CALCULO HIDRAULICO DE LA LINEA DE CONDUCCION DE AGUA CRUDA - 1er TRAMO - CAPTACION - P

TRAMO COTA DE TUBERIA PROFUNDIDAD PENDIENTE DIAMETRO CAUDAL


COTA DE TERRENO (msnm) (m) DE TUBERIA LONGITUD (m)
DEL AL DEL AL DEL AL DEL AL (m/m) (mm) Horizontal Inclinada (l/s)
0 + 0.00 0 + 15.506 2,807.000 2,807.050 2,806.281 2,805.800 0.72 1.25 0.03102 226.2 15.506 15.51 40.00
0 + 15.51 0 + 17.00 2,807.050 2,806.300 2,805.800 2,805.050 1.25 1.25 0.50201 226.2 1.494 1.67 40.00
0 + 17.00 0 + 37.06 2,806.300 2,806.010 2,805.050 2,804.760 1.25 1.25 0.01446 226.2 20.057 20.06 40.00
0 + 37.06 0 + 48.23 2,806.010 2,805.990 2,804.760 2,804.690 1.25 1.30 0.00627 226.2 11.171 11.17 40.00
0 + 48.23 0 + 55.61 2,805.990 2,806.000 2,804.690 2,804.750 1.30 1.25 -0.00812 226.2 7.386 7.39 40.00
0 + 55.61 0 + 87.38 2,806.000 2,806.010 2,804.750 2,804.610 1.25 1.40 0.00441 226.2 31.762 31.76 40.00
0 + 87.38 0 + 98.59 2,806.010 2,806.000 2,804.610 2,804.750 1.40 1.25 -0.01249 226.2 11.212 11.21 40.00
0 + 98.59 0 + 106.81 2,806.000 2,806.000 2,804.750 2,804.700 1.25 1.30 0.00608 226.2 8.223 8.22 40.00
0 + 106.81 0 + 112.81 2,806.000 2,805.970 2,804.700 2,804.720 1.30 1.25 -0.00334 226.2 5.996 6.00 40.00
0 + 112.81 0 + 120.75 2,805.970 2,806.000 2,804.720 2,804.730 1.25 1.27 -0.00126 226.2 7.94 7.94 40.00
0 + 120.75 0 + 122.23 2,806.000 2,804.000 2,804.730 2,803.280 1.27 0.72 0.97973 226.2 1.48 2.07 40.00
0 + 122.23 0 + 125.76 2,804.000 2804.000 2,803.280 2803.250 0.72 0.750 0.00850 226.2 3.53 3.53 40.00
0 + 125.76 0 + 125.76 2,804.000 2804.000 2,803.250 2804.612 0.75 -0.612 226.2 1.362 40.00

C.N.A. = 2,805.738 msnm


hFlinea = 0.463 m
hFaccesorios = 0.190 m
htotal = 0.653 m
Pllegada = 1.436 m

373281251.xlsx 1/26
O - CAPTACION - PRESEDIMENTADOR

VELOCIDAD PENDIENTE PERDIDA DE COTA PIEZOMETRICA PRESION (m)


HIDRAULICA CARGA (m) (msnm)
(ms) (%0) DEL AL DEL AL
1.00 3.62 0.05616 2,806.701 2,806.645 0.42 0.85
1.00 3.62 0.00605 2,806.645 2,806.639 0.85 1.59
1.00 3.62 0.07262 2,806.639 2,806.567 1.59 1.81
1.00 3.62 0.04044 2,806.567 2,806.526 1.81 1.84
1.00 3.62 0.02674 2,806.526 2,806.499 1.84 1.75
1.00 3.62 0.11498 2,806.499 2,806.384 1.75 1.77
1.00 3.62 0.04059 2,806.384 2,806.344 1.77 1.59
1.00 3.62 0.02977 2,806.344 2,806.314 1.59 1.61
1.00 3.62 0.02171 2,806.314 2,806.292 1.61 1.57
1.00 3.62 0.02874 2,806.292 2,806.264 1.57 1.53
1.00 3.62 0.00750 2,806.264 2,806.256 1.53 2.98
1.00 3.62 0.01278 2,806.256 2,806.243 2.98 2.99
1.00 3.62 0.00493 2,806.243 2,806.238 2.99 1.63

