Project:

Subject :

Page Item Description Unit

BILL NO.2: DEMOLITION WORKS


DEMOLITION WORKS :
2/1 A Demolition; basement floor level Item
2/1 B Demolition; ground floor level Item
2/1 C Demolition; first floor level Item
2/1 D Demolition; second floor level Item
2/1 E Demolition; roof level Item

CONNECTION FOR NEW & EXISTING STRUCTURES


2/1 F Structure connection; basement floor level Item
2/1 G Structure connection; ground floor level Item
2/1 H Structure connection; first floor level Item
2/1 I Structure connection; second floor level Item
2/1 J Structure connection; roof level Item
page 2/1
2/2 BILL NO.2: DEMOLITION WORKS
2/2 Summary:
2/2 page 2/1
2/2 SUB-TOTAL FOR BILL NO.2 : DEMOLITION WORKS
BILL NO.3: PILING WORKS
3/2 A Allow for all piling equipment, plants & tools Item
3/2 B Moving & handling piling equipment Item
3/2 C Submission of piling recods Item
3/2 D Allow of the setting out of piles position Item
3/2 E Prepare and submit 2 sets of as built dwgs Item
page 3/2
BILL NO.3: PILING WORKS
3/3 A Supply & deliver, 150 x 150mm initial pile, 6m length no.
3/3 B Supply & deliver, 150 x 150mm extension pile, 6m length no.
3/3 C Supply & deliver, 150 x 150mm extension pile, 3m length no.
3/3 D
3/3 E
3/3 F
3/3 G
page 3/3
BILL NO.3: PILING WORKS
3/4 Summary:
3/4 page 3/2
3/4 page 3/3
3/4 SUB-TOTAL FOR BILL NO.3: PILING WORKS
BILL NO.4: BUILDING WORKS (WBLFF)
WORK BELOW LOWEST FLOOR LEVEL
4/1 A Excavation for basement to RL; n.e. 1.5m deep m3
4/1 B Excavation for basement to RL; exceeding 1.5m but n.e 3.0m deep m3
c C Excavation for basement to RL; exceeding 3.0m but n.e 4.5m deep m3
4/1 D Excavation pit for pile caps, n.e 1.5m deep m3
4/1 E Excavation pit for pile caps, exceedubg 1.5m deep but n.e 3.0m deepm3
4/1 F Excavation trench for basement floor beams; n.e 1.5m deep m3
4/1 G Excavation for swimming pool; n.e. 1.5m deep m3
4/1 H Excavation for swimming pool; exceeding 1.5m but n.e exceeding 3. m3
4/1 I Hardcore, 150mm thk; to basement floor slab m2
4/1 J Hardcore, 150mm thk; to ground floor slab m2
4/1 K Hardcore, 150mm thk; to apron slab m2
4/1 L Hardcore, 150mm thk; to swimming pool base m2
page 4/1
BILL NO.4: BUILDING WORKS (WBLFF)
4/2 A Conc. G15; as blinding bed 50mm thk, under pile caps m2
4/2 B Conc. G15; as blinding bed 50mm thk, under basement floor beams m2
4/2 C Conc. G30; in pile caps m3
4/2 D Conc. G30; in column stumps m3
4/2 E Conc. G30 in basement floor beams m3
4/2 F Conc. G30 in basement floor slab,200mm thk m2
4/2 G Conc. G30 in ground floor slab, 125mm thk m2
4/2 H Conc. G30 in apron slab, 125mm thk m2
4/2 I Conc. G30 in RC base wall, 300mm thk m2
4/2 J Conc. G30 in RC low wall, 150mm thk m2
4/2 K Conc. G30 in swimming pool slab, 200mm thk m2
4/2 L Conc. G30 in swimming pool wall, 150mm thk m2
4/2 M Conc. G30 in balancing tank wall, 230mm thk m2
4/2 N Conc. G30 in over flow rain m3
page 4/2
BILL NO.4: BUILDING WORKS (WBLFF)
4/3 A Bar, in pile caps kg
4/3 B Bar, in column stumps kg
4/3 C Bar, in basement floor beams kg
4/3 D Bar, in basement floor slab kg
4/3 E Bar, in ground floor slab kg
4/3 F Bar,in apron slab kg
4/3 G Bar, in RC basement wall kg
4/3 H Bar in RC low wall kg
4/3 I Bar, in swimming pool slab kg
4/3 J Bar, in swimming pool wall kg
4/3 K Bar, in balancing tank wall kg
4/3 L Bar, in overflow drain kg
4/3 M BRC; A7 to ground floor slab m2
4/3 N BRC; A7 to apron slab m2
4/3 O BRC; A10 to basement floor slab m2
page 4/3
BILL NO.4: BUILDING WORKS (WBLFF)
4/4 A BRC; A10 to pile caps m2
4/4 B BRC; A10 to column stumps m2
4/4 C BRC; A10 to basement floor beams m2
4/4 D BRC; A10 to RC basement wall m2
4/4 E BRC; A10 to RC low wall m2
4/4 F BRC; A10 to swimming pool wall m2
4/4 G BRC; A10 to balancing tank wall m2
4/4 H BRC; A10 to over floor drain m2
4/4 I PE Sheet, 0.125mm thk, 2 layers; under basement slab m2
4/4 J PE Sheet, 0.125mm thk, 2 layers; under ground floor slab m2
4/4 K PE Sheet, 0.125mm thk, 2 layers; under swimming pool slab m2
4/4 L Anti-termitte; 5 years warranty, under floor slab & beams Item
page 4/4
BILL NO.4: BUILDING WORKS (WBLFF)
4/5 A "Crystalite" waterproofing system; to basement floor slab m3
4/5 B "Crystalite" waterproofing system; to basement walls m3
4/5 C "Crystalite" waterproofing system; to swimming pool wall & slab m3
4/5 D "Crystalite" waterproofing system; to balancing tank wall m3
4/5 E "Crystalite" waterproofing system; to over flow drain m3
4/5 F Cementitious waterproofing water membrane; to basement floor slabm2
4/5 G Cementitious waterproofing water membrane; to basement walls m2
4/5 H Cementitious waterproofing water membrane; to swimming pool wallm2
4/5 I Cementitious waterproofing water membrane; to balancing tank wallm2
4/5 J Cementitious waterproofing water membrane; to over floor drain m2
4/5 K Sundries; Allow waterstop to basement slab/wall Item
4/5 L Sundries; Allow for constructin joints to basement slabs Item
page 4/5
BILL NO.4: BUILDING WORKS (WBLFF)
Summary:
4/6 page 4/1
4/6 page 4/2
4/6 page 4/3
4/6 page 4/4
4/6 page 4/5
