m O2 Long- Corte Espesor mm

10.00 20.00 9.53

TABLA DE CONSUMO DE OXIGENO PARA CORTE


Esp. (mm) Oxig. (m) Gas (Bot) Observaciones
3.18 0.17 0.01
4.50 0.24 0.01
4.76 0.25 0.01
6.00 0.31 0.01
6.35 0.33 0.01
7.94 0.42 0.02
9.53 0.50 0.02
12.70 0.67 0.03
15.88 0.83 0.03
19.05 1.00 0.04
22.23 1.17 0.05
25.40 1.33 0.05
28.58 1.50 0.06
31.75 1.67 0.07
38.10 2.00 0.08
44.45 2.33 0.09
50.80 2.67 0.11
Consumibles

RENDIMIENTOS MATERIALES CONSUMIBLES

RENDIMIENTOS un/TN

ESTRUCTURAS ERECCION MONTAJE


ITEM DESCRIPCION UN. FABRICACION MONTAJE AREN. y PINT. TANQUES EQUIPOS
1 Electrodo de acero al carbono kg 16.00 2.00 20.00 0.70
2 Electrodo de acero inoxidable kg
3 Varillas kg
4 Varillas de tungsteno und
5 Oxigeno m3 10.00 1.50 8.00 0.80
6 Acetileno m3 4.95 0.74 3.96 0.40
7 Gas propano kg 1.35 0.45
8 Gas argon m3
9 Nitrogeno m3
10 Discos esmeril und 1.20 0.20 2.00 0.15
11 Escobillas acero al carbono und 0.10 0.20
12 Escobillas acero inoxidable und
13 Brocas und 0.50
14 Arena m3 0.80 1.20
15 Solventes gl 0.001 0.001
16 Brochas und 0.002 0.002 0.002
17 Pintura m2

1 pie3 = 0.0283 m3
1 lb = 0.45 kg

RENDIMIENTOS MATERIALES CONSUMIBLES


ENSAMBLADO Y MONTAJE

Ensamblado de estructuras Montaje de estructuras Ensamblado de elementos


RECURSO UNIDAD fabricados en Lima incl. baran, parrillas, escal calderados fabricados en
REND.ORIG. REND.FIN. REND.ORIG. REND.FIN. REND.ORIG. REND.FIN.
1. Acetileno m3/tn 0.299 0.147 1.201 1.164 0.312 0.460
2. Oxigeno m3/tn 1.000 0.530 3.435 4.413 1.014 2.225
3. Soldadura kg/tn 0.204 0.489 0.500 3.771 0.200 3.312
4. Disco esmepz/tn 0.102 0.140 0.599 0.811 0.104 0.124

Pgina 2
Consumibles

MONTAJE
CALDERERIA
9.00

6.00
2.97

0.40

0.001
0.002

Montaje de elementos
calderados
REND.ORIG. REND.FIN.
1.169 1.268
1.624 2.186
0.520 9.574
0.286 0.479

Pgina 3
ENSAYOS NO DESTRUCTIVOS Y SUPERVISION
FABRICACION TIPO UNIDAD COSTO/UN. PROVEED.
Particulas Magneticas ml 12.00 S.G.S.
Prueba Radiografica Placa 4.00 S.G.S.
FABRICACION DE Sup. Prueba Hidrostatica Global 100.00 S.G.S.
TANQUE A PRESION de Supervision Prueba Neumatica Global 80.00 S.G.S.
GLP
Certificado de Fabricacin Global 200.00 S.G.S.
Supervisin de Tanques Semana 150.00 S.G.S.
ERVISION
FECHA OBSERVACIONES
17-Jun-02 En coplas y entradas de hombre
17-Jun-02 Long. 15" efectivas
17-Jun-02
17-Jun-02
17-Jun-02 Entregas 05 das despues
17-Jun-02 02 visitas por semana

3,830.23
381.00
10.053088
SERVICIO DE TRANPORTE - CARACTERISTICAS Y PRECIOS
DESCRIPCION PESO (Ton) TIPO CAP. (Ton) RUTA TIEMPO COSTO ($) PROVEEDOR FECHA OBSERVACIONES