373281251.xlsx 2/26
CALCULO HIDRAULICO DE LA LINEA DE CONDUCCION CAPTACION LA QUESERA - PRESEDIMENTADOR

Para la determinacin de las caractersticas de la lnea de impulsin calcularemos las perdidas de cargas en
la linea y en la cmara de bombeo

1.-Clculo de Prdidas de Carga

Ht = hf + hk

hf = Perdidas de carga por friccin


hk = Perdidas de carga singulares

Para el clculo de las prdidas de carga es utilizada la ecuacin de Hazen-Willians:

DH = 10,643*C-1,85 D-4,87 Q1,85 L + 0,0826 K D-4 Q2

donde:

C = Coeficiente de friccin de la tubera


D = Dimetro de la tubera (m)
Q = Caudal (m3/s)
L = Longitud de la tubera (m)
K = Coeficiente de Prdidas

1.1.- Clculo de prdidas 1er tramo Captacion - PTAP

C= 150 PVC
D= 0.2262 m
L= 127.90 m
Q= 0.04000 m3/s V = 0.995368501 m/s
L/D = 565.42943 < 4000 Linea corta

N Accesorios : K Kt DN
5 Coso 2230' 0.1 0.50 200
4 Codos 1115' 0.1 0.40 200
3 Codos 45 0.2 0.60 200
2 Codos 90 0.4 0.80 200

DH1 = 178.56 Q1,85 + 118.78 Q2


DH1 = 0.65 m
CPLlegada = 2806.05 CLlegada = 2804.612 CNA =

CH-LINEA- CAP - PRES 3/26


Presion = 1.44 m

CH-LINEA- CAP - PRES 4/26


GRAFICO - PERFIL HIDRAULICO DE LA LINEA DE CONDUCCION

Qmd = 0.04000 l/s


V= 0.9953685012 m/s
S= 0.3568373162 %

Captacion la
Quesera
C.Salida=2,806.281
msnm PRESEDIMENTADOR
C.Llegada=2,804.612 msnm

L = 127.90 m

CH-LINEA- CAP - PRES 5/26


NDUCCION CAPTACION LA QUESERA - PRESEDIMENTADOR

hf
25.82 Q2
20.66 Q2
30.98 Q2
41.31 Q2
118.78

2805.73844

CH-LINEA- CAP - PRES 6/26


HIDRAULICO DE LA LINEA DE CONDUCCION

PRESEDIMENTADOR
C.Llegada=2,804.612 msnm

CH-LINEA- CAP - PRES 7/26


SUSTENTACION DE METRADOS
TRAZO Y REPLANTEO

LINEA DE CONDUCCION DE AGUA CRUDA 1ER TRAMO - CAPTACION - PR


PLANILLA DE METRADOS PARA LAS PARTIDAS TRAZO Y REPLANTE

Cota de Terreno
Cota de Fondo msnm) Profundidad (m)
TRAMO (msnm)
DEL AL Ext. Sup. Ext. Inf. Ext. Sup. Ext. Inf. Ext. Sup.

