FEATURE

A new trend in mobile


water-treatment
plant hire
Plant breakdowns can be solved by hiring a mobile water-treatment unit.
However, mains water is not always the same and a change of water supply at
an industrial water treatment plant, from river to borehole, or vice versa, can be
devastating. According to Mark Dyson of Aquamove, one solution is a mobile
fleet including a range of pretreatment processes.

When Aquamove Veolia Water Solutions &


Technologies brand for mobile water systems
is to hire a trailer-mounted mobile water-
treatment system whilst repairs are carried
Expanding production
set up its mobile water-treatment plant facil- out. However, the introduction of common Whilst many of the applications for mobile
ity in the UK its was to provide temporary carriage and extended water supply networks units are emergencies, this is not always the
systems for plant breakdowns, planned main- has brought a different kind of problem. case.
tenance and commissioning. It was ultimately Mains water, unlike gas, oil and electricity, is An unexpectedly full order book often cre-
for temporary requirements, and that is still not always the same: seasonal algal growth on ates an urgent need to expand production
the main application, but over recent years a a reservoir can increase the organic content quickly, and a mobile plant can provide the
new trend has been developing long-term causing rapid fouling of ion-exchange resins additional treated water that is needed whilst a
plant rentals. and RO membranes. permanent plant is being installed. Sometimes,
Initially, the mobile fleet was equipped companies need to carry out production tri-
with just reverse osmosis (RO) and ion- If the raw-water quality als, and may want to look at the effects of
exchange demineralisation systems to cover changes, the mobile plant water quality on their production processes.
mechanical breakdown of on-site systems, Temporary deionisation plants provide a cost-
and these are still the two most widely used
can be easily reconfigured. effective means of finding out if it is worth-
packages. Deionisation trailers typically No wonder that more and while making a substantial capital investment
provide two streams of cation, anion and more temporary systems are in permanent plant.
mixed-bed ion-exchange, which are capable becoming permanent. Of course, many mobile customers hire tem-
of producing 100 m3/h of 0.1 S/cm high- porary plants to provide treated water during
purity water. Another possibility is that the water supplier a planned maintenance shutdown of the water
When the ion-exchange resins are exhaust- may have to change the source of the water treatment plant and similar non-emergency
ed, the complete trailer is returned to the supply from river to borehole, or vice versa, situations. Over the last year the service has
central regeneration facility, which means zero with a sudden and dramatic change in total dis- provided, among many others, a filtration and
discharge on-site and no problems associ- solved solids. The water still meets the require- RO plant to treat an unexpectedly high volume
ated with handling or disposing of regenerant ments set for drinking water, but the effect of landfill leachate resulting from high rainfall;
chemicals. Since the plant footprint is bigger on an industrial water-treatment plant can be a RO system to upgrade a poorly performing
than ion-exchange, containerised RO units are devastating. For instance, ion-exchange plants river-water treatment plant; and a RO and
generally capable of producing up to 25 m3/h designed for thin, upland water may have insuf- deionisation plant to feed a power and steam
of permeate with a conductivity typically less ficient capacity to treat thicker borehole water, utilities plant at a major chemicals complex
than 20 S/cm in a single pass. If higher qual- whilst those designed for hard, borehole water during a planned outage.
ity treated water is needed, two units can be may suffer from fouling by higher concentra- But, perhaps surprisingly, an increasing
configured in series as twin pass giving per- tions of natural organic matter in supplies number of customers are making a case for
meate of less than 5 S/cm. derived from moorland reservoirs. long-term hire. This may be because the capital
To meet this demand, the mobile fleet was investment in a permanent plant would not
expanded to include a range of pretreatment pay back within the lifetime of the project a
No standby capacity processes, including coagulation and floc- nuclear power station decommissioning project
Financial constraints often mean that there culation, clarification, filtration, activated and limited life power station refurbishment are
is no standby capacity in the on-site water carbon adsorption and softening all in real examples where this approach has proved
treatment plant, so when a vessel fails or modular configurations to provide the right to be cost-effective.
there is a fire in the plant room, production process route to treat any raw water quality to The temporary plant approach also provides
is at risk. When an emergency like this does achieve any treated water quality and quantity other advantages. The quality of the treated
occur the simplest solution to the problem required. water is guaranteed and the treatment pro-