Virola 3.5m x 13.5m 45.00 CBE 50.00 Lima-Talara 2.00 5,200.00 Cesaro 18-May-02
Virola 3.5m x 13.5m 45.00 CBE Lima-Talara 2.00 4,950.00 Stiglich 28-May-02 Permisos y Reforz Puentes seran
reembolsados al transportista, escolta
$120.00; Stdby $ 400.00

Tq. 10,000 Glns con silletas 5.00 CB 15.00 Lima-Cuajone 2.00 1,320.00 E.T. Lambayeque 14-Jun-02 Tf. 323-0501; Fax:323-1391
Servicio de transporte por carga 30.00 SMT 30.00 Lima-Bayovar 2.00 755.00 Trans. Canadian 31-Jul-02 Tf. 332-3026; Tfax. 331-0250; incluye
completa estibaje, carga y descarga.

373909026.xls 12/07/2017
Transporte
RATIOS DE ESTRUCTURAS VARIOS

Descripcin Peso (kg) Area (m) US$/kg Observaciones

Barandas STD ; TB 1 1/2", PT 1/4" x 4" 15 - 16 25.0 0.87 Estndar Bechtel


Escalera Vertical con Canastilla 5.80m 220 7.6 0.50 Estndar Bechtel
HAUG S.A. AREA DE PRESUPUESTOS

MONTAJE DE VALVULAS
300#
ITEM DESCRIPCION 150# 600# 900# REV. OBSERVACIONES
- 400#

Vlvula 1/4" 1.60 1.80 2.00 2.20 0


Vlvula 3/8" 1.60 1.80 2.10 2.30 0
Vlvula 1/2" 1.60 1.80 2.10 2.30 0
Vlvula 3/4" 1.60 1.90 2.30 2.50 0
Vlvula 1" 1.70 1.90 2.40 2.60 0
Vlvula 1 1/4" 1.70 1.90 2.50 2.70 0
Vlvula 1 1/2" 1.80 2.00 2.80 3.00 0
Vlvula 2" 1.90 2.40 3.10 3.30 0
Vlvula 2 1/2" 2.40 2.90 3.50 3.90 0
Vlvula 3" 2.80 3.30 4.00 4.40 0
Vlvula 3 1/2" 3.40 4.10 4.90 5.30 0
Vlvula 4" 4.10 4.80 5.60 6.00 0
Vlvula 5" 4.70 5.50 6.30 6.80 0
Vlvula 6" 5.20 6.10 6.90 7.50 0
Vlvula 8" 7.00 8.20 9.40 10.20 0
Vlvula 10" 9.00 10.20 11.50 12.50 0
Vlvula 12" 11.10 12.70 14.50 15.70 0
Vlvula 14" 12.70 14.60 16.70 18.10 0
Vlvula 16" 14.70 16.90 19.20 20.80 0
Vlvula 18" 16.30 18.90 22.00 23.80 0
Vlvula 20" 18.70 21.60 25.10 27.10 0
Vlvula 24" 21.70 25.10 29.40 31.80 0
Vlvula 26" 22.90 26.40 31.00 33.40 0
Vlvula 28" 24.10 27.90 32.70 35.30 0
Vlvula 30" 25.30 29.20 34.30 36.90 0
Vlvula 32" 26.50 30.70 35.90 38.70 0
Vlvula 34" 27.70 32.00 37.40 40.40 0
Vlvula 36" 28.90 33.20 40.00 42.00 0
Vlvula 38" 30.10 34.50 41.40 43.60 0
Vlvula 40" 31.00 35.70 42.70 45.10 0
Vlvula 42" 32.10 36.90 44.10 46.70 0
Vlvula 44" 33.30 38.10 45.50 48.30 0
Vlvula 46" 34.50 39.30 46.90 49.90 0
Vlvula 48" 35.80 40.50 48.20 51.40 0