0 + 0 0 + 15.51 2807 2807.05 2806.281 2805.8 0.72


0 + 15.506 0 + 17.00 2807.05 2806.3 2805.8 2805.05 1.25
0 + 17 0 + 37.06 2806.3 2806.01 2805.05 2804.76 1.25
0 + 37.057 0 + 48.23 2806.01 2805.99 2804.76 2804.69 1.25
0 + 48.228 0 + 55.61 2805.99 2806 2804.69 2804.75 1.30
0 + 55.614 0 + 87.38 2806 2806.01 2804.75 2804.61 1.25
0 + 87.376 0 + 98.59 2806.01 2806 2804.61 2804.75 1.40
0 + 98.588 0 + 106.81 2806 2806 2804.75 2804.7 1.25
0 + 106.811 0 + 112.81 2806 2805.97 2804.7 2804.72 1.30
0 + 112.807 0 + 120.75 2805.97 2806 2804.72 2804.73 1.25
0 + 120.747 0 + 122.23 2806 2804 2804.73 2803.28 1.27
0 + 122.227 0 + 125.76 2804 2804 2803.28 2803.25 0.72
0 + 125.757 0 + 125.76 2804 2804 2803.25 2804.612 0.75

TRAZO Y REPLANTEO INICIAL DE LA LINEA DE CONDUCCION DE AGUA TRATADA(ml) =


REPLANTEO FINAL DE LA LINEA DE CONDUCCION DE AGUA TRATADA(ml) =

373281251.xlsx/Trazo y repl. 8/26


SUSTENTACION DE METRADOS
TRAZO Y REPLANTEO

A CRUDA 1ER TRAMO - CAPTACION - PRESEDIMENTADOR


ARA LAS PARTIDAS TRAZO Y REPLANTEO INICIAL

Longitud
Profundidad (m) Dimetro Longitud
Corregida
Ext. Inf. Prom ( mm ) (m) (m)

1.25 0.98 226.2 15.506 15.51


1.25 1.25 226.2 1.494 1.67
1.25 1.25 226.2 20.057 20.06
1.30 1.28 226.2 11.171 11.17
1.25 1.28 226.2 7.386 7.39
1.40 1.33 226.2 31.762 31.76
1.25 1.33 226.2 11.212 11.21
1.30 1.28 226.2 8.223 8.22
1.25 1.28 226.2 5.996 6.00
1.27 1.26 226.2 7.94 7.94
0.72 0.99 226.2 1.48 2.07
0.75 0.73 226.2 3.53 3.53
-0.61 0.07 226.2 0 1.36
125.76 127.90
127.90
127.90

373281251.xlsx/Trazo y repl. 9/26


LINEA DE CONDUCCION DE AGUA CRUDA - 1ER TRAMO - CAPTACION
SUSTENTACION - PRESEDIMEN
DE METRADOS
EXCAVACION, RELLENO, INSTALACION
PLANILLA DE METRADOS PARA LAS PARTIDAS EXCAVACION, REFINE, RELLENO, ELIMINACION Y SUMINI

TRAMO Cota de Terreno


Cota de Fondo msnm) Profundidad (m) Dimetro Longitud Tipo de Clase de Tubera
(msnm)
Terreno
DEL AL Ext. Sup. Ext. Inf. Ext. Sup. Ext. Inf. Ext. Sup. Ext. Inf. Prom ( mm ) (m) Del Al 0.60

