Quality Assurance Versus Quality Control_iFluids Engineering
Third Party Inspection and Quality Management Services across India, Middle East, Singapore
Quality Assurance Versus Quality Control_iFluids Engineering
Third Party Inspection and Quality Management Services across India, Middle East, Singapore
Quality Assurance Versus Quality Control_iFluids Engineering
Third Party Inspection and Quality Management Services across India, Middle East, Singapore
QC is to adopt and follow what are the requirements in the Scope of work, Condition of Contract, Specification. QA provided Scope of Work, 1. Project And to execute the project as per such Conditions of Contract, Procurement standards in no more no less. Specification. QC shall make sure that all works to be executed as per standards and drawings. QC will conduct periodical checks of QA ensures drawings are submitted revisions and issue log of drawings to and approved by the Local 2. Drawing staff to update them for the new Authorities and or Engineer for site revisions. QC will withdraw uncontrolled application. copy of drawings. QC is to Monitor the latest revision of Material Approval Request (MAR) by QA is to make sure materials is acquiring material log sheet from submitted via Material Approval Document Control. QC is to check 3. Materials Request (MAR) and shall ensure materials upon arrival on site to verify compliance of specification. compliance from the approved MAR. QC is to conduct site surveillance for the materials used on site. QC shall make sure that such documents QA to record the outgoing and are stamped and filed in a manner that it incoming of the materials submittal can be searchable. When placed in box or MAR, Drawings and Related files make sure clearly labeled. 4. Document Documents and make sure recorded Controller it in log sheets. Document QC shall stamped drawings with controlling process or procedure set "Controlled Copy" for the latest revision out in the company procedures shall and otherwise stamped as "Superseded". be followed. Drawing shall Stamped "Issued for Construction" when released for site use. QC shall issue a Material Inspection for checking with the Engineer. QC shall Example: Ceramic tile Material 5. QA/QC verify the size, thickness, colour shade QA shall make sure that material has Engineer and the supplier. Requirements from MAR approved. approved MAR shall be verified by means of such physical check. QC is to check and verify the activity, QA is concern with the fabrication of material and tests by means of Method Statement, Inspection and 6. Site Inspections as detailed in the MS and Test Plan including Checklist for Activity ITP. Stages of activity that will satisfy each activity in order to meet the standard or requirements shall be written requirements. on Checklist.