4/6 1 page 4/6
BILL NO.4: BUILDING WORKS (FRAME)
4/7 A Conc. G30; in suspended floor beams m3
4/7 B Conc. G30; in suspended first floor beams m3
4/7 C Conc. G30; in suspended second floor beams m3
4/7 D Conc. G30; in columns m3
4/7 E Conc. G30; in stiffeners m3
4/7 F Conc. G30; in feature wall, 150mm thk m2
4/7 G Conc. G30; in steps m3
4/7 H Bar, in suspended ground floor beams kg
4/7 I Bar, in suspended first floor beams kg
4/7 J Bar, in suspended second floor beams kg
4/7 K Bar, in columns kg
4/7 L Bar, in stiffeners kg
4/7 M Bar, in feature pond wall kg
4/7 N Bar, in steps kg
page 4/7
BILL NO.4: BUILDING WORKS (FRAME)
4/8 A Fwk; to columns m2
4/8 B Fwk; to stiffeners m2
4/8 C Fwk; to feature pond wal m2
4/8 D Fwk; to riser 100mm-200mm high m
4/8 E Fwk; to open string, 300mm width m
4/8 F Fwk; to sides & soffit suspended ground floor beams m2
4/8 G Fwk; to sides & soffit first floor beams m2
4/8 H Fwk; to sides & soffit suspended second floor beams m2
4/8 I Waterproofing "Pentens T100" to feature pond wall & slab m2
4/8 J Waterproofing "Pentens T100" to planter box wall & slab m2
4/8 K Waterproofing "Pentens T100" to gutter wall & slab m2
4/8 L Metal works, work to ground floor- 150 x 150 x 5mm SHS m
page 4/8
BILL NO.4: BUILDING WORKS (FRAME)
Summary:
4/9 page 4/7
4/9 page 4/8
2 page 4/9
BILL NO.4: BUILDING WORKS (UPPER FLOOR)
4/10 A Conc. G30; in suspended ground floor slab; 125mm thick m2
4/10 B Conc. G30; in suspended ground floor slab; 125mm thick m2
4/10 C Conc. G30; in suspended first floor slab; 125mm thick m2
4/10 D Conc. G30; in suspended first floor slab; 150mm thick m2
4/10 E Conc. G30; in suspended second floor slab; 125mm thick m2
4/10 F Conc. G30; in suspended second floor slab; 150mm thick m2
4/10 G BRC A7; Suspended ground floor slab m2
4/10 H BRC A7; suspended first floor slab m2
4/10 I BRC A7; suspended second floor slab m2
4/10 J BRC A8; in suspended ground floor slab m2
4/10 K BRC A8; in suspended first floor slab m2
4/10 L BRC A8, in suspended second floor slab m2
page 4/10
BILL NO.4: BUILDING WORKS (UPPER FLOOR)
4/11 A Bar; in suspended ground floor slab kg
4/11 B Fwk; to suspended ground floor slab m2
4/11 C Fwk; to suspended first floor slab m2
4/11 D Fwk; to suspended second floor slab m2
4/11 E Fwk; E.O for forming scupper drain: 150 x 50mm deep m
4/11 F Fwk; E.O for forming scupper drain: 75 x 50mm deep m
page 4/11
BILL NO.4: BUILDING WORKS (FRAME)
Summary:
4/12 page 4/10
4/12 page 4/11
3 page 4/12
BILL NO.4: BUILDING WORKS (ROOF)
4/13 A Conc. G30; in suspended roof beams m3
4/13 B Conc. G30; in suspended roof slabs, 150mm thk m2
4/13 C Bar; in suspended roof beams kg
4/13 D Bar; in suspended roof slab kg
4/13 E BRC, A8 to suspended roof slab kg
4/13 F Fwk: to sides and soffit of suspended roof beams m2
4/13 G Fwk; to soffit of suspended roof slab m2
page 4/13
BILL NO.4: BUILDING WORKS (ROOF)
4/14 A Waterproofing; "Pentens T-10" to suspended flat roof slab m2
4/14 B Waterproofing; to futter wall & slab m2
4/14 C Roof truss; to pitched roof 5' m2
4/14 D " Weatherclip 655" 0.53mm thk colourbond metal roofing sheet m2
page 4/14
BILL NO.4: BUILDING WORKS (ROOF)
4/15 A Aluminium foil to 1 layer of double sided aluminium foil to roof 5' pi m2
4/15 B 50kg/m2 thermal rockwool ; to roof 5'pitched m2
4/15 C Cement board, 10m thk under the roof m2
4/15 D 100mm dia. PVC RWDP fixed to walls, columns/ceiling. m
4/15 E E.O for bend no.
4/15 F E.O for framing outlet no.
4/15 G 100mm dia RWDP; underground complete with concrete casement m
page 4/15
BILL NO.4: BUILDING WORKS (ROOF)
4/16 A Floor Trap; 100mm x 100mm work to gutter no.
4/16 B Gauge 1.5 metal fascia sheet, 550mm girth, work to roof m
page 4/16
BILL NO.4: BUILDING WORKS (ROOF)
Summary:
page 4/13
page 4/14
page 4/15
page 4/16
4 page 4/17
BILL NO.4: BUILDING WORKS (EXTERNAL WALLS)
4/18 A Clay common brick; to walls, 115mm thick m2
4/18 B Clay common brick; to walls 300mm thick (feature wall) m2
4/18 C Clay common brick; to swimming pool brick seat; 600 x 650mm high m
4/18 D Ventilation block to walls, 300mm thk m2
4/18 E Acrylic sheet panel, 100mm thick, fixed to swimming pool 1550mm hm
page 4/18
BILL NO.4: BUILDING WORKS (EXTERNAL WALLS)
4/19 A Glass Railing with 8mm thk green tinted glass; to 1st Flr (New gardenm
4/19 B Glass Railing with 8mm thk green tinted glass; to 2nd flr (New gardenm
4/19 C Glass Railing with 8mm thk green tinted glass; to 2nd flr (Roof Terracem
page 4/19
BILL NO.4: BUILDING WORKS (EXTERNAL WALLS)
Summary:
page 4/18
page 4/19
5 page`4/20
BILL NO.4: BUILDING WORKS (INTERNAL WALLS)
4/21 A Clay common bricks to walls, 115mm thk m2
4/21 B Glass railing with 8mm thk tempered clear glass m
6 page 4/21
BILL NO.4: BUILDING WORKS (WINDOWS & DOORS)
4/22 A Concrete Lintol; 225 x 125mm high m
4/22 B Window coping; 225 x 100mm high including reinforment bar m
4/22 A Aluminium glass windows & doors ; Type S1- 2550 x 3000mm high no.
4/22 B Aluminium glass windows & doors ; Type S3- 2100 x 3000mm high no.
