Preface
Out of an estimated 141 m ha, net cultivated area, 65.3 m ha (46%) is rain-fed, contributing 44% of the total food grain
production which supports 40% of countrys estimated population of 1.24 billion in 2015. Cultivation of course cereals (91%),
pulses (90%), oilseeds (80%) and cotton (65%) predominates in these rain-fed areas. Crop yields vary from 1-2 ton/ha, whereas the
potential is around 4 t/ha. Two thirds of livestock which is an alternative source of income to the farmers sustain these regions.
World Development Report (2008) highlighted that in order to meet world food demand, water productivity enhancement
through water management and water use efficiency (WUE) of crops need to be improved in rain-fed areas. Water resource
management in rain-fed agriculture requires a landscape perspective along with interactions from farm to households to watersheds, at national and
regional levels.
Under PMKSY, district level irrigation plans ought to be prepared on priority basis to render irrigation water to each field and produce
more crop per drop of water In Jhansi district of Bundelkhand region approximately 66.62% cultivated area is unirrigated/ rain-fed and needs grass
root planning for augmenting irrigation resources to realize the goals of PMKSY.
This document has been prepared as per format provided covering eight blocks and 894 revenue villages in the district Jhansi with geographical
area of 502918.04 ha. District profile and its demography, human population has been given for the years 2011 and projected for 2020 with the
increment of 2.1% per year categorising it into male, female, SC/ST and general. Livestock information, agro-ecology, climate, hydrology, topography,
soil profile along with land slope have been described in details. Soil erosion and runoff status in different blocks varied from 2.50 ton to 16.50 ton/ha
due to multidirectional slope which is most important in devising irrigation plans. Land use patterns are given village and block wise for effective water
use. Catchment area in the district including river basin and sub-basin is quite large being 249499.82 ha showing great potential for water harvesting. As
the net irrigated area, partially irrigated area along with protective irrigation is only 143231 ha (33.38%) major cropped area remains un-irrigated or
totally rain-fed being 285766 ha (66.62%) posing immense challenges in alleviating irrigation resources. When one looks at total water demands for
various sectors such as domestic (0.065 BCM), crops (0.922 BCM), livestock (0.028 BCM), industrial (0.060 BCM) and power generation (0.051 BCM)
it is apparent that crops requirement is maximum which must be addressed to through proper water management and enhancement of water use
efficiency (WUE). Keeping in view the surface (0.676 BCM) and groundwater (0.613 BCM) availability and present water demand (1.149 BCM) and
2
District Irrigation Plan of Jhansi
projected water requirement by 2020 (1.436 BCM) the strategic action plan from various sources such as major and minor irrigation, lift, groundwater
development (check-dams), drip and sprinkler has been prepared to achieve the objectives of PMKSY. While major irrigation projects can be developed
in due course the immediate need is to 1) connect major water resorvoirs with source of water, 2) erect small check-dams on streams and rivulets at
appropriate places preferably towards tail ends to harvest maximum rain water and 3) provide small pumps sets and water conveyer pipes at subsidized
rates to the farmers. This would enhance groundwater recharge raising the water table and making dried bore wells viable and retain the water up to
April/May in streams / rivulets for irrigation use as well as for human and livestock consumption. It is interesting to note that India receives 4000 billion
cubic meter (BCM) of rain water annually and about 240 BCM equivalent rain water is available (not more than 25.3% of the rain water is utilized) for
harvesting in small scale storages. The Central Ground Water Authority (CGWA) has issued regulatory directions for more than 100 ground water
block, and a 2010 World Bank Report has warned that if indiscriminate exploitation of ground water continues unabated, about 60% of all ground water
blocks will be in critical condition by 2025. Therefore, moisture conservation, improving soil biology and cost effective expansion of irrigation in
rainfed areas are of utmost importance which can be brought about by a) moisture conservation through mulching, crop rotation, inter- cropping and
protected cropping b) improving soil biology to enhance drought tolerance through Rhizobia, Mycorrhizee, plant growth-promoting rhizobacteria
(PGPR) and c) cost effective expansion of irrigation in rain-fed areas through deficit irrigation, partial root drying and alternate wetting and drying of
soil as in rice production under SRI cultivation, where water consumption is 40% less with 30% more grain yield.
The immense efforts of Sri Sanjay Kumar (IAS), CDO, Jhansi and Dr U.P Singh Deputy Director Agriculture, Jhansi are praiseworthy in
preparation of this important document. I hope this will be quite valuable in strategic plan formulation to meet the irrigation augmentation in Jhansi
District.
3
District Irrigation Plan of Jhansi
INDEX
S.No. Particulars Page No.
1. Executive Summary 1
2. Introduction 2
a. Background 2
b. Vision 3
c. Objectives 3
d. Strategy/Approach 4
e. Rationale/Justification Statement 5
3. Chapter-I : General Information of the District 6
a. District Profile 7
b. Physical and Geographical features of District 7
c. Location map of District 8
d. Demography of District 9
e. Biomass and Livestock 48
f. Agro-Ecology, Climate, Hydrology and Topography 49
g. Soil Profile 55
h. Soil Erosion and Runoff Status 59
i. Land Use Pattern 63
j. River basins / sub-basins and Catchment area of each of the basin 98
k. Topographical features 99
4 Chapter-II: District Water Profile 100
a. Area-wise, Crop-wise Irrigation Status 101
b. Production and Productivity of major Crops 106
c. Irrigation based Classification 109
4
District Irrigation Plan of Jhansi
5
District Irrigation Plan of Jhansi
Executive Summary
Jhansi district has total geographical area of 502918.04 ha out of which 337821 ha area is net sown area. In rabi season the entire area is under
cultivation of different crops, area sown more than once is 172946 ha with an average cropping intensity of 151.28%. Total area covering all blocks
under forest, wasteland and under other uses is 19475, 53531 and 46504 ha respectively. Net irrigated area, partially/protective irrigated and totally
rainfed area is 107395, 35836 and 290766 ha respectively in all eight block of district. Mauranipur and Babina blocks are under semi-critical condition,
rest six blocks are under safe condition as per ground water report. Block wise status of water availability, crop, population, livestock and industrial
water demand in the district is given in chapter-III. Total existing water availability in district is 1.288798 BCM, while crop, human population,
livestock, industrial and for power generation water demand presently is 0.92235023, 0.06510034, 0.02877455, 0.1592765 and 0.026 BCM
respectively, totalling to 1.201501612 BCM. Against this water demand the projected water requirement by the year 2020 would be 1.43124169 BCM.
To achieve these goals the strategic action plan has been prepared with the help of all line departments of the district under PMKSY main component
with the objectives of AIBP, Har Khet Ko Pani and per drop more crop using micro irrigation and supplementary water management activities,
PMKSY watershed, convergence with MGNREGA, state planned scheme of irrigation, NABARD loan projects, establishment of solar pumps for
irrigation and canal, dams, bundhies, reservoirs and ponds repairing have been allocated Rs 26565.03, 84098.42, 35847.20, 8670.60, 17825.88,
33966.46, 12724.17, 116544.57, 2657.51 and 44737.18 lacs respectively. The total outlay of DIP is 383637.03 lacs in five year duration. The details of
strategic action plan are presented in chapter-V as per guidelines of DIP under PMKSY.
6
District Irrigation Plan of Jhansi
1. Introduction:
i) Background
The Bundelkhand region (23010 - 260 30 N and 780 20-810 40 E) covering 7 districts of U.P. and 6 districts of M.P. is under severe stress for
natural resources and Jhansi district is the headquarter of this region. District is suffering from water stress conditions and therefore there is an urgent
need to develop efficient irrigation facilities adopting watershed development approaches. Since water is indispensable for life, conservation,
fortification and judicious management of water resources play pivotal role in development of other natural resources viz. soil, vegetation, human and
animal. The district Jhansi in true sense represents climatic, ecological, physiographic diversification of the region. It is situated in the South West
corner of Bundelkhand region between 7818'8.08"E to 7825'16.63"E latitude & 2557'6.45"N to256'33.11"N longitude with a geographical area of
502.91 thousands ha, its western areas being covered with hillocks. The important rivers of the district are Betwa, Pahuj, Dhasaan & Lakheri. The major
lakes and reservoirs in the district are Kachneo lake, Arjar lake, Barwar lake Barwasag lake, Magarpur lake, Siaori lake, Magarwara lake and Pachwara
lake, important dams area Pahuj,Dongri,Paricha, Dhukuwan, Pahari, Saprar, Lahchura and Khprar with total storage capacity of 374.66 MCM. These
water resources provide drinking water to human and livestock population and substantial irrigation water for crop cultivation.
The District Jhansi is administratively divided into 8 blocks namely Baragaon, Chirgaon, Moth, Gursarai, Bamaur, Mauranipur, Babina and
Bangra with 5 Tehsils, 894 revenue villages and 496 Gram Sabha.
The total geographical area of the district (502,918 ha) including forest, wasteland and other than cultivated area constitute about 21% of the
total geographical area which indicates possibilities for further expansion in the cultivated area. Cultivable waste accounts for 47779 ha, which is
significantly high indicating additional opportunity of crop and livestock intensification and diversification. One of the important thrust areas could be
utilization of the districts current fallow, which can be converted in productive agro- system.
Geographical climatic and edaphic characteristics of the district determine the type of farming system to be followed. In Jhansi soils are rocky,
fields are undulated (0.5% to 10% slope) with hillocks here and there. Climate is semi-arid with moisture deficiency index ranging from 40 - 60. Erratic
rainfall distribution and dry spells are common. Two groups of soils viz. red and black are found in the district. Red soils are generally light shallow,
7
District Irrigation Plan of Jhansi
with low water retention, deficient in nutrients and are easily workable, whereas, black soils are deep, highly water retentiveand productive but difficult
to work in rainy season. Broadly speaking, there are three types of holdings, rain fed, partially irrigated and totally irrigated.
The climate of the district is characterized by long and intensive hot summer, low and irregular rainfall and short mild winter. Monthly mean
data of rainfall and temperature are presented in table
The summer season in Jhansi district begins by the middle of March when temperature isaround 330C and it extends up to mid June when
temperature rises to 420C or more, maximum temperature being around 47 to 490C and the the minimum 6.20C normally recorded in January. The
maximum relative humidity is recorded in July and minimum in May.
Annual rainfall of the district varies between 867 to 1062 mm. The major portion of rainfall is received during months of July and August and
sometime in early September. Thus July, August and September are water surplus and the remaining months are water deficient months. The
distribution of rainfall is very erratic. Low rainfall and droughts are common features of the district. Some times long dry spells during rainy season are
also experienced which adversely affect the crops.
ii) Vision
The vision of District Irrigation Plan is essentially based on location specific planning of irrigation facilities. Planning at grass root level
with participatory approach of different line departments with their schemes and should be attempted with a clear vision.
iii) Objectives
d) Improve on-farm water use efficiency to reduce wastage and increase availability both in duration and practices.
e) Enhance the adoption of precision-irrigation and other water saving technologies (More crop per Drop).
f) Enhance recharge of aquifers and introduce sustainable water conservation practices.
g) Ensure the integrated development of rainfed areas using the watershed approach towards soil and water conservation regeneration of
ground water, arresting runoff, providing livelihood options and other NRM activities.
h) Promote extension activities relating to water harvesting, water management and crop alignment for farmers and grass root level field
functionaries.
i) Explore the feasibility of reusing treated municipal waste for peri-urban agriculture, and
j) Attract greater private investment in irrigation.
This will in turn increase agriculture production and productivity and enhance farm income.
Strategy/approach
To achieve above objectives, PMKSY will strategize by focussing on end-to-end solution in irrigation supply chain, viz. Water sources,
distribution networks, efficient farm level application, extension services on new technologies & information etc. Broadly PMKSY will
focus on:-
a) Creation of new water sources, repair, restoration and renovation of defunct water sources, construction of water harvesting
structures, secondary & micro storage, groundwater development, enhancing potentials of traditional water bodies at village level like
Bavadi, Old Open Dug well, Bandhas, Kundi and Sagar in Bundelkhand.
b) Developing / Augmenting distribution network where irrigation sources (both assured and protective) are available or created;
c) Promotion of scientific moisture conservation and runoff control measures to improve groundwater recharge so as to create
opportunities for farmer to access recharge water through shallow tube/dug well;
d) Promoting efficient water conveyance and field application devices within the farm viz. Underground piping system, Drip & Sprinkler,
pivots, rain-guns and other application devices etc.;
e) Encouraging community irrigation through registered user groups/farmer producers organisations/NGOs and
9
District Irrigation Plan of Jhansi
f) Farmer oriented activities like capacity building, training and exposure visit, demonstration, farm schools, skill development in
efficient water crop management practices (crop alignment) including large scale awareness on more crop per drop of water though mass
media campaign, exhibition, field days, and extension activities through short animation films etc.
The aforesaid areas only outline the broad contours of PMKSY; combination of intervention may be required depending on location
specific conditions and requirements, which will be identified District and State Irrigation Plans. More focus on irrigation development
will be given to deficient states in terms of irrigation coverage.
iv) Rationale / Justification Statement: In reference to the status and need of irrigation
It is very necessary to fulfil the requirement of crop, population, livestock, industrial and power generation water demand for coming
years, by avoiding misuse and mis-management of water in every sector. It has to be improved by the holistic planning of all line
departments by this DIP under PMKSY. Even though, Jhansi district receives 815mm ( Singh et al. 2013) annual average precipitation it
has severe water scarcity due to heavy runoff/soil loss, land degradation, poverty and poor socio-economic status. Impacts of integrated
activities of DIP under PMKSY with their interventions on water balance will improve soil, water and crop production.
