105 106 479.14 478.14 30.71 3.26% 2 61 12 366 888 3.83 1.311 0.0015 6.81 2.500 83.52 8.12 0.60400 0.19400 0.0815 1.51 477.08 476.57 1.68% 2.06
106 107 478.14 477.00 40.18 2.84% 1 62 6 372 903 3.83 1.332 0.0015 6.91 2.333 77.96 8.12 0.61871 0.22000 0.0887 1.44 476.94 475.80 2.84%
107 108 477.00 475.84 59.47 1.95% 5 67 30 402 976 3.81 1.440 0.0015 7.43 1.935 64.64 8.12 0.63437 0.22800 0.1149 1.23 475.80 474.69 1.87% 1.20
108 109 475.84 474.62 49.64 2.46% 3 70 18 420 1019 3.79 1.504 0.0015 7.74 2.172 72.56 8.12 0.65065 0.22000 0.1066 1.41 474.64 473.47 2.36% 1.20
109 110 474.62 473.44 48.55 2.43% 3 73 18 438 1063 3.78 1.569 0.0015 8.04 2.160 72.15 8.12 0.66097 0.22600 0.1115 1.43 473.42 472.29 2.33% 1.20
RAMAL III
qdomiciliar q. diseo SECCION LLENA
ESTACIONES COTAS TERRENO D.H. S (%) No. DE CASAS No. HABITANTES FH Fqm v/V d/D q/Q v COTAS INVERT s% PROF.
(m3/da) (M3/DA)
DE A INICIAL FINAL ACTUAL ACUMULADO ACTUAL ACUMULADO FUTURO ACTUAL V Q SALIDA ENTRADA TUBO POZO
168 167 494.74 493.84 41.90 2.15% 3 20 18 120 291 4.08 0.430 0.0015 2.38 1.672 31.22 6.07 0.58897 0.18600 0.0762 0.98 493.44 492.77 1.61% 1.30
167 166 493.84 493.14 48.26 1.45% 2 22 12 132 320 4.07 0.473 0.0015 2.61 1.374 25.66 6.07 0.64368 0.21600 0.1016 0.88 492.72 491.94 1.61%
166 165 493.14 492.38 29.84 2.55% 2 24 12 144 350 4.05 0.516 0.0015 2.83 1.821 34.00 6.07 0.60771 0.19600 0.0833 1.11 491.94 491.41 1.77% 1.20
165 161 492.38 491.67 47.50 1.49% 6 30 36 180 437 4.00 0.645 0.0015 3.50 1.395 26.04 6.07 0.69745 0.24800 0.1343 0.97 491.31 490.47 1.77%
161 160 491.67 489.94 39.69 4.36% 1 37 6 222 539 3.96 0.795 0.0015 4.26 2.382 44.47 6.07 0.63309 0.21000 0.0959 1.51 490.47 488.79 4.23% 1.20
160 157 489.94 488.33 43.22 3.73% 1 38 6 228 553 3.95 0.817 0.0015 4.37 2.202 41.11 6.07 0.65065 0.22000 0.1064 1.43 488.74 487.18 3.61% 1.20
157 153 488.33 487.29 26.75 3.89% 1 43 6 258 626 3.92 0.924 0.0015 4.91 2.250 42.00 6.07 0.33675 0.07600 0.1169 0.76 487.13 486.09 3.89% 1.20
RAMAL III
qdomiciliar q. diseo SECCION LLENA
ESTACIONES COTAS TERRENO D.H. S (%) No. DE CASAS No. HABITANTES FH Fqm v/V d/D q/Q v COTAS INVERT s% PROF.