0 + 0 0 + 15.506 2807.000 2807.050 2806.281 2805.800 0.72 1.25 0.98 226.20 15.51 TR Serie 10 Serie 10
0 + 15.506 0 + 17 2807.050 2806.300 2805.800 2805.050 1.25 1.25 1.25 226.20 1.67 TR Serie 10 Serie 10
0 + 17 0 + 37.057 2806.300 2806.010 2805.050 2804.760 1.25 1.25 1.25 226.20 20.06 TR Serie 10 Serie 10
0 + 37.057 0 + 48.228 2806.010 2805.990 2804.760 2804.690 1.25 1.30 1.28 226.20 11.17 TR Serie 10 Serie 10
0 + 48.228 0 + 55.614 2805.990 2806.000 2804.690 2804.750 1.30 1.25 1.28 226.20 7.39 TR Serie 10 Serie 10
0 + 55.614 0 + 87.376 2806.000 2806.010 2804.750 2804.610 1.25 1.40 1.33 226.20 31.76 TR Serie 10 Serie 10
0 + 87.376 0 + 98.588 2806.010 2806.000 2804.610 2804.750 1.40 1.25 1.33 226.20 11.21 TR Serie 10 Serie 10
0 + 98.588 0 + 106.811 2806.000 2806.000 2804.750 2804.700 1.25 1.30 1.28 226.20 8.22 TR Serie 10 Serie 10
0 + 106.811 0 + 112.807 2806.000 2805.970 2804.700 2804.720 1.30 1.25 1.28 226.20 6.00 TR Serie 10 Serie 10
0 + 112.807 0 + 120.747 2805.970 2806.000 2804.720 2804.730 1.25 1.27 1.26 226.20 7.94 TR Serie 10 Serie 10
0 + 120.747 0 + 122.227 2806.000 2804.000 2804.730 2803.280 1.27 0.72 0.99 226.20 2.07 TR Serie 10 Serie 10
0 + 122.227 0 + 125.757 2804.000 2804.000 2803.280 2803.250 0.72 0.75 0.73 226.20 3.53 TR Serie 10 Serie 10
0 + 125.757 0 + 125.757 2804.000 2804.000 2803.250 2804.612 0.75 -0.61 0.07 226.20 1.36 TR Serie 10 Serie 10

Rango
DN250 TR

METRADOS DE EXCAVACION DE ZANJA PARA INST. DE TUB. POR PROFUNDIDAD Y TIPO DE TERRENO (ML) RELLENO Y COM

TERRENO ROCOSO DN 250 MM TERRENO ROCO

Exc. zanja (mq) p/tub t-rocoso DN 250 de 0,60 a 1,00 m de prof. = 21.12 Relleno comp. zanj

373281251.xlsx/Exc-Ref-Rell-Elim-Sum-Inst (3) 10/26


TRAMO Cota de Terreno
Cota de Fondo msnm) Profundidad (m) Dimetro Longitud Tipo de Clase de Tubera
SUSTENTACION DE METRADOS
(msnm) EXCAVACION, RELLENO, INSTALACION
Terreno
DEL AL Ext. Sup. Ext. Inf. Ext. Sup. Ext. Inf. Ext. Sup. Ext. Inf. Prom ( mm ) (m) Del Al 0.60
Exc.zanja (mq) p/tub t-rocoso DN 250 de 1,01 a 1,25 m de prof. = 21.73 Relleno comp. zanj
Exc. zanja (mq) p/tub t-rocoso DN 250 de 1,26 a 1,50 m de prof. = 83.69 Relleno comp. zanj
Exc. zanja (mq) p/tub t-rocoso DN 250 de 1,51 a 1,75 m de prof. = 0.00 Relleno comp. zanj
Exc. zanja (mq) p/tub t-rocoso DN 250 de 1,76 a 2,00 m de prof. = 0.00 Relleno comp. zanj
Exc. zanja (mq) p/tub t-rocoso DN 250 de 2,01 a 2,50 m de prof. = 0.00 Relleno comp. zanj
Exc. zanja (mq) p/tub t-rocoso DN 250 de 2,51 a 3,00 m de prof. = 0.00 Relleno comp. zanj
Exc. zanja (mq) p/tub t-rocoso DN 250 de 3,01 a 3,50 m de prof. = 0.00 Relleno comp. zanj
Exc. zanja (mq) p/tub t-rocoso DN 250 de 3,51a 4,00 m de prof. = 0.00 Relleno comp. zanj
Exc. zanja (mq) p/tub t-rocoso DN 250 de 4,01 a 5,00 m de prof. = 0.00 Relleno comp. zanj
Exc. zanja (mq) p/tub t-rocoso DN 250 de 5,01 a 6,00 m de prof. = 0.00 Relleno comp. zanj
Exc. zanja (mq) p/tub t-rocoso DN 250 de 6,01 a 7,00 m de prof. = 0.00 Relleno comp. zanj
Exc. zanja (mq) p/tub t-rocoso DN 250 de 7,01 a 8,00 m de prof. = 0.00 Relleno comp. zanj
Total (ml) = 126.54

