TABLE 6: CONSTRUCTION EXPERIENCE In addition, Malakoff, through TJSB,
Station Location MW COD Remarks will also be part operator via
Lumut Malaysia 1,303 Block 1: July 1996 1 month early and on budget subcontracting to a local company of
CCGT Block 2: January 1997 6 months early and on budget
the Shuaibah-III.
GB3 Malaysia 640 OCGT 01 2 months early and on budget
CCGT CCGT 02
TJSB has also successfully completed a
Tanjung Bin Malaysia 2,100 U1 06 16 days ahead of contractual
COAL U2 06 schedule
5-year Operations Management
U3 07 Services (OMS) contract with
Those stations that are in operation have been commissioned on time or early and on budget. Petronas Gas Berhads two COGEN
plants from 25 October 1999 to 26
TABLE 7: O&M PORTFOLIO October 2004.
Plant Name Configuration Generating Generation Type COD O&M Term
Capacity
Local
(MW) In early 2008, TJSB has secured another
Segari Energy Venture 6x143.3(GT) 1,303 MW CCGT 1996 15 OMS contract for five years in Kuwait
Lumut Power Plant 2x221.5(ST)
(LPP) Malaysia for a newly completed 800MW Open
Cycle Gas Turbine utilizing Alstom 13E2
GB3 (LPP Block 3) 3x143.3(GT) 640 MW OCGT 2001 21
Malaysia 1x221.5(ST) CCGT 2002 gas turbines. A total of 16 TJSBs
Prai Power Plant, 1x230(GT) 350 MW CCGT (Single-shaft) 2003 21
personnel had been deployed to
Malaysia 1x120(ST) undertake the O&M of the power plant.
Tanjung Bin Power 3x700 (Coal) 2,100 MW Coal Fired 2006* 25** In addition, TJSB in collaboration with
Malaysia
PT. PJB of Indonesia had engaged 12 of
International
their Operators to assist in the plants
Az Zour, Kuwait 5 x 160 (GT) 800 MW OCGT 2008 5
day-to- day operation.
O&M Via Subcontracting
Shuaibah-III 3x300 (thermal) 900 MW IWPP 2009 20
Water and Electricity 880,000m3/day TJSB had also been awarded with a
Company, Saudi Arabia
one-year contract for supply of
Souk Tleta, Algeria 13 x RO Train 200,000m3/day IWP 2009 20 experienced manpower to undertake
06 CUF Kerteh 6x36(GT) 216 COGEN 1999 5 major overhauls at Aluminum Bahrain
CUF Gebeng 3x36(GT) 108 COGEN 1999 5
(ALBA), Bahrain.
Total O&M Potfolio 6,103 MW Power, 1,080,000m3/day Water
Capability & Experience In Power & Water
O&M Strategy
TJSBs excellent track record in O&M
Malakoff participates in power and CONSTRUCTION EXPERIENCE
business is a manifestation of its
water projects as sole or as Malakoffs engineering personnel are
commitment to provide maximum
co-developer, looking to secure an highly experienced in varying areas of
value to its customers by achieving
appropriate interest in the project planning, design review, project
high standards in performance and
company. management, building and
costs, without compromising health,
commissioning of gas-fired, coal-fired,
safety and environmental care. Its
Malakoff also seeks to participate in, oil-fired, and hydro technologies.
business strategy revolves around the
and add value through, the operation Within the past 15 years, Malakoff has
following principles:
& maintenance and project planned, built and commission two (2)
management roles since, in doing so, it CCGT power plants and one (1) To meet Clients Business Objectives
can safeguard its investment by coal-fired power plant as depicted in and ensuring the plant performance
ensuring that World Class standards the table 6. and plant availability to its highest
are employed across a number of key possible standards;
activities. OPERATION AND MAINTENANCE To develop a dynamic workforce
EXPERIENCE
equipped with the right expertise,
Malakoffs Operations & Maintenance
Malakoffs strong track record as an IPP competencies and capabilities;
(O&M) activity is carried out by its
and IWPP clearly demonstrates its To implement the latest O&M tools
wholly-owned subsidiary,
qualifications as an international and methodologies that are
Teknik Janakuasa Sdn Bhd (TJSB). The
power project developer. Our track adaptable to the business
total O&M portfolio of Teknik
record is summarized in table 5 (see environment and culture;
Janakuasa is more than 5200 MW as
previous page)
depicted in the table 7.