4/22 C Aluminium glass windows & doors ; Type S1- 2000 x 2700mm high no.
4/22 D Aluminium glass windows & doors ; Type S1- 6400 x 2400mm high no.
4/22 E Aluminium glass windows & doors ; Type S1- 16865 x 3700mm high no.
page 4/22
BILL NO.4: BUILDING WORKS (WINDOWS & DOORS)
4/23 A Alum. Glasss windows & doors, Type FD1- 5920 x 2700mm high no.
4/23 B Alum. Glasss windows & doors, Type GD1 (frameless glass panel)- 5 no.
4/23 C Alum. Glasss windows & doors, Type D4 (frameless glass panel)- 900 no.
4/23 D Alum. Glasss windows & doors, Type W1 (frameless glass panel)- 15 no.
4/23 E Alum. Glasss windows & doors, Type W2 (frameless glass panel)- 75 no.
page 4/23
BILL NO.4: BUILDING WORKS (WINDOWS & DOORS)
4/24 A Alum. Glass windows & doors, W3 no.
4/24 B Alum. Glass windows & doors, W4 no.
4/24 C Alum. Glass windows & doors, W5 no.
4/24 D Alum. Glass windows & doors, W6 no.
4/24 E Alum. Glass windows & doors, W7 no.
4/24 F Alum. Glass windows & doors, W8 no.
4/24 G Alum. Glass windows & doors, W9 no.
4/24 H Alum. Glass windows & doors, W10 no.
4/24 I Alum. Glass windows & doors, W11 no.
4/24 J Alum. Glass windows & doors, W12 no.
4/24 K Alum. Glass windows & doors, W12a no.
4/24 L Alum. Glass windows & doors, W13 no.
4/24 M Alum. Glass windows & doors, W14 no.
4/24 N Alum. Glass windows & doors, W15 no.
4/24 O Alum. Glass windows & doors, W16 no.
4/24 P Alum. Glass windows & doors, W17 no.
page 4/24
BILL NO.4: BUILDING WORKS (WINDOWS & DOORS)
4/25 A D5 no.
4/25 B SC1 no.
4/25 C SC2 no.
4/25 D SC3 no.
4/25 E SC4 no.
4/25 F SC5 no.
4/25 G SC6 no.
page 4/25
BILL NO.4: BUILDING WORKS (WINDOWS & DOORS)
4/26 A D1 no.
4/26 B D2 no.
4/26 C D3 no.
4/26 D SD1 no.
4/26 E SD2 no.
4/26 A D6 no.
page 4/26
Summary :
BILL NO.4: BUILDING WORKS (WINDOWS & DOORS)
page 4/22
page 4/23
page 4/24
page 4/25
page 4/26
7 page 4/27
BILL NO.4: BUILDING WORKS (WALL FINISHES )
4/28 A plastering; m2
4/28 B plastering; m2
4/28 C Skim coat m2
4/28 D Niro white tiles m2
page 4/28
BILL NO.4: BUILDING WORKS (WALL FINISHES )
4/29 A Niro white tiles m2
4/29 B Niro white tiles m2
4/29 C Niro white tiles m2
4/29 D Niro white tiles m2
page 4/29
BILL NO.4: BUILDING WORKS (WALL FINISHES )
4/30 A nippon painting; m2
4/30 B nippon painting; m2
4/30 C nippon painting; m2
4/30 D Repainting; internally Item
4/30 E Repainting; Externally Item
page 4/30
summary:
BILL NO.4: BUILDING WORKS (WALL FINISHES )
page 4/28
page 4/29
page 4/30
8 page 4/31
BILL NO.4: BUILDING WORKS (WALL FINISHES )
4/32 A Paving; m2
4/32 B Paving; m2
4/32 C MML Tiles m2
4/32 D Niro Tiles m2
4/32 E Niro Tiles m2
4/32 F Niro Tiles m2
4/32 G Niro Tiles m2
page 4/32
BILL NO.4: BUILDING WORKS (WALL FINISHES )
4/33 A Niro Tiles m2
4/33 B Niro Tiles m2
4/33 C Niro Tiles m2
4/33 D Niro Tiles m2
4/33 E Niro Tiles m2
4/33 F Niro Tiles m2
4/33 G Niro Tiles m2
4/33 H Niro Tiles m2
4/33 I Niro Tiles m
page 4/33
BILL NO.4: BUILDING WORKS (FLOOR FINISHES )
4/34 A Niro Tiles m2
4/34 B Niro Tiles m2
4/34 C Niro Tiles m2
page 4/34
BILL NO.4: BUILDING WORKS (FLOOR FINISHES )
4/35 A Pebble wash stone m2
4/35 B carpet m2
4/35 C carpet m
4/35 D Waterproofing, pentens T100 m2
page 4/35
summary:
BILL NO.4: BUILDING WORKS (FLOOR FINISHES )
page 4/32
page 4/33
page 4/34
page 4/35
9 page 4/36
BILL NO.4: BUILDING WORKS (CEILING FINISHES)
4/37 A Skim coat m2
4/37 B Fibrous plasterglass ceiling board; m2
4/37 C Fibrous plasterglass ceiling board; m2
4/37 D E.O for light through m
4/37 E E.O for curtain pelmet m
4/37 F E.O for forming 600 x 600 manholes no.
4/37 G Nyatoh timber strip ceiling m2
4/37 H Plywood with Armira laminated vinyl m2
page 4/37
BILL NO.4: BUILDING WORKS (CEILING FINISHES)
4/38 A Painting; m2
4/38 B Painting; m2
4/38 C Painting; m
4/38 D Painting; m
page 4/38
summary :
BILL NO.4: BUILDING WORKS (CEILING FINISHES)
page 4/37
page 4/38
10 page 4/39
BILL NO.4: BUILDING WORKS (SANITARY APPLIANCES)
4/40 A Washdown pedestal wc no.
4/40 B vanity basin no.
4/40 C wash hand basin no.
4/40 D toilet paper holder no.
4/40 E soap dis no.
4/40 F shower set no.
4/40 G floor trap no.
11 page 4/40
BILL NO.4: BUILDING WORKS (MISCELLANEOUS)
4/41 A Demolition;
4/41 B Demolition;
4/41 C Demolition; item
4/41 D Demolition;
4/41 E Demolition;
4/41 F Connection;
4/41 G Connection;
4/41 H Connection; Item
4/41 I Connection;
4/41 J Connection;
page 4/41
BILL NO.4: BUILDING WORKS (MISCELLANEOUS)
4/42 A Spiral staircase no.
4/42 BI. Vanity Counter ; no.
4/42 BII. Vanity Counter ; no.
4/42 BIII. Vanity Counter ; no.
4/42 CI Timber ledge & wrought iron bracket no.
4/42 CI Timber ledge & wrought iron bracket no.
4/42 CII Timber ledge & wrought iron bracket no.
page 4/42
BILL NO.4: BUILDING WORKS (MISCELLANEOUS)
4/43 A Glass canopy; no.
4/43 B Glass canopy; no.
4/43 C Glass canopy; no.
4/43 D Glass canopy; no.
4/43 E Glass canopy; no.
4/43 F Glass canopy; no.
4/43 G Glass canopy; no.
4/43 H Brickwall pump sump no.
4/43 I MS Cat Ladder no.
page 4/43
Summary :
BILL NO.4: BUILDING WORKS (MISCELLANEOUS)
page 4/41
page 4/42
page 4/43
12 page 4/44

