Section 2,02 Utility Adjustments
A. General
1 is the poiey of the MOC that all uty
Felocation work to be accomplished by other
than the highway contractor shall be com-
pleted prior to the tendering of the highway
projec For purposes of this manual, utes
$e defined faites, or systems ws to pro
flue, transmit or dnrbute communications,
etre, heat, gs, ol, chemical. products
Srater, steam, Waste and storm water, The
may be puvately publicly or cooperatively
‘owned. Ualis affected by highway projets
Shall tally be relocate by the owe der
Agreement withthe MOC. The wity owner
Sail be responsible for preparing plans based
‘on data provided by the Engineer
“The MOC may direst the Engineer 19 include
the work ar part ofthe highway construction
plans. Thie may oocur when the relocation
tor is minor ahd no Hazardous material ae
Involve
In oth cases the Engincr shal be responsible
for locating and identifying all wie within
the projet right-of-way. Utes shall be ac
brataly surveyed and located relative 10 the
Fighway centerline
1 Utility Data and Plans
iility relocation plans may be prepared by
the uilty owner OF the Engineer If by the
‘tility owner the Engineer shall deliver four
{opis ofthe preliminary plans tothe MOC 60
‘ays prio ta forwarding the final PS&E as
cmb for MOC approval a required by sox
tion 2-301. The preliminary plans shall show
the utilities eeguting relocation, the new hh:
Way contin, ground profile and projected
{rade line, and proposed roadway template. In
{dition the following formation shall be
provided for each ofthe Fallowing types
1, Pipe Lines
* Location
Size (diameter)
Gauge
Height above or dep below ground line
“Type of material transported
Pressurized? Its, at what pressure?
Schedule of usage
Pipe materia
Owner's name and address
2. Sewer Lines
* Location
Size (diameter)
Type of pine
Depth below ground tine
202, 8,€
+ Pump it stations
+ Owner's name and address
3 Communications Lines
* Pate locations and pole ideation num
bers avaiable
+ Type, size, and pole material
+ Number of ines
* Location of buried ines and terminal boxes
+ Owners name and sve
4. Power Lincs
+ Pole (ower) Hats onl ye Aentieae
tion numbers
+ Line voltage
1 Number of lines
+ Type size, and pole (tower) material
* Owner's mame and address
In general, the preliminary uty plans shall
te the same sive and have the sume format as
the plan and profile shots (See Exhibit 3.02.8),
“The contours and unnecessary planimeric ea
tures may be deleted. For clanfieation pur~
‘poses the plan sale my’ Be enlarged.
“The Engicershll be availabe to consult with
and advise the wilty owner on technical de-
tas pertaining to the wy plans. IF the eo
tation work i to be ascompished by the ute
ity owner the inforzation in 1, 2, 3 and 4
above, aloag with the proposed uit eeloca
tio information shall be shown on the plan
tnd profile shestsprevded that such data
‘ot so voluminous tha the plans become difi-
ult to read. Should ths be the case the uty
plans may be incorporated directly into the
Fighway plan assemtly: The contract dock
ments shall cleely sate that the relocation
‘ork is 0 he accomphshed by others.
1f the relation work o be accomplished by
the highway contactor, the above plan data
fn specication shal be included inthe con
tract documents
Where the Engine is responsible for both the
uty relocation deign and. the contract
plans, the early delivery of preliminary plans
fo the MOC shall no be required. When pre-
paring the conrict ns, the Eaginec’ shall
Include those lems described in 1, 2,3 and 4
shove and any additinal drawings or design
data requized by the contractor to relocate the
utes
, Estimate of Cost
‘The estimated cost of relocating wits shall
te shown on the Engineer Estimate prepared
sccording 40 2-308. On peojicts where the
a72nc
relocations are included as part ofthe contract, forms the relocation at MOC expense the et
the cost estimate shall be reflected inthe id mated cost shall be shown as line et the
hems: On projects where the uty owner per-—hottom of the estimate