WORK SCOPE FOR ASSET LIFE STUDY-FITNESS FOR

SERVICE (FFS)
1. To provide Qualified, Certified and Competent manpower to do an assessment for
Pressure Vessel Equipment thats has more than 20 years of service life by year
2017 & 2018. The scopes include as below;

Detail study on each equipment condition, operational history, deterioration


mechanism, NDT results trending and RBI results comparison.

2. Contractor need to provide FPG with


a. Copy of Certificate of Competency of the Assessor.

3. 3 set of final reports including one softcopy either CD or VCD or DVD to be made
available.
a. All report (Original & Copy) would be in Color printed.
b. To review with FPG Team for any clarification, suggestion or improvement.
c. Presentation to DOSH if needed.

4. List of equipment:

Target ALS-
Equipment DOSH In Service Years In
Bil Name of Equipment FFS to be
Tag Registration No. Since Service
Conducted

1 E-108 Ester Wash Water Cooler PMT 94591 1997 20 2017

2 E-110B Ester Dryer Reboiler B PMT 129006 1997 20 2017

3 E-301 Dry Glycerine Preheater PMT 94592 1997 20 2017

4 E-310 Glycerine Evaporator Ejector Intercondenser PMT 94594 1997 20 2017

5 E-311 Glycerine Evaporator Ejector Aftercondenser PMT 94595 1997 20 2017

6 E-411A MeOH Concentrator Feed Bottoms Interchanger A PMT 94938 1998 19 2018

7 E-411B MeOH Concentrator Feed Bottoms Interchanger B PMT 94939 1998 19 2018

8 E-413 MeOH Concentrator Reboiler PMT 94927 1998 19 2018

9 E-512 H2 Recompressor Bypass Cooler PMT 75265 1998 19 2018

10 E-722 Alcohol Bottom Wash Water Heater PMT 94593 1997 20 2017

11 V-1363 Media Filter PMT 129911 1998 19 2018

12 V-1364 Carbon Filter PMT 129913 1998 19 2018