance of engineers will also be helpful for me to gain a better knowledge.

I realize that PT. Pertamina Geothermal Energy is one of successful geothermal company
in Indonesia. The sophisticated technologies, a lot of innovations, and experienced
human resources of PT. Pertamina GeothermaL Energy would make great experiences
for undergraduate student, like me. According to that, I intend to apply a practical
training program in PT. Pertamina GeothermaL Energy. I believe that I can get more
knowledge and experiences in both technical and practical skills to be a competent and
well-prepared engineer.

II.4 METHODS

The learning methods in this practical training that I would like to have are learning and
exploring typical cases occurred in the field. Besides that, I would like to learn the
softwares of geothermal engineering used in PT. Pertamina Geothermal Energy.
II.5 PARTICIPANT

The participant applying the practical training program from Petroleum Engineering

Department Program of Bandung Institute of Technology is:

Name : Muhamad Choirul Azis

Students Number : 122 13060

Phone : +6285771364672

E-mail : choirul_aziz HYPERLINK


"mailto:choirul_aziz@students.itb.ac.id"@students.itb.ac.id
CHAPTER III

CLOSING
This is my proposal of Practical Training Program in PT. Pertamina Geothermal Eneergy. I
am looking forward to join this company in practical training program. Considering my
limitations, I hope PT. Pertamina Geothermal Energy could give me supports and advices
in having good quality time of this Practical Training Program.

The supports I expect that will be helpful for me are:

1. A tutor guiding me along the practical training.

2. Facilitation in doing observation and taking the necessary data needed.


3. Accommodation along practical training.

I arrange this proposal to complete all requirements for Practical Training Program in PT.
Pertamina Geothermal Energy. End of words, I thank you for your help and
consideration.

Bandung, January 2016

Known and approved by:

Chief of Petroleum Enginering Participant


Departement ITB,

Dr.-Ing. Bonar Tua Halomoan Marbun Muhamad Choirul Azis

NIP 197512222009121002 NIM 12213060

You might also like