PARTICIPANTS MANUAL
Author : on c
E-mail: dedoan@gmail.com
Cell phone: (+084)938491888
@Author : on c dedoan@gmail.com
Agenda
2
@Author : on c dedoan@gmail.com
1
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
Purpose Pr oject
Plans Process Area Sampling of Work
describes the purpose of the process Products graphic showing a
area sampling of work products in
Relevant Terminology relation to PA specific practices
definitions of important terms DAR SP 1.6
Process Area Sampling of
from the model glossary Select
Solutions PA Relationships graphic
When a PA Is Not Done Well showing a sampling of PA
discussion points for when a relationship to PA specific
PA is not done well practices
@Author : on c dedoan@gmail.com
Managing the
PAs Project
REQM,
PP,PMC Organizing
Managing
and
RSKM the Work
SAM,IPM
Improvement
PAs Infrastructure
OPF Enabling
OPD Improvement of
IPM the Work
OT
@Author : on c dedoan@gmail.com
2
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
@Author : on c dedoan@gmail.com
Topics
6
Requirement Management
@Author : on c dedoan@gmail.com
3
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
Purpose
v Manage requirements of the projects products and product
components and to ensure alignment between those
requirements and the projects plans and work products.
@Author : on c dedoan@gmail.com
Relevant Terminology
8
Requirements Traceability
v A discernable association between requirements and
related requirements, implementations, and verifications.
Bidirectional Traceability
v An association among two or more logical entities that
is discernable in either direction (i.e., to and from an
entity).
@Author : on c dedoan@gmail.com
4
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
@Author : on c dedoan@gmail.com
Manage Requirements
SG 1 Requirements are managed and inconsistencies
with project plans and work products are identified.
@Author : on c dedoan@gmail.com
5
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
Manage Requirements
SP 1.1 Understand Requirements
SP 1.2 Obtain Commitment to Requirements
SP 1.3 Manage Requirements Changes
SG 1 SP 1.4 Maintain Bidirectional Traceability of
Requirements
SP 1.5 Ensure Alignment Between Project
Work and Requirements
@Author : on c dedoan@gmail.com
Requirements Management
Manage
Requirements
Id en tif y In con sisten cies Docu men tation of In con sisten cies In clu d in g S ou rces,
Betw een Project Work an d Con d ition s, an d Ration ale
Req u iremen ts Corrective Action s
@Author : on c dedoan@gmail.com
6
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
SP 1.1 SP 1.2
Obtain
Understand Commitment
Requirements to
Requirements
Requirements Traceability
Matrix
@Author : on c dedoan@gmail.com
RD SP 2.1
Establish
Product and
RD SP 3.3 SP 1.1 SP 1.2 SP 1.3 Product
Component
Obtain Manage Requirements
Analyze Understand Commitment Requirements
Requirements Requirements to Changes
Requirements CM SP 2.1
Track
SP 1.4 SP 1.5 Change
Ensure Requests
Maintain Alignment
Bidirectional Between Project
Traceability of Work and
Requirements Requirements
@Author : on c dedoan@gmail.com
7
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
Manage Requirements
SP 1.1 Understand Requirements
SP 1.2 Obtain Commitment to Requirements
SG 1 SP 1.3 Manage Requirements Changes
Focus
Area SP 1.4 Maintain Bidirectional Traceability of
Requirements
SP 1.5 Ensure Alignment Between Project
Work and Requirements
@Author : on c dedoan@gmail.com
@Author : on c dedoan@gmail.com
8
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
Topics
17
Requirement Management
@Author : on c dedoan@gmail.com
Purpose
Establish and maintain plans that define project activities.
Product
Planning
@Author : on c dedoan@gmail.com
9
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
Relevant Terminology
19
Project
A managed set of interrelated activities and resources, including
people, that delivers one or more products or services to a customer
or end user.
A project has an intended beginning (i.e., project startup) and end.
Projects typically operate according to a plan. Such a plan is
frequently documented and specifies what is to be delivered or
implemented, the resources and funds to be used, the work to be
done, and a schedule for doing the work. A project can be composed
of projects.
In some contexts, the term program is used to refer to a project.
@Author : on c dedoan@gmail.com
Future projects cannot learn from completed projects because there are no
lessons learned.
@Author : on c dedoan@gmail.com
10
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
Establish Estimates
SG 1 Estimates of project planning parameters are
established and maintained.
@Author : on c dedoan@gmail.com
Establish Estimates
SP 1.1 Estimate the Scope of the Project
SP 1.2 Establish Estimates of Work Product and
SG 1 Task Attributes
SP 1.3 Define Project Lifecycle Phases
SP 1.4 Estimate Effort and Cost
@Author : on c dedoan@gmail.com
11
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
@Author : on c dedoan@gmail.com
Project Planning
@Author : on c dedoan@gmail.com
12
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
Project Planning
@Author : on c dedoan@gmail.com
Project Planning
Pr actices Ob tain Plan Commitmen t Docu men ted Req u ests f or Commitmen ts
Docu men ted Commitmen ts
Typical Wor k Pr oducts
@Author : on c dedoan@gmail.com
13
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
@Author : on c dedoan@gmail.com
@Author : on c dedoan@gmail.com
14
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
@Author : on c dedoan@gmail.com
@Author : on c dedoan@gmail.com
15
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
@Author : on c dedoan@gmail.com
1. Tools
2. Budget/funding
3. Staff
4. Project plans
5. Facilities
@Author : on c dedoan@gmail.com
16
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
Topics
33
Requirement Management
@Author : on c dedoan@gmail.com
Purpose
Provide understanding of the projects progress so that
appropriate corrective actions can be taken when the
projects performance deviates significantly from the plan.