1 CANTIDADES PARA MANIPULEO, INSTALACION, COLOCACIN DE PERNOS Y EMPAQUETADURAS, NO SOLDADURAS


2 PARA VALVULAS OPERADAS x 125%
LOS RATIOS DE EMPERNADO HAS SIDO ASUMIDOS

373909026.xls
12/07/2017
Vlvulas
GRUAS PERU - CARACTERISTICAS Y PRECIOS
CARACTERISTICAS ALQUILER
DESCRIPCION TIPO PLUMA (Pies) EXT. (PIES) LUGAR TIEMPO HH/MES US/MES US$/HM MOV. (US$) PROP. OBSERVACIONES

Gra P & H; 66 Tn Telescopica 114.00 33.00 YANAC. 1 mes 200.00 16,700.00 83.50 11,000.00 GRUAS No Inc. C. A, AL, M; Ex.M. 23/06/02 16,700.00
Gra Terex; 90 Tn, RT-190 Telescopica 124.50 74.00 YANAC. 1 mes 200.00 19,100.00 95.50 15,500.00 GRUAS 19,100.00
Gra P & H; 90 Tn; 790TC Celosia 90.00 270-60 YANAC. 1 mes 200.00 18,500.00 92.50 9,000.00 GRUAS
Gra Lorain; 27.5 Tn; LRT-275 Telescopica 81.00 YANAC. 4 mes 200.00 10,000.00 50.00 6,000.00 GRUAS

Gra P & H; 66 Tn; T-650 Telescopica 114.00 33.00 YANAC. 3 mes 240.00 14,500.00 60.42 9,900.00 GRUAS No Inc. C. A, AL, M; Ex.M. 23/06/02
Gra Terex; 30 Tn; RT-230 Telescopica 94.00 43.00 YANAC. 2 mes 240.00 10,800.00 45.00 6,900.00 GRUAS
Gra P & H; 20 Tn; R-200 Telescopica 80.00 0.00 YANAC. 2 mes 240.00 9,500.00 39.58 6,000.00 GRUAS

Gra P & H; 60 Tn; XLT-600 Telescopica 114.00 35.70 YANAC. 1 mes 200.00 15,000.00 75.00 VIVARGO No Inc. C. A, AL, y Ex.M 23/06/02
Gra Grove; 30 Tn; RT63S Telescopica 90.00 21.00 YANAC. 4 mes 200.00 10,000.00 50.00 VIVARGO

Gra P&H; 140 Tn; 9125-ATC Celosia 120.00 270-60 TOQUEP. 3 mes 240.00 19,900.00 82.92 17,050.00 GRUAS No Inc. C. A, AL, M; Ex.M. 03/09/01
Gra P&H; 65 Tn; CN-165 Telescopica 126.00 60.00 TOQUEP. 5 mes 240.00 15,500.00 64.58 7,100.00 GRUAS
Gra Terex; 50 Tn; RT-450 Telescopica 105.15 58.00 TOQUEP. 5 mes 240.00 13,200.00 55.00 4,750.00 GRUAS
Gra Terex; 30 Tn; RT-230 Telescopica 94.00 43.00 TOQUEP. 5 mes 240.00 10,800.00 45.00 4,480.00 GRUAS
Gra Lorain; 27.5 Tn; LRT-275 Telescopica 81.00 TOQUEP. 5 mes 240.00 10,300.00 42.92 4,380.00 GRUAS

Gra P&H; 50 Tn Telescopica TALARA 1 mes 200.00 12,200.00 61.00 5,600.00 CESARO No Inc. C. A, AL, M; Ex.M. 24/05/02
Gra P&H; 9125; 100 Tn Celosia TALARA 1 mes 200.00 19,900.00 99.50 19,880.00 CESARO

373909026.xls 12/07/2017
Gras
366.67 17,066.67
516.67 19,616.67

373909026.xls 12/07/2017
Gras
PLANCHAS NACIONALES E IMPORTADAS
ITEM DESCRIPCION MATERIAL PESO US$/TN COND.
PL 19.1 x 1,500 x 12,000 SA 612 - SA20 2,691.77 425.00 CIF-CALLAO
IMPORTADAS
PROVEED OBSERVACIONES
MATHIEU AMBERES-BELGICA, US TEST US$15.0 TM
FUENTE : COSAPI S.A.
MONTAJE DE EQUIPOS
RATIO
ITEM DESCRIPCION UNIDAD REV.
kg/hh