10
District Irrigation Plan of Jhansi
Chapter-I
11
District Irrigation Plan of Jhansi
12
District Irrigation Plan of Jhansi
13
District Irrigation Plan of Jhansi
14
District Irrigation Plan of Jhansi
16
District Irrigation Plan of Jhansi
18
District Irrigation Plan of Jhansi
19
District Irrigation Plan of Jhansi
21
District Irrigation Plan of Jhansi
22
District Irrigation Plan of Jhansi
23
District Irrigation Plan of Jhansi
24
District Irrigation Plan of Jhansi
25
District Irrigation Plan of Jhansi
27
District Irrigation Plan of Jhansi
28
District Irrigation Plan of Jhansi
29
District Irrigation Plan of Jhansi
30
District Irrigation Plan of Jhansi
36
District Irrigation Plan of Jhansi
489 LUHARI Luhari 152587 822 797 1619 216 798 0 0 97 821 313 1619
490 BHITHAURA Bhitaura 152588 947 836 1783 233 863 0 0 104 920 337 1783
491 SILGUWA Luhar Gaon Bhat 152589 560 517 1077 28 105 0 0 155 972 183 1077
492 SILGUWA Silguwan 152590 646 531 1177 126 466 0 0 96 711 222 1177
494 ULDAN Uldan 152591 2833 2523 5356 684 2529 0 0 411 2827 1095 5356
495 SANAURA Bar Urf Rampur 152592 170 147 317 34 124 0 0 35 193 69 317
496 SANAURA Amanpura 152593 289 258 547 84 312 2 6 18 229 104 547
497 SIJARO Sijara 152594 913 849 1762 163 604 0 0 190 1158 353 1762
498 SIJARO Ghatrajwara 152595 0 0 0 0 0 0
499 BUDHAWALI Budhawali 152596 889 832 1721 276 1023 5 18 68 680 350 1721
500 CHAUKRI Chaukri 152597 772 690 1462 153 565 0 0 149 897 302 1462
501 PATHAKARKA Patha Kharka 152598 1540 1358 2898 179 664 28 98 339 2136 546 2898
502 RAJPURA Rajpura 152599 1175 1138 2313 242 896 0 0 255 1417 497 2313
503 PATHAKARKA Gairaha 152600 537 525 1062 50 184 0 0 183 878 233 1062
Name of State- Uttar Pradesh
Name of District- Jhansi
5. Name of Block Bangra
Code of Population SC ST General Total
Name of the Gram Name of the
Villages No. of No. of No. of No. of No. of No. of No. of No. of
Panchayat Villages covered M F Total
covered Household Members Household Members Household Members Household Members
504 PACHWARA Pachwara 152601 1870 1735 3605 390 1444 1 5 292 2156 684 3605
505 SANAURA Sanaura 152602 482 427 909 126 465 0 0 59 444 185 909
506 PALRA Palara 152603 2677 2470 5147 510 1886 0 0 405 3261 915 5147
507 GHURAT Ghurat 152604 2287 2115 4402 513 1897 0 0 309 2505 822 4402
508 BANGRADWA Bangara Dhawa 152605 1499 1334 2833 191 706 0 0 308 2127 499 2833
509 BANGARDHA Sewkara Dhawa 152606 215 203 418 11 41 0 0 65 377 76 418
510 BAGRAUNI Bagarauni 152607 715 650 1365 162 599 0 0 75 766 237 1365
511 RATUSA Ratosa 152608 1088 1033 2121 256 946 0 0 164 1175 420 2121
512 CHIRAKNA Chirkana 152609 351 325 676 112 413 0 0 31 263 143 676
513 CHIRKANA Sewara 152610 462 417 879 96 357 0 0 68 522 164 879
514 MAGARWRA Magarwara 152611 2091 1832 3923 311 1151 1 2 372 2770 684 3923
37
District Irrigation Plan of Jhansi
515 KACHNEV Kachaneo 152612 2807 2624 5431 344 1271 1 4 722 4156 1067 5431
516 LARAUN Kagar 152613 569 507 1076 139 515 0 0 88 561 227 1076
517 LARAUN Hanspura 152614 192 164 356 69 344 0 0 8 12 77 356
518 KATERA DEHAT Katera Rural 152615 3688 3232 6920 403 1491 3 9 918 5420 1324 6920
519 PADRA Padra 152616 1935 1751 3686 277 1025 17 58 370 2603 664 3686
520 LARON Laron 152617 1012 900 1912 184 680 1 2 189 1230 373 1912
521 BHATA Naraich 152618 616 579 1195 185 683 0 0 33 512 218 1195
522 BHATA Bhata 152619 515 472 987 85 314 0 0 112 673 197 987
523 BHATA Rasidpur 152620 0 0 0 0 0 0
524 PATHGUWA Path Guwan 152621 1297 1117 2414 305 1128 0 0 140 1286 445 2414
525 BAMHAURAI
152622 655 554 1209 78 287 0 0 159 922 237 1209
SUHAGI Gudha
526 TIKARI Tikari 152623 1514 1402 2916 162 598 1 5 372 2313 535 2916
527 TIKARI Nimoni 152624 579 492 1071 95 353 0 0 128 718 223 1071
528 PACHAURO Pachauro 152625 817 748 1565 144 531 0 0 129 1034 273 1565
Name of State- Uttar Pradesh
Name of District- Jhansi
5. Name of Block Bangra
Code of Population SC ST General Total
Name of the Gram Name of the
Villages No. of No. of No. of No. of No. of No. of No. of No. of
Panchayat Villages covered M F Total
covered Household Members Household Members Household Members Household Members
529 MAKAURI Bhakauro 152626 1129 1054 2183 132 490 0 0 247 1693 379 2183
530 LUHARGAO Luhar Gaon
152627 2035 1854 3889 533 1973 0 0 169 1916 702 3889
RANIPUR Ranipur
531 BAMHAURAI
152628 1444 1350 2794 162 601 0 0 340 2193 502 2794
SUHAGI Bamhauri Suhagi
532 DEVRI
152629 42 37 79 0 0 0 0 17 79 17 79
SINGHPURA Bhoraro
533 BASARI Basari 152630 906 838 1744 184 682 0 0 135 1062 319 1744
534 BAONDA Bonda 152631 1435 1279 2714 190 703 0 0 260 2011 450 2714
536 NAVADA Atpei 152632 365 341 706 117 432 0 0 12 274 129 706
537 NAVADA Nawada 152633 635 600 1235 180 899 0 0 57 336 237 1235
538 KUWANGAO Kuraicha 152634 726 680 1406 161 594 0 0 117 812 278 1406
38
District Irrigation Plan of Jhansi
539 KUWAN Syawni Bugurg 152635 369 367 736 109 403 0 0 14 333 123 736
540 KUWAN Kuwan 152636 803 741 1544 101 374 0 0 157 1170 258 1544
541 BUDIYA
152637 1313 1152 2465 270 1000 0 0 131 1465 401 2465
BAMHAURI Budhiya Bamhauri
542 VIJARAWARA Bijarwara 152638 1166 1074 2240 191 708 0 0 181 1532 372 2240
543 BIJARWARA Baghauri 152639 226 224 450 67 308 0 1 9 141 76 450
Total 82525 74923 157448 14715 54612 69 241 15042 102595 29826 157448
39
District Irrigation Plan of Jhansi
561 KHEDARKA Khandarka 152657 1168 1032 2200 296 1066 0 0 150 1134 446 2200
562 KHEDARKA Khanuwan 152658 622 572 1194 94 338 0 0 140 856 234 1194
563 AKSEW Akseo 152659 1720 1520 3240 335 1207 0 1 238 2032 574 3240
564 MADWA Madwan 152660 1180 1030 2210 256 922 0 0 199 1288 455 2210
565 TILAERA Tilera 152661 1032 971 2003 279 1004 0 0 101 999 380 2003
566 SIJARI
152662 594 529 1123 109 391 0 0 101 732 210 1123
KHURD Baraura
567 SIJARI
152663 994 910 1904 111 401 0 0 240 1503 351 1904
BUJURG Sijari Bugurg
Name of State- Uttar Pradesh
Name of District- Jhansi
6. Name of Block Mauranipur
Code of Population SC ST General Total
Name of the Name of the
Villages
Gram Villages No. of No. of No. of No. of No. of No. of No. of No. of
Panchayat covered covered M F Total Household Members Household Members Household Members Household Members
568 SIJARI
152664 1175 1065 2240 229 825 0 0 178 1415 407 2240
KHURD Sijari Khurd
569 GHATLAHCH
152665 1502 1289 2791 242 870 0 0 259 1921 501 2791
URA Ghatlahchura
570 BAMHAURI Larauni 152666 549 486 1035 109 391 0 0 88 644 197 1035
571 BAMHAURI Bamhauri 152667 1501 1309 2810 298 1073 0 0 250 1737 548 2810
572 CHAKARA Chakara 152668 1727 1522 3249 218 1864 0 0 306 1385 524 3249
573 DHAMNA Dhamna
152669 1817 1688 3505 337 1213 0 1 297 2291 634 3505
PAYAK Payak
574 DHVAKAR Dhawakar 152670 3137 2747 5884 647 2329 0 0 381 3555 1028 5884
575 RORA Rora 152671 1050 872 1922 229 823 0 0 101 1099 330 1922
576 BHATPURA Bhatpura 152672 1250 1137 2387 225 810 0 0 200 1577 425 2387
577 DHAWKAR Tungarwara 152673 1 0 1 0 0 0 0 1 1 1 1
578 MAELONI Lakhesur 152674 362 305 667 16 57 0 0 113 610 129 667
579 MAELONI Mailoni 152675 508 434 942 72 258 0 0 88 684 160 942
580 BUKHARA Sitaura 152676 652 555 1207 136 489 0 0 63 718 199 1207
581 DURGAPUR Saptwara 152677 383 338 721 89 322 0 0 49 399 138 721
582 DURGAPUR Durgapur 152678 498 439 937 124 448 0 0 51 489 175 937
583 SEYWANI Siyawnikhurd 152679 1196 1103 2299 215 774 0 0 194 1525 409 2299
40
District Irrigation Plan of Jhansi
KHURD
584 MENDKI Merki 152680 1026 903 1929 219 788 0 0 129 1141 348 1929
585 RUPA Rupa
152681 1430 1320 2750 196 704 0 0 359 2046 555 2750
DHAMNA Dhamana
586 JHANKRI Piprokhar 152682 485 417 902 103 372 0 0 88 530 191 902
587 JHANKRI Churari 152683 712 621 1333 103 369 0 0 134 964 236 1333
588 JHANKRI Jhankari 152684 713 674 1387 137 494 0 0 118 893 255 1387
589 MAU DEHAT Jalalpura 152685 114 115 229 0 0 0 0 44 229 44 229
590 MAU DEHAT Kharka Sani 152686 556 503 1059 158 570 0 0 43 489 201 1059
Name of State- Uttar Pradesh
Name of District- Jhansi
6. Name of Block Mauranipur
Code of Population SC ST General Total
Name of the Name of the
Villages
Gram Villages No. of No. of No. of No. of No. of No. of No. of No. of
Panchayat covered covered M F Total Household Members Household Members Household Members Household Members
591 MAUDEHAT Mau Rural 152687 0 0 0 0 0 0
592 MAELONI Dhimloni 152688 0 0 0 0 0 0
593 RAUNI Madha 152689 58 67 125 14 109 0 0 2 16 16 125
594 CHITABAD Kanja 152690 207 187 394 27 134 0 0 38 260 65 394
595 CHITABAD Bagkanja 152691 0 0 0 0 0 0
596 RAUNI Roni 152692 1466 1326 2792 412 1483 0 0 106 1309 518 2792
597 CHITABAD Chitawad 152693 760 683 1443 118 425 0 0 158 1018 276 1443
598 RANI Singarwara 152694 341 301 642 59 213 0 0 71 429 130 642
599 BARAGAON Baragaon 152695 2844 2615 5459 559 2011 0 0 394 3448 953 5459
600 BHADARWA
152696 2563 2387 4950 334 1203 0 0 501 3747 835 4950
RA Bhadarwara
601 BUKHARA Bukhara 152697 748 658 1406 193 694 0 0 52 712 245 1406
602 KHARKAMA
152698 31 21 52 0 0 0 0 11 52 11 52
PUR Ganupura
603 KHARKAMP
152699 942 842 1784 294 1058 0 0 71 726 365 1784
U Kharakamuaf
604 NAYAGAWO
152700 502 450 952 83 298 0 0 83 654 166 952
N Barua Muaf
605 NAYAGAWO Naya Gaon 152701 795 772 1567 189 680 0 0 81 887 270 1567
41
District Irrigation Plan of Jhansi
N
606 DHAYPURA Dhaipura 152702 1090 988 2078 253 912 0 0 86 1166 339 2078
607 BASARIYA Basariya 152703 994 932 1926 255 917 0 0 92 1009 347 1926
608 DEVRIGHAT Deori Ghat 152704 487 397 884 130 467 0 0 26 417 156 884
609 DEVRAIGHA
152705 466 410 876 53 189 0 0 109 687 161 876
T Puruwa
610 BHANDRA Bhandra 152706 1150 1044 2194 159 573 0 0 216 1621 375 2194
611 KHILARA Khilara 152707 843 721 1564 191 687 0 0 56 877 247 1564
612 PANCHAMPU
152708 679 589 1268 189 682 3 11 37 575 230 1268
RA Harpura
Name of State- Uttar Pradesh
Name of District- Jhansi
6. Name of Block Mauranipur
Code of Population SC ST General Total
Name of the Name of the
Villages
Gram Villages No. of No. of No. of No. of No. of No. of No. of No. of
Panchayat covered covered M F Total Household Members Household Members Household Members Household Members
613 GHATKATOR
152709 1805 1666 3471 222 798 0 0 423 2673 645 3471
A Ghatkotra
614 MATHUPURA Mathupura 152710 954 851 1805 194 699 0 0 175 1106 369 1805
615 CHURARA Churara 152711 2467 2192 4659 361 1300 3 10 437 3349 801 4659
616 BERA Kaimari 152712 325 315 640 13 45 0 0 99 595 111 640
617 BERA Bira 152713 1211 1092 2303 160 576 0 0 225 1727 385 2303
618 DHAURAI Dhauri 152714 1377 1231 2608 316 1136 0 0 122 1472 438 2608
619 BAKHTAR Kailua 152715 329 271 600 73 261 0 0 29 339 101 600
620 BAKHTAR Bakhtar 152716 600 462 1062 147 530 0 0 39 532 186 1062
621 TAKTAULI Taktoli 152717 1632 1481 3113 304 1093 0 0 257 2020 561 3113
622 TAKTAULI Mailwar 152718 670 583 1253 91 329 0 0 155 924 246 1253
623 PANCHAMPU
152719 491 455 946 135 487 0 0 45 459 180 946
RA Panchampura
624 DHAKRWAR
152720 1220 1067 2287 169 609 0 1 293 1677 462 2287
A Dhakarwara
625 PATHA Patha 152721 1646 1435 3081 401 1444 0 1 134 1636 535 3081
626 152722 1338 1208 2546 231 832 0 0 203 1714 434 2546
KADAURA Kadaura
627 KHAKAURA Birguan 152723 734 652 1386 39 139 1 2 196 1245 235 1386
42
District Irrigation Plan of Jhansi
628 KHAKAURA Khakora 152724 1985 1858 3843 306 1101 0 0 354 2742 660 3843
629 BHANPURA Bhanpura 152725 1594 1485 3079 204 733 15 52 332 2294 551 3079
Total 87399 78433 165423 16855 60777 42 144 13550 104911 30448 165423
43
District Irrigation Plan of Jhansi
648 Mathan Pura 152814 631 579 1210 119 453 0 0 122 757 241 1210
PHALGUVA Rampura
649 Patheswar 152815 0 0 0 0 0 0
650 PADRI Padri 152816 1617 1522 3139 162 614 0 0 435 2525 597 3139
651 BIRGUWA Birguwa 152817 1246 1159 2405 264 1004 1 4 202 1397 467 2405
652 MAWAIGIRD Mawaigird 152818 838 697 1535 122 463 0 0 168 1072 290 1535
653 PARSAR Khiriyapali 152819 114 94 208 12 46 0 0 28 162 40 208
Name of State- Uttar Pradesh
Name of District- Jhansi
7. Name of Block Badagaon
44
District Irrigation Plan of Jhansi
672 DAN Dunara 152838 323 299 622 46 173 0 0 66 449 112 622
673 DAUN Daun 152839 711 661 1372 149 567 0 0 100 805 249 1372
674 DAUN Bhupnagar 152840 456 417 873 48 183 0 0 132 690 180 873
675 DAUN Sujataa 152841 129 98 227 0 0 0 0 58 227 58 227
676 BARATA Tor Barata 152842 9 6 15 0 1 0 0 6 14 6 15
677 BARATA Barata 152843 2052 1895 3947 332 1261 0 0 421 2686 753 3947
678 MADORA Hajipura 152844 294 250 544 58 222 0 0 35 322 93 544
Name of State- Uttar Pradesh
Name of District- Jhansi
7. Name of Block Badagaon
45
District Irrigation Plan of Jhansi
697 HARPURA Harpura 152863 715 665 1380 10 38 0 0 326 1342 336 1380
698 TALARMANNA Talarmanna 152864 1378 1278 2656 0 0 0 0 551 2656 551 2656
699 JAGANNATH PURA Jagannath Pura 152865 55 74 129 0 0 0 0 20 129 20 129
700 GHUGHUWA Ghughuwa 152866 833 724 1557 53 200 0 0 262 1357 315 1557
701 TALARMUNA Dani Pura 152867 366 320 686 0 0 0 0 138 686 138 686