REFINE Y NIVELACION ZANJA PARA TUB. POR TIPO DE TERRENO Y PARA TODA PROFUNDIDAD (ML) ELIMINACION DE

Refine y nivelacin zanja terr-rocoso para tub DN 250 p/toda prof. = 126.54 m Eliminacin de des
Total (ml) = 126.54 m
SUMINISTRO DE

Suministro de tube

INSTALACION DE

Instalacin de tube

373281251.xlsx/Exc-Ref-Rell-Elim-Sum-Inst (3) 11/26


R TRAMO - CAPTACION - PRESEDIMENTADOR SUSTENTACION DE METRADOS
EXCAVACION, RELLENO, INSTALACION
NE, RELLENO, ELIMINACION Y SUMINISTRO DE TUBERIAS

INSTALACION DE TUBERIAS POR PROFUNDIDAD

1.00 1.25 1.50 1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 8.00

15.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 1.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 20.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 11.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 7.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 31.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 11.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 8.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 7.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LINEA DE CONDUCCION DE AGUA TRATADA
1.00 1.25 1.50 1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 8.00 SUB-TOTAL
21.12 21.73 83.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 126.54
126.54

RELLENO Y COMPACTACION DE ZANJA A PULSO PARA TUB. POR PROFUNDIDAD Y TIPO DE TERRENO (ML)

TERRENO ROCOSO DN 250

Relleno comp. zanja (mq) p/tub t-rocoso DN250 de 0,60 a 1,00 m prof. 21.12

373281251.xlsx/Exc-Ref-Rell-Elim-Sum-Inst (3) 12/26


INSTALACION DE TUBERIAS POR PROFUNDIDAD SUSTENTACION DE METRADOS
EXCAVACION, RELLENO, INSTALACION
1.00 1.25 1.50 1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 8.00
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 1,01 a 1,25 m prof. 21.73
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 1,26 a 1,50 m prof. 83.69
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 1,51 a 1,75 m prof. 0.00
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 1,76 a 2,00 m prof. 0.00
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 2,01 a 2,50 m prof. 0.00
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 2,51 a 3,00 m prof. 0.00
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 3,01 a 3,50 m prof. 0.00
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 3,51a 4,00 m prof. 0.00
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 4,01 a 5,00 m prof. 0.00
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 5,01 a 6,00 m prof. 0.00
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 6,01 a 7,00 m prof. 0.00
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 7,01 a 8,00 m prof. 0.00
Total (ml) = 126.54

ELIMINACION DE DESMONTE R= 5 Km PARA TODA PROFUNDIDAD

Eliminacin de desmonte R = 10 Km (Carg+V) t-rocoso p/tub DN 250 p/toda prof. = 126.54 m


Total (ml) = 126.54 m
SUMINISTRO DE TUBERIA PVC-U UF ISO 4435

Suministro de tubera DN 250 PVC-U UF ISO 1452 PN 10 = 127.90 m


Total (ml) = 127.90 m

INSTALACION DE TUBERIA DE PVC P/AGUA

Instalacin de tubera de PVC para agua potable DN 250 incl. Prueba hidrulica (S/acceso vehicular) = 127.90 m

373281251.xlsx/Exc-Ref-Rell-Elim-Sum-Inst (3) 13/26


METRADO DE ACCESORIOS EN LA LINEA DE CONDUCCION 1ER TRAMO - CAPTACION AL PRESEDIMENTADOR

PENDIENTE Angulo Angulo de Codos Verticale


TRAMO COTA DE TERRENO COTA DE TUBERIA PROFUNDIDAD (m) DE TUBERIA DIAMETRO
Total codo
DEL AL DEL AL DEL AL DEL AL PROMEDIO (m/m) (mm) 45