General Summary :
1 page 4/6
2 page 4/9
3 page 4/12
4 page 4/17
5 page`4/20
6 page 4/21
7 page 4/27
8 page 4/31
9 page 4/36
10 page 4/39
11 page 4/40
12 page 4/44
0%
CODE Qty Rate Amount (RM) Base Rate

DEMO 1 62,000.00 62,000.00 62,000.00


DEMO
DEMO
DEMO
DEMO

CONNECTION
CONNECTION
CONNECTION
CONNECTION
CONNECTION 1 58,000.00 58,000.00 58,000.00
120,000.00

120,000.00
120,000.00

PILE 1 10,000.00 10,000.00 10,000.00


PILE 1 10,000.00 10,000.00 10,000.00
PILE 1 10,000.00 10,000.00 10,000.00
PILE 1 7,500.00 7,500.00 7,500.00
PILE 1 1,500.00 1,500.00 1,500.00
39,000.00

PILE 130 160.00 20,800.00 160.00


PILE 650 160.00 104,000.00 160.00
PILE 130 120.00 15,600.00 120.00
PILE 5200 23.00 119,600.00 23.00
PILE 780 16.00 12,480.00 16.00
PILE 130 30.00 3,900.00 30.00
PILE 12 2,600.00 31,200.00 2,600.00
307,580.00

39,000.00
307,580.00
346,580.00
EXC 249 30.00 7,470.00 30.00
EXC 249 35.00 8,715.00 35.00
EXC 157 38.00 5,966.00 38.00
EXC 35 30.00 1,050.00 30.00
EXC 5 35.00 175.00 35.00
EXC 27 30.00 810.00 30.00
EXC 95 30.00 2,850.00 30.00
EXC 22 35.00 770.00 35.00
HARD 166 18.00 2,988.00 18.00
HARD 142 18.00 2,556.00 18.00
HARD 16 18.00 288.00 18.00
HARD 63 18.00 1,134.00 18.00
34,772.00

CONC. G15 24 18.00 432.00 18.00


CONC. G15 123 18.00 2,214.00 18.00
CONC. G30 16 350.00 5,600.00 350.00
CONC. G30 4 350.00 1,400.00 350.00
CONC. G30 25 350.00 8,750.00 350.00
CONC. G30 166 34.00 5,644.00 34.00
CONC. G30 142 25.00 3,550.00 25.00
CONC. G30 16 25.00 400.00 25.00
CONC. G30 233 35.00 8,155.00 35.00
CONC. G30 2 26.00 52.00 26.00
CONC. G30 63 27.00 1,701.00 27.00
CONC. G30 56 26.00 1,456.00 26.00
CONC. G30 14 26.50 371.00 26.50
CONC. G30 4 350.00 1,400.00 350.00
41,125.00

BAR 1,253 4.20 5,262.60 4.20


BAR 1,992 4.20 8,366.40 4.20
BAR 2,908 4.20 12,213.60 4.20
BAR 1,021 4.20 4,288.20 4.20
BAR 242 4.20 1,016.40 4.20
BAR 76 4.20 319.20 4.20
BAR 12,630 4.20 53,046.00 4.20
BAR 24 4.20 100.80 4.20
BAR 1,807 4.20 7,589.40 4.20
BAR 1,666 4.20 6,997.20 4.20
BAR 453 4.20 1,902.60 4.20
BAR 603 4.20 2,532.60 4.20
BRC A7 142 17.00 2,414.00 17.00
BRC A7 16 17.00 272.00 17.00
BRC A10 420 20.00 8,400.00 20.00
114,721.00

BRC A10 73 20.00 1,460.00 20.00


BRC A10 44 20.00 880.00 20.00
BRC A10 168 20.00 3,360.00 20.00
BRC A10 466 20.00 9,320.00 20.00
BRC A10 4 20.00 80.00 20.00
BRC A10 112 20.00 2,240.00 20.00
BRC A10 28 20.00 560.00 20.00
BRC A10 42 20.00 840.00 20.00
PE 166 5.00 830.00 5.00
PE 142 5.00 710.00 5.00
PE 63 5.00 315.00 5.00
ANTI 1 4,500.00 4,500.00 4,500.00
25,095.00

WP 33 115.00 3,795.00 115.00


WP 70 115.00 8,050.00 115.00
WP 21 115.00 2,415.00 115.00
WP 3 115.00 345.00 115.00
WP 4 115.00 460.00 115.00
WP 166 58.00 9,628.00 58.00
WP 233 58.00 13,514.00 58.00
WP 119 58.00 6,902.00 58.00
WP 14 58.00 812.00 58.00
WP 24 58.00 1,392.00 58.00
WP 1 1,000.00 1,000.00 1,000.00
WP 1 1,000.00 1,000.00 1,000.00
49,313.00

34,772.00
41,125.00
114,721.00
25,095.00
49,313.00
265,026.00

CONC. G30 52 350.00 18,200.00 350.00


CONC. G30 25 350.00 8,750.00 350.00
CONC. G30 12 350.00 4,200.00 350.00
CONC. G30 27 350.00 9,450.00 350.00
CONC. G30 6 350.00 2,100.00 350.00
CONC. G30 14 26.00 364.00 26.00
CONC. G30 3 350.00 1,050.00 350.00
BAR 6,611 4.20 27,766.20 4.20
BAR 4,362 4.20 18,320.40 4.20
BAR 1,386 4.20 5,821.20 4.20
BAR 5,678 4.20 23,847.60 4.20
BAR 652 4.20 2,738.40 4.20
BAR 516 4.20 2,167.20 4.20
BAR 270 4.20 1,134.00 4.20
125,909.00

FWK 402 36.00 14,472.00 36.00


FWK 118 36.00 4,248.00 36.00
FWK 28 36.00 1,008.00 36.00
FWK 34 8.00 272.00 8.00
FWK 11 15.00 165.00 15.00
FWK 396 36.00 14,256.00 36.00
FWK 304 36.00 10,944.00 36.00
FWK 164 36.00 5,904.00 36.00
WP 25 58.00 1,450.00 58.00
WP 6 58.00 348.00 58.00
WP 23 58.00 1,334.00 58.00
METAL 23 65.00 1,495.00 65.00
55,896.00

125,909.00
55,896.00
181,805.00

CONC. G30 - 25.00 0.00 25.00


CONC. G30 122 25.00 3,050.00 25.00
CONC. G30 50 25.00 1,250.00 25.00
CONC. G30 123 26.00 3,198.00 26.00
CONC. G30 48 25.00 1,200.00 25.00
CONC. G30 63 26.00 1,638.00 26.00
BRC A7 - 17.00 0.00 17.00
BRC A7 223 17.00 3,791.00 17.00
BRC A7 134 17.00 2,278.00 17.00
BRC A8 255 19.50 4,972.50 19.50
BRC A8 123 19.50 2,398.50 19.50
BRC A8 115 19.50 2,242.50 19.50
26,018.50