702 CHIPLOTHA Chiplotha 152868 771 691 1462 77 292 0 0 212 1170 289 1462
Total 57051 51329 108021 8260 31268 30 109 12387 77003 20678 108021
721 NANDWARIYA Deora 152217 450 457 907 46 147 0 0 134 760 180 907
722 NANDWARIYA Nandsiya 152218 628 588 1216 94 302 0 0 120 914 214 1216
723 KARGAWAN Karguwan 152219 2646 2447 5093 377 1206 0 0 529 3887 906 5093
724 SEMRI Semari 152220 1719 1551 3270 335 1071 0 0 246 2199 581 3270
725 LUDHIYAI Ludhiyai 152221 635 542 1177 124 398 0 0 108 779 232 1177
726 KARKOS Karkos 152222 731 693 1424 200 639 0 0 97 785 297 1424
Name of State- Uttar Pradesh
Name of District- Jhansi
8 Name of Block Chirgaon
Name of the Code of Population SC ST General Total
Name of the
Villages Villages No. of No. of No. of No. of No. of No. of No. of No. of
Gram Panchayat covered M F Total
covered Household Members Household Members Household Members Household Members
727 LUDHIYAI Barhata 152223 336 266 602 14 44 0 0 87 558 101 602
728 LUDHIYAI Dabri 152224 22 22 44 10 44 0 0 0 0 10 44
729 LUDHIYAI Purachir Gaon 152225 93 72 165 8 27 0 0 22 138 30 165
730 BARAL Baral 152226 1627 1424 3051 216 692 0 0 303 2359 519 3051
731 MODKALA Mod Khurd 152227 627 566 1193 188 600 0 0 67 593 254 1193
732 MOHKALA Mod Kalan 152228 804 743 1547 106 339 0 0 194 1208 300 1547
733 NARI Nibi 152229 345 307 652 43 138 0 0 87 514 130 652
734 NARI Behta Sant 152230 155 145 300 53 169 0 0 5 131 58 300
735 NARI Khiriya Ram 152231 106 98 204 7 22 0 0 44 182 51 204
736 NARI Nari 152232 361 306 667 50 160 3 9 63 498 116 667
737 CHIRAUNA Chhirauna 152233 1575 1466 3041 380 1216 5 15 208 1810 593 3041
738 PAHADI
152234 633 586 1219 132 421 0 0 110 798 242 1219
BUJURG Mirona
739 JARYAI Jarayai 152235 1177 1064 2241 347 1110 0 0 107 1131 454 2241
740 SIMTHARI Simthari 152236 1109 932 2041 158 505 0 0 206 1536 364 2041
741 GUREI Mudei 152237 807 737 1544 88 283 0 0 194 1261 282 1544
742 BITHARI Bithari 152238 843 762 1605 108 347 0 0 232 1258 340 1605
743 BITTI Madguwan 152239 468 461 929 88 282 0 0 118 647 206 929
744 ATBEI Atpei 152240 913 798 1711 101 322 0 0 236 1389 337 1711
745 ATLEI Narain Pura 152241 0 0 0 0 0 0
47
District Irrigation Plan of Jhansi
746 GUREI Bawari 152242 303 268 571 61 196 0 0 61 375 122 571
747 MIYANPUR Miya Pur 152243 896 789 1685 211 674 0 0 128 1011 339 1685
748 PACHAR Pachar 152244 811 729 1540 108 347 0 0 179 1193 287 1540
749 PACHAR Dharam Pura 152245 137 115 252 0 0 0 0 46 252 46 252
750 BAJHERA Ramaiya Pura 152246 364 351 715 56 179 0 0 61 536 117 715
751 BAJHERA Bajhera 152247 679 626 1305 105 336 0 0 140 969 245 1305
752 CHIRGAON Chir Gaon
152248 5360 4675 10035 345 1104 16 51 1580 8880 1941 10035
DEHAT (Rural)
753 SULTANPURA Sultan Pura 152249 877 828 1705 84 269 0 0 245 1436 329 1705
754 Dhamna
152250 274 249 523 48 153 0 0 56 370 104 523
SIKARI BUJURG Bujurg
755 SIRYA Siya 152251 1207 1125 2332 204 652 0 0 155 1680 359 2332
756 RAMNAGAR Ramnagar 152252 682 746 1428 108 347 0 0 154 1081 262 1428
757 KATGU Musawali 152253 0 0 0 0 0 0
758 BHARATPURA Dedar 152254 190 204 394 17 53 0 0 54 341 71 394
759 BHARATPURA Dewal 152255 114 123 237 0 0 0 0 46 237 46 237
760 DWARA
152256 700 665 1365 210 671 0 1 35 693 245 1365
BUKURG Dabrabuzurg
761 BHARATPURA Shah Pura 152257 0 0 0 0 0 0
762 BHARATPURA Bharat Pura 152258 543 473 1016 92 294 0 0 73 722 165 1016
763 SIKARI BUJURG Sikari Buzurg 152259 444 393 837 60 191 0 0 91 646 151 837
764 AUBARA Aupara 152260 870 774 1644 112 359 0 0 195 1285 307 1644
765 PAHARI
152261 1422 1443 2865 484 1550 0 0 76 1315 560 2865
BUJURG Pahari Buzurg
766 GULARA Gulara 152262 559 507 1066 80 255 0 0 106 811 186 1066
767 GULARA Maheba 152263 443 390 833 74 237 0 0 107 596 181 833
768 GULARA Murata 152264 290 276 566 46 146 0 0 45 420 91 566
769 DHWANI Girari 152265 0 0 0 0 0 0
770 DHWANI Dhawani 152266 615 570 1185 107 342 0 0 131 843 238 1185
771 DHWANI Ghusguwan 152267 337 309 646 62 198 0 0 69 448 131 646
772 SIKRI BUJURG Bajata 152268 0 0 0 0 0 0
773 KUKURGAWO Kukur Gaon 152443 711 647 1358 156 499 0 0 119 859 275 1358
774 KUKURGAWO Dineri 152444 291 275 566 39 126 0 0 76 440 115 566
48
District Irrigation Plan of Jhansi
775 KHILLAVARI
152445 116 105 221 3 11 0 0 37 210 40 221
BUJURG Dinera
776 BARIBUJURG Rawatpura 152446 485 470 955 119 381 0 0 77 574 196 955
778 Kalyanpura
152447 42 40 82 12 37 0 0 5 45 17 82
BARIBUJURG (Moth)
779 PIPRA Pipara 152448 1576 1450 3026 292 934 1 2 281 2090 573 3026
780 MATHADILAWL
152449 450 397 847 71 228 0 0 99 619 170 847
I Mawai
781 Madha
152450 508 442 950 113 363 0 0 69 587 182 950
ATHADILAWLI Dilawali
782 BAGHAIRA Baghaira 152451 1343 1150 2493 255 816 0 0 199 1677 454 2493
783 BARIBUJURG Khilla 152452 447 406 853 156 498 0 0 27 355 183 853
784 BAGHERA Saigaon 152453 0 0 0 0 0 0
785 BARI BUJURG Bari Bujurg 152454 534 532 1066 67 215 0 0 123 851 190 1066
786 KUKURGAWO Phool Khiriya 152455 414 448 862 63 200 0 0 103 662 165 862
787 BAMANWAO Bamanwan 152456 2028 1888 3916 161 516 0 0 609 3400 770 3916
788 KHUARGAWOD Kalayan Pura
152457 261 237 498 38 122 0 0 60 376 98 498
HAR State
789 RMPURA Budhupura 152458 259 218 477 104 466 0 0 4 11 108 477
790 BANGRA
152459 1377 1233 2610 434 1390 0 0 57 1220 491 2610
BANGRI Bangri Bangra
791 RMPURA Ram Pura 152460 904 781 1685 156 498 0 0 152 1187 308 1685
792 LUHARGAWO
152461 248 244 492 21 68 0 0 63 424 84 492
DHAR Kalothra Ghat
793 LUHARGAWO Luhar Gaon
152462 355 360 715 53 170 0 0 83 545 136 715
GHAT Ghat
794 BARAURA Bhat Pura 152463 295 262 557 54 172 0 0 41 385 95 557
795 BAROR Baror 152464 699 653 1352 111 356 0 0 147 996 258 1352
796 CHANDVARI Chandwari 152465 837 822 1659 200 639 0 0 127 1020 327 1659
797 SITAORA Sitora 152466 573 522 1095 160 639 0 0 37 456 197 1095
798 SETAURA Sitori 152467 0 0 0 0 0 0
799 SITAURA Jaswant Pura 152468 0 0 0 0 0 0
800 SITAURA Khoh 152469 302 253 555 55 343 0 0 55 212 110 555
801 BERWAI Berwai 152470 717 677 1394 86 276 0 0 190 1118 276 1394
802 BERWAI Parsa 152471 686 611 1297 136 434 0 0 96 863 232 1297
49
District Irrigation Plan of Jhansi
803 RORA Bakayan 152472 493 448 941 119 381 0 0 65 560 184 941
804 RAURA Rora 152473 592 517 1109 118 379 0 0 81 730 199 1109
805 CHAMNA
152474 318 269 587 75 373 0 0 27 214 102 587
KHURD Bharrol
806 CHAMNA
152475 311 278 589 64 206 0 0 61 383 125 589
KHURD Dhabara
807 DHAMNA
152476 0 0 0 0 0 0
KHURD Dabra Khurd
808 DHAMNA
152477 0 0 0 0 0 0
KHURD Singhpura
809 DHAMNA Dhamna
152478 1070 939 2009 176 564 0 0 211 1445 387 2009
KHURD Buzurg
810 PACCHARGADH Khadeshar 152479 290 235 525 0 0 0 0 97 525 97 525
811 PACCHARGADH Itora 152480 588 536 1124 197 629 0 0 16 495 213 1124
812 BAREI Bairishal Pura 152481 102 92 194 9 30 0 0 30 164 39 194
813 SARAUL Bishan Para 152482 3 2 5 1 5 0 0 0 0 1 5
814 BAREI Barei 152483 750 666 1416 136 434 0 0 128 982 264 1416
815 PACCHARGARH Pachchar Garh 152484 674 653 1327 131 419 0 0 136 908 267 1327
816 UJAYAN Ujayan 152485 1778 1515 3293 337 1078 5 15 299 2200 641 3293
817 SARAUL Majhari 152486 0 0 0 0 0 0
818 SARAUL Saraul 152487 975 846 1821 60 193 0 0 248 1628 308 1821
819 ITVA KHURD Sikari Khurd 152488 291 249 540 0 0 3 10 93 530 96 540
820 ITVA KHURD Bakua Khurd 152489 251 250 501 7 21 0 0 81 480 88 501
821 ITVA KHURD Tajpura 152490 149 142 291 52 262 0 0 4 29 56 291
822 ITWAN Itwan 152491 302 232 534 82 327 0 0 11 207 93 534
823 ITWAN KHURD Pahari Khurd 152492 85 64 149 0 0 0 0 27 149 27 149
Total 76105 69045 145150 13330 43081 36.25 116 14021 101953 27388 145150
Source- www.censusindia.gov.in (Digital Dairy of UP-2011)
50
District Irrigation Plan of Jhansi
51
District Irrigation Plan of Jhansi
52
District Irrigation Plan of Jhansi
Cumulative
up to 30 up to 60
Summer
Winter
Min
Rainy
Min Min.
Mean
Mean
Mean
Mean
Mini.
Mini.
Mini.
Max.
Max.
Max.
Max.
Mini
1. Jan- 12.1 1.2
Feb-19.6 1.3
Hot sub-humid eco-region
with red and black soils
multidirectional slopes
Mar-9.6 0.9
Undulating with
April-2.8 0.3
May-10.5 1.3
113.9
13.32
35489
91.9
66.5
28.2
49.4
36.3
26.5
17.6
18.2
32.6
28.5
5.73
2.84
4.75
161
325
243
Jun-107.2 5.2
8.7
Jul-223.7 10.7
Aug-240 11.8
Sept.-146.6 6.2
Oct-21 1
Nov-3.6 0.5
Dec-9.1 0.4
Cumulative
up to 30 up to 60
Summer
Winter
Min
Rainy
Min Min.
Mean
Mean
Mean
Mean
Mini.
Mini.
Mini.
Max.
Max.
Max.
Max.
Mini
multidirectional slopes
Mar-9.6 0.9
Undulating with
April-2.8 0.3
May-10.5 1.3
113.9
41.60
14.90
25.90
14.23
64923
32.2
51.0
24.4
16.2
35.6
6.34
2.94
4.95
91.9
66.5
215
395
305
Jun-107.2 5.2 5.4
Jul-223.7 10.7
Aug-240 11.8
Sept.-146.6 6.2
Oct-21 1
Nov-3.6 0.5
Dec-9.1 0.4
Note: NRCAF/CAFRI Jhansi & RSS, Bharari, Jhansi is situated in Baragaon block and NRCAF/CAFRI is working in babina block also, data based on 30 years. Rest block of Jhansi is very similar to the
Garhkundar watershed (Distt.: Tikamgarh, MP), CAFRI, Jhansi watershed and their monitoring systems for PET, soil loss, runoff and rainfall intensity is based on their data.
53
District Irrigation Plan of Jhansi
Cumulative
up to 30 up to 60
Summer
Winter
Min
Rainy
Min Min.
Mean
Mean
Mean
Mean
Mini.
Mini.
Mini.
Max.
Max.
Max.
Max.
Mini
1. Jan- 12.1 1.2
Feb-19.6 1.3
Hot sub-humid eco-region
with red and black soils
multidirectional slopes
Mar-9.6 0.9
Undulating with
April-2.8 0.3
May-10.5 1.3
113.9
13.32
51453
91.9
66.5
28.2
49.4
36.3
26.5
17.6
18.2
32.6
28.5
5.73
2.84
4.75
141
309
225
Jun-107.2 5.2
8.7
Jul-223.7 10.7
Aug-240 11.8
Sept.-146.6 6.2
Oct-21 1
Nov-3.6 0.5
Dec-9.1 0.4
Cumulative
up to 30 up to 60
Summer
Winter
Min
Rainy
Min Min.
Mean
Mean
Mean
Mean
Mini.
Mini.
Mini.
Max.
Max.
Max.
Max.
Mini
multidirectional slopes
Mar-9.6 0.9
Undulating with
April-2.8 0.3
May-10.5 1.3
172.50
113.9
41.60
14.90
25.90
14.23
62977
32.2
51.0
24.4
16.2
35.6
6.34
2.94
4.95
91.9
66.5
110
235
Jun-107.2 5.2
5.4
Jul-223.7 10.7
Aug-240 11.8
Sept.-146.6 6.2
Oct-21 1
Nov-3.6 0.5
Dec-9.1 0.4
Note: NRCAF/CAFRI Jhansi & RSS, Bharari, Jhansi is situated in Baragaon block and NRCAF/CAFRI is working in babina block also, data based on 30 years. Rest block of Jhansi is very similar to the
Garhkundar watershed (Distt.: Tikamgarh, MP), under CAFRI, Jhansi, their monitoring systems for PET, soil loss, runoff and rainfall intensity is based on their data.
54
District Irrigation Plan of Jhansi
Cumulative
up to 30 up to 60
Summer
Winter
Min
Rainy
Min Min.
Mean
Mean
Mean
Mean
Mini.
Mini.
Mini.
Max.
Max.
Max.
Max.
Mini
1. Jan- 12.1 1.2
Feb-19.6 1.3
Hot sub-humid eco-region
with red and black soils
multidirectional slopes
Mar-9.6 0.9
Undulating with
April-2.8 0.3
May-10.5 1.3
113.9
13.32
54226
91.9
66.5
28.2
49.4
36.3
26.5
17.6
18.2
32.6
28.5
5.73
2.84
4.75
335
215
Jun-107.2 5.2
8.7
95
Jul-223.7 10.7
Aug-240 11.8
Sept.-146.6 6.2
Oct-21 1
Nov-3.6 0.5
Dec-9.1 0.4
Cumulative
up to 30 up to 60
Summer
Winter
Min
Rainy
Min Min.
Mean
Mean
Mean
Mean
Mini.
Mini.
Mini.
Max.
Max.
Max.
Max.
Mini
multidirectional slopes
Mar-9.6 0.9
Undulating with
April-2.8 0.3
May-10.5 1.3
251.50
113.9
41.60
14.90
25.90
14.23
51778
32.2
51.0
24.4
16.2
35.6
6.34
2.94
4.95
91.9
66.5
155
348
Jun-107.2 5.2
5.4
Jul-223.7 10.7
Aug-240 11.8
Sept.-146.6 6.2
Oct-21 1
Nov-3.6 0.5
Dec-9.1 0.4
Note: NRCAF/CAFRI Jhansi & RSS, Bharari, Jhansi is situated in Baragaon block and NRCAF/CAFRI is working in babina block also, data based on 30 years. Rest block of Jhansi is very similar to the
Garhkundar watershed (Distt.: Tikamgarh, MP), under CAFRI, Jhansi, their monitoring systems for PET, soil loss, runoff and rainfall intensity is based on their data.
55
District Irrigation Plan of Jhansi
Cumulative
up to 30 up to 60
Summer
Winter
Min
Rainy
Min Min.
Mean
Mean
Mean
Mean
Mini.
Mini.
Mini.
Max.
Max.
Max.
Max.
Mini
1. Jan- 12.1 1.2
Feb-19.6 1.3
Hot sub-humid eco-region
with red and black soils
multidirectional slopes
Mar-9.6 0.9
Undulating with
April-2.8 0.3
May-10.5 1.3
113.9
13.32
70496
91.9
66.5
28.2
49.4
36.3
26.5
17.6
18.2
32.6
28.5
5.73
2.84
4.75
343
216
Jun-107.2 5.2
8.7
89
Jul-223.7 10.7
Aug-240 11.8
Sept.-146.6 6.2
Oct-21 1
Nov-3.6 0.5
Dec-9.1 0.4
Cumulative
up to 30 up to 60
Summer
Winter
Min
Rainy
Min Min.
Mean
Mean
Mean
Mean
Mini.
Mini.
Mini.
Max.
Max.
Max.
Max.
Mini
multidirectional slopes
Mar-9.6 0.9
Undulating with
April-2.8 0.3
May-10.5 1.3
163.50
113.9
41.60
14.90
25.90
14.23
79989
32.2
51.0
24.4
16.2
35.6
6.34
2.94
4.95
91.9
66.5
250
Jun-107.2 5.2
5.4
77
Jul-223.7 10.7
Aug-240 11.8
Sept.-146.6 6.2
Oct-21 1
Nov-3.6 0.5
Dec-9.1 0.4
Note: NRCAF/CAFRI Jhansi & RSS, Bharari, Jhansi is situated in Baragaon block and NRCAF/CAFRI is working in babina block also, data based on 30 years. Rest block of Jhansi is very similar to the
Garhkundar watershed (Distt.: Tikamgarh, MP), CAFRI, Jhansi watershed and their monitoring systems for PET, soil loss, runoff and rainfall intensity is based on their data.