0 + 0.00 0 + 15.51 2,807.000 2,807.050 2,806.281 2,805.800 0.72 1.25 0.98 0.03102 226.2 -1.78
0 + 15.51 0 + 17.00 2,807.050 2,806.300 2,805.800 2,805.050 1.25 1.25 1.25 0.50201 226.2 -26.66 24.88
0 + 17.00 0 + 37.06 2,806.300 2,806.010 2,805.050 2,804.760 1.25 1.25 1.25 0.01446 226.2 -0.83 25.83
0 + 37.06 0 + 48.23 2,806.010 2,805.990 2,804.760 2,804.690 1.25 1.30 1.28 0.00627 226.2 -0.36 0.47
0 + 48.23 0 + 55.61 2,805.990 2,806.000 2,804.690 2,804.750 1.30 1.25 1.28 -0.00812 226.2 0.47 0.82
0 + 55.61 0 + 87.38 2,806.000 2,806.010 2,804.750 2,804.610 1.25 1.40 1.33 0.00441 226.2 -0.25 0.72
0 + 87.38 0 + 98.59 2,806.010 2,806.000 2,804.610 2,804.750 1.40 1.25 1.33 -0.01249 226.2 0.72 0.97
0 + 98.59 0 + 106.81 2,806.000 2,806.000 2,804.750 2,804.700 1.25 1.30 1.28 0.00608 226.2 -0.35 1.06
0 + 106.81 0 + 112.81 2,806.000 2,805.970 2,804.700 2,804.720 1.30 1.25 1.28 -0.00334 226.2 0.19 0.54
0 + 112.81 0 + 120.75 2,805.970 2,806.000 2,804.720 2,804.730 1.25 1.27 1.26 -0.00126 226.2 0.07 0.12
0 + 120.75 0 + 122.23 2,806.000 2,804.000 2,804.730 2,803.280 1.27 0.72 0.99 0.97973 226.2 -44.41 44.49 1
0 + 122.23 0 + 125.76 2,804.000 2,804.000 2,803.280 2,803.250 0.72 0.75 0.73 0.00850 226.2 -0.49 43.93 1
0 + 125.76 0 + 125.76 2,804.000 2,804.000 2,803.250 2,804.612 0.75 -0.61 0.07 226.2

Suministro einstalacion de codos de 1115'x250 PVC UF PN 10 3


Suministro einstalacion de codos de 2230'x250 PVC UF PN 10 5
Suministro einstalacion de codos de 45x250 PVC UF PN 10 3
Suministro einstalacion de codos de 90x250 PVC UF PN 10 1
Concreto p/anclaje de accesorio f'c 210 k/cm2 (cemento P-I) 10.7835 m3
A DE CONDUCCION 1ER TRAMO - CAPTACION AL PRESEDIMENTADOR

Codos Verticales Codos Horizontales


2230' 90 1115' 2230' 45 90

1 1
1
1
1
1
1
1
1

1
DIMENSIONAMIENTO DE LOS BLOQUES DE ANCLAJE

Predimensionamiento del Bloque Para 3 CodoS de 11 o15' PROG : 0+ 37.06 0


0+ 87.38 0
0+ 98.59 0
L 0.500 m h 1.275 m
B 1.800 m Terreno Rocoso
b 0.400 m
Hm 0.550 m
V 0.303 m3

Fuerzas actuantes
F = empuje hidralico
F=KPS

D 250 mm 1/4 90

t 11.25 1/8 45
K 0.20 1/16 22.5
S 0.05 m2 1/32 11.25
P 1 Mpa
F 0.96 Ton
P = Peso del bloque
pe 2.300 Ton/m3
P= 0.696 Ton
W = Peso de las tierras
pe 2.00 Ton/m3
W 1.403 Ton
B = Apoyo de la pared de la Zanja
B 1.876 Ton
f = friccin en el suelo
Empuje 2.10
Angulo 35
f= 1.47 Ton
Verificacin de equilibrio fuerzas
R= 1.876 + 1.47 - 0.96 = 2.38 Ton