BAR - 4.20 0.00 4.20


FWK 122 36.00 4,392.00 36.00
FWK 173 36.00 6,228.00 36.00
FWK 111 36.00 3,996.00 36.00
FWK 19 25.00 475.00 25.00
FWK 13 26.50 344.50 26.50
15,435.50

26,018.50
15,435.50
41,454.00

CONC. G30 16 350.00 5,600.00 350.00


CONC. G30 13 26.00 338.00 26.00
BAR 1,822 4.20 7,652.40 4.20
BAR 56 4.20 235.20 4.20
BRC A8 16 19.00 304.00 19.00
FWK 268 36.00 9,648.00 36.00
FWK 13 36.00 468.00 36.00
24,245.60

WP 16 58.00 928.00 58.00


WP 29 58.00 1,682.00 58.00
ROOF 180 85.00 15,300.00 85.00
ROOF 217 30.00 6,510.00 30.00
24,420.00

ROOF 217 11.50 2,495.50 11.50


ROOF 217 37.00 8,029.00 37.00
ROOF 217 12.00 2,604.00 12.00
RWDP 258 50.00 12,900.00 50.00
RWDP 70 35.00 2,450.00 35.00
RWDP 35 45.00 1,575.00 45.00
RWDP 63 75.00 4,725.00 75.00
34,778.50

ROOF 35 28.00 980.00 28.00


ROOF 44 68.00 2,992.00 68.00
3,972.00

24,245.60
24,420.00
34,778.50
3,972.00
87,416.10

BRICK 857 16.00 13,712.00 16.00


BRICK 4 20.00 80.00 20.00
BRICK 4 55.00 220.00 55.00
BRICK 2 20.00 40.00 20.00
ACRY SHEET 4 100.00 400.00 100.00
14,452.00

GLAZING 11 420.00 4,620.00 420.00


GLAZING 21 420.00 8,820.00 420.00
GLAZING 9 420.00 3,780.00 420.00
17,220.00

14,452.00
17,220.00
31,672.00

BRICK 582 16.00 9,312.00 16.00


GLAZING 14 420.00 5,880.00 420.00
15,192.00

CONC. 118 47.00 5,546.00 47.00


CONC. 12 47.00 564.00 47.00
ALUM 1 573.75 573.75 573.75 2.55
ALUM 1 472.50 472.50 472.50 2.1
ALUM 1 405.00 405.00 405.00 2
ALUM 1 1,152.00 1,152.00 1,152.00 6.4
ALUM 1 4,680.04 4,680.04 4,680.04 16.865
13,393.29

ALUM 2 1,198.80 2,397.60 1,198.80 5.92


ALUM 1 4,680.04 4,680.04 4,680.04 6.8
ALUM 1 4,680.04 4,680.04 4,680.04 0.9
ALUM 1 111.00 111.00 111.00 1.5
ALUM 8 74.93 599.40 74.93 0.75
12,468.08

ALUM 4 19.98 79.92 19.98 0.9


ALUM 1 79.92 79.92 79.92 0.9
ALUM 1 333.00 333.00 333.00 3
ALUM 1 162.80 162.80 162.80 2.2
ALUM 1 133.20 133.20 133.20 1.5
ALUM 1 111.00 111.00 111.00 1.5
ALUM 1 310.80 310.80 310.80 3.5
ALUM 2 76.59 153.18 76.59 0.9
ALUM 1 231.99 231.99 231.99 3.8
ALUM 1 173.99 173.99 173.99 2.85
ALUM 1 173.99 173.99 173.99 2.85
ALUM 1 133.20 133.20 133.20 1.5
ALUM 1 122.10 122.10 122.10 1.1
ALUM 1 79.97 79.97 79.97 1.33
ALUM 1 99.90 99.90 99.90 1.5
ALUM 1 1,893.29 1,893.29 1,893.29 4.3
4,272.25

DOOR 4 2,045.30 8,181.20 2,045.30


DOOR 3 3,300.00 9,900.00 3,300.00
DOOR 1 2,750.00 2,750.00 2,750.00
DOOR 1 2,900.00 2,900.00 2,900.00
DOOR 1 3,700.00 3,700.00 3,700.00
DOOR 3 1,900.00 5,700.00 1,900.00
DOOR 1 2,850.00 2,850.00 2,850.00
35,981.20

DOOR 1 3,435.00 3,435.00 3,435.00


DOOR 5 1,145.00 5,725.00 1,145.00
DOOR 2 960.00 1,920.00 960.00
DOOR 2 2,290.00 4,580.00 2,290.00
DOOR 1 3,055.00 3,055.00 3,055.00
DOOR 1 400.00 400.00 400.00
19,115.00

13,393.29
12,468.08
4,272.25
35,981.20
19,115.00
85,229.81

PLAS 932 39.50 36,814.00 39.50


PLAS 2,532 36.00 91,152.00 36.00
SC 2,532 9.50 24,054.00 9.50
TILE 21 65.00 1,365.00 65.00
153,385.00

TILE 922 65.00 59,930.00 65.00


TILE 2,532 65.00 164,580.00 65.00
TILE 2,532 65.00 164,580.00 65.00
TILE 21 65.00 1,365.00 65.00
390,455.00

PAINT 922 13.50 12,447.00 13.50


PAINT 2,412 11.00 26,532.00 11.00
PAINT 165 12.00 1,980.00 12.00
PAINT 1 12,000.00 12,000.00 12,000.00
PAINT 1 18,000.00 18,000.00 18,000.00
70,959.00

153,385.00
390,455.00
70,959.00
614,799.00

PAV 85 33.00 2,805.00 33.00


PAV 454 33.00 14,982.00 33.00
TILE 226 62.00 14,012.00 62.00
TILE 19 65.00 1,235.00 65.00
TILE 5 65.00 325.00 65.00
TILE 5 65.00 325.00 65.00
TILE 46 65.00 2,990.00 65.00
36,674.00

TILE 19 65.00 1,235.00 65.00


TILE 20 65.00 1,300.00 65.00
TILE 26 65.00 1,690.00 65.00
TILE 14 65.00 910.00 65.00
TILE 9 65.00 585.00 65.00
TILE 7 65.00 455.00 65.00
TILE 8 65.00 520.00 65.00
TILE 6 65.00 390.00 65.00
TILE 34 18.00 612.00 18.00
7,697.00

TILE 9 65.00 585.00 65.00


TILE 60 65.00 3,900.00 65.00
TILE 143 65.00 9,295.00 65.00
13,780.00

PEBBLE 8 698.00 5,584.00 698.00


CARPET 85 100.00 8,500.00 100.00
CARPET 31 65.00 2,015.00 65.00
WP 35 58.00 2,030.00 58.00
18,129.00

36,674.00
7,697.00
13,780.00
18,129.00
76,280.00

SC 18 4.50 81.00 4.50


CEILING 578 38.00 21,964.00 38.00
CEILING - 42.00 0.00 42.00
CEILING 188 65.00 12,220.00 65.00
CEILING 70 35.00 2,450.00 35.00
CEILING 10 180.00 1,800.00 180.00
CEILING 101 180.00 18,180.00 180.00
CEILING 14 150.00 2,100.00 150.00
58,795.00