Source- Based on 30 year Climatic data of CAFRI, Jhansi
56
District Irrigation Plan of Jhansi
57
District Irrigation Plan of Jhansi
1400 1477.6
1438.3
1307.5
1200
1183.7
1000
923.7
800
713.5 722.3
600 688.2
594.8 612.2
576.6
400 448.6
369.13
200
0
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
58
District Irrigation Plan of Jhansi
59
District Irrigation Plan of Jhansi
60
District Irrigation Plan of Jhansi
61
District Irrigation Plan of Jhansi
62
District Irrigation Plan of Jhansi
63
District Irrigation Plan of Jhansi
64
District Irrigation Plan of Jhansi
65
District Irrigation Plan of Jhansi
66
District Irrigation Plan of Jhansi
67
District Irrigation Plan of Jhansi
128 CHEVTA Chheota 602.86 706.68 384.86 321.82 183.62 163.37 35.33 19.3
129 ATA Diviyapur 462.89 382.38 215.16 167.22 177.72 189.62 30.52 27.39
130 ATA Ata 663.67 609.61 333.41 276.20 182.84 290.66 31.67 7.93
131 ATA Sajauni 490.55 351.93 189.02 162.91 186.19 283.13 15.97 2.44
132 ATA Gatara 201.99 163.87 86.75 77.12 188.90 105.23 3.79 6.22
133 SAKIN Jakhaila 542.28 845.68 488.13 357.55 173.25 0 21.85 30.61
134 LOHAGARH Lohagarh 1463.42 2441.12 1293.87 1147.25 188.67 0 143.09 26.19
135 KARAHI Karai 960.15 1417.18 883.09 534.09 160.48 0 70.44 6.62
136 IMALIYA
STATE Aira 337.11 587.12 308.23 278.89 190.48 0 24.13 4.75
137 IMALIYA
STATE Imiliya (State) 287.1 455.11 261.41 193.70 174.10 0 20.39 5.3
138 MADORA
KALA Madora Kalan 303.7 500.63 273.33 227.30 183.16 0 27.26 3.11
139 MADORA
KALA Tigra Kalan 203.1 371.51 194.51 177.00 191.00 0 8.47 0.12
140 IMALIYA
STATE Baidora 209.58 358.50 189.68 168.82 189.00 0 17.16 2.74
141 SERSA Sersa 1829.65 2924.78 1633.41 1291.37 179.06 0 5.58 190.12
142 IMALIYA
STATE Nibola 84.97 147.15 80.14 67.01 183.62 0 3.56 1.27
Name of State- Uttar Pradesh
Name of District- Jhansi
2. Name of Block- Moth
Area in ha
S.No. Name of Gram Name of Village Total Area Under Agriculture Area under Area Under Area under
Panchayat Covered Geographical Gross Net Sown Area Sown Cropping Forest Wasteland other Uses
Area Cropped Area (2) more than Intencity
Area (1) once (1-2) (%)
143 DHAURKA Gyarai 304.05 509.19 286.51 222.68 177.72 0 15.39 2.15
144 BADERA Badaira 418.03 706.97 386.66 320.31 182.84 0 28.16 3.21
145 BADERA Khakal 325.29 605.63 325.28 280.35 186.19 0 0 0
146 JARHA KALA Kashipura 243.3 419.45 222.05 197.40 188.90 0 19.89 2.23
147 JARHA KALA Jarha Kalan 393.46 635.72 366.94 268.78 173.25 0 23.02 3.34
148 JARHA KALA Kharila 244.72 427.39 226.53 200.86 188.67 0 16.03 2.15
149 SESA Sesa 647.58 835.06 520.35 314.71 160.48 42.4 41.3 43.53
150 SESA Ghateshwar 313.15 298.52 156.72 141.80 190.48 119.32 20.45 16.66
151 MAHARAJGANJ Garauli 93.45 138.27 79.42 58.85 174.10 9.46 3.25 0.12
152 MAHARAJGANJ Maharaj Ganj 384.72 509.66 278.26 231.40 183.16 33.43 72.03 1
153 MAHARAJGANJ Dhera 392.6 582.66 305.06 277.60 191.00 56.54 28.8 2.21
154 MAHARAJGANJ Karila 147.96 164.17 86.86 77.31 189.00 45.5 13.54 2.91
72
District Irrigation Plan of Jhansi
155 SESA Kanaucha 152.73 145.06 81.01 64.05 179.06 52.74 2.97 16
156 POONCH Poonchh 837.55 1530.75 833.65 697.10 183.62 0 3.9 0
157 BABAR Brasingh Pura 154.21 252.08 141.84 110.24 177.72 0 11.26 1.11
158 DHAURAKA Dhaurka 388.74 647.58 354.18 293.40 182.84 0 30.45 4.11
159 BAWAI Bawai 546.6 947.45 508.87 438.58 186.19 0 34.51 3.21
160 SIANDARA Sikandra 179.17 288.19 152.56 135.63 188.90 0 21.56 5.04
161 SIKANDARA Sukupura 107.34 165.16 95.33 69.83 173.25 0 8.14 3.87
162 FATEHPUR
STATE Fatehpur (State) 509.45 680.39 360.63 319.76 188.67 0 125.53 23.29
163 FATEHPUR
STATE Dhamdhauli 387.85 432.43 269.46 162.97 160.48 0 100.59 17.8
164 FATEHPUR
STATE Bhaura Arich 210.8 334.43 175.57 158.86 190.48 0 32.81 2.42
165 FATEHPUR
STATE Salemapur 297.27 335.28 192.58 142.70 174.10 0 104.46 1.23
166 SIKANDARA Sarai Jhansi 251.04 303.35 165.62 137.73 183.16 0 43.34 42.08
167 SIKANDARA Datawali Khurd 224.21 278.78 145.96 132.82 191.00 0 25.42 52.83
168 SIKANDRA Maboosa 161.82 175.26 92.73 82.53 189.00 0 20.25 48.84
169 PAGARI Kayla 426.58 300.07 167.58 132.49 179.06 0 49.56 209.44
170 PANARI Tati Khilli 96.54 53.23 28.99 24.24 183.62 0 4.59 62.96
Name of State- Uttar Pradesh
Name of District- Jhansi
2. Name of Block- Moth
Area in ha
S.No. Name of Gram Name of Village Total Area Under Agriculture Area under Area Under Area under
Panchayat Covered Geographical Gross Net Sown Area Sown Cropping Forest Wasteland other Uses
Area Cropped Area (2) more than Intencity
Area (1) once (1-2) (%)
171 MADORA
KHURD Madora Khurd 473.41 699.61 393.66 305.95 177.72 0 70.04 9.71
172 PANARI Panari 1143.52 1152.73 630.46 522.27 182.84 0 513.05 0
173 IPIHIYA Paraichha 727 482.23 259 223.23 186.19 399 41 28
174 IMALIYA Silari 412 452.55 282 170.55 160.48 47 26 57
175 SENA Ahrora 110 188.58 99 89.58 190.48 0 3 8
176 SENA Tanda 375.75 569.27 326.98 242.29 174.10 0 23.59 25.18
177 BAMHRAULI Bamhroli 673.1 826.75 451.382 375.37 183.16 0 93.94 127.78
178 BARTHARI Moth (Rural) 247 24.83 13 11.83 191.00 0 0 234
179 BARTHARI Barthari 248.63 437.27 231.36 205.91 189.00 0 4.74 12.53
180 JAURA Amkhera 226 358.12 200 158.12 179.06 0 21 3.02
181 JAURA Jaura 14.9 11.20 6.1 5.10 183.62 0 0 8.8
73
District Irrigation Plan of Jhansi
74
District Irrigation Plan of Jhansi
215 CHIRGAON
KHURD Padauri Estate 97.06 172.74 91.56 81.18 188.67 0 4.61 0.88
216 CHIRGAON
KHURD Thiprai 105.89 157.94 98.42 59.52 160.48 0 7.47 0
217 CHIRGAON
KHURD Khidar Pura 85.62 153.95 80.82 73.13 190.48 0 0 4.8
218 CHIRGAON
KHURD Chir Gaon Khurd 600.76 987.22 567.04 420.18 174.10 0 28.48 5.24
219 CHIRGAON
KHURD Pipra 110.91 193.69 105.75 87.94 183.16 0 2.47 2.69
220 CHIRGAON
KHURD Bari 72.36 131.43 68.81 62.62 191.00 0 3.55 0
221 BADOKHARI Badokhari 465.32 776.92 411.07 365.85 189.00 0 0 54.248
222 BANGARI Bangari 719.43 1217.57 679.98 537.59 179.06 0 0 39.46
223 BANGARI Pokhipura 77.59 133.33 72.61 60.72 183.62 0 0 4.98
224 PAHARPUR Paharpura
STATE (Estate) 312.38 492.12 276.91 215.21 177.72 0 21.81 13.65
225 PAHARPUR
STATE Samthar(Dehat) 990.266 1284.56 702.56 582.00 182.84 0 105.47 181.23
226 BAHADURPUR Chatreshpur 282.32 353.92 190.09 163.83 186.19 58.35 16.65 17.25
227 BAHADURPUR Deogarh 522.25 743.13 393.4 349.73 188.90 60.09 14.48 53.91
Name of District- Jhansi
2. Name of Block- Moth
Area in ha
S.No. Name of Gram Name of Village Total Area Under Agriculture Area under Area Under Area under
Panchayat Covered Geographical Gross Net Sown Area Sown Cropping Forest Wasteland other Uses
Area Cropped Area (2) more than Intencity
Area (1) once (1-2) (%)
228 BAHADURPUR Bahadur Pur 293.57 411.74 237.66 174.08 173.25 1.23 12.35 42.04
229 BAHADURPUR Chamrai Mali 589.27 989.68 524.56 465.12 188.67 0 45.44 19.28
230 PAHADPUR
STATE Angthari 373.58 556.35 346.68 209.67 160.48 0 18.23 8.67
231 BANGARI Barthari Estate 420.96 751.98 394.78 357.20 190.48 0 0 26.18
232 DATAWALI
KALA Chaktor Belma 219.37 332.06 190.73 141.33 174.10 0 9.16 19.48
233 DATAWALI
KALA Datawali Kalan 622.89 992.82 542.05 450.77 183.16 0 59.7 21.08
234 PAHARPUR
STATE Belma Kalan 373.57 662.16 346.68 315.48 191.00 0 18.23 8.66
235 PAHARPUR
STATE Chak Datawali 48.06 82.18 43.48 38.70 189.00 0 4.58 0
75
District Irrigation Plan of Jhansi
236 BARNAYA Barnaya 480.2 583.52 325.88 257.64 179.06 0 37.69 116.11
237 BARNAYA Bajeta 215.08 273.19 148.78 124.41 183.62 49.62 11.27 5.41
238 BARNAMA Jera 185.79 293.42 165.1 128.32 177.72 0 0 20.06
239 KADAUR Bamrauli Estate 424.54 655.01 358.24 296.77 182.84 9.58 17.19 39.53
240 KADUR Kandaur 716.07 1154.03 619.82 534.21 186.19 0.04 29.34 66.87
241 KHAJURI Khajuri 428.38 748.88 396.44 352.44 188.90 0 28.48 3.46
242 KHAJURI Bajhera Estate 236.17 374.39 216.1 158.29 173.25 0 12.25 7.81
243 SHAJHANAPUR Shahjahanpur 1680.18 2878.51 1525.7 1352.81 188.67 0 127.77 26.71
244 KHJADAUA Khadauwa 438.91 646.40 402.79 243.61 160.48 0 23.29 12.84
245 KHADAUA Birguwan 471.6 761.18 399.61 361.57 190.48 0 28.6 43.4
246 SIMRIYA Simiriya 331.07 522.91 300.35 222.56 174.10 0 24.18 6.54
247 SAURAI Saurai 411.15 699.03 381.65 317.38 183.16 0 21.2 8.29
248 SAURAI Chandar 272.56 399.30 209.06 190.24 191.00 0 32.48 31.02
249 PANDORI Shahpur 607.98 876.85 463.94 412.91 189.00 39.25 55.57 49.21
250 PANGERI Todi Ki Sarai 8.59 10.33 5.77 4.56 179.06 0 0 2.8
251 PANGERI Dhawar 166.74 265.09 144.37 120.72 183.62 0 15.29 7.61
252 PANDAURI Pandauri 305.67 484.50 272.62 211.88 177.72 0 0 33.26
253 LADAWARA Paharpura(Moth) 311.89 531.35 290.61 240.74 182.84 0 14.72 6.57
254 LADAWARA Ladawara 752.71 1212.68 651.32 561.36 186.19 0 93.29 8.89
255 PANDAURI Dasna 206.08 280.03 148.24 131.79 188.90 0 0 57.84
256 PANDAURI Say 308.92 423.19 244.27 178.92 173.25 0 23.09 41.56
Name of District- Jhansi
2. Name of Block- Moth
Area in ha
S.No. Name of Gram Name of Village Total Area Under Agriculture Area under Area Under Area under
Panchayat Covered Geographical Gross Net Sown Area Sown Cropping Forest Wasteland other Uses
Area Cropped Area (2) more than Intencity
Area (1) once (1-2) (%)
257 TALAUD Talaur 753.76 1251.53 663.35 588.18 188.67 6.55 58.04 25.82
258 TALAUD Lidhari 423.44 631.29 345.27 286.02 182.84 6.98 51.25 19.99
259 BELMA Belma 679.56 1070.28 574.84 495.44 186.19 0.85 77.49 26.38
260 BELMA Basauna 225.38 341.30 180.58 160.72 189.00 0 17.67 27.22
261 LAWAN Lawan 906.62 1467.00 819.28 647.72 179.06 0 60.63 26.72
262 PULIYA Puliya 693.89 1164.41 634.14 530.27 183.62 0 41.23 18.53
263 PUL GAHNA Pulgahana 416.93 730.66 386.59 344.07 189.00 0 22.85 7.5
264 PUL GAHNA Pasaiya 620.52 1027.86 574.03 453.83 179.06 0 27.73 18.75
265 CHAPAR Chhapar 834.13 1385.43 754.51 630.92 183.62 0 65.06 14.58
266 KUTHWALI Budhawali 610.84 822.01 449.58 372.43 182.84 0 73.68 87.59
267 BHAROSA Bharosa 576.6 978.55 525.57 452.98 186.19 0 39.86 12.26
268 REV Reb 943.52 1537.06 840.66 696.40 182.84 0 15.29 88.2
76
District Irrigation Plan of Jhansi
79
District Irrigation Plan of Jhansi
82
District Irrigation Plan of Jhansi
87
District Irrigation Plan of Jhansi
554 Dhanora Dhanora 2272 1860 1488 372 125.00 260 236 88
555 Jakhora Jakhora 701 703 542 161 129.70 0 108 51
556 Bargain Khangar Bargain Khangar 541 624 457 167 136.54 0 36 48
557 Bhomai 193 229 164 65 139.63 0 19 10
Name of State- Uttar Pradesh
Name of District- Jhansi
6. Name of Block- Bamaur
Area in ha
S.No. Name of Gram Name of Village Total Area Under Agriculture Area Area Area
Panchayat Covered Geographical Gross Net Sown Area Cropping under Under under
Area Cropped Area (2) Sown Intencity Forest Wasteland other
Area (1) more (%) Uses
than once
(1-2)
558 Dudi Dudi 906 724 520 204 139.23 58 95 110
559 Malheta 974 319 308 11 103.57 174 307 188
600 Kudari Kudari 1073 687 506 181 135.77 151 161 255
601 Behtar 599 543 433 110 125.40 0 156 10
602 Gokul Gokul 1253 733 645 88 113.64 125 110 238
603 Khama 373 199 196 3 101.53 0 74 103
604 Pahra 630 226 187 39 120.86 167 107 188
605 Ghatiyari Ghatiyari 490 266 228 38 116.67 115 102 50
606 Tharro 626 310 302 8 102.65 177 119 159
607 Pratapura 683 197 167 30 117.96 300 180 36
607 Devri Devri 636 275 248 27 110.89 0 202 176
608 Kakarbai Kakarbai 2562 945 605 340 156.20 332 147 1043
609 Barmain Barmain 792 620 490 130 126.53 198 88 16
610 Kharwanch Kharwanch 637 466 392 74 118.88 0 200 45
611 Dhamnod Dhamnod 1571 618 591 27 104.57 563 308 109
612 Kacheer Kacheer 2698 1014 777 237 130.50 1287 257 304
613 Hiranagar Hiranagar 670 734 474 260 154.85 139 54 3
614 Siya Siya 820 698 693 5 100.72 0 79 48
615 Dhurchau 584 188 127 61 148.03 195 16 246
616 Kharka Kharka 754 736 563 173 130.73 67 54 70
617 Sarseda Sarseda 1244 1616 1111 505 145.45 0 106 27
618 Bachheh Bachheh 1202 1420 1095 325 129.68 0 59 49
619 Barora Barora 507 595 410 185 145.12 0 48 49
89
District Irrigation Plan of Jhansi
92
District Irrigation Plan of Jhansi
93
District Irrigation Plan of Jhansi
94
District Irrigation Plan of Jhansi
95
District Irrigation Plan of Jhansi
96
District Irrigation Plan of Jhansi
99
District Irrigation Plan of Jhansi
100
District Irrigation Plan of Jhansi
1.8: River basins / sub-basins and Catchment area of each of the basins covered in the district
S. No Name of Block Name of River Basin/Sub-basin Catchment area of each basins Joint area with name of block
(ha) (ha)
5 Bangra Dasan & Lakheri River (Yamuna sub- 30895.76 14235.25 (Mauranipur)
basin)
6 Gursarai Dasan & Lakheri River (Yamuna sub- 42128.70 22522.08 (Bamaur)
basin)
7 Bamaur Dasan & Lakheri River (Yamuna sub- 35391.84 16260.02 (Gursarai)
basin)
8 Mauranipur Dasan & Lakheri River (Yamuna sub- 33025.78 5055.36 (Gursarai)
basin)
101
District Irrigation Plan of Jhansi
102
District Irrigation Plan of Jhansi
Chapter-II
103
District Irrigation Plan of Jhansi
A. Cereals 258 324 582 12560 6890 19450 0 0 0 12818 7214 20032
B. Coarse
0 1243 1243 0 0 0 0 0 0 0 1243 1243
Cereals
D. Oil Seeds 639 7680 7719 1860 4530 6390 0 0 0 1899 12210 14109
E. Fibre 0 0 0 0 0 0 0 0 0 0 0 0
Total 1095 27737 28232 18706 30245 48951 99 0 99 19300 57982 77282 135
104
District Irrigation Plan of Jhansi
A. Cereals 973 238 1211 5234 7654 12888 0 0 0 6207 7892 14099
B. Coarse
0 1430 1430 0 0 0 0 0 0 0 1430 1430
Cereals
D. Oil Seeds 18 6540 6558 560 1860 2420 0 0 0 578 8400 8978
E. Fibre 0 0 0 0 0 0 0 0 0 0 0 0
Total 1277 20779 22056 9132 22818 31950 122 0 122 10531 43597 54128 210
3. Name of Block- Babina
Horticulture and Plantation
Kharif (Area in ha) Rabi (Area in ha) Summer (Area in ha) Gross Total (Area in ha)
Crop Type Crops (Area in ha)
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
A. Cereals 450 150 600 5245 9870 15115 0 0 0 5695 10020 15715
B. Coarse
56 1860 1916 0 0 0 0 0 0 56 1860 1916
Cereals
D. Oil Seeds 48 18450 18498 2245 5468 7713 0 0 0 2293 23918 26211
E. Fibre 0 0 0 0 0 0 0 0 0 0 0 0
Total 867 44880 45747 9705 48543 58248 125 0 125 10697 93423 104120 156
105
District Irrigation Plan of Jhansi
A. Cereals 3456 150 3606 22455 4658 27113 0 0 0 25911 4808 30719
B. Coarse
120 1860 1980 0 0 0 0 0 0 120 1860 1980
Cereals
C. Pulses 24350 4368 28718 13560 8892 22452 125 0 125 38035 13260 51295
D. Oil Seeds 2467 1860 4327 4356 2268 6624 0 0 0 6823 4128 10951
E. Fibre 0 0 0 0 0 0 0 0 0 0 0 0
Total 32086 8298 40384 41259 16158 57417 270 0 270 73615 24456 98071 213
106
District Irrigation Plan of Jhansi
C. Pulses 4876 24568 29444 5265 25680 30945 0 0 0 10141 50248 60389
D. Oil Seeds 1876 5894 7770 2134 2654 4788 0 0 0 4010 8548 12558
E. Fibre 0 0 0 0 0 0 0 0 0 0 0 0
F. Fodder 346 124 470 346 240 686 0 0 0 692 464 1156
Total 9456 31400 40856 12246 33817 46063 56 0 56 21755 65217 86972 365
6. Name of Block- Mauranipur
Horticulture and Plantation
Kharif (Area in ha) Rabi (Area in ha) Summer (Area in ha) Gross Total (Area in ha)
Crop Type Crops (Area in ha)
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
C. Pulses 3468 18650 22118 4756 28632 33388 0 0 0 8224 47282 55506
D. Oil Seeds 2268 5468 7736 1958 3245 5203 0 0 0 4226 8713 12939
E. Fibre 0 0 0 0 0 0 0 0 0 0 0 0
Total 8232 25773 34005 11506 36869 48375 125 0 125 19863 62642 82505 384
107
District Irrigation Plan of Jhansi
C. Pulses 865 43588 44453 1230 51224 52454 0 0 0 2095 94812 96907
D. Oil Seeds 245 12458 12703 360 5432 5792 0 0 0 605 17890 18495
E. Fibre 0 0 0 0 0 0 0 0 0 0 0 0
Total 1346 57856 59202 2753 66283 69036 0 0 0 4099 124139 128238 146
8. Name of Block- Bamaur
Horticulture and Plantation
Kharif (Area in ha) Rabi (Area in ha) Summer (Area in ha) Gross Total (Area in ha)
Crops (Area in ha)
Crop Type
Irrigate Irrigate
Irrigated Rainfed Total Irrigated Rainfed Total Rainfed Total Rainfed Total Irrigated Rainfed Total
d d
A. Cereals 0 0 0 856 7645 8501 0 0 0 856 7645 8501
B. Coarse
0 1678 1678 0 0 0 0 0 0 0 1678 1678
Cereals
C. Pulses 745 54692 55437 942 56422 57364 0 0 0 1687 111114 112801
D. Oil Seeds 186 14562 14748 164 7652 7816 0 0 0 350 22214 22564
E. Fibre 0 0 0 0 0 0 0 0 0 0 0 0
Total 999 70944 71943 2088 71869 73957 0 0 0 3087 142813 145900 568
108
District Irrigation Plan of Jhansi
Season Cereals Coarse Pulses Oil Fibre Rainfed Irrigated Area Production Productivity Cost of Production Productivity Cost of Production Productivity Cost of
Cereals Seeds Crops Area Area (ha) (qtn/yr) or Yield Cultivation (qtn/yr) or Yield Cultivation (qtn/yr) or Yield Cultivation
(ha) (ha) (kgs/ha) on (Rs/ha) (kgs/ha) on (Rs/ha) (kgs/ha) on (Rs/ha)
Kharif 582 1243 18511 7719 0 27712 343 28055 200634.88 724 12729 3169.32 924 15412 203804.2 824 14070.5
Rabi 19450 0 22440 6390 0 30180 18100 48280 299385.6 992 13577 229508 1268 18117 528893.6 1130 15847
Summer 0 0 32 0 0 0 32 32 0 0 173.44 542 12124 173.44 542 12124
Note - Season wise Average Productivity of all crops of block is taken under rainfed and irrigated condition, while, Vegetable and fodder production and area is not included in this.