1 Intercambiadores de Calor kg 17.00 0


2 Torres de Destilacin Armadas kg 16.00 0
3 Torres de Destilacin por Partes kg 12.00 0
4 Bandejas y Platos Interiores kg 3.00 0
5 Anillos Catalizadores kg 2.00 0
6 Recipientes a Presin kg 15.00 0
7 Compresores Reciprocantes Rotativos kg 11.00 0
8 Hornos Verticales (Inc. Estructuras) kg 10.00 0
9 Serpentines Interiores de Acero al Carbono kg 1.50 0
10 Bombas Centrufugas y Reciprocantes kg 9.00 0
11 Molinos de Bolas kg 25.00 0
12 Forros de Molinos kg 40.00 0
13 Chancadoras Cnicas kg 30.00 0
14 Forros de Chancadoras kg 18.00 0
15 Puentes Grua kg 20.00 0
16 Alimentadores Vibratorios kg 12.00 0
17 Tolvas mecnicas sin forro kg 16.00 0
18 Celdas de Flotacin de 100 p kg 12.00 0
19 Espesadores Mecanismos de 40 pies kg 13.00 0
20 Chutes y Caldereria kg 10.00 0
EQUIPO S
21 Muy Liviano (Menos de 500kg) kg 3-6 0
22 Liviano (500 -1,000 kg) kg 8- 12 0
23 Semipesado (1,000 a 5,000kg) kg 15 - 20 0
24 Pesado (5,000 a 20,000kg) kg 22 - 30 0
25 Muy Pesado (mas de 20,000kg) kg 30 - 40 0

FUENTE : COSAPI S.A.


OBSERVACIONES
FABRICACION Y MONTAJE DE TANQUES
RANGO TALLER EN CAMPO
DESCRIPCION FABRIC. AREN. COMERCIAL PINT. ANTIC. 1M ER. SOLD. PINT. ACAB. 1M REV. OBSERVACIONES
KG/HH M/HH KG/HH M/HH KG/HH KG/HH M/HH KG/HH
CILINDRO 16.00 1.90 3.00 8.00 2.30 0
TECHO 24.00 1.90 3.00 8.00 2.30 0
10,000 BBL
MENOR DE

FONDO 40.00 3.00 8.00 2.30 0


ESTRUCTURA TECHO 4.00 1.00 20.00 2.00 40.00 8.00 1.40 28.00 0
ESCALERAS, BARANDAS 4.00 1.00 20.00 2.00 40.00 6.00 1.40 28.00 0
ACCESORIOS 3.00 0.90 15.00 1.50 25.00 4.00 1.00 17.00 0
CILINDRO 20.00 1.90 3.00 9.00 2.30 0
TECHO 30.00 1.90 3.00 9.00 2.30 0
40,000 BBL
10,000 A

FONDO 50.00 3.00 9.00 2.30 0


ESTRUCTURA TECHO 6.00 1.20 25.00 2.20 46.00 12.00 1.60 33.00 0
ESCALERAS, BARANDAS 4.00 1.00 20.00 2.00 40.00 8.00 1.40 28.00 0
ACCESORIOS 4.00 0.90 15.00 1.50 25.00 4.00 1.00 17.00 0
CILINDRO 25.00 1.90 3.00 12.00 2.30 0
TECHO 40.00 1.90 3.00 12.00 2.30 0
40,000 BBL
MAYOR DE

FONDO 60.00 3.00 12.00 2.30 0


ESTRUCTURA TECHO 8.00 1.20 30.00 2.20 55.00 14.00 1.60 40.00 0
ESCALERAS, BARANDAS 4.00 1.00 20.00 2.00 40.00 8.00 1.40 28.00 0
ACCESORIOS 4.00 0.90 15.00 1.50 254.00 4.00 1.00 17.00 0

NOTAS
1 SOLO EXTERIORMENTE
2 PINTADO ASFALTICO EXTERIOR
3 CORTE BISELADO ROLADO Y CUADRADO
4 CORTE BISELADO Y CUADRADO
Estructuras Metlicas

RENDIMIENTOS - ESTRUCTURAS METALICAS ( MODIFICADO )