F.S. = (B + f) / F = 3.48

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 1.61 SI FSD > 1.50 OK


caso contrario aumentar dimensiones

Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 1.53 SI FSV > 1.30 OK


caso contrario aumentar dimensiones

Predimensionamiento del Bloque Para 5 Codos de 22 o15'

PROG : 0+ 15.51 0
0+ 17.00 0
L 0.500 m h 1.250 m 0+ 55.61 0
B 1.200 m 0+ 106.8 0
b 0.400
Hm 0.550 m Terreno Rocoso
V 0.220 m3

Fuerzas actuantes
F = empuje hidralico
F=KPS

D 250 mm 1/4 90

t 22.5 1/8 45
K 0.39 1/16 22.5
S 0.05 m2 1/32 11.25
P 1 Mpa
F 1.92 Ton
P = Peso del bloque
pe 2.300 Ton/m3
P= 0.506 Ton
W = Peso de las tierras
pe 2.00 Ton/m3
W 1.000 Ton
B = Apoyo de la pared de la Zanja
B 1.342 Ton
f = friccin en el suelo
Empuje 1.51
Angulo 35
f= 1.05 Ton
Verificacin de equilibrio fuerzas
R= 1.342 + 1.05 - 1.92 = 0.48 Ton

F.S. = (B + f) / F = 1.25

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 1.84 SI FSD > 1.50 OK


caso contrario aumentar dimensiones

Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 1.53 SI FSV > 1.30 OK


caso contrario aumentar dimensiones

Predimensionamiento del Bloque Para 3 Codos de 45 o

PROG : 0+ 48.23 0
L 1.200 m h 0.735 m 0+ 120.7 0
B 0.600 m 0+ 122.2 0
b 0.400 m
Hm 1.600 m
V 1.152 m3 Terreno Rocoso friccion

Fuerzas actuantes
F = empuje hidralico
F=KPS

D 250 mm 1/4 90

t 45 1/8 45
K 0.77 1/16 22.5
S 0.05 m2 1/32 11.25
P 1 Mpa
F 3.76 Ton
P = Peso del bloque
pe 2.300 Ton/m3
P= 2.208 Ton
W = Peso de las tierras
pe 2.00 Ton/m3
W 0.882 Ton
B = Apoyo de la pared de la Zanja
B 2.456 Ton
f = friccin en el suelo
Empuje 3.09
Angulo 35
f= 2.16 Ton
Verificacin de equilibrio fuerzas
R= 2.456 + 2.16 - 3.76 = 0.86 Ton

F.S. = (B + f) / F = 1.23

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 1.66 SI FSD > 1.50 OK


caso contrario aumentar dimensiones

Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 1.42 SI FSV > 1.30 OK


caso contrario aumentar dimensiones

Predimensionamiento del Bloque Para Codo de 90 o


PROG : 0+ 125.8 0

L 2.000 m h 0.069 m Terreno Rocoso friccion


B 1.400 m
b 0.400 m
Hm 1.900 m
V 5.320 m3

Fuerzas actuantes
F = empuje hidralico
F=KPS

D 250 mm 1/4 90

t 90 1/8 45
K 1.41 1/16 22.5
S 0.05 m2 1/32 11.25
P 1 Mpa
F 6.94 Ton
P = Peso del bloque
pe 2.300 Ton/m3
P= 7.866 Ton
W = Peso de las tierras
pe 2.00 Ton/m3
W 0.248 Ton
B = Apoyo de la pared de la Zanja
B 3.485 Ton
f = friccin en el suelo
Empuje 8.11
Angulo 35
f= 5.68 Ton
Verificacin de equilibrio fuerzas
R= 3.485 + 5.68 - 6.94 = 2.22 Ton