109
District Irrigation Plan of Jhansi
110
District Irrigation Plan of Jhansi
111
District Irrigation Plan of Jhansi
Gross Irrigated Area Net Irrigated Area Partially Irrigated/Protective Un-Irrigated or Totally Rainfed
Irrigation
Gross Irrigated Area Net Irrigated Area Partially Irrigated/Protective Un-Irrigated or Totally Rainfed
Irrigation
Gross Irrigated Area Net Irrigated Area Partially Irrigated/Protective Un-Irrigated or Totally Rainfed
Irrigation
112
District Irrigation Plan of Jhansi
Gross Irrigated Area Net Irrigated Area Partially Irrigated/Protective Un-Irrigated or Totally Rainfed
Irrigation
Gross Irrigated Area Net Irrigated Area Partially Irrigated/Protective Un-Irrigated or Totally Rainfed
Irrigation
Gross Irrigated Area Net Irrigated Area Partially Irrigated/Protective Un-Irrigated or Totally Rainfed
Irrigation
113
District Irrigation Plan of Jhansi
Gross Irrigated Area Net Irrigated Area Partially Irrigated/Protective Un-Irrigated or Totally Rainfed
Irrigation
Gross Irrigated Area Net Irrigated Area Partially Irrigated/Protective Un-Irrigated or Totally Rainfed
Irrigation
114
District Irrigation Plan of Jhansi
Chapter-III
Water Availability
Total water availability in the District from different sources is 1.288798 BCM, out of this availability canals (major & medium), minor
irrigation tanks/dams, lift irrigation/diversions, water bodies including rain water harvesting, untreated effluent, perennial source of water
from rivers dams of Pahuj, Cizar, Lakheri, Pahari and Erich under surface irrigation is 0.374, 0.13873, 0.0117036, 0.002434, 0.001434
and 0.14754 BCM respectively. However, groundwater availability from open dug well and tube well is about 0.417059 BCM i.e. total
draft from ground water, while availability is 0.612956 BCM total in district. Block wise details of groundwater availability is presented
in Table:3.2. Babina and Mauranipur block are in semi critical condition, rest blocks are in safe range. Canal commond area and other
services commond area village wise is presented in Table:3.3. Other services commond area will be reported lateron on micro level
planning. Existing type irrigation system in district in reported in Table:3.4, block wise surface irrigation from canals,
tanks/ponds/reservoirs, groundwater from open dug wells, tubewells and bore well is formulate. Other source of irrigation from water
harvesting structure and water extracting devices and lift information is also reported in the table. Several in situ and ex situ interventions
were implemented in the district by the different line departments under IWMP. The most common interventions are field bunding,
contour bunding and cultivating crop across the slope, which harvest surface runoff, allow more water to percolate and dispose excess
115
District Irrigation Plan of Jhansi
116
District Irrigation Plan of Jhansi
Status of Block as per Central Ground Water Board Notification Ground Water (BCM)
Status of Block as per Central Ground Water Board Notification Ground Water (BCM)
Status of Block as per Central Ground Water Board Notification Ground Water (BCM)
Status of Block as per Central Ground Water Board Notification Ground Water (BCM)
117
District Irrigation Plan of Jhansi
Status of Block as per Central Ground Water Board Notification Ground Water (BCM)
Status of Block as per Central Ground Water Board Notification Ground Water (BCM)
Status of Block as per Central Ground Water Board Notification Ground Water (BCM)
Status of Block as per Central Ground Water Board Notification Ground Water (BCM)
118
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
22 90 21 69 21 69
23 272 45 227 45 227
24 364 78 286 78 286
25 745 193 552 193 552
26 393 115 278 115 278
27
13 2 11 2 11
28 24 2 22 2 22
29 1050 289 761 289 761
30 1257 297 960 297 960
31
150 44 106 44 106
32 796 151 645 151 645
33
517 105 412 105 412
34
777 362 415 362 415
35 328 88 240 88 240
36 1258 556 702 556 702
37 1134 602 532 602 532
38 88 12 76 12 76
39 378 81 297 81 297
40 224 178 46 178 46
41 54 29 25 29 25
42 375 240 135 240 135
43 135 105 30 105 30
120
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
45 130 96 34 96 34
46 430 265 165 265 165
47 170 117 53 117 53
121
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
2. Name Of Block- Bangra
122
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
21 119 47 72 47 72
22 513 204 309 204 309
23 528 143 385 143 385
24 113 11 102 11 102
25 135 53 82 53 82
26 486 193 293 193 293
27
1 0 1 0 1
28 491 175 316 175 316
29 170 85 85 85 85
30 325 160 165 160 165
31 470 210 260 210 260
32 355 180 175 180 175
33 143 75 68 75 68
34 230 90 140 90 140
35 215 102 113 102 113
36
180 80 100 80 100
37 115 55 60 55 60
38 120 60 60 60 60
39 230 110 120 110 120
40 60 15 45 15 45
41 35 10 25 10 25
42 30 13 17 13 17
123
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
43 30 14 16 14 16
44 48 20 28 20 28
45
15 9 6 9 6
46 20 12 8 12 8
47 60 32 28 32 28
48 58 35 23 35 23
49 55 30 25 30 25
50
24 11 13 11 13
51 30 15 15 15 15
124
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
3. Name Of Block- Moth
125
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
4. Name Of Block- Moth
22 50 40 10 40 10
23 17 15 2 15 2
24 1495 1065 430 1065 430
25 133 120 13 120 13
26 108 100 8 100 8
27 200 190 10 190 10
28 5 5 0 5 0
29 360 355 5 355 5
30 575 550 25 550 25
31 555 540 15 540 15
32 153 140 13 140 13
33 563 396 167 396 167
34 205 170 35 170 35
35 304 260 44 260 44
36 284 250 34 250 34
37 545 510 35 510 35
38 75 55 20 55 20
39 95 75 20 75 20
40 100 90 10 90 10
41 746 705 41 705 41
42 574 540 34 540 34
126
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
5. Name Of Block- Moth
43 21 16 5 16 5
44 570 550 20 550 20
45 140 129 11 129 11
46 8 5 3 5 3
47 65 60 5 60 5
48 20 10 10 10 10
49 32 20 12 20 12
50 541 520 21 520 21
51 37 0 37 0 37
52 11 0 11 0 11
53 89 35 54 35 54
54 477 182 340 182 340
56 144 54 90 54 90
57 69 28 41 28 41
58 294 98 196 98 196
59 193 59 134 59 134
60 4 0 4 0 4
61 114 46 68 46 68
62 61 24 37 24 37
63 57 27 30 27 30
64 220 89 131 89 131
65 165 63 102 63 102
127
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
6. Name Of Block- Moth
128
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
6. Name Of Block- Moth
129
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
6. Name Of Block- Moth
108 126 53 73 53 73
109 3804 1397 73 1397 73
110 345 95 25 95 25
111 289 32 62 32 62
112 515 127 388 127 388
113
283 29 254 29 254
114 152 15 137 15 137
115 122 46 16 46 16
116 217 56 161 56 161
117 72 26 46 26 46
118 74 27 47 27 47
119 229 110 119 110 119
120 163 63 100 63 100
121 365 136 229 136 229
122 1030 491 539 491 539
123 268 87 181 87 181
124 - - - - -
125 340 106 234 106 234
126 - - - - -
127 - - - - -
128 - - - - -
130
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
6. Name Of Block- Moth
129 - - - - -
130 - - - - -
131 - - - - -
132 - - - - -
133 - - - - -
134 - - - - -
135 - - - - -
136 - -- - -- -
137 - - - - -
138 --- - - - -
139 - - - - -
140 - - - - -
141 - - - - -
142 - - - - -
143 - - - - -
144 - - - - -
145 - - - - -
146 - - -- - --
147 - - - - -
148 - - - - -
149 - - - - -
150 - - - - -
131
District Irrigation Plan of Jhansi
151 - - -
152 52 22 30 22 30
153 268 89 179 89 179
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
7. Name Of Block- Baragaon
132
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
8. Name Of Block- Baragaon
133
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
9. Name Of Block- Baragaon
134
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
10. Name Of Block- Baragaon
59 - - - - -
60 - - - -
61 308 235 73 235 73
62 583 320 263 320 263
63 160 90 70 90 70
64 315 274 41 274 41
65 804 446 358 446 358
66 508 370 138 370 138
67 510 310 200 310 200
68 720 520 200 520 200
69 200 98 102 98 102
70 300 0 300 0 300
71 738 350 388 350 388
135
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
11. Name Of Block- Chirgaon
1 - 260 - 260 -
2 - 110 - 110 -
3 1 - 1 -
4 20 - 20 -
5 20 - 20 -
6 81 35 46 35 46
7 137 116 21 116 21
8 375 320 55 320 55
9 319 310 9 310 9
10 298 260 38 260 38
11 226 220 6 220 6
12 284 260 24 260 24
13 158 140 18 140 18
14 236 205 31 205 31
15 316 310 6 310 6
16 230 200 30 200 30
17 31 28 3 28 3
18 113 110 3 110 3
19 121 105 16 105 16
20 85 70 15 70 15
136
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
Name Of Block- Chirgaon
21 30 23 7 23 7
22 407 385 22 385 22
23 840 800 40 800 40
24
39 30 9 30 9
25 58 58 0 58 0
26 193 150 43 150 43
27 420 390 30 390 30
28 - - -
29 798 753 45 753 45
30 335 212 123 212 123
31 853 816 37 816 37
32 853 816 37 816 37
33 165 160 5 160 5
34 539 508 31 508 31
35 220 210 10 210 10
36 215 210 5 210 5
37 381 380 1 380 1
38 264 260 4 260 4
39 262 250 12 250 12
40 149 145 4 145 4
41 227 220 7 220 7
137
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
Name Of Block- Chirgaon
42 60 50 10 50 10
43 309 92 217 92 217
44 310 83 227 83 227
45 66 26 40 26 40
46 41 8 33 8 33
47
289 116 173 116 173
48 279 112 167 112 167
49 62 16 46 16 46
50 307 123 184 123 184
51 425 65 360 65 360
52 157 42 115 42 115
53 78 23 55 23 55
54 412 103 309 103 309
55 36 14 22 14 22
56 245 46 199 46 199
57 246 68 178 68 178
58 473 120 353 120 353
59 568 104 464 104 464
60 150 45 105 45 105
61 248 88 160 88 160
138
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
Name Of Block- Chirgaon
139
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
Name Of Block- Bamour
1
258 66 192 66 192
2 248 92 156 92 156
3 100 36 64 36 64
4 22 6 16 6 16
5 - - - - -
6 1 0 1 0 1
7 189 66 123 66 123
8 520 135 385 135 385
9 250 82 168 82 168
10 685 158 527 158 527
11 286 77 209 77 209
12 374 75 299 75 299
13 184 50 134 50 134
14 311 102 209 102 209
15 275 46 229 46 229
16 119 35 84 35 84
17 70 11 59 11 59
18 - - - - -
19 - - - - -
20 513 154 359 154 359
21 107 37 70 37 70
140
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
Name Of Block- Bamour
141
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
Name Of Block- Babina
1 - - - - -
2 - - - - -
3 688 411 277 411 277
4 118 57 61 57 61
5 435 303 132 303 132
6 - - -
7 - - - - -
8
- - - - -
9 110 33 77 33 77
10 24 5 19 5 19
11 22 22 0 22 0
12 54 29 25 29 25
13 - - - -
14 - - - - -
15 2 2 0 2 0
16 159 122 37 122 37
17 32 20 12 20 12
18 69 41 28 41 28
19 41 40 1 40 1
20 44 16 28 16 28
142
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
Name Of Block- Babina
21 20 9 11 9 11
22 16 2 14 2 14
23 59 9 50 9 50
24 90 50 40 50 40
25 70 60 10 60 10
26 76 20 56 20 56
27 50 20 30 20 30
28 800 550 250 550 250
29 570 300 270 300 270
30 435 335 100 335 100
31 681 450 231 450 231
32 43 24 19 24 19
143
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
Name Of Block- Gursarai
144
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
Name Of Block- Gursarai
145
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
Name Of Block- Gursarai
146
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
Name Of Block- Gursarai
61 - - - - -
62 225 27 198 27 198
63 97 0 97 0 97
64 12 0 12 0 12
65 167 55 112 55 112
66 975 429 546 429 546
67 196 32 164 32 164
68 297 66 231 66 231
69 888 301 587 301 587
70 168 68 100 68 100
71 82 16 66 16 66
72 91 17 74 17 74
73 195 28 167 28 167
74 57 0 57 0 57
75 67 44 23 44 23
76 41 0 41 0 41
77 17 0 17 0 17
78 56 44 12 44 12
79 1 0 1 0 1
80 38 3 35 3 35
147
District Irrigation Plan of Jhansi
S.No. Name of Village Information of Canal Command (Ha.) Information on the Other Services Command Total Area
(Ha.)