PAINT 18 16.00 288.00 16.00


PAINT 578 16.00 9,248.00 16.00
PAINT 188 10.00 1,880.00 10.00
PAINT 70 10.00 700.00 10.00
12,116.00

58,795.00
12,116.00
70,911.00

SANITARY 4 2,800.00 11,200.00 2,800.00


SANITARY 1 3,000.00 3,000.00 3,000.00
SANITARY 4 1,800.00 7,200.00 1,800.00
SANITARY 4 15.00 60.00 15.00
SANITARY 4 18.00 72.00 18.00
SANITARY 4 550.00 2,200.00 550.00
SANITARY 4 25.00 100.00 25.00
23,832.00

DEMO
DEMO
DEMO 0.00
DEMO
DEMO INCLUDED
CONNECTION
CONNECTION
CONNECTION 0.00
CONNECTION
CONNECTION INCLUDED
-

MISC 1 8,000.00 8,000.00 8,000.00


MISC 1 3,500.00 3,500.00 3,500.00
MISC 1 7,000.00 7,000.00 7,000.00
MISC 1 3,800.00 3,800.00 3,800.00
MISC 1 100.00 100.00 100.00
MISC 1 100.00 100.00 100.00
MISC 4 150.00 600.00 150.00
23,100.00

MISC 1 4,734.00 4,734.00 4,734.00


MISC 1 7,861.50 7,861.50 7,861.50
MISC 1 3,523.50 3,523.50 3,523.50
MISC 2 1,062.00 2,124.00 1,062.00
MISC 1 8,743.50 8,743.50 8,743.50
MISC 1 3,658.50 3,658.50 3,658.50
MISC 1 4,077.00 4,077.00 4,077.00
MISC 1 8,010.00 8,010.00 8,010.00
MISC 1 360.00 360.00 360.00
43,092.00

-
23,100.00
43,092.00
66,192.00

265,026.00
181,805.00
41,454.00
87,416.10
31,672.00
15,192.00
85,229.81
614,799.00
76,280.00
70,911.00
23,832.00
66,192.00
1,559,808.91

BILL 2 120,000.00
BILL 3 346,580.00
BILL 4 1,559,808.91
BILL 5 109,855.00
BILL 6 190,900.00
BILL 7 686,141.80

TOTAL EXLUDE PRELIMINARIES 3,013,285.71 3,001,296.00


PRELIMINARIES 116,357.20 0.00
GRAND TOTAL : 3,129,642.91 3,001,296.00
3.00 7.65 75 573.75
3.00 6.30 75 472.50
2.70 5.40 75 405.00
2.40 15.36 75 1,152.00
3.70 62.40 75 4,680.04

2.70 15.98 75 1,198.80


2.70 62.40 75 4,680.04
2.40 62.40 75 4,680.04
2.00 3.00 37 111.00
2.70 2.03 37 74.93

0.60 0.54 37 19.98


2.40 2.16 37 79.92
3.00 9.00 37 333.00
2.00 4.40 37 162.80
2.40 3.60 37 133.20
2.00 3.00 37 111.00
2.40 8.40 37 310.80
2.30 2.07 37 76.59
1.65 6.27 37 231.99
1.65 4.70 37 173.99
1.65 4.70 37 173.99
2.40 3.60 37 133.20
3.00 3.30 37 122.10
1.63 2.16 37 79.97
1.80 2.70 37 99.90
11.90 51.17 37 1,893.29
Page Item Description Unit CODE Qty Rate
BILL NO.5; EXTERNAL WORKS
5/1 A Drainage; UPVC pipe m 120 150.00
5/1 B Drainage; connection item 1 3,000.00
5/1 C Brick sumps; no. 19 1,500.00
5/1 D Brick sumps; item 1 3,000.00
5/1 E Manholes & Sewerage pipes no, 8 2,000.00
5/1 F Manholes & Sewerage pipes m 101 250.00
5/1 G Manholes & Sewerage pipes item 1 3,000.00
Page 5/1
BILL NO.5; EXTERNAL WORKS
5/2 A Water & elec. Compartment no. 1 2,800.00
5/2 B Repainting no. 487 15.00
5/2 C Gazebo no. 1 3,000.00
page 5/2

Page 5/1
page 5/2
0%
Amount (RM) Base Rate

18,000.00 150.00
3,000.00 3,000.00
28,500.00 1,500.00
3,000.00 3,000.00
16,000.00 2,000.00
25,250.00 250.00
3,000.00 3,000.00
96,750.00

2,800.00 2,800.00
7,305.00 15.00
3,000.00 3,000.00
13,105.00

96,750.00
13,105.00
109,855.00
Page Item Description Unit CODE Qty Rate
SP-EE-1 A Preliminaries
SP-EE-1 B Elec. Serv.
SP-EE-1 C Lighting Protection& earthing
SP-EE-1 D Telephone
SP-EE-1 E SMATV
SP-EE-1 F Lighting control
SP-EE-1 G Contingency
SP-EE-1 H Testing

SP-EE-2 A Preliminaries
SP-EE-2 1 LS 1 2,000.00
SP-EE-2 2 LS 1 2,000.00
SP-EE-2 3 LS 1 1,500.00
SP-EE-2 4 LS 1 750.00
SP-EE-2 5 LS 1 750.00
SP-EE-2 6 LS 1 750.00
SP-EE-2 7 LS 1 750.00
SP-EE-2 8 LS 1 750.00
SP-EE-2 9 LS 1 5,000.00
SP-EE-2 10 LS 1 -
SP-EE-3 11 LS 1 750.00
SP-EE-3 12 LS 1 750.00
SP-EE-3 13 LS 1 2,000.00
SP-EE-3 14 LS 1 3,000.00
SP-EE-3 15 LS 1 2,000.00
SP-EE-4 16 LS 1 750.00
SP-EE-4 17 LS 1 750.00
SP-EE-4 18 LS 1 -