Plan vs Actual
@Author : on c dedoan@gmail.com
17
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
@Author : on c dedoan@gmail.com
18
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
@Author : on c dedoan@gmail.com
M on itor Commitmen ts
Record s of Commitmen t Review s
Pr actices
Con d u ct Prog ress Review s Docu men ted Project Review Resu lts
Typical Wor k Pr oducts
Con d u ct M ileston e Review s Docu men ted M ileston e Review Resu lts
@Author : on c dedoan@gmail.com
19
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
Goals
@Author : on c dedoan@gmail.com
Issues and
Project Plans Corrective
Actions
@Author : on c dedoan@gmail.com
20
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
@Author : on c dedoan@gmail.com
@Author : on c dedoan@gmail.com
21
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
Topics
43
Requirement Management
@Author : on c dedoan@gmail.com
v Purpose
Identify potential problems before they occur so that risk
handling activities can be planned and invoked as needed
across the life of the product or project to mitigate adverse
impacts on achieving objectives.
Risks
@Author : on c dedoan@gmail.com
22
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
Risks that are known to project staff are often not known to
management.
@Author : on c dedoan@gmail.com
Mitigate Risks
SG 3 Risks are handled and mitigated as appropriate to
reduce adverse impacts on achieving objectives.
@Author : on c dedoan@gmail.com
23
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
Mitigate Risks
SG 3 SP 3.1 Develop Risk Mitigation Plans
SP 3.2 Implement Risk Mitigation Plans
@Author : on c dedoan@gmail.com
Risk Management
Pr actices
@Author : on c dedoan@gmail.com
24
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
Risk Management
Goals
Pr actices
@Author : on c dedoan@gmail.com
Risk Management
@Author : on c dedoan@gmail.com
25
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
Plans Risk
Repository
@Author : on c dedoan@gmail.com
@Author : on c dedoan@gmail.com
26
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
@Author : on c dedoan@gmail.com
@Author : on c dedoan@gmail.com
27
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
Topics
55
Requirement Management
@Author : on c dedoan@gmail.com
Purpose
The purpose of Supplier Agreement Management (SAM) is
to manage the acquisition of products and services from
suppliers.
PA
S S
@Author : on c dedoan@gmail.com
28
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
Relevant Terminology
57
Supplier
An entity delivering products or performing services being acquired.
An individual, partnership, company, corporation, association, or
other entity having an agreement with an acquirer for the design,
development, manufacture, maintenance, modification, or supply of
items under the terms of an agreement.
Supplier agreement
A documented agreement between the acquirer and supplier.
@Author : on c dedoan@gmail.com
The management and technical staff do not have insight into supplier
activities.
Supplier products are accepted even when they do not meet the
product requirements.
@Author : on c dedoan@gmail.com
29
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
@Author : on c dedoan@gmail.com
@Author : on c dedoan@gmail.com
30
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
S tatemen ts of Work
Estab lish S u p p lier Con tracts
Ag reemen ts M emoran d a of Ag reemen t
Licen sin g ag reemen t
Goals
Pr actices
@Author : on c dedoan@gmail.com
@Author : on c dedoan@gmail.com
31
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
@Author : on c dedoan@gmail.com
@Author : on c dedoan@gmail.com
32
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
@Author : on c dedoan@gmail.com
Topics
66
Requirement Management
@Author : on c dedoan@gmail.com
33
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
Purpose
v Establish and manage the project and the involvement of relevant
stakeholders according to an integrated and defined process that
is tailored from the organizations set of standard processes.
Project B
Project C
Organizational
Organizational
Process Assets
Process Assets
Project A
@Author : on c dedoan@gmail.com
@Author : on c dedoan@gmail.com
34
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
@Author : on c dedoan@gmail.com
@Author : on c dedoan@gmail.com
35
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
@Author : on c dedoan@gmail.com
Goals
In teg rate Plan s
Integrated Plans
Practices
Typical Work Products Work Products Created by Performing the Projects Defined Process
M an ag e th e Project Usin g th e Collected Measures ( Actual) and Progress Records or Reports
In teg rated Plan s Revised Requirements, Plans, and Commitments
Integrated Plans
36
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
Coordinate and
Use the
Collaborate
Projects
With Relevant
Defined Process
Stakeholders
Agendas and Schedules for Collaborative Activities
Documented Issues ( e.g., issues with customer requirements,
product and product-component requirements, product architecture,
M an ag e S takeh old er and product design)
In volvemen t Recommendations for Resolving Relevant Stakeholder Issues
Practices
Resolve Coord in ation Relevant Stakeholder Coordination Issues
Typical Work Products
Issu es Status of Relevant Stakeholder Coordination Issues
@Author : on c dedoan@gmail.com
@Author : on c dedoan@gmail.com
37
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
@Author : on c dedoan@gmail.com
PMC SP 1.2
Monitor
Commitments
@Author : on c dedoan@gmail.com
38
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
Projects (IPM)
@Author : on c dedoan@gmail.com
@Author : on c dedoan@gmail.com
39
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
@Author : on c dedoan@gmail.com
Topics
80
Requirement Management
@Author : on c dedoan@gmail.com
40
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
@Author : on c dedoan@gmail.com
@Author : on c dedoan@gmail.com
41
Capability Maturity Model Integration version 1.3
PARTICIPANTS MANUAL
@Author : on c dedoan@gmail.com
42