Total Area Developed Undeveloped Total Area Developed Undeveloped Developed Undeveloped
Area Area Area Area Command Command
1 2 3 4 5 6 7 8 9 10
Name Of Block- Gursarai
148
District Irrigation Plan of Jhansi
No
3 0 2 0 4 4 9 0 34 0 0 2 0 36 472 5 58 513
Command
Area (ha) 3456 0 443 0 457 0 432 0 2345 0 0 145 0 164 1876 117 7278 2157
No
3 0 2 0 3 2 9 0 48 0 0 4 0 24 880 0 71 904
Command
Area (ha) 1876 0 543 0 768 45 124 0 1765 0 0 623 0 505 3456 0 5744 3961
No
4 0 6 0 2 8 18 0 26 0 6 8 0 48 768 7 78 823
Command
Area (ha) 12460 0 118 0 54 64 958 0 1868 0 435 265 0 234 2560 233 16222 3027
149
District Irrigation Plan of Jhansi
No
3 0 2 0 0 6 35 0 56 5 10 8 0 56 668 5 125 729
Command
Area (ha) 31917 0 175 0 0 456 870 0 3260 26 340 680 0 1250 2168 117 37724 3535
No
5 0 3 0 8 4 18 0 88 0 0 8 0 48 367 10 134 425
Command
Area (ha) 7560 0 76 0 125 0 156 0 1560 0 0 340 0 360 1806 165 9817 2331
No
2 0 4 0 1 4 12 0 122 0 0 10 0 36 472 5 155 513
Command
Area (ha) 4560 0 370 0 78 0 266 0 2540 0 0 3540 0 164 1876 117 11354 2157
150
District Irrigation Plan of Jhansi
No
2 0 0 0 5 3 18 0 92 0 0 5 0 23 211 0 125 234
Command
Area (ha) 1240 0 0 0 156 0 115 0 1170 0 0 120 0 260 580 0 2801 840
No
2 0 4 0 2 2 8 0 109 0 0 10 0 31 96 5 137 132
Command
Area (ha) 1430 0 60 0 36 12 70 0 1230 0 0 250 0 170 980 117 3088 1267
151
District Irrigation Plan of Jhansi
Chapter-IV
Water Requirement / Demand
The domestic water demand for human population for the district is 0.06510034 BCM and block wise crop water requirement is calculated
on the basis of some assumption, while, block wise present water demand for crops are Chirgaon (0.1296821), Baragaon (0.06891395),
Babina (0.07256298), Moth (0.39023395), Bangra (0.1153827), Mauranipur (0.1081328), Bamaur (0.0152992) and Gursarai (0.02214255
BCM), total for the crops in the 2015 is 0.92235023 BCM. Livestock present water demand is 0.028774552, industrial 0.1592765, power
generation 0.026 total for district it is 1.201501612 BCM. It will increase upto 1.436124169 BCM in the year 2020. Block wise extra water
potential to be created in Chirgaon, baragaon, Babina, Moth, Bangra, Mauranipur, Bamaur and Gursarai is 0.14978535, 0.11968398,
0.10596518, 0.4679704, 0.12009272, 0.11373314, 0.11128312 and 0.12282372 BCM respectively. Water partitioning differed from year to
year depending on rainfall amount and its distribution. In general, groundwater recharge increased with increasing rainfall amount. Impact
of integrated irrigation management work and watershed development interventions on groundwater recharge was observed positive but
152
District Irrigation Plan of Jhansi
Blocks Population in 2015 Projected population in 2020 Gross Water Demand (BCM)
153
District Irrigation Plan of Jhansi
154
District Irrigation Plan of Jhansi
Block Crops Area Sown Irrigated Area Crop Water Water potential Existing Water Water
(ha) (ha) demand (mm) required (BCM) potential potential to be
(BCM) created (BCM)
Rabi
Cereals Wheat 16780 11450 760 0.08702
Durum Wheat 1140 0
Barley 650 750 680 0.0051
Oat 880 360 650 0.00234
Total 19450 12560
Coarse Cereals Nil 0 0
Pulses Field Pea 11540 2890 325 0.0093925
Lentil 5250 120 320 0.000384
Chickpea 5650 670 310 0.002077
Total 22440 3680
Oilseeds Rai/Mustard 4870 1430 680 0.009724
Linseed 1070 0
Toriya 450 430 560 0.002408
Total 6390 1860
Fodder Berseem 214 340 870 0.002958
Oat 126 60 760 0.000456
Barley 175 50 740 0.00037
Total 515 450
Vegetables All
156 156 870 0.0013572
0.090779* 0.14978535*
G. Total 48951 18706 0.1296821
Note: * Denoted the annual existing water potential and water potential to be created
155
District Irrigation Plan of Jhansi
Block Crops Area Sown (ha) Irrigated Area Crop Water Water potential Existing Water Water potential
(ha) demand (mm) required potential (BCM) to be created
(BCM) (BCM)
2. Baragaon Kharif
Cereals Paddy 1211 973 1045 0.01016785
Total 1211 973
Coarse Cereals Sorghum 760 0
Bajra 165 0
Maize 505 0
Total 1430 0
Pulses Moong 4870 8 360 0.0000288
Urd 7630 24 340 0.0000816
Arhar 78 0
Total 12578 32
Oilseeds Til 5480 6 305 0.0000183
Groundnut 345 4 650 0.000026
Soybean 733 8 750 0.00006
Total 6558 18
Fodder Sorghum, Bajra 111 86 625
& Gwar
0.0005375
Vegetables All 168 168 680 0.0011424
G. Total 22056 1277 0.073879* 0.11968398*
0.012062
156
District Irrigation Plan of Jhansi
Block Crops Area Sown (ha) Irrigated Area Crop Water Water potential Existing Water Water potential
(ha) demand (mm) required potential (BCM) to be created
(BCM) (BCM)
Rabi
Cereals Wheat 10240 5234 760 0.0397784
Durum Wheat 448 0
Barley 1250 0 680 0
Oat 950 0 650 0
Total 12888 5234
Coarse Cereals Nil 0 0
Pulses Field Pea 7540 2752 325 0.008944
Lentil 4055 71 320 0.0002272
Chickpea 4530 52 310 0.0001612
Total 16125 2875
Oilseeds Rai/Mustard 1850 560 680 0.003808 0.073879 0.11968398
Linseed 10 0
Toriya 560 0 560 0
Total 2420 560
Fodder Berseem 340 234 870 0.0020358
Oat 126 82 760 0.0006232
Barley -92 4 740 0.0000296
Total 374 320
Vegetables All 156 143 870 0.0012441
G. Total 31963 9132 0.06891395 0.073879* 0.11968398*
Note: * Denoted the annual existing water potential and water potential to be created
157
District Irrigation Plan of Jhansi
Block Crops Area Sown (ha) Irrigated Area Crop Water Water potential Existing Water Water potential
(ha) demand (mm) required potential (BCM) to be created
(BCM) (BCM)
3. Babina Kharif
Cereals Paddy 600 450 1045 0.0047025
Total 600 450
Coarse Cereals Sorghum 450 32 754 0.00024128
Bajra 365 12 650 0.000078
Maize 1101 12 775 0.000093
Total 1916 56
Pulses Moong 4876 8 360 0.0000288
Urd 19435 20 340 0.000068
Arhar 77 0
Total 24388 28
Oilseeds Til 10675 12 305 0.0000366
Groundnut 7823 36 650 0.000234
Soybean 0 0 750 0
Total 18498 48
Fodder Sorghum, Bajra 170 110 625
0.0006875
& Gwar
Vegetables All 175 175 680 0.00119
G. Total 45747 867 0.059531* 0.10596518*
158
District Irrigation Plan of Jhansi
Block Crops Area Sown (ha) Irrigated Area Crop Water Water potential Existing Water Water potential
(ha) demand (mm) required potential (BCM) to be created
(BCM) (BCM)
Rabi
Cereals Wheat 14355 5245 760 0.039862
Durum Wheat 91 0
Barley 543 0 680 0
Oat 126 0 650 0
Total 15115 5245
Coarse Cereals Nil 0 0
Pulses Field Pea 9547 1680 325 0.00546
Lentil 10008 0 320 0
Chickpea 14580 0 310 0
Total 34135 1680
0.059531* 0.10596518*
Oilseeds Rai/Mustard 3656 2245 680 0.015266
Linseed 3515 0
Toriya 542 0 560 0
Total 7713 2245
Fodder Berseem 880 286 870 0.0024882
Oat 87 25 760 0.00019
Barley 103 9 740 0.0000666
Total 1070 320
Vegetables All 215 215 870 0.0018705
G. Total 58248 9705 0.07256298 0.059531* 0.10596518*
Note: * Denoted the annual existing water potential and water potential to be created
159
District Irrigation Plan of Jhansi
Block Crops Area Sown (ha) Irrigated Area Crop Water Water Existing Water Water
(ha) demand (mm) potential potential (BCM) potential to be
required created
(BCM) (BCM)
4. Moth Kharif
Cereals Paddy 3606 3456 1045 0.0361152
Total 3606 3456
Coarse Cereals Sorghum 664 80 754 0.0006032
Bajra 465 20 650 0.00013
Maize 851 20 775 0.000155
Total 1980 120
Pulses Moong 5234 4400 360 0.01584
Urd 23480 19950 340 0.06783
Arhar 4 0
Total 28718 24350
Oilseeds Til 3246 1895 305 0.00577975
Groundnut 10 10 650 0.000065
Soybean 1071 562 750 0.004215
Total 4327 2467
Fodder Sorghum, Bajra 1510 1450 625
& Gwar 0.0090625
160
District Irrigation Plan of Jhansi
Block Crops Area Sown (ha) Irrigated Area Crop Water Water Existing Water Water
(ha) demand (mm) potential potential (BCM) potential to be
required created
(BCM) (BCM)
Rabi
Cereals Wheat 25125 20680 760 0.157168
Durum Wheat 0 0
Barley 1856 890 680
0.006052
Oat 132 885 650 0.0057525
Total 27113 22455
Coarse Cereals Nil 0 0
Pulses Field Pea 9547 10560 325 0.03432
Lentil 3040 560 320 0.001792
0.108368* 0.4679704*
Chickpea 9865 2440 310 0.007564
Total 22452 13560
Oilseeds Rai/Mustard 4320 3450 680 0.02346
Linseed 1849 0
Toriya 455 906 560 0.0050736
Total 6624 4356
Fodder Berseem 765 446 870 0.0038802
Oat 65 54 760 0.0004104
Barley 58 48 740 0.0003552
Total 888 548
Vegetables All 340 340 870 0.002958
G. Total 57417 41259 0.39023395 0.108368* 0.4679704*
Note: * Denoted the annual existing water potential and water potential to be created
161
District Irrigation Plan of Jhansi
Block Crops Area Sown (ha) Irrigated Area Crop Water Water potential Existing Water Water potential
(ha) demand (mm) required potential (BCM) to be created
(BCM) (BCM)
5. Bangra Kharif
Cereals Paddy 2289 2243 1045 0.02343935
Total 2289 2243
Coarse Cereals Sorghum 430 0 754 0
Bajra 123 0 650 0
Maize 215 0 775 0
Total 768 0
Pulses Moong 4987 1184 360 0.0042624
Urd 24380 3458 340 0.0117572
Arhar 77 234
Total 29444 4876
Oilseeds Til 7564 1866 305 0.0056913
Groundnut 128 10 650 0.000065
Soybean 78 0 750 0
Total 7770 1876
Fodder Sorghum, Bajra 470 346 625
& Gwar 0.0021625
162
District Irrigation Plan of Jhansi
Block Crops Area Sown (ha) Irrigated Area Crop Water Water potential Existing Water Water potential
(ha) demand (mm) required potential (BCM) to be created
(BCM) (BCM)
Rabi
Cereals Wheat 8965 4133 760 0.0314108
Durum Wheat 453 0
163
District Irrigation Plan of Jhansi
Block Crops Area Sown (ha) Irrigated Area Crop Water Water potential Existing Water Water potential
(ha) demand (mm) required potential (BCM) to be created
(BCM) (BCM)
6. Mauranipur Kharif
Cereals Paddy 1860 1860 1045 0.019437
Total 1860 1860
Coarse Cereals Sorghum 760 0 754 0
Bajra 325 0 650 0
Maize 483 0 775 0
Total 1568 0
Pulses Moong 5360 702 360 0.0025272
Urd 15685 2766 340 0.0094044
Arhar 1073 0
Total 22118 3468
Oilseeds Til 7564 2245 305 0.00684725
Groundnut 165 23 650 0.0001495
Soybean 7 0 750 0
Total 7736 2268
Fodder Sorghum, Bajra 543 456 625
& Gwar 0.00285
164
District Irrigation Plan of Jhansi
Block Crops Area Sown (ha) Irrigated Area Crop Water Water potential Existing Water Water potential
(ha) demand (mm) required potential (BCM) to be created
(BCM) (BCM)
Rabi
Cereals Wheat 6325 3776 760 0.0286976
Durum Wheat 2074 0
165
District Irrigation Plan of Jhansi
Block Crops Area Sown (ha) Irrigated Area Crop Water Water potential Existing Water Water potential
(ha) demand (mm) required potential (BCM) to be created
(BCM) (BCM)
7. Bamaur Kharif
Cereals Paddy 0 0 1045 0
Total 0 0
Coarse Cereals Sorghum 890 0 754 0
Bajra 432 0 650 0
Maize 356 0 775 0
Total 1678 0
Pulses Moong 1896 122 360 0.0004392
Urd 52382 623 340 0.0021182
Arhar 1159 0
Total 55437 745
Oilseeds Til 14698 186 305 0.0005673
Groundnut 50 0 650 0
Soybean 0 0 750 0
Total 14748 186
Fodder Sorghum, Bajra 36 24 625
& Gwar 0.00015
166
District Irrigation Plan of Jhansi
Block Crops Area Sown (ha) Irrigated Area Crop Water Water potential Existing Water Water potential
(ha) demand (mm) required potential (BCM) to be created
(BCM) (BCM)
Rabi
Cereals Wheat 8475 856 760 0.0065056
Durum Wheat 12 0
Barley 8 0 680 0
Oat 6 0 650 0
Total 8501 856
Coarse Cereals Nil 0 0
Pulses Field Pea 7850 392 325 0.001274 0.065848* 0.11128312*
Lentil 11056 413 320 0.0013216
Chickpea 38458 137 310 0.0004247
Total 57364 942
Oilseeds Rai/Mustard 6864 164 680 0.0011152
Linseed 947 0
Toriya 5 0 560 0
Total 7816 164
Fodder Berseem 185 48 870 0.0004176
Oat 12 5 760 0.000038
Barley 11 5 740 0.000037
Total 208 58
Vegetables All 68 68 870 0.0005916
G. Total 73957 2088 0.0152992 0.065848* 0.11128312*
Note: * Denoted the annual existing water potential and water potential to be created
167
District Irrigation Plan of Jhansi
Existing
Water potential
Irrigated Area Crop Water Water potential Water
Block Crops Area Sown (ha) to be created
(ha) demand (mm) required (BCM) potential
(BCM)
(BCM)
8.Gursarai Kharif
Cereals Paddy 94 94 1045 0.0009823
Total 94 94
Coarse Cereals Sorghum 890 0 642.5
Bajra 480 0 446
Maize 316 0 448
Total 1686 0
Pulses Moong 7650 16 360 0.0000576
168
District Irrigation Plan of Jhansi
Existing
Water potential
Irrigated Area Crop Water Water potential Water
Block Crops Area Sown (ha) to be created
(ha) demand (mm) required (BCM) potential
(BCM)
(BCM)
Rabi
Barley 46 0
Oat 66 0
Total 10461 984
Coarse Cereals Nil 0 0
Pulses Field Pea 12340 1230 350 0.004305
Lentil 11654 0 0.082989* 0.12282372*
Chickpea 28460 0
Total 52454 1230
Oilseeds Rai/Mustard 4230 340 745 0.002533
Linseed 1302 0
Toriya 260 20 650 0.00013
Total 5792 360
Fodder Berseem 74 74 950 0.000703
Oat 86 0
Barley 64 0
Total 224 74
Vegetables All 105 105 960 0.001008
0.082989* 0.12282372*
G. Total 69036 2753 0.02214255
Note: * Denoted the annual existing water potential and water potential to be created
169
District Irrigation Plan of Jhansi
Block Total number of Present Water Water Demand in Existing Water Water Potential to be
Livestock Demand (BCM) 2020 (BCM) Potential (BCM) created (BCM)
170
District Irrigation Plan of Jhansi
Block Name of the Industry Present Water Water Demand in 2020 Existing Water Water Potential to be
Demand (BCM) (BCM) Potential (BCM) created (BCM)
1. Baragaon M/S Prem Aata Daliya Nirman Kendra
Flour mills (5) 0.0152992
Oil extraction units (5)
Diamond Cement 0.3977792
Utsav fertilizers (Khaitan chemicals)
Jal Sansthan (Bruasagar) 0.0032
Total 0.018499
2. Babina BHEL, Jhansi 0.0012795
Flour mills (5)
Oil extraction units (5) 0.065 0.033267
Drinking Water fro Matatila
Jalsansthan (Phahunj) 0.0040
Total 0.07028
3. Chirgaon M/S Jhha Flour Mill
M/S Anjali Icecream 0.005101
0.2654548
Oil Expepeller 0.005101
Flour mills
Total 0.010202
4. Moth Rajput Oilmill
M/S Shivshakti Uydyog 0.0112097 0.2914522
Mini Grama Udyog Unit (10)
Total 0.0112097
5. Bangra Khadi Udyog (4)
0.0082572 0.2146872
Oil/Flour units (5)
Total 0.0082572
6. Mauranipur Prem Expeller 0.0052754
Mini Grama Udyog Unit (8)
0.1371604
Ranipur Gramoudhyog (10) units
Jal sansthan (Ranipur) 0.0040
Total 0.009275
171
District Irrigation Plan of Jhansi
Block Name of the Industry Present Water Water Demand in 2020 Existing Water Water Potential to be
Demand (BCM) (BCM) Potential (BCM) created (BCM)
7. Gursarai M/S Shahid Attta Chakki & Other small
Scale Industries 0.0057654
0.1499004
Jal Sansthan fro Barbar Lake 0.0020
Total 0.007765
8. Bamaur Flour mills (4)
Mini Grama Udyog Unit (6) 0.0057836 0.1503736
Oil extraction units (10)
Total 0.0057836
Jhansi Sanjay Flour Mill
Rashkhan Processing Unit
M/S Sapana Products
M/S Bajrang Food Products 0.0178654
M/S Sapana Products 0.4645004
Mini Grama Udyog Unit (25)
Bijolli Industrial Area (34) Major Units
City Showroom/Mall/Small Units
N.C.R. Railway 0.00014
Total 0.018005
G. Total 0.1592765 2.1045752
172
District Irrigation Plan of Jhansi
Block Power Present Water Water Demand in Existing Water Water Potential to be
Requirement Demand (BCM) 2020 (BCM) Potential (BCM) created (BCM)
MW
Baragaon
1. Parichha Power Plant unit I 110 0.002 0.002 0.002 0.002
2. Parichha Power Plant Unit II 110 0.002 0.002 0.002 0.002
3. Parichha Power Plant Unit III 210 0.005 0.005 0.005 0.005
4. Parichha Power Plant Unit IV 210 0.005 0.005 0.005 0.005
5. Parichha Power Plant Unit V 250 0.006 0.006 0.006 0.006
6. Parichha Power Plant Unit VI 250 0.006 0.006 0.006 0.006
Total 1140 0.026 0.026 0.026 0.026
173
District Irrigation Plan of Jhansi
174
District Irrigation Plan of Jhansi
Name of Blocks Existing Water availability Total (BCM) Water Demand (BCM) Water Gap (BCM)
(BCM)
Surface Water Ground Water Present Projected Present Projected
(2020) (2020)
175
District Irrigation Plan of Jhansi
Chapter-V
Strategic Action Plan for Irrigation in District under PMKSY
With recognizing the importance of agriculture water management, irrigation management and watershed development programmes in India was
initiated in 1970s at national scale. The programme is implemented by government of India, state governments departments with involvement of
consortium partners including NGOs in different phases. These programmes was initially designed mainly on engineering aspects such as constructing
masory dam/check dams and measures for protecting soil erosion but village community was not directly involved in planning and implementation
process. Therefore the programme initially did not benefit to the farming community as it was expectd (Gol, 1994). The main aim of recently revised
integrated watershed management programme (IWMP) is to enhance rural livelihood and wellbeing, building ecosystem services, recognizing the value
of well managed water and land resources. Now this IWMP, MGNREGA, Irrigation, Minor Irrigation, Agriculture, Horticulture and other water related
departments are merged with PMKSY for over all development of agriculture. Agricultural systems especially rainfed agriculture in semi-arid tropics are
highly vulnerable to various types of climatic shocks and socio-economic pressures. Upcoming challenges such as climate change which is characterized
with high frequency of occurrence of extreme events such as heavy downpour, longer duration dry spells, shifting length of growing period and
temperature stress, are being recognized in district as well as many part of India (Agrawal, 2008, Boomiraj et al., 2010). In such condition, District
Irrigation Plan (DIP) under PMKSY with integrated watershed interventions leverage and strengthen desirable development by improving capacity to
cope with inherent dryspells and reducing their negative impacts on crop yields and sunsequently livelihoods of people. To achieve the goals of DIP
strategic action pan for five years is prepared with help of all water related departments of district Jhansi. The aim is to prove the impact of DIP under
PMKSY interventions on 1) surface and groundwater hydrology 2) crop yields, income from crops water productivity and 3) soil loss and sediment
transport. This DIP focuses on water balance componenets and quantifies several ecosystem services generated or maintained in different intervention
which proposed in this DIP for dry and normal years. With help of different departments covering all the componenets of DIP like AIBP, water for
every field, per drop more crop (Micro Irrigation + Supplemetary water management activities), Watershed development, convergence with
MGNREGA, state planned schemes of irrigation, NABARD loan projects, solar pumps for irrigation and canal, dams, reservoir and bundhies repairing
and renovation, total activities planned for district presented in this chapter. Total outlay of plan is Rs 383637.03 lacs for five years.