SP-EE-5 B ELECTRICAL SERVICES


SP-EE-5 1 Supply and install complete system
SP-EE-5 1.01 LS 1 500.00
SP-EE-5 1.02 LS 1 500.00
SP-EE-5 1.03 LS 1 500.00
SP-EE-5 1.04 LS 1 500.00
2 UPVC Conduit
SP-EE-5 2.01 LS 1 500.00
SP-EE-5 2.02 LS 1 500.00
SP-EE-5 2.03 LS 1 500.00
SP-EE-5 2.04 LS 1 500.00
SP-EE-5 2.05 LS 1 500.00
SP-EE-5 2.06 LS 1 500.00
SP-EE-5 2.07 LS 1 500.00
-
3 Electrical Wiring Works -
SP-EE-5 3.01 LS 1 500.00
SP-EE-5 3.02 LS 1 500.00
SP-EE-5 3.03 LS 1 500.00
SP-EE-5 3.04 LS 1 500.00
-
4 SIRIM & TNB -
SP-EE-5 4.01 LS 1 500.00
SP-EE-5 4.02 LS 1 500.00
SP-EE-5 4.03 LS 1 500.00
SP-EE-5 4.04 LS 1 500.00
-
5 MSB -
SP-EE-6 5.01 Lot 1 500.00
SP-EE-6 5.02 Lot 1 500.00
SP-EE-6 5.03 Lot 1 500.00
SP-EE-6 5.04 Lot 1 500.00
SP-EE-6 5.05 Lot 1 500.00
SP-EE-6 5.06 Lot 1 500.00
SP-EE-6 5.07 Lot 1 500.00
SP-EE-6 5.08 Lot 1 500.00
-
SP-EE-6 6 TNB Meter Lot 1 500.00
SP-EE-6 7 150Amp Swtich Lot 1 500.00
8 earting system -
SP-EE-6 8.01 Lot 1 500.00
SP-EE-6 8.02 Lot 1 500.00
-
SP-EE-6 9 Provisional Power Supply Sum 1 750.00
SP-EE-6 10 Means od Electrical LS 1 750.00
SP-EE-6 11 Liaisoning with TNB LS 1 1,500.00
SP-EE-6 12 Testing LS 1 1,000.00
SP-EE-6 13 To allow for completion LS 1 -

C Lighting Protection & Earting System -


SP-EE-7 1 -
SP-EE-7 1.01 Lighting rod Lot 1 1,500.00
SP-EE-7 1.02 aluminium tape Lot 1 750.00
SP-EE-7 1.03 heater panel Lot 1 750.00
-
2 To supply and install down conductor -
SP-EE-7 2.01 Lot 1 750.00
SP-EE-7 2.02 Lot 1 750.00
SP-EE-7 2.03 Lot 1 750.00
-
3 Earth Termination -
SP-EE-7 3.01 Lot 1 500.00
SP-EE-7 3.02 Lot 1 500.00
SP-EE-7 3.03 Lot 1 500.00
SP-EE-7 3.04 Lot 1 500.00
SP-EE-7 3.05 Lot 1 500.00
-
SP-EE-7 4 Testing Lot 1 1,500.00
SP-EE-7 5 Completion L/S 1 1,500.00

D Telephone -
SP-EE-8 1 All wiring -
SP-EE-8 1.01 Cat 6 data Lot 1 500.00
-
SP-EE-8 2 Filter Lot 1 500.00
SP-EE-8 3 Single mode Lot 1 500.00
SP-EE-8 4 fibre wall Lot 1 500.00
SP-EE-8 5 SOHO box Lot 1 500.00
SP-EE-8 6 Fibnre Lot 1 500.00
SP-EE-8 7 electric L/S 1 500.00
SP-EE-8 8 TM L/S 1 1,500.00
SP-EE-8 9 Testing L/S 1 1,500.00
SP-EE-8 10 Completion -
SP-EE-8 10.01 L/S 1 -
SP-EE-8 10.02 L/S 1 -

SP-EE-9 E SMATV -
SP-EE-9 1 ASTRO -
SP-EE-9 1.01 Lot 1 500.00
SP-EE-9 2 -
SP-EE-9 2.01 no 1 500.00
SP-EE-9 2.02 no 1 500.00
SP-EE-9 2.03 no 1 500.00
SP-EE-9 2.04 no 1 500.00
SP-EE-9 2.05 no 1 500.00
SP-EE-9 2.06 Lot 1 500.00
SP-EE-9 2.07 Lot 1 500.00
SP-EE-9 2.08 no 1 500.00
SP-EE-9 2.09 no 1 500.00
SP-EE-9 3 Sum 1 1,500.00
SP-EE-9 4 L/S 1 1,500.00
SP-EE-9 5 L/S 1 1,500.00
SP-EE-9 6 L/S 1 -
SP-EE-10 F Lighting control system -
SP-EE-10 1 Lot 1 700.00
SP-EE-10 2 -
SP-EE-10 2.01 Lot 1 750.00
SP-EE-10 2.02 Lot 1 750.00
SP-EE-10 2.03 Lot 1 750.00
SP-EE-10 2.04 no 1 1,000.00
SP-EE-10 2.05 no 1 750.00
SP-EE-10 2.06 no 1 750.00
SP-EE-10 3 L/S 1 750.00
SP-EE-10 4 L/S 1 750.00
SP-EE-10 5 L/S 1 750.00
SP-EE-10 6 -
SP-EE-10 6.01 L/S 1 -
SP-EE-10 6.02 L/S 1 -
-

C-H-S-1 Cold Water, hot water & sanitary

CWPS -
C-H-S-2 1 Lot 1 1,000.00
C-H-S-2 2 L/S 1 750.00
C-H-S-2 3a L/S 1 750.00
C-H-S-2 b L/S 1 750.00
C-H-S-2 c L/S 1 750.00
C-H-S-2 d L/S 1 750.00
C-H-S-2 e L/S 1 750.00
C-H-S-2 f L/S 1 750.00
C-H-S-2 g L/S 1 750.00
C-H-S-2 h L/S 1 750.00
C-H-S-2 hi. L/S 1 750.00
C-H-S-2 hii. L/S 1 750.00
C-H-S-2 hiii. L/S 1 750.00
C-H-S-2 hiv. L/S 1 750.00
C-H-S-2 -
C-H-S-2 hot water services ppr pipe -
C-H-S-2 4a L/S 1 500.00
C-H-S-2 b L/S 1 500.00
C-H-S-2 c L/S 1 500.00
C-H-S-2 d L/S 1 500.00
C-H-S-2 e L/S 1 500.00
C-H-S-2 f L/S 1 500.00
C-H-S-2 g L/S 1 500.00
C-H-S-2 h L/S 1 500.00
C-H-S-2 i m 1 500.00
C-H-S-2 j m 1 200.00
C-H-S-2 k m 1 200.00
C-H-S-2 -
C-H-S-2 5 cold water services ppr pipe -
C-H-S-2 a L/S 1 500.00
C-H-S-2 b L/S 1 500.00
C-H-S-2 c L/S 1 500.00
C-H-S-2 e L/S 1 500.00
C-H-S-2 e L/S 1 500.00
C-H-S-2 f L/S 1 500.00
C-H-S-2 g L/S 1 500.00
C-H-S-2 h L/S 1 500.00
C-H-S-2 i L/S 1 500.00
C-H-S-2 j L/S 1 500.00
C-H-S-2 k L/S 1 500.00
C-H-S-2 l L/S 1 500.00
C-H-S-2 m L/S 1 500.00
C-H-S-2 n L/S 1 500.00
C-H-S-2 o m 1 500.00
C-H-S-2 p no 1 500.00
C-H-S-2 q L/S 1 1,000.00
C-H-S-2 r m 1 850.00
C-H-S-2 s m 1 850.00
C-H-S-2 t m 1 850.00
C-H-S-3 6a L/S 1 1,500.00
C-H-S-3 7a L/S 1 1,500.00
C-H-S-3 8a L/S 1 1,500.00

