You are on page 1of 2

MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL

OBRA: PROYECTO INTEGRACION VIAL TACNA - LA PAZ, TRAMO: TACNA - COLLPA (FRONTERA CON BOLIVIA)
SUB TRAMO: KM 43+610 @ KM 94+000
CONTRATISTA: ICCGSA
SUPERVISOR: HOB CONSULTORES S.A.

METRADO MURO DE CONCRETO CICLOPEO - NUEVO


PRESUPUESTO ADICIONAL N 10

501.E 502.A 503.J

PROGRESIVA EXCAVACIN NO CONCRETO


LONGITUD CLASIFICADA RELLENOS PARA CLASE J
MURO (km) LADO PARA ESTRUCTURAS F'C=175 KG/CM 2
ESTRUCTURAS +30%PG

INICIO FINAL (m) (m 3) (m 3) (m 3)

1 46+475.00 46+492.63 IZQ. 20.00 104.10 52.18 37.35


2 57+780.00 57+804.10 IZQ. 25.00 99.80 67.40 48.23
3 58+000.00 58+009.47 IZQ. 10.00 58.30 33.10 19.73
4 60+140.00 60+165.22 DER. 25.00 196.18 123.38 61.05
5 60+476.00 60+513.50 DER. 37.50 243.88 165.09 85.09
6 60+602.00 60+648.54 DER. 45.00 433.10 261.18 149.50
7 60+670.00 60+719.26 DER. 50.00 656.83 386.90 189.25
8 62+879.00 62+889.72 Izq. 10.00 79.00 39.50 22.10
9 76+652.50 76+660.00 IZQ. 7.50 46.86 26.83 14.71
10 76+690.00 76+699.93 IZQ. 10.00 59.90 33.03 20.05
11 91+684.52 91+713.34 IZQ. 22.50 195.64 104.78 62.10
12 63+742.35 63+769.73 IZQ. 30.00 184.68 109.86 66.40

METRADO NUEVO 2,358.26 1,403.22 775.56


TERA CON BOLIVIA)

515.A 508.A 540.B 525.A 530.B

GEOCOMPUEST
ENCOFRADO Y TUBERA HDPE TUBO DE PVC- JUNTA PARA
O
DESENCOFRADO CORRUGADA 4" SAP, D=2" MUROS
DE DRENAJE

(m 2) (m) (m) (m 2) (m 2)

108.37 23.78 - 39.70 7.47


138.59 29.84 7.44 50.75 9.65
50.32 11.72 2.00 15.00 1.98
150.75 30.23 4.00 47.80 12.21
214.25 41.09 6.00 68.90 19.98
350.20 57.70 16.89 136.90 29.90
427.30 64.18 21.58 144.45 37.85
60.64 12.00 1.24 22.10 4.42
39.55 9.06 - 11.25 3.91
51.02 11.56 - 15.00 4.01
156.70 28.13 6.69 60.50 13.18
170.51 36.71 - 50.38 15.54

1,918.20 356.00 65.84 662.73 160.10