Section 2,02 Utility Adjustments A. General 1 is the poiey of the MOC that all uty Felocation work to be accomplished by other than the highway contractor shall be com- pleted prior to the tendering of the highway projec For purposes of this manual, utes $e defined faites, or systems ws to pro flue, transmit or dnrbute communications, etre, heat, gs, ol, chemical. products Srater, steam, Waste and storm water, The may be puvately publicly or cooperatively ‘owned. Ualis affected by highway projets Shall tally be relocate by the owe der Agreement withthe MOC. The wity owner Sail be responsible for preparing plans based ‘on data provided by the Engineer “The MOC may direst the Engineer 19 include the work ar part ofthe highway construction plans. Thie may oocur when the relocation tor is minor ahd no Hazardous material ae Involve In oth cases the Engincr shal be responsible for locating and identifying all wie within the projet right-of-way. Utes shall be ac brataly surveyed and located relative 10 the Fighway centerline 1 Utility Data and Plans iility relocation plans may be prepared by the uilty owner OF the Engineer If by the ‘tility owner the Engineer shall deliver four {opis ofthe preliminary plans tothe MOC 60 ‘ays prio ta forwarding the final PS&E as cmb for MOC approval a required by sox tion 2-301. The preliminary plans shall show the utilities eeguting relocation, the new hh: Way contin, ground profile and projected {rade line, and proposed roadway template. In {dition the following formation shall be provided for each ofthe Fallowing types 1, Pipe Lines * Location Size (diameter) Gauge Height above or dep below ground line “Type of material transported Pressurized? Its, at what pressure? Schedule of usage Pipe materia Owner's name and address 2. Sewer Lines * Location Size (diameter) Type of pine Depth below ground tine 202, 8,€ + Pump it stations + Owner's name and address 3 Communications Lines * Pate locations and pole ideation num bers avaiable + Type, size, and pole material + Number of ines * Location of buried ines and terminal boxes + Owners name and sve 4. Power Lincs + Pole (ower) Hats onl ye Aentieae tion numbers + Line voltage 1 Number of lines + Type size, and pole (tower) material * Owner's mame and address In general, the preliminary uty plans shall te the same sive and have the sume format as the plan and profile shots (See Exhibit 3.02.8), “The contours and unnecessary planimeric ea tures may be deleted. For clanfieation pur~ ‘poses the plan sale my’ Be enlarged. “The Engicershll be availabe to consult with and advise the wilty owner on technical de- tas pertaining to the wy plans. IF the eo tation work i to be ascompished by the ute ity owner the inforzation in 1, 2, 3 and 4 above, aloag with the proposed uit eeloca tio information shall be shown on the plan tnd profile shestsprevded that such data ‘ot so voluminous tha the plans become difi- ult to read. Should ths be the case the uty plans may be incorporated directly into the Fighway plan assemtly: The contract dock ments shall cleely sate that the relocation ‘ork is 0 he accomphshed by others. 1f the relation work o be accomplished by the highway contactor, the above plan data fn specication shal be included inthe con tract documents Where the Engine is responsible for both the uty relocation deign and. the contract plans, the early delivery of preliminary plans fo the MOC shall no be required. When pre- paring the conrict ns, the Eaginec’ shall Include those lems described in 1, 2,3 and 4 shove and any additinal drawings or design data requized by the contractor to relocate the utes , Estimate of Cost ‘The estimated cost of relocating wits shall te shown on the Engineer Estimate prepared sccording 40 2-308. On peojicts where the a7 2nc relocations are included as part ofthe contract, forms the relocation at MOC expense the et the cost estimate shall be reflected inthe id mated cost shall be shown as line et the hems: On projects where the uty owner per-—hottom of the estimate 388

You might also like