F.S. = (B + f) / F = 1.32

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 1.64 SI FSD > 1.50 OK


caso contrario aumentar dimensiones

Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 3.68 SI FSV > 1.30 OK


caso contrario aumentar dimensiones
LOQUES DE ANCLAJE

+ 48.23 1 1.28
+ 98.59 1 1.33
+ 106.8 1 1.28
3
friccion 35

+ 17.00 2 1.25
+ 37.06 1 1.25
+ 87.38 1 1.33
+ 112.8 1 1.28
5
friccion 35
+ 55.61 1 1.28
+ 122.2 1 0.99
+ 125.8 1 0.73
3

friccion 35
+ 125.8 1 0.07

friccion 35
LINEA DE CONDUCCION PRIMER TRAMO - ENTERRADO

Accesorio Diametro Presion Dimensiones (m)


Tipo de
Tipo Und (mm) (Mpa) terreno h L B b Hm p
Codo 11 15'
o
3 250 1.00 Rocoso 1.28 0.5 1.8 0.4 0.55 0.15
Codo 22 30'
o
5 250 1.00 Rocoso 1.25 0.5 1.2 0.4 0.55 0.15
Codo 45o 3 250 1.00 Rocoso 0.73 1.2 0.6 0.4 1.6 0.15
Codo 90o 1 250 1.00 Rocoso 0.07 2.0 1.4 0.4 1.9 0.15
V (m3)

0.30
0.22
1.15
5.32
METRADO RESUMEN DE LA LINEA DE CONDUCCION 1ER TRAMO - CAPTACION AL PRESEDIMENTADOR

ITEM DESCRIPCION

01.00 LINEA DE CONDUCCION DE AGUA CRUDA CAPTACION - PRESEDIMENTADOR


01.01 Obras provisionales y preliminares
01.01.01 Trazo y replanteo inicial del proyecto, para lneas-redes con estacin total
01.01.02 Replanteo final de la obra, para lneas redes con estacin total
01.01.03 Cerco de malla HDP de 1 m altura para limite de seguridad de obra
01.01.04 Riego de zona de trabajo para mitigacion de impacto ambiental
01.02 Instalacion de la linea de conduccion
01.02.01 Exc. zanja (mq) p/tub t-rocoso DN 250 de 0,60 a 1,00 m de prof.
01.02.02 Exc.zanja (mq) p/tub t-rocoso DN 250 de 1,01 a 1,25 m de prof.
01.02.03 Exc. zanja (mq) p/tub t-rocoso DN 250 de 1,26 a 1,50 m de prof.
01.02.04 Refine y nivelacin zanja terr-rocoso para tub DN 250 p/toda prof.
01.02.05 Relleno comp. zanja (mq) p/tub t-rocoso DN250 de 0,60 a 1,00 m prof.
01.02.06 Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 1,01 a 1,25 m prof.
01.02.07 Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 1,26 a 1,50 m prof.
01.02.08 Eliminacin de desmonte R = 10 Km (Carg+V) t-rocoso p/tub DN 250 p/toda prof.
01.02.09 Suministro de tubera DN 250 PVC-U UF ISO 1452 PN 10
01.02.10 Instalacin de tubera de PVC para agua potable DN 250 incl. Prueba hidrulica (S/acceso vehicular)
01.02.11 Suministro e instalacion de codos de 45x250 PVC UF
01.02.12 Suministro e instalacion de codos de 2230'x250 PVC UF
01.02.13 Concreto f'c 210 kg/cm2 para anclajes de accesorios DN 250
01.02.14 Pruebas de compactacin de suelos (proctor modificado y de control de compactacin - densidad de campo)
01.02.15 Prueba hidrulica de tubera agua potable (incl. desinfeccin) DN 250
N AL PRESEDIMENTADOR

UNIDAD CANTIDAD

Km 0.128
Km 0.128
m 255.800
m 127.900

m 21.12
m 21.73
m 83.69
m 126.54
m 21.12
m 21.73
m 83.69
m 126.54
m 127.90
m 127.90
Und 5
Und 5
m3 10.78
Und 3
m 127.900