SP-ACMV-1 ACMV
SP-ACMV-1 A Preliminaries
SP-ACMV-1 B Mechanical Ventilation System
SP-ACMV-1 C Air Conditiong system
SP-ACMV-1 D Contigency Sum

SP-ACMV-2 A Preliminaris
SP-ACMV-2 1 L/S 1 2,500.00
SP-ACMV-2 2 L/S 1 2,500.00
SP-ACMV-2 3 L/S 1 2,500.00
SP-ACMV-2 4 L/S 1 2,500.00
SP-ACMV-2 5 L/S 1 2,500.00
SP-ACMV-2 6 L/S 1 2,500.00
SP-ACMV-2 7 L/S 1 2,500.00
SP-ACMV-2 8 L/S 1 1,000.00
SP-ACMV-2 9 L/S 1 750.00
SP-ACMV-2 10 L/S 1 -
SP-ACMV-3 11 L/S 1 500.00
SP-ACMV-3 12 L/S 1 500.00
SP-ACMV-3 13 L/S 1 500.00
SP-ACMV-3 14 L/S 1 500.00
SP-ACMV-3 15 L/S 1 1,500.00
SP-ACMV-4 16 L/S 1 1,500.00
SP-ACMV-4 17 L/S 1 1,500.00
SP-ACMV-4 18 L/S 1 -

B Mechanical Ventilation System -


SP-ACMV-5 1 -
SP-ACMV-5 1.01 Lot 1 500.00
SP-ACMV-5 1.02 Lot 1 500.00
SP-ACMV-5 1.03 Lot 1 500.00
SP-ACMV-5 1.04 Lot 1 500.00
SP-ACMV-5 1.05 Lot 1 500.00
SP-ACMV-5 1.06 Lot 1 500.00
SP-ACMV-5 1.07 Lot 1 500.00
SP-ACMV-5 1.08 Lot 1 500.00
SP-ACMV-5 2 1 -
SP-ACMV-5 2.01 L/S 1 1,500.00
SP-ACMV-5 2.02 L/S 1 1,500.00

SP-ACMV-6 C Air-Conditioning System -


SP-ACMV-6 1 To supply & install 1 lot of air cooled split system -
SP-ACMV-6 1.01 Lot 1 750.00
SP-ACMV-6 1.02 Lot 1 750.00
SP-ACMV-6 1.03 Lot 1 750.00
SP-ACMV-6 1.04 Lot 1 750.00
SP-ACMV-6 1.05 Lot 1 750.00
SP-ACMV-6 1.06 Lot 1 750.00
SP-ACMV-6 1.07 Lot 1 750.00
SP-ACMV-6 1.08 Lot 1 750.00
SP-ACMV-6 1.09 Lot 1 750.00
SP-ACMV-6 1.10 Lot 1 750.00
SP-ACMV-6 1.11 Lot 1 750.00
SP-ACMV-6 1.12 Lot 1 750.00
SP-ACMV-6 1.13 Lot 1 750.00
SP-ACMV-6 1.14 Lot 1 750.00
SP-ACMV-6 1.15 Lot 1 750.00
SP-ACMV-6 -
SP-ACMV-6 2 To supply & install GI supply, return.. -
SP-ACMV-6 2.01 Lot 1 500.00
SP-ACMV-6 2.02 Lot 1 500.00
SP-ACMV-6 2.03 Lot 1 500.00
SP-ACMV-6 2.04 Lot 1 500.00
SP-ACMV-6 2.05 Lot 1 500.00
SP-ACMV-6 2.06 Lot 1 500.00
SP-ACMV-6 -
SP-ACMV-6 3 To supply & install 1 mixed flow -
SP-ACMV-6 3.01 Lot 1 500.00
SP-ACMV-6 3.02 Lot 1 500.00
SP-ACMV-6 -
SP-ACMV-6 4 To provide own means of elec.. L/S 1 1,500.00
SP-ACMV-6 5 Testing commisioning L/S 1 1,500.00

Summary :
Electrical
Cold Water & hot water
ACMV
-
Amount (RM) Base Rate
24,250.00
19,500.00
10,750.00
6,500.00
9,500.00
7,700.00
15,000.00
-
93,200.00

2,000.00 2,000.00
2,000.00 2,000.00
1,500.00 1,500.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
5,000.00 5,000.00
included -
750.00 750.00
750.00 750.00
2,000.00 2,000.00
3,000.00 3,000.00
2,000.00 2,000.00
750.00 750.00
750.00 750.00
- -
24,250.00
-
-
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
-
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
-
-
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
-
-
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
-
-
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
-
500.00 500.00
500.00 500.00
-
500.00 500.00
500.00 500.00
-
750.00 750.00
750.00 750.00
1,500.00 1,500.00
1,000.00 1,000.00
- -
19,500.00
-
-
1,500.00 1,500.00
750.00 750.00
750.00 750.00
-
-
750.00 750.00
750.00 750.00
750.00 750.00
-
-
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
-
1,500.00 1,500.00
1,500.00 1,500.00
10,750.00
-
-
500.00 500.00
-
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
1,500.00 1,500.00
1,500.00 1,500.00
-
- -
- -
6,500.00
-
-
500.00 500.00
-
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
1,500.00 1,500.00
1,500.00 1,500.00
1,500.00 1,500.00
- -
9,500.00
-
700.00 700.00
-
750.00 750.00
750.00 750.00
750.00 750.00
1,000.00 1,000.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
-
- -
- -
7,700.00

31,700.00

-
1,000.00 1,000.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
-
-
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
200.00 200.00
200.00 200.00
-
-
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
1,000.00 1,000.00
850.00 850.00
850.00 850.00
850.00 850.00
1,500.00 1,500.00
1,500.00 1,500.00
1,500.00 1,500.00

25,750.00
7,000.00
18,250.00
15,000.00
66,000.00

2,500.00 2,500.00
2,500.00 2,500.00
2,500.00 2,500.00
2,500.00 2,500.00
2,500.00 2,500.00
2,500.00 2,500.00
2,500.00 2,500.00
1,000.00 1,000.00
750.00 750.00
INCLUDED -
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
1,500.00 1,500.00
1,500.00 1,500.00
1,500.00 1,500.00
- -
25,750.00
-
-
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
-
1,500.00 1,500.00
1,500.00 1,500.00
7,000.00
-
-
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
750.00 750.00
-
-
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
500.00 500.00
-
-
500.00 500.00
500.00 500.00
-
1,500.00 1,500.00
1,500.00 1,500.00
18,250.00

93,200.00
31,700.00
66,000.00
190,900.00