8
Membrane Technology August 2014
FEATURE

cess is tailored to meet current water quality can be handled as easily as that taken from
needs, whether that is for de-alkalised water the mains.
for soft drinks manufacturing, purified water
for pharmaceuticals, demineralised water for
A typical temporary or mobile plant might
consist of pretreatment systems in trailers,
Elga Process Water
high-pressure boilers or even ultrapure water using multi-media filtration, organic scaveng- changes its name
for semiconductor manufacturing. If the treated ing or granular activated carbon adsorption;
water quality needs to be upgraded, it is an easy RO in a second trailer and even mixed-bed to Veolia Water
matter to change the trailer for one using
a more advanced treatment process.
ion-exchange polishing, carried out by a third.
Temporary tanks and pumps also can be pro-
Technologies
vided in trailers together with all interconnect- Having traded as Elga Process Water for
ing flexible hoses, water meters and fittings, over a decade with Veolia as a parent, the
Case study: and, of course, mobile generators to make the company now feels that it is in a strong
waste plant system completely stand-alone. position to fully rebrand as Veolia Water
Technologies.
In this example, energy from a waste plant, This is part of an overall rebranding of
which incinerates 225 000 tonnes per year
Membrane-based Veolia Environnement, which will be known
of non-recyclable domestic waste, produces degassing process simply as Veolia and will represent the
400C superheated steam in a 46-bar water three business activities of water, waste and
tube boiler. This steam drives a turbine The latest addition to the range is Remox (see energy.
that generates electricity for export to the Membrane Technology February 2014, page 5).
National Grid. This membrane-based degassing process
Make-up water for the boiler is produced removes carbon dioxide and oxygen from water.
New identity
by an on-site ion-exchange demineralisation Dissolved CO2 reduces the efficiency of ion- Commenting on the new identity, Martyn
plant that consists of cation exchanger, anion exchange and continuous electro-deionisation Fisher, Managing Director, Process Water,
exchanger and mixed-bed polishing. However, processes. Membrane degassing works by Veolia Water Technologies, said: We are
this was failing to meet the 20-g/l silica water passing the water across a gas-permeable mem- transforming the business into one that
quality requirement. brane, on the other side of which is a flow of is focused on building partnerships with
The initial solution to this problem was to atmospheric air. CO2 transfers across the mem- customers, developing and delivering new
provide three mobile, temporary mixed-bed brane from the gas-rich water to the CO2-lean products, providing market-leading cus-
polishers to treat the water from the demin- inert gas. The process reduces dissolved CO2 tomer services and service support. Our
eralisation plant mixed beds and reduce the to less than 0.3 mg/l. Replacing the air with new brand recognises that we are part of a
silica to less than 10 g/l. Continuous quality an inert gas either nitrogen or water vapour global team capable of offering innovative,
monitoring of the treated water for conductiv- generated under vacuum enables dissolved integrated and sustainable water-treatment
ity and silica was also provided. The ionic load oxygen to be removed. products and technology to a world that is
on the mobile units was very low and exhaus- Oxygen causes corrosion in boiler systems severely water stressed.
tion infrequent. They were not regenerated so it has to be removed from boiler feed-water Coinciding with the rebrand, Veolia Water
on-site, but returned to the central regenera- by adding oxygen scavenging chemicals such Technologies has moved from Marlow to a
tion station and exchanged for a regenerated as sulphite or carbohydrazide. Remox removes new high-tech office in High Wycombe.
unit. This temporary approach proved to be dissolved oxygen to less than 0.01 mg/l, dra- Fisher continued: It is an exciting time
so reliable and cost-effective that it was used matically reducing the consumption of oxygen for us and our customers who will benefit
for an extended period. scavengers. from the move. It is equipped with the lat-
The long-term rental of mobile water-treat- Dissolved oxygen in semiconductor rinse est technology, which will help promote our
ment systems ensures that the plant is avail- water can result in wafer surface defects, whilst culture of working smarter, streamline our
able immediately, has no associated capital in food and beverage products it can impair processes and integrate our systems, mak-
cost and does not require any housing all of shelf-life and taste. Remox is the first mem- ing all aspects of customer contact more
the equipment is installed in a standard 12-m brane degasser to be available on the rental efficient from sales enquiries and contract
(40-ft) trailer which is insulated and supplied market and can treat up to 100 m3 of water execution to technical support and booking
with heating and lighting, so that the internal per hour. The degassing system is fully auto- service engineers.
environment is just like most plant rooms. matic with on-line monitoring for complete
These trailers are also kitted out with appro- operational security, and is complete with all high level of certainty, and with no require-
priate safety equipment and complete with necessary compressed air, nitrogen and vacuum ment for capital investment. If the raw-water
all necessary instrumentation and controls. equipment. quality changes, the mobile plant can be easily
They can be positioned to make the best use reconfigured. No wonder that more and more
of available space and connected to existing temporary systems are becoming permanent.
pipework using flexible hoses.
Permanent
In terms of process technology, the range is Operational problems with mobile plants are Contact:
almost unlimited. Mobile units are complete- rare, there are hardly any chemical additions Veolia Water Technologies, Windsor Court,
ly modular, so any configuration of processes and no chemical handling and disposal issues, Kingsmead Business Park, High Wycombe
can be combined to make up a complete and regular maintenance service visits are HP11 1JU, UK. Tel: +44 1628 89 70 00,
system to suit any application, which means included in the hire contract. This means that www.aquamove.co.uk,
that water from a borehole, river or reservoir total operational costs can be forecast with a www.veoliawatertechnologies.co.uk/processwater

9