176
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated Cost
the Blocks Ministry/ Capacity Area / Implementation (Rs.in lacs)
Department (cum) Irrigation (5/7 yrs)
Potential (ha)
I Baragaon
1 MoWR AIBP Major Irrigation
2 MoWR Minor Irrigation (Blast
Well) 625 1300 5 yr 3254.38
3 MoWR Surface Minor Irrigation
Total 3254.38
4 MoWR Har khet ko pani Lift Irrigation 625 260 5 yr 459.38
5 MoWR Ground Water
Development 20 120 5 yr 813.75
(Checkdam)
6 MoWR RRR of Water Bodies 4 564 5 yr 254.00
MoWR RRR of Baragaon Pump
Canal 1 4543 5 yr 8135.04
Total 9662.17
7 MoWR Construction of Field Channels
7.1 MoWR Lined Field Channels 6003 5 2012.75
7.2 MoWR Unlined Channels 6003 5 160.34
8 MoWR Micro Irrigation 667 5 333.5
Total 2506.59
9 MOA & FWDAC Per drop more DPAP Drip
& FW crop (Micro (Orchard&Vegetables) 1250 1250 475
Irrigation) 5 yr
177
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated Cost
the Blocks Ministry/ Capacity Area / Implementation (Rs.in lacs)
Department (cum) Irrigation (5/7 yrs)
Potential (ha)
I Baragaon
11 MOA & FWDAC Non DPAP Drip
& FW 1500 1500 5 yr 570
12 MOA & FWDAC Non DPAP Sprinkler
& FW 1560 1560 5 yr 374.4
Total 4480.9
13 MOA & FWDAC Per drop more Topping up of
& FW crop MGNREGA 580 3450 5 414.00
14 MOA & FWDAC (Supplementary Drought Proofing
& FW water through check dams/
management Water Harvesting 12 654 5 144.00
activities) Structures
15 Secondary Storage
Structures - - - 0
16 On Farm Development
(Distribution of pipe/
raised bed and furrow 2500 5000 5 300
systems etc.)
Total 858.00
17 DoLR-MoRD PMKSY Newly Created WHS
17.1 DoLR-MoRD Watershed Farm Ponds
178
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated Cost
the Blocks Ministry/ Capacity Area / Implementation (Rs.in lacs)
Department (cum) Irrigation (5/7 yrs)
Potential (ha)
I Baragaon
17.4 DoLR-MoRD Percolation Tanks
17.5 DoLR-MoRD Other Ground Water
Recharge Structures 1322.0382 5 158.65
179
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated Cost
the Blocks Ministry/ Capacity Area / Implementation (Rs.in lacs)
Department (cum) Irrigation (5/7 yrs)
Potential (ha)
I Baragaon
19.3 DoLR-MoRD Creation of Irrigation
canals and Drains 150 501.66 5 yr 99.69
19.4 DoLR-MoRD Providing Infrastructure
for Irrigation 238 102.6 5 yr 638.19
19.5 DoLR-MoRD Land development 2819 1014.59 5 yr 2107.94
Total 3701.5
20 DoLR-MoRD Renovation
20.1 DoLR-MoRD Renovation of water
bodies including 67 62.3 5 yr 124.34
desilting
20.2 DoLR-MoRD Renovation &
Maintenance of
21.25 63.75 km 5 yr 20.73
Irrigation Canals &
Drains
Total 145.07
21 State Planned Scheme of Irrigation
21.1 Irrigation and AIBP Major Irrigation
Water Resource (Modernization under
Deparatement UP RRR of Baragaon Pump 1 1000 5 yr 865.71
(IWRDUP) Canal)
180
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated Cost
the Blocks Ministry/ Capacity Area / Implementation (Rs.in lacs)
Department (cum) Irrigation (5/7 yrs)
Potential (ha)
I Baragaon
22 Irrigation Scheme Name of the
of State Scheme
0.00
Agriculture
Department
23 Irrigation Scheme
of other Line
Department of 0.00
State Govt.
Total 1120.21
24 Externally aided Name of
projects Scheme
25 Other loan Name of
projects like Scheme 0
NABARD
26 Establishment of solar pump for 3 HP @ Rs 439000/ set
irrigation under non conventional (25% Farmers share) 75 500 246.9375
energy management scheme
5 yr
5 HP @ Rs 531200 set
(50% Farmers share) 25 250 66.4
Total 313.34
G. Total 27175.35
181
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated Cost
the Ministry/ Capacity (cum) Area / Implementation (Rs. in lacs)
Blocks Department Irrigation (5/7 yrs)
Potential (ha)
II Babina
1 MoWR AIBP Major Irrigation 0
2 MoWR Minor Irrigation (Blast
Well) 625 1300 5 yr 3254.38
Total 3254.38
4 MoWR Har khet ko pani Lift Irrigation 625 260 5 yr 459.38
5 MoWR Ground Water
Development 20 120 5 yr 813.75
(Checkdam)
Total 1527.13
182
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated Cost
the Ministry/ Capacity (cum) Area / Implementation (Rs. in lacs)
Blocks Department Irrigation (5/7 yrs)
Potential (ha)
10 MOA & DPAP Sprinkler
FWDAC & FW 2600 2600 5 yr 624
Total 4480.9
13 MOA & Per drop more Topping up of
FWDAC & FW crop MGNREGA 540 3200 5 384.00
(Supplementary
14 MOA & Drought Proofing
water
FWDAC & FW through check dams/
management 18 2450 5 261.00
Water Harvesting
activities)
Structures
15 Secondary Storage
Structures 0.00
16 On Farm
Development
(Distribution of pipe/ 2600 5200 5 312.00
raised bed and furrow
systems etc.)
Total 957.00
17 DoLR-MoRD Newly Created WHS
17.1 DoLR-MoRD PMKSY Farm Ponds
Watershed 0
17.2 DoLR-MoRD Check Dams
2113.965 5 253.68
183
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated Cost
the Ministry/ Capacity (cum) Area / Implementation (Rs. in lacs)
Blocks Department Irrigation (5/7 yrs)
Potential (ha)
II Babina
17.3 DoLR-MoRD Nallah Bunds
1644.195 5 197.3
17.4 DoLR-MoRD Percolation Tanks 0
17.5 DoLR-MoRD Other Ground Water
Recharge Structures 939.54 5 112.75
Total 563.73
18 DoLR-MoRD Renovated WHS
18.1 Farm Ponds 0
18.2 DoLR-MoRD Check Dams
905.985 5 108.72
Total 241.63
184
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated Cost
the Ministry/ Capacity (cum) Area / Implementation (Rs. in lacs)
Blocks Department Irrigation (5/7 yrs)
Potential (ha)
II Babina
19 DoLR-MoRD Newly Created
19.1 DoLR-MoRD Convergence Water conservation
with 2348.85 293.61
MGNREGA Water conservation 500.63 3044 5 yr 332
19.2 DoLR-MoRD Water Harvesting 40 44.79 5 yr 110.54
19.3 DoLR-MoRD Creation of Irrigation
canals and Drains 150 501.66 5 yr 99.69
Total 145.07
185
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated Cost
the Ministry/ Capacity (cum) Area / Implementation (Rs. in lacs)
Blocks Department Irrigation (5/7 yrs)
Potential (ha)
II Babina
21 State Planned Scheme of Irrigation
21.1 State Irrigation Name of the Major Irrigation
Department Scheme 1
Project for Providing irrigation facilities in
15 villages of Babina block (Under RIDF) 5% State share 4400 3 yr. 1180.19
186
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated Cost
the Ministry/ Capacity (cum) Area / Implementation (Rs. in lacs)
Blocks Department Irrigation (5/7 yrs)
Potential (ha)
II Babina
26 Establishment of solar pump for 3 HP @ Rs 439000/
irrigation under non conventional set (25% Farmer's 75 500 5 yr 246.9375
energy management scheme share)
5 HP @ Rs 531200/
set (50% Farmer's 25 250 66.4
share)
Total 313.34
G. Total 38923.42
187
District Irrigation Plan of Jhansi
S. No. Name of the Concerned Component Activity Total Number/ Command Period of Estimated Cost
Blocks Ministry/ Capacity (cum) Area / Implementation (Rs. in lacs)
Department Irrigation (5/7 yrs)
Potential (ha)
III Chirgaon
1 MoWR AIBP Major Irrigation (Lift
Canal including 114 cusec 8361 - 275.49
Baragaon Block)
188
District Irrigation Plan of Jhansi
S. No. Name of the Concerned Component Activity Total Number/ Command Period of Estimated Cost
Blocks Ministry/ Capacity (cum) Area / Implementation (Rs. in lacs)
Department Irrigation (5/7 yrs)
Potential (ha)
III Chirgaon
MoWR RRR of Bharatpura
pump Canal 1 607 5 yr 1470.26
Total 17574.74
7 MoWR Construction of Field Channels
7.1 MoWR Lined Field Channels 22461.3 5 yr 7531.05
7.2 MoWR Unlined Channels 22461.3 5 yr 599.94
8 MoWR Micro Irrigation 2495.7 5 yr 1247.85
Per drop more Total 9378.84
9 MOA & crop (Micro DPAP Drip 1250 1250 5 yr 475
FWDAC & FW Irrigation) (Orchard&Vegetables) 3125 3125 2437.5
189
District Irrigation Plan of Jhansi
S. No. Name of the Concerned Component Activity Total Number/ Command Period of Estimated Cost
Blocks Ministry/ Capacity (cum) Area / Implementation (Rs. in lacs)
Department Irrigation (5/7 yrs)
Potential (ha)
III Chirgaon
13 MOA & Per drop more Topping up of
FWDAC & FW crop MGNREGA 760 4800 5 576.00
(Supplementary
14 MOA & Drought Proofing
water
FWDAC & FW through check dams/
management 24 3240 5 348.00
Water Harvesting
activities)
Structures
15 Secondary Storage
Structures 0.00
16 On Farm
Development
(Distribution of pipe/ 2750 5860 5 351.60
raised bed and furrow
systems etc.)
Total 1275.60
17 DoLR-MoRD
Newly Created WHS
17.1 DoLR-MoRD PMKSY Farm Ponds
Watershed
17.2 DoLR-MoRD Check Dams
3638.73825 5 436.65
190
District Irrigation Plan of Jhansi
S. No. Name of the Concerned Component Activity Total Number/ Command Period of Estimated Cost
Blocks Ministry/ Capacity (cum) Area / Implementation (Rs. in lacs)
Department Irrigation (5/7 yrs)
Potential (ha)
III Chirgaon
17.6 DoLR-MoRD Fishery ponds/ Cattle
pond
Total 970.34
18 DoLR-MoRD Renovated WHS
18.1 Farm Ponds
18.2 DoLR-MoRD Check Dams
1559.45925 5 187.12
18.3 DoLR-MoRD Nallah Bunds
1212.91275 5 145.55
18.4 DoLR-MoRD Percolation Tanks
18.5 DoLR-MoRD Other Ground Water
Recharge Structures 693.093 5 83.17
191
District Irrigation Plan of Jhansi
S. No. Name of the Concerned Component Activity Total Number/ Command Period of Estimated Cost
Blocks Ministry/ Capacity (cum) Area / Implementation (Rs. in lacs)
Department Irrigation (5/7 yrs)
Potential (ha)
III Chirgaon
19.4 DoLR-MoRD Providing
Infrastructure for 238 102.6 5 yr 638.19
Irrigation
19.5 DoLR-MoRD Land development 2819 1014.59 5 yr 2107.94
Total 3793.74
20 DoLR-MoRD Renovation
20.1 DoLR-MoRD Renovation of water
bodies including 67 62.3 5 yr 124.34
desilting
20.2 DoLR-MoRD Renovation &
Maintenance of
Irrigation Canals & 21.25 63.75 km 5 yr 20.73
Drains
Total 145.07
21 State Planned Scheme of Irrigation
21.1 State Irrigation Name of the Major Irrigation
Department Scheme
21.2 State Irrigation Name of the Medium Irrigation 150 560 5 yr 254.5
Department Scheme
(Deep & Medium
boring)
21.3 Irrigation and Name of the Surface Minor
Water Resource Scheme Irrigation
Deppartement,
Uttar Pradesh
(I.W.R.D.U.P.)
192
District Irrigation Plan of Jhansi
S. No. Name of the Concerned Component Activity Total Number/ Command Period of Estimated Cost
Blocks Ministry/ Capacity (cum) Area / Implementation (Rs. in lacs)
Department Irrigation (5/7 yrs)
Potential (ha)
III Chirgaon
22 Irrigation Har khet ko Constraction of Girari 1 700 5 yr
Scheme of State pani Pump Canal under
4037.71
Agriculture Lift Irrgation
Department
23 Irrigation
Scheme of other
Line Department
of State Govt.
Total 4292.21
24 Externally aided Name of
projects Scheme
25 Other loan Name of
projects like Scheme
NABARD
26 Establishment of solar pump for irrigation under non 3 HP @ Rs 439000/
conventional energy management scheme set (25% Farmer's 75 500 5 yr 246.9375
share)
5 HP @ Rs 531200/
set (50% Farmer's 25 250 66.4
share)
Total 313.34
G. Total 46170.49
193
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated
the Blocks Ministry/ Capacity Area / Implementation Cost (Rs. in
Department (cum) Irrigation (5/7 yrs) lacs)
Potential (ha)
IV Moth
1 MoWR AIBP Major Irrigation
2 MoWR Minor Irrigation (Blast
Well) 625 1300 5 yr 3254.38
3 MoWR Surface Minor
- - - -
Irrigation
Total 3254.38
4 MoWR Har khet ko pani Lift Irrigation 625 260 5 yr 459.38
Constraction of
Dhikauli Pump Canal 1 750 5 yr 4455.00
under Lift Irrgation
Constraction of Genga
Kabula Pump Canal 1 500 5 yr 3897.85
under Lift Irrgation
5 MoWR Ground Water
Development 20 120 5 yr 813.75
(Checkdam)
6 MoWR RRR of Water Bodies 4 564 5 yr 254
Total 9879.98
7 MoWR Construction of Field Channels
7.1 MoWR Lined Field Channels 13146.3 4407.82
7.2 MoWR Unlined Channels 13146.3 351.14
8 MoWR Micro Irrigation 1460.7 730.35
Total 5489.31
194
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated
the Blocks Ministry/ Capacity Area / Implementation Cost (Rs. in
Department (cum) Irrigation (5/7 yrs) lacs)
Potential (ha)
IV Moth
9 MOA & Per drop more crop DPAP Drip
FWDAC & FW (Micro Irrigation) (Orchard&Vegetables) 1250 1250 475.00
5 yr
Total 4480.90
13 MOA & Per drop more crop Topping up of
FWDAC & FW (Supplementary water MGNREGA 560 3600 5 432.00
14 MOA & management Drought Proofing
FWDAC & FW activities) through check dams/
Water Harvesting 8 1860 5 150.40
Structures
15 Secondary Storage
Structures
16 On Farm Development
(Distribution of pipe/
raised bed and furrow 2400 4800 5 144.00
systems etc.)