(m3/da) (M3/DA)
DE A INICIAL FINAL ACTUAL ACUMULADO ACTUAL ACUMULADO FUTURO ACTUAL V Q SALIDA ENTRADA TUBO POZO
153 152 487.29 486.27 24.88 4.10% 2 59 12 354 859 3.84 1.268 0.0015 6.60 2.310 43.13 6.07 0.72275 0.26400 0.1531 1.67 483.69 483.34 1.43% 3.60
152 151 486.27 485.18 24.85 4.39% 2 61 12 366 888 3.83 1.311 0.0015 6.81 2.390 44.61 6.07 0.72275 0.26400 0.1526 1.73 483.34 482.98 1.43%
151 149 485.18 483.90 29.94 4.28% 2 63 12 378 918 3.82 1.354 0.0015 7.02 2.359 44.05 6.07 0.73197 0.27000 0.1593 1.73 482.93 482.75 0.60% 2.25
149 148 483.90 482.94 38.95 2.46% 1 67 6 402 976 3.81 1.440 0.0015 7.43 1.791 33.44 6.07 0.80384 0.32000 0.2221 1.44 482.70 481.79 2.34% 1.20
148 147 482.94 481.29 64.28 2.57% 5 72 30 432 1049 3.79 1.547 0.0015 7.94 1.828 34.13 6.07 0.81456 0.32800 0.2327 1.49 481.74 480.14 2.49% 1.20
147 143 481.29 480.90 30.46 1.28% 2 74 12 444 1078 3.78 1.590 0.0015 8.14 1.291 24.10 6.07 0.90217 0.40000 0.3379 1.16 480.09 478.85 4.07% 1.20
143 142 480.90 480.18 33.85 2.13% 0 86 0 516 1252 3.73 1.848 0.0015 9.36 1.664 31.07 6.07 0.87466 0.37600 0.3011 1.46 478.80 478.33 1.38% 2.10
142 141 480.18 478.96 37.85 3.22% 0 86 0 516 1252 3.73 1.848 0.0015 9.36 2.049 38.24 6.07 0.82507 0.33600 0.2446 1.69 478.33 477.81 1.38%
141 129 478.96 478.13 35.80 2.32% 0 86 0 516 1252 3.73 1.848 0.0015 9.36 1.737 32.44 6.07 0.86513 0.36800 0.2884 1.50 477.76 476.98 2.18% 1.20
MEMORIA DE CALCULO ALCANTARILLADO SANITARIO
PROYECTO: CONSTRUCCIN SISTEMA DE ALCANTARILLADO SANITARIO, FASE I
UBICACIN: ALDEA LAS MARGARITAS, MALACATN, SAN MARCOS.
FECHA: ABRIL 2,013
RAMAL I
qdomiciliar q. diseo SECCION LLENA
ESTACIONES COTAS TERRENO D.H. S (%) No. DE CASAS No. HABITANTES FH Fqm v/V d/D q/Q v COTAS INVERT s% PROF.
(m3/da) (M3/DA)
DE A INICIAL FINAL ACTUAL ACUMULADO ACTUAL ACUMULADO FUTURO ACTUAL V Q SALIDA ENTRADA TUBO POZO
129 127 478.13 477.36 29.30 2.63% 1 141 6 846 2053 3.58 3.030 0.0015 14.69 2.246 75.03 8.12 0.39091 0.15600 0.1958 0.88 476.93 476.21 2.46% 1.20
127 125 477.36 475.51 66.45 2.78% 2 147 12 882 2141 3.56 3.159 0.0015 15.25 2.311 77.22 8.12 0.77897 0.30200 0.1975 1.80 476.16 473.96 3.31% 1.20
125 124 475.51 473.50 67.20 2.99% 5 158 30 948 2301 3.54 3.396 0.0015 16.28 2.396 80.04 8.12 0.78459 0.30600 0.2034 1.88 473.91 472.55 2.02% 1.60
124 110 473.50 473.44 15.82 0.38% 0 158 0 948 2301 3.54 3.396 0.0015 16.28 0.991 51.81 10.16 0.88632 0.38600 0.3142 0.88 472.30 472.29 1.01% 1.20
110 111 473.44 472.14 59.67 2.18% 4 235 24 1410 3422 3.39 5.050 0.0015 23.23 2.374 124.18 10.16 0.76467 0.29200 0.1870 1.82 472.24 470.69 2.60% 1.20
111 112 472.14 471.18 33.20 2.89% 1 236 6 1416 3437 3.39 5.072 0.0015 23.31 2.735 143.07 10.16 0.73805 0.27400 0.1630 2.02 470.64 469.91 2.21% 1.50
