You are on page 1of 4

CURRICULAM VITAE

Malik Nasir Mehmood

Abu Dhabi U.A.E

Mobile No: 0509759082

E-Mail Address: mehmoodn9@gmail.com

Having Valid U.A.E Driving License.

OBJECTIVE:
To seek a job that will suit to my acquired knowledge and use my
special skills and abilities with regards to the company goals and to
develop further my talents and skills for continues improvement.

Cv for the post of Land Surveyor


Personal Details______________________________________________

Name :Malik Nasir Mehmood


Father Name : Malik Abdul Khaliq
Nationality : Pakistan
Religion : Islam
Permanent Address : Moin auto store near post office chakwal road choa saiden shah District
chakwal.
Date of Birth : 09-07-1985
Marital Status : Married
Profession : Land Surveyor
Language Known : Native Urdu & Fluent in Panjabi &English
Education and Professional Status

Passed SSC From Board of Intermediate &Secondary Education Rawalpindi.


Three years Diploma of Associate Engineer (Civil) from Punjab Board of Technical
Education Lahore.
Equipment & Computer Skills

GPS Leica viva 14 & 15


Automatic level machines
Total Station Leica1202/1205&Trimble 5500
Ms Office, Internet Explorer, Computer basic
Auto cad & Leica Geo Office
CAREER SUMMARY
A Land Surveyor with significant More than (12) years experience in Land Surveying (10 Years in
UAE and 02 in Pakistan) for, Roads, Infrastructure ,Bridges, Utilities, Building and Topographical
Survey

CURRENT EMPLOYER: WESTERN BAINOONA GROUP FOR GENERAL CONTRACTING- LLC


PROJECT: INTERNAL ROAD AT VARIOS LOCTION IN AL AIN STAGE20
Period of Employment: From 16 September 2016 to TILL DATE
Designation: Seiner Land Surveyor

Setting out and leveling for Road Earthwork, Sub Grade, and Sub Base.
kerb stones Layout of roads centerline (Curves & Straights).
Footpath Layout of roads and interlock tiles.
Observations of the Cross-Sections.
Plotting of Cross-Sections and earthwork volume calculations,

CURRENT EMPLOYER: LERSON & TURBO TRANSPORTATION INFRASTRUCTURE


LIMITED, U.A.E
PROJECT: MAFRAQ TO GHWAIFAT BORDER POST HIGHWAY
IMPROVEMENT PROJECT SECTION -4A.
Period of Employment: From June 28 2014 to 15 September 2016
Designation: Seiner Land Surveyor
Establishment of Control Points.
Setting out and leveling for Road Earthwork, Sub Grade, Sub Base, Improve Rock kerb stones alignment
& leveling, Cement Stabilize Asphalt leveling.
Setting out of culvert, Water Duct, Storm Water Duct, Street Light Ducts, Telecom Ducts.
Pre-marking for roads as per drawing.
Pilling setting-out & cut-out levels, Pile caps.
Piers, Bearing Adjustment, Bottom & Top slab leveling, Cantilever Adjustment, Bridge barrier.
Preparing Reports for as-Built

EMPLOYER: SIXCONSTRUCT LIMITED, U.A.E


PROJECT: CULTURE VILLAGE PHASE1 ROADS AND INFRASTRUCTURE.
Period of Employment: From April 2013 up to 20 MAY 2014
Designation: Seiner Land Surveyor
Responsibilities and nature of works:
Preparing of control point for construction work &Maintain control points.
Layout of roads centerline (Curves & Straights
Observations of the Cross-Sections
Plotting of Cross-Sections and earthwork volume calculations.
Calculations and fixing of slope stakes.
Setting-out of alignment for pipeline with the coordinates, by bearing and distance.
Controlling of levels of pipe inverts.
To make survey of the existing conditions and prepare the Drawings.
Checking the Contractor s setting-out line and levels .With the using of modern
Total Station and leveling Equipments.