Total 726.40
195
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated
the Blocks Ministry/ Capacity Area / Implementation Cost (Rs. in
Department (cum) Irrigation (5/7 yrs) lacs)
Potential (ha)
IV Moth
17 DoLR-MoRD PMKSY Watershed Newly Created WHS
17.1 DoLR-MoRD Farm Ponds
196
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated
the Blocks Ministry/ Capacity Area / Implementation Cost (Rs. in
Department (cum) Irrigation (5/7 yrs) lacs)
Potential (ha)
IV Moth
19 DoLR-MoRD Newly Created
19.1 DoLR-MoRD Convergence with Water conservation
MGNREGA 983.5 5 yr 122.94
Water conservation 500.63 3044 5 yr 332
19.2 DoLR-MoRD Water Harvesting 40 44.79 5 yr 110.54
19.3 DoLR-MoRD Creation of Irrigation
canals and Drains 150 501.66 5 yr 99.69
19.4 DoLR-MoRD Providing
Infrastructure for 238 102.6 5 yr 638.19
Irrigation
19.5 DoLR-MoRD Land development 2819 1014.59 5 yr 2107.94
Total 3411.3
20 DoLR-MoRD Renovation
20.1 DoLR-MoRD Renovation of water 67 62.3 5 yr 124.34
bodies including
desilting
197
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated
the Blocks Ministry/ Capacity Area / Implementation Cost (Rs. in
Department (cum) Irrigation (5/7 yrs) lacs)
Potential (ha)
IV Moth
21 State Planned Scheme of Irrigation
21.1 State Irrigation Name of the Scheme Major Irrigation
Department
21.2 State Irrigation Name of the Scheme Medium Irrigation
Department (Deep & Medium 150 560 5 yr 254.5
boring)
21.3 State Irrigation Name of the Scheme Surface Minor
Department Irrigation
22 Irrigation Name of the Scheme
Scheme of State
Agriculture
Department
23 Irrigation
Scheme of other
Line
Department of
State Govt.
24 Externally aided Name of Scheme
projects
25 Other loan Name of Scheme
projects like
NABARD
Total 254.5
26 Establishment of solar pump for irrigation 3 HP @ Rs 352800/ set 50 500 5 yr 176.4
under non conventional energy 5 HP @ Rs 668400/ set
management scheme 25 250 167.1
Total 343.5
G. Total 28322.54
198
District Irrigation Plan of Jhansi
Total 3254.38
4 MoWR Har khet ko pani Lift Irrigation 625 260 5 yr 459.38
5 MoWR Ground Water
Development 20 120 5 yr 813.75
(Checkdam)
6 MoWR RRR of Water Bodies
4 564 5 yr 254
Total 1527.13
7 MoWR Construction of Field Channels
7.1 MoWR Lined Field Channels 7090.2 2377.27
7.2 MoWR Unlined Channels 7090.2 189.38
8 MoWR Micro Irrigation 787.8 393.9
Total 2960.55
9 MOA & DPAP Drip 1250 1250 475
Per drop more
FWDAC & (Orchard&Vegetables) 3125 3125 5 yr 2437.5
crop (Micro
FW
Irrigation)
199
District Irrigation Plan of Jhansi
200
District Irrigation Plan of Jhansi
201
District Irrigation Plan of Jhansi
202
District Irrigation Plan of Jhansi
203
District Irrigation Plan of Jhansi
Total 343.5
G. Total 21642.53
204
District Irrigation Plan of Jhansi
Total 1527.13
7 MoWR Construction of Field Channels
7.1 MoWR Lined Field Channels
15023.7 5 5037.3
7.2 MoWR Unlined Channels 15023.7 5 401.28
8 MoWR Micro Irrigation 1669.3 5 834.65
Total 6273.23
205
District Irrigation Plan of Jhansi
Total 4480.9
13 MOA & Per drop more Topping up of
FWDAC & FW crop MGNREGA 540 5460 5 655.2
14 MOA & (Supplementary Drought Proofing
FWDAC & FW water through check dams/
management 22 4680 5 281.6
Water Harvesting
activities) Structures
15 Secondary Storage
Structures 0
16 On Farm
Development
(Distribution of pipe/ 2400 5460 5 327.6
raised bed and furrow
systems etc.)
Total 1264.4
206
District Irrigation Plan of Jhansi
207
District Irrigation Plan of Jhansi
208
District Irrigation Plan of Jhansi
S. Name of the Concerned Component Activity Total Number/ Command Period of Estimated
No. Blocks Ministry/ Capacity Area / Implementation Cost (Rs.
Department (cum) Irrigation (5/7 yrs) in lacs)
Potential (ha)
VI Mauranipur
24 Externally aided Name of
projects Scheme
25 Other loan Name of Major Irrigation - 95% NABARD 46485 3 yr 34178.57
projects like Scheme Revised Project of Share
NABARD Modernisation of
Pahari Dam
Total Revised Project of Modernisation of Pahari Dam 35977.44
26 Establishment of solar 3 HP @ Rs 352800/ set
pump for irrigation under 50 500 176.4
non conventional energy 5 yr
management scheme 5 HP @ Rs 668400/ set
25 250 167.1
Total 343.5
G. Total 64063.86
210
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated
the Blocks Ministry/ Capacity (cum) Area / Implementation Cost (Rs. in
Department Irrigation (5/7 yrs) lacs)
Potential (ha)
VII Gursarai
1 MoWR AIBP Major Irrigation
2 MoWR Minor Irrigation
(Blast Well) 625 1300 5 yr 3254.38
3 MoWR Surface Minor
- - - 0
Irrigation
Total 3254.38
4 MoWR Har khet ko Lift Irrigation 625 260 5 yr 459.38
5 MoWR pani Ground Water
Development 20 120 5 yr 813.75
(Checkdam)
6 MoWR RRR of Water Bodies 4 564 5 yr 254
Total 1527.13
7 MoWR Construction of Field Channels
7.1 MoWR Lined Field Channels 5 yr
27148.8 9101.72
7.2 MoWR Unlined Channels 27148.8 5 yr 725.06
8 MoWR Micro Irrigation 3016.2 5 yr 1508.1
Total 11334.88
211
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated
the Blocks Ministry/ Capacity (cum) Area / Implementation Cost (Rs. in
Department Irrigation (5/7 yrs) lacs)
Potential (ha)
VII Gursarai
9 MOA & Per drop more DPAP Drip 1250 1250 475
FWDAC & crop (Micro (Orchard&Vegetables) 5 yr
FW Irrigation) 3125 3125 2437.5
10 MOA & DPAP Sprinkler
FWDAC & 2600 2600 5 yr 624
FW
11 MOA & Non DPAP Drip
FWDAC & 1500 1500 5 yr 570
FW
12 MOA & Non DPAP Sprinkler
FWDAC & 1560 1560 5 yr 374.4
FW
Total 4480.9
13 MOA & Per drop more Topping up of
FWDAC & crop MGNREGA 540 4580 5 549.6
FW (Supplementary
14 MOA & water Drought Proofing
FWDAC & management through check dams/
34 4650 5 435.2
FW activities) Water Harvesting
Structures
15 Secondary Storage
Structures 0
212
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated
the Blocks Ministry/ Capacity (cum) Area / Implementation Cost (Rs. in
Department Irrigation (5/7 yrs) lacs)
Potential (ha)
VII Gursarai
16 On Farm
Development
(Distribution of pipe/ 2400 3460 5 207.6
raised bed and furrow
systems etc.)
Total 1192.4
17 DoLR-MoRD Newly Created WHS
17.1 DoLR-MoRD PMKSY Farm Ponds
Watershed
17.2 DoLR-MoRD Check Dams
9277.38 5 1113.29
213
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated
the Blocks Ministry/ Capacity (cum) Area / Implementation Cost (Rs. in
Department Irrigation (5/7 yrs) lacs)
Potential (ha)
VII Gursarai
18 DoLR-MoRD Renovated WHS
18.1 Farm Ponds
18.2 DoLR-MoRD Check Dams
3976.02 5 477.12
214
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated
the Blocks Ministry/ Capacity (cum) Area / Implementation Cost (Rs. in
Department Irrigation (5/7 yrs) lacs)
Potential (ha)
VII Gursarai
19.4 DoLR-MoRD Providing
Infrastructure for 238 102.6 5 yr 638.19
Irrigation
19.5 DoLR-MoRD Land development 2819 1014.59 5 yr 2107.94
Total 4576.89
20 DoLR-MoRD Renovation
20.1 DoLR-MoRD Renovation of water
bodies including 67 62.3 5 yr 124.34
desilting
20.2 DoLR-MoRD Renovation &
Maintenance of
21.25 63.75 km 5 yr 20.73
Irrigation Canals &
Drains
Total 145.07
21 State Planned Scheme of Irrigation
21.1 State Irrigation Name of the Major Irrigation
Department Scheme
21.2 State Irrigation Name of the Medium Irrigation 150 560 5 yr 254.5
Department Scheme
(Deep & Medium
boring)
21.3 State Irrigation Name of the Surface Minor
Department Scheme Irrigation
215
District Irrigation Plan of Jhansi
S. No. Name of Concerned Component Activity Total Number/ Command Period of Estimated
the Blocks Ministry/ Capacity (cum) Area / Implementation Cost (Rs. in
Department Irrigation (5/7 yrs) lacs)
Potential (ha)
VII Gursarai
22 Irrigation Name of the
Scheme of Scheme
State
Agriculture
Department
23 Irrigation
Scheme of
other Line
Department of
State Govt.
Total 254.5
24 Externally Name of
aided projects Scheme
25 Other loan Name of
projects like Scheme
NABARD
26 Establishment of solar pump for 3 HP @ Rs 352800/ set 50 500 5 yr 176.4
irrigation under non conventional
energy management scheme 5 HP @ Rs 668400/ set 25 250 167.1
Total 343.5
G. Total 30643.89
216
District Irrigation Plan of Jhansi
217
District Irrigation Plan of Jhansi
218
District Irrigation Plan of Jhansi
16 On Farm
Development
(Distribution of pipe/ 2400 3860 5 231.6
raised bed and furrow
systems etc.)
Total 1241.6
17 DoLR-MoRD Newly Created WHS
17.1 DoLR-MoRD PMKSY Farm Ponds
Watershed
17.2 DoLR-MoRD Check Dams
9264.59415 1111.75
219
District Irrigation Plan of Jhansi
220
District Irrigation Plan of Jhansi
221
District Irrigation Plan of Jhansi
222
District Irrigation Plan of Jhansi
223
District Irrigation Plan of Jhansi
Renovation & Repairing of Canals, Reservoirs, Jal Sanchay Bundhies & Ponds of District Jhansi under PMKSY
Department of Irrigation and Water Resource, Jhansi Division, Betwa Nahar, Jhansi
224
District Irrigation Plan of Jhansi
Total (2) 12168.76 1527.13 26953.58 15369.29 4487.68 7800.36 12862.01 2929.61 84098.42
Per drop more crop (Micro
Irrigation) 4480.90 4480.90 4480.90 4480.90 4480.90 4480.90 4480.90 4480.90 35847.20
New WHS 793.23 563.73 970.34 236.04 2171.40 2798.84 2473.97 2470.56 12478.11
Rennovated WHS 339.96 241.63 415.84 101.16 930.60 1199.51 1060.27 1058.80 5347.77
Total (5) 1133.19 805.36 1386.18 337.20 3102.00 3998.35 3534.24 3529.36 17825.88
Convergence with
MGNREGA
New 3701.50 3581.97 3793.74 3411.30 4419.30 4746.09 4576.89 4575.11 32805.90
Rennovation 145.07 145.07 145.07 145.07 145.07 145.07 145.07 145.07 1160.56
225
District Irrigation Plan of Jhansi
Total (6) 3846.57 3727.04 3938.81 3556.37 4564.37 4891.16 4721.96 4720.18 33966.46
State Planned Scheme of 1120.21 1434.69 4292.21 254.50 254.50 2053.37 254.50 3060.19 12724.17
Irrigation
NABARD Loan Projects 0.00 22423.58 0.00 0.00 0.00 35977.44 0.00 58143.55 116544.57
Establishment of solar pump
for irrigation under non
313.34 313.34 313.34 343.50 343.50 343.50 343.50 343.50 2657.51
conventional energy
management schem
Canal, Dams, Bundhies and 44737.18
Ponds Repairing
G Total 27175.35 38923.42 46170.49 28322.54 21642.53 64063.86 30643.89 81957.77 383637.03
226
District Irrigation Plan of Jhansi
References
Agrawal, P.K., 2008. Global climate change and Indian agriculture impacts. Adaption and mitigation. IndianJ. Sci. 78. 911-919.
Central Water Commission, 2005, Ministry of Water Resources, Govt. Of India, Hand Book of Water Resources statistics. 2005.
Government of India, 2008. Common guidelines for watershed development projects. Deptt. of Land Resources, Ministry of Rural Development, Govt.
NAAS, 2009. State of Indian Agriculture. National Academy of Agriculture Sciences. New Delhi.
NRCAF, 2009. Garhkundar-Dabar Watershed Project A successful model for Bundelkhand region. Technical Bulletin.
Ramesh Singh, Kaushal K. Garg, Suhas P. Wani, Tiwari, R.K., Dhayani S.K. 2014. Impact of water management interventions on hydrology and
ecosystem services in Garhkundar-Dabar watershed of Bundelkhand region, Central India. Journal of Hydrology. 509 (2014) 132-149.
Rockstrom, J., Hatibu, N., Oweis T.Y., Wani. S.P. Barron J., Bruggeman, A., Farahani J., Karberg L., Qiang. Z., 2002. Managing water in rainfed
agriculture in Molden D. (Ed.). Water for food, water for life: a comprehensive assessment of water management in agriculture. International
Water Management Institute., Landon UK: Earthscan: and Colombo, Sri Lanka, pp 315-348.
Wani, S.P. Sreedevi T.K., Rochstrom J., Ramakrishna Y.S. 2009. Rainfed agriculture past trend and future prospects. In Wani S.P. Rackstrom J., Qwies
T (Ed.) Rainfed agriculture; Unlocking the potential Comprehensive Assessment of Water Management in Agriculture Series.CAB
www.nbsslup.in
www.calameo.com
www.nih.ernet.in
www.cpcb.nic.in
227
District Irrigation Plan of Jhansi
www.india-wris.nrsc.gov.in
www.censusindia.gov.in/DigitalLibrary/Archive_home.aspx
www.indiawaterportal.org
www.imdaws.com/viewawsdata.aspx
https://data.gov.in/catalogs/ministry_department/in
http://imdagrimet.gov
For all
www.indiastat.com
www.swaraup.gov.in
www.cgwb.gov.in
www.iwmi.cgiar.org
www.cwc.nic.in
228
District Irrigation Plan of Jhansi
229
District Irrigation Plan of Jhansi
230
District Irrigation Plan of Jhansi
231
District Irrigation Plan of Jhansi
232
District Irrigation Plan of Jhansi
233
District Irrigation Plan of Jhansi
234
District Irrigation Plan of Jhansi
235
District Irrigation Plan of Jhansi
236
District Irrigation Plan of Jhansi
237
District Irrigation Plan of Jhansi
238
District Irrigation Plan of Jhansi
239
District Irrigation Plan of Jhansi
240
District Irrigation Plan of Jhansi
241
District Irrigation Plan of Jhansi
242
District Irrigation Plan of Jhansi
243
District Irrigation Plan of Jhansi
244
District Irrigation Plan of Jhansi
245
District Irrigation Plan of Jhansi
246
District Irrigation Plan of Jhansi
247
District Irrigation Plan of Jhansi
248
District Irrigation Plan of Jhansi
249
District Irrigation Plan of Jhansi
250
District Irrigation Plan of Jhansi
251
District Irrigation Plan of Jhansi
252
District Irrigation Plan of Jhansi
253
District Irrigation Plan of Jhansi
254
District Irrigation Plan of Jhansi
255
District Irrigation Plan of Jhansi
256
District Irrigation Plan of Jhansi
257
District Irrigation Plan of Jhansi
258
District Irrigation Plan of Jhansi
259
District Irrigation Plan of Jhansi
260
District Irrigation Plan of Jhansi
261
District Irrigation Plan of Jhansi
262
District Irrigation Plan of Jhansi
263
District Irrigation Plan of Jhansi
264
District Irrigation Plan of Jhansi
265
District Irrigation Plan of Jhansi
266
District Irrigation Plan of Jhansi
267
District Irrigation Plan of Jhansi
268