112 113 471.18 470.32 24.57 3.50% 2 238 12 1428 3466 3.39 5.115 0.0015 23.49 3.009 157.41 10.16 0.71964 0.26200 0.1492 2.17 469.91 469.36 2.21%
113 114 470.32 470.35 21.01 0.14% 1 239 6 1434 3481 3.39 5.136 0.0015 23.58 0.608 31.79 10.16 1.09542 0.64200 0.7416 0.67 469.36 468.90 2.21%
114 115 470.35 469.44 45.90 1.98% 4 243 24 1458 3539 3.38 5.222 0.0015 23.93 2.265 118.46 10.16 0.78178 0.30400 0.2020 1.77 468.85 467.99 1.87% 1.50
115 116 469.44 468.57 44.20 1.97% 2 245 12 1470 3568 3.38 5.265 0.0015 24.10 2.257 118.04 10.16 0.78459 0.30600 0.2042 1.77 467.94 467.12 1.86% 1.50
116 117 468.57 469.09 26.70 1.95% 2 247 12 1482 3597 3.37 5.308 0.0015 24.28 2.245 117.41 10.16 0.78738 0.30800 0.2068 1.77 467.07 466.14 3.47% 1.50
117 118 469.09 468.33 9.48 8.02% 1 248 6 1488 3612 3.37 5.330 0.0015 24.36 4.554 238.22 10.16 0.64368 0.21600 0.1023 2.93 466.14 465.81 3.47%
118 119 468.33 466.29 28.07 7.27% 3 251 18 1506 3655 3.37 5.394 0.0015 24.62 4.336 226.81 10.16 0.65411 0.22200 0.1086 2.84 465.81 464.84 3.47%
119 120 466.29 464.00 21.10 10.85% 2 253 12 1518 3685 3.37 5.437 0.0015 24.80 5.951 440.73 12.09 0.54173 0.16200 0.0563 3.22 464.79 462.55 10.62% 1.50
120 121 464.00 464.20 23.43 0.85% 3 256 18 1536 3728 3.36 5.502 0.0015 25.06 1.669 123.60 12.09 0.78459 0.30600 0.2027 1.31 462.50 462.26 1.03% 1.50
121 122 464.20 464.19 20.35 0.54% 0 256 0 1536 3728 3.36 5.502 0.0015 25.06 1.328 98.36 12.09 0.83537 0.34400 0.2548 1.11 462.26 462.05 1.03%
122 123 464.19 464.87 49.58 1.37% 3 259 18 1554 3772 3.36 5.566 0.0015 25.32 2.115 156.67 12.09 0.73502 0.27200 0.1616 1.55 461.99 461.50 1.00% 2.20
123 77 464.87 465.07 18.42 1.09% 2 261 12 1566 3801 3.35 5.609 0.0015 25.49 1.882 139.40 12.09 0.76177 0.29100 0.1829 1.43 461.50 461.32 1.00%
77 78 465.07 466.10 38.00 2.71% 0 465 0 2790 6772 3.12 9.993 0.0015 42.26 2.974 220.25 12.09 0.77043 0.29600 0.1919 2.29 461.27 460.95 0.84% 3.80
78 79 466.10 465.13 44.98 2.16% 0 465 0 2790 6772 3.12 9.993 0.0015 42.26 2.653 196.46 12.09 0.79567 0.31400 0.2151 2.11 460.90 460.43 1.05%
79 80 465.13 463.83 16.38 7.94% 0 465 0 2790 6772 3.12 9.993 0.0015 42.26 5.875 669.86 15 0.55785 0.17000 0.0631 3.28 460.45 460.28 1.05%
80 463.83 460.23
MEMORIA DE CLCULO
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
CONSTRUCCIN SISTEMA DE ALCANTARILLADO SANITARIO,
ALDEA LAS MARGARITAS, MALACATN, SAN MARCOS
1
PROYECTO: CONSTRUCCIN SISTEMA DE ALCANTARILLADO SANITARIO,
ALDEA LAS MARGARITAS, MALACATN, SAN MARCOS
MEMORIA DE CLCULO
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
CONSTRUCCIN SISTEMA DE ALCANTARILLADO SANITARIO,
ALDEA LAS MARGARITAS, MALACATN, SAN MARCOS
2
PROYECTO: CONSTRUCCIN SISTEMA DE ALCANTARILLADO SANITARIO,
ALDEA LAS MARGARITAS, MALACATN, SAN MARCOS
A = Q/V
A=bxh
Relacin es b=2h
A = 2hxh
b = 2h
b = 2x0.15
b = 0.30 ms.
