Our optimization study suggested that using higher discharge For Hassi Mouina South (TNK-E & TNK-W ) the
pressure from the CPF (within the compression ratio limit of one production will be sent to GR5 - PC3 Up stream of
stage compressor) in order to select smaller pipeline diameter existing compression at KRECHBA (pressure
lead to lower total cost (including CAPEX and OPEX). approximately 45 bara).
The recommended HP compressor discharge pressure is as
follows: For Hassi-Ba Hamou and Hassi Mouina North
Acceptance of High discharge - HBH : 96 barG. (HTJ&HTJW ) Engineer shall follow optimization study.
1 pressure from HP Compressor to - HMN : 118 barG.
reduce total Cost - HMS : 124 barG.
We would like a confirmation that SH acceptance criteria would
be based on optimization study results. This will allow us to go
ahead with the Compression Package optimization and start
inquiry with vendors.

Knowing that the Hassi Mouina South


Since the base case solution (according to ITT) presents 63 km (TNK-E & TNK-W ) sale gas export pressure at Tie-in
of rocky profile which will lead to increased construction cost point is 45 bara (GR5 - PC3 Up stream of existing
and schedule, we are studying two other alternatives: compression at KRECHBA ) the Engineer shall prepare
- ALT-1 : HMS to GR5 PC-4. technical and economical comparison between the two
- ALT-2 : HMS to HBH. proposed New routing alternatives:
New routing alternatives for HMS - ALT-1 : HMS to GR5 PC-4.
2 We would like a confirmation that SH acceptance criteria would - ALT-2 : HMS to HBH.
export pipeline
be based on optimization study results which will lead to the and the base case solution with 45 bara at Tie-in point.
most cost effective routing of the HMS (Hassi Mouina South)
export pipeline.

CO2 content in HMS is 2,35 MOL %. This is exceeding the Sales The Produced Gas will be mixed with others gas at GR5
HMS CO2 content slightly exceeds
3 Gas specification of 2,0 MOL %. pipeline.
the Sales Gas Spec.
4 Especially for Compressor trains and GTG, we would like to The philosophy adopted by SH is 3X50%
Sparing Philosophy know SH preference or directives, based on past experience
In Hassi Mouna North, the phase-1 operation is too short, just For the development of Hassi Mouina South (TNK)
two years where arrival pressure to CPF is around 78 bar. Fields, Engineer shall respect the phasing defined in the
Then, pressure will be 39 bar. Basis of Design.
In HMN, possibility to consider 39
5 inlet pressure from phase-1 in If reservoir engineering confirms that starting from 39 bar in
order to increase plateau phase-1 will increase plateau life, this will be recommended by
JGC since the gathering system design pressure will decrease
significantly, and it will be more easier to standardize between
the HP gas compressors in the three sites.
We JGC Algeria couldn't understand the basis to define such The GTG capacity of 7 MW in HBH and 5 MW in both
Basis of GTG capacity of 7 MW in capacity for the GTG. We would like SH to provide a background TNK and HTJ are results of SH in house study and was
6 HBH and 5 MW in both HMN and on the basis of this pre-selection. communicated only for information. Engineer shall
HMS define the required and optimal capacity during
Engineering phase of the project.

After analyzing SH BODs data it is important to note that wells The wells production profile are not available. Engineer
production profiles are not available, this data are very shall design the flow lines based on the maximum flow
important in order to propose a good design and propose a rate by wells and minimum flowing pressure.
7 Production Profile for each well good investment to SH.

The production profile available is the one @ inlet CPFs, no


information's about individual wells PP.

We need more information about HMS wellpad configuration as Please find in the attached document the numbers of
number of wells for wellpads is not defined in BOD. This could wells assigned to each wellpads.
Number of wells assigned to each be solved by obtaining production profile per individual well.
8
multi wellpad in HMS field With such information we will be able to define the flowline and
trunk line size in HMS field. Wells number in each
Multi Wellpad.doc

This data is required to the characterization of the well streams The Hypothetical Properties of pseudo component C5+
in the Process Simulation. of HBH/RM fields are :
Molecular weight : 83.42 g/mol.
Hypothetical Properties of pseudo
9 Standard Ideal Liquid mass density : 658.6 Kg/m3
component C5+ of HBH/RM fields
The data will be confirmed before starting the Basic
Engineering study.
In HBH & RM BOD the Max and Min relative humidity is missing. Please find in the attached document the Max and Min
This information will allow us to better compare Gas Turbine relative humidity for HBH & RM Fields.
performance based on Fuel Gas consumption.
10 Relative Humidity missing data Moyenne mensuelle
des humidits relatives HBH.doc

Please find in the attached document the Reviewed


Basis of Design of HBH & RM wells coordinates for RM Field.
Fields.
11
Table 3.2.2.b : Preliminary Raw gas
well coordinates of RM field Reviewed
Coordinates of RM Field Wells.docx