EMPLOYER: SIXCONSTRUCT LIMITED., U.A.E


PROJECT: Techhint Ruwais Jetty, Sulphur Handling Terminal, Ruwais - U.A.E
Period of Employment : FROM DECEMBER 2011 up to APRIAL 2013
Designation: Land Surveyor
About the project:
It is a challenging project consisting 206 Rake Piles (concrete socket + steel pile) for two Ship loader,
Berthing Dolphins, and One Dolphin & Mooring Dolphins.
The Accountabilities
Includes all sorts of survey related jobs & records such as;
Over all in charge for piling and alignment of super structure coming over it.
Preparation of spreadsheet in Excel for getting Design data of rake pile (Formula).
Traversing and fixing of benchmarks.
Ensuring best practices are followed and quality assurance goals are obtained; as well as participate in
development of best practices as related to land surveying.
Joint survey with consultant so as to tune the project.

EMPLOYER: SIXCONSTRUCT LIMITED., U.A.E


PROJECT: Upper Zakkum Artificial Island, Abu Dhabi, U.A.E
Period of Employment : From July 2011 up to December 2011
Designation: MARINE SURVEYOR
Project Detail : The site preparation includes dredging & pumping onshore .A
Projected Quantity of 22-27 million m3 of sand. For shore Protection an approximate amount of 7million m3rock &
approximate amount of 250,000 m3 of concrete blocks.
Skills summary
Preparing of control point for construction work &Maintain control points.
Topography and leveling work for construction.
Preparing cross section for Approval.
Calculation quantity for dumping.
Setting out all dredging limits, slopes, rock works &Reclamation boundaries.
Update daily progress, weekly & monthly progress reports.

EMPLOYER: SIXCONSTRUCT LIMITED., U.A.E


PROJECT: Stoam water Project Yas Island Development Project, Abu Dhabi, U.A.E
Period of Employment : From April 2010 up to July 2011
Designation: Land SURVEYOR
Responsibilities and nature of works:
Layout of roads centerline (Curves & Straights
Observations of the Cross-Sections
Plotting of Cross-Sections and earthwork volume calculations.
Calculations and fixing of slope stakes.
Setting-out of alignment for pipeline with the coordinates, by bearing and distance.
Controlling of levels of pipe inverts.
To make survey of the existing conditions and prepare the Drawings.
Checking the Contractor s setting-out line and levels .With the using of modern
Total Station and leveling Equipments.
Setting out works for the theme park construction designed by Warner brothers.
Setting out and leveling works of the structural steel works within building.& Leveling

EMPLOYER: SIXCONSTRUCT LIMITED., U.A.E


PROJECT: Ferrari World Yas Island Development Project Abu Dhabi, U.A.E
Period of Employment : From December 2007 up to April 2010
Designation: Land SURVEYOR
Project: Ferrari World, Abu Dhabi
Responsibilities and nature of works:
Setting-out of concrete columns & concrete walls.
Maintain structural level on each floor.
Opening marking for various building services.
Layout of block work..
Setting-out and leveling for pedestals of different mechanical equipments.
Leveling and setting out for the commercial building construction.
Leveling and setting out of the kerbs, centerline of taxiway, and drainage works in the car parking.
Leveling and setting out for the building concreting works: walls (straight & curved), slabs
Setting out for the fixing of tower plates within the slab, plates for the various rides within building.
Leveling and setting out for the plumbing works: pipelines, manholes, gully traps etc.
Leveling for all finishing works.
Alignment & leveling for steel structural canopy on top.
Setting-out & leveling of service road and building parking

Projects with Pehmah Survey &Consulting Engineers Karachi.


Period of Employment : From 27th June 2005 up to 27th sep.2007
Designation: Land SURVEYOR
Layout of roads centerline (Curves & Straights),
Observations of the Cross-Sections.
Plotting of Cross-Sections and earthwork volume calculations,
Calculations and fixing of slope stakes.