(1) (2) (3)
REND. COMPUESTOS
EN TALLER EN CAMPO Fab. + Mont. + Fab. +
Aren. + Pintura Mont. +
TIPO DE ESTRUCTURA Rango Densid Fab. Aren. M. Blanco P. Antic. (1m) Montaje P. Acab.(1m) Primer Acab. Ar.+ Pint.
kg/m m2/Ton kg/HH m2/HH kg/HH m2/HH kg/HH kg/HH m2/HH kg/HH kg/HH kg/HH kg/HH
Principales
MUY PESADA > 90 16.00 18.00 3.00 200.00 2.75 183.33 36.00 2.50 166.67 13.99 25.14 9.87
PESADA 30 / 90 25.00 16.00 2.75 110.00 2.50 100.00 24.00 2.25 90.00 10.92 15.65 7.29
MEDIANA 18 / 30 35.00 14.00 2.50 83.33 2.25 75.00 18.00 2.00 66.67 9.08 11.69 5.85
LIVIANA 5 / 18 40.00 12.00 2.25 56.25 2.00 50.00 12.00 1.75 43.75 7.09 7.75 4.29
LIGERA (Escal. Barandas) <5 50.00 10.00 2.00 40.00 1.75 35.00 10.00 1.50 30.00 5.49 6.00 3.39
Complementarios
REJILLAS PLATAFORMAS 50.00 8.00 1.75 35.00 1.50 30.00 16.00 1.25 25.00 4.54 7.02 3.34
RACKS DE TUBERIAS 40.00 12.00 2.25 56.25 2.00 50.00 14.00 1.75 43.75 7.09 8.54 4.52
SOPORTES MEDIANOS 50.00 10.00 2.00 40.00 1.75 35.00 10.00 1.50 30.00 5.49 6.00 3.39
SOPORTES CHICOS 60.00 8.00 1.75 29.17 1.50 25.00 7.00 1.25 20.83 4.18 4.19 2.49
Otros
TANQUES METALICOS 20.00 12.00 4.00 200.00 3.75 187.50 10.00 3.50 175.00 10.10 8.97 4.98

Notas: (1) Se considera 2 manos de Pintura Anticorrosiva


(2) se considera 2 manos de Pintura de Acabado
(3) Se consideran los mismos parametros de los casos (1) y (2)
Fuente : Cosapi - Tecpro

Pgina 16 de 19
CONOS SUPERIORES
DESCRIPCION t (mm) M (m) m (m) H (m) AREA (m) PESO

130-AA-131 9.00 5,500 1,000 25.28 1,786.06


130-AA-015 9.00 8,000 1,500 53.68 3,792.74
130-AA-018 6.00 4,500 800 16.88 795.03

CILINDROS
DESCRIPCION t (mm) M (m) m (m) H (m) AREA (m) PESO

130-AA-131 9.00 5,500 7,000 120.95 8,545.21


130-AA-015 9.00 8,000 10,000 251.33 17,756.28
130-AA-018 6.00 4,500 6,000 84.82 3,995.16

CONO INFERIOR TRUNCO


DESCRIPCION t (mm) M (m) m (m) H (m) AREA (m) PESO

130-AA-131 9.00 5,500 500 4,500 48.52 3,427.73


130-AA-015 9.00 8,000 500 6,700 102.52 7,242.73
130-AA-018 6.00 4,500 500 3,700 33.03 1,555.88

PESO Y AREA TOTAL


DESCRIPCION t (mm) M (m) m (m) H (m) AREA (m) PESO

130-AA-131 194.75 13,758.99


130-AA-015 407.53 28,791.75
130-AA-018 134.74 6,346.07
MAQUINAS HERRAMIENTAS
ITEM DESCRIPCION UNIDAD US$

1 Taladro hm 18.00
2 Torno Vertical hm 35.00
3 Mandrino hm 35.00
4 Torno 1.4 x 6.04 m hm 22.00
5 Fresadora hm 16.00
6 Soldadura hm 5.80
RRAMIENTAS
OBSERVACIONES

Valor Venta US$


Valor Venta US$
Valor Venta US$
Valor Venta US$
Valor Venta US$
Valor Venta US$

You might also like