La relacin del largo es igual a 20 veces el alto del tirante, por lo que:
Largo igual a 20x0.25m.
Largo = 5.00 m.
Chequeo de Rejilla:
Seccin = A*b x A + T
A
Donde:
A = ancho de abertura
T = Espesor Barra
Ab= rea til
S = 0.031 M2
3
PROYECTO: CONSTRUCCIN SISTEMA DE ALCANTARILLADO SANITARIO,
ALDEA LAS MARGARITAS, MALACATN, SAN MARCOS
A = L.b L = 5.30
Q=AxV => A= Q
V
A = 0.0110648
0.30
A = 0.03688 m2
4
PROYECTO: CONSTRUCCIN SISTEMA DE ALCANTARILLADO SANITARIO,
ALDEA LAS MARGARITAS, MALACATN, SAN MARCOS
Velocidad de Arrastre:
Q=AxV
A= b. L
L = A = 0.55 M2
b 0.60 M
L = 1.00 m
L = 0.92m => Sedimentador
b = 0.60 m
L 2 = L L1
L 2 = 5.30 1.00 => 4.30 donde se acumula el sedimento
Vol. s = 20% L x V x h
Vol. = h 2 x L 2 b
2
h = Volumen de Sedimento x 2
L2 xb
h = 0.053 x 2
4.30 x 0.60
5
PROYECTO: CONSTRUCCIN SISTEMA DE ALCANTARILLADO SANITARIO,
ALDEA LAS MARGARITAS, MALACATN, SAN MARCOS
A= 2 b l = Q Asumir L=4b
C.U.S.
L= 6.50 M se redondea
b = 1.60 M
Volumen de Sedimentadores:
Vol = Q.T
Area Transversal
AT = 2 (b c. + 0.375 b 2)
AT = 2 (1.60 x 1 + 0.375 x 2.56) = AT = 5-12 m2
6
PROYECTO: CONSTRUCCIN SISTEMA DE ALCANTARILLADO SANITARIO,
ALDEA LAS MARGARITAS, MALACATN, SAN MARCOS
Abertura 0.20 M
Traslape 0.20 M
X=3a+ 2b
X = 3 (0.75) + 2 (1.60) = X= 5.45 m
L= largo 6.50
X= ancho 5.45
Vol= f x L + 2 x L 2 x 2
2 * 4 * 3
Vol= f x L + xL x 2
* 2 * 3
Vol= f x L 2 x2 L = f x L = x2 L
* 6 12
Vol = f x L + x2 L
12
F = vol - x2 L
12 = 191.20 M3 - (5.45)2 * 6.50 / 12
L*x 6.50*5.45
Determinacin de g
g = 1 = g = 1 x =
x/2 2 2 * 2
g = 1 x = g= x = 5.45 = 1. 36
2 * 2 4 4
g = 1.36
7
PROYECTO: CONSTRUCCIN SISTEMA DE ALCANTARILLADO SANITARIO,
ALDEA LAS MARGARITAS, MALACATN, SAN MARCOS
Altura Total
Ht=Y+ C+d+e+f+g
H t = 9.48 m.
Donde:
Le = DBO del afluente
Lo = DBO del afluente
h = Altura del filtro en metros
Q = Carga Hidrulica
Le = 1 Eficiencia
Lo.
0.25 =
Ln (0.25) = 0.62*h Despejando la altura h de esta ecuacin se tiene
h= 2.24 mts.
8
PROYECTO: CONSTRUCCIN SISTEMA DE ALCANTARILLADO SANITARIO,
ALDEA LAS MARGARITAS, MALACATN, SAN MARCOS
Q d = 956.00 M3
da
Longitud = 5b
Area = Lb
Ancho b = 2.50 M
Largo L= 12.50 M (5 * 2.50)
Volumen = 26.56 m3
Largo L = 12.50 M
Ancho a = 2.50 M
Altura h = 1.11 M
9
PROYECTO: CONSTRUCCIN SISTEMA DE ALCANTARILLADO SANITARIO,
ALDEA LAS MARGARITAS, MALACATN, SAN MARCOS
Asumiendo una capa de lodo de 0.10 m el ancho recomendable del patio es 6.00
m
Vol = a x L
7.00
10