OBRA : PROYECTO INTEGRACION VIAL TACNA - LA PAZ, TRAMO: TACNA - COLLPA (FRONTERA CON BOLIVIA) SUB

TRAMO: KM 43+610 @ KM 94+000


CONTRATO : 0092-2016-MTC/20
PROPIETARIO : MTC - PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL - PROVIAS NACIONAL
CONTRATISTA : INGENIEROS CIVILES Y CONTRATISTAS GENERALES S.A.
SUPERVISION : HOB CONSULTORES S.A.
TRAMO: TACNA - COLLPA (FRONTERA CON BOLIVIA ), SUBTRAMO: KM 43+610 - KM 94+000

RESUMEN DE METRADOS - MUROS

MUROS
METRADO
ITEM PARTIDAS UND CONCRETO CONCRETO
MSR TIPO 1 MSR TIPO 2 TOTAL
CICLOPEO ARMADO
500 OBRAS DE ARTE Y DRENAJE
EXCAVACIN NO CLASIFICADA PARA
501.E m3 10,484.91 6,182.06 5,077.53 7,111.53 28,856.03
ESTRUCTURAS
501.F EXCAVACION MANUAL m3 - -
502.A RELLENOS PARA ESTRUCTURAS m3 4,713.76 3,630.41 8,344.17
502.C RELLENO PARA SUELO REFORZADO m3 - 5,285.20 7,269.65 12,554.85
502.D RELLENO NO ESTRUCTURAL m3 - - -
503.D1 CONCRETO CLASE D (F'C = 210 KG/CM2) m3 1,281.35 1,281.35
503.H CONCRETO CLASE H (F'C= 100 KG/CM2) m3 122.08 122.08
503.J CONCRETO CLASE J (F'C = 175 KG/CM2 + 30%PG) m3 3,229.85 3,229.85
503.K CONCRETO CLASE K (F'C = 140 KG/CM2 + 30%PG) m3 1.57 3.64 5.21
504 ACERO DE REFUERZO FY= 4200 KG/CM2 kg - 62,108.25 62,108.25
508.A TUBERA HDPE CORRUGADA 4" m 1,479.04 375.12 195.10 369.35 2,418.61
508.A TUBERA HDPE CORRUGADA 6" m - -
511.A2 GEOTEXTIL NO TEJIDO CLASE 2 m2 - 2,677.89 3,059.20 5,737.09
515.A ENCOFRADO Y DESENCOFRADO m2 8,138.06 3,287.47 11,425.53
640.G PIEDRA ASENTADA m3 - - -
523.A GEOMALLA DE POLIESTER TIPO I m2 - - 7,040.80 3,914.00 10,954.80
523.B GEOMALLA DE POLIESTER TIPO II m2 - - -
525.A GEOCOMPUESTO DE DRENAJE m2 2,192.40 1,047.68 770.50 1,174.80 5,185.38
526.A ELEMENTO MURO DE SUELO REFORZADO TIPO I m3 - - 1,214.77 1,214.77
526.B ELEMENTO MURO DE SUELO REFORZADO TIPO II m3 - 1,340.40 1,340.40
530.B JUNTA PARA MUROS m2 597.91 80.48 678.39
540.B TUBO DE PVC-SAP, D=2" m 24.93 94.66 119.59
590.B BARANDA METLICA TIPO II m - -
653 GEOMANTO m3 - - -
CONTRATO : 0092-2016-MTC/20
PROPIETARIO : MTC - PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL -
CONTRATISTA : INGENIEROS CIVILES Y CONTRATISTAS GENERALES S.A.
SUPERVISION : HOB CONSULTORES S.A.

TRAMO: TACNA - COLLPA (FRONTERA CON BOLIVIA ), SUBTRAMO: KM 43+610 - KM 94+000


METRADO DE MUROS CONCRETO CICLOPEO BARRERA

PROGRESIVA RELLENOS
LONGITUD
MURO (km) LADO PARA
ESTRUCTURAS

INICIO FINAL (m) (m 3)

1 46+695.00 46+719.17 DER. 25.00 126.40


2 46+994.64 47+015.00 DER. 20.00 89.16
3 48+230.00 48+264.38 DER. 35.00 136.08
4 48+825.00 48+841.83 Izq. 15.00 58.41
5 49+863.78 49+911.03 IZQ. 45.00 247.41
6 49+995.00 50+015.00 IZQ. 20.00 102.98
7 52+080.97 52+109.91 IZQ. 25.00 167.81
8 53+332.34 53+352.09 IZQ. 20.00 222.30
9 53+825.00 53+840.00 IZQ. 15.00 58.28
10 55+450.00 55+490.19 IZQ. 40.00 89.08
11 55+902.48 55+932.68 IZQ. 30.00 105.90
12 58+575.00 58+585.00 IZQ. 10.00 49.55
13 59+070.00 59+070.00 IZQ. 15.00 27.03
14 59+480.00 59+530.00 IZQ. 50.00 263.00
15 62+385.00 62+415.00 IZQ. 30.00 107.80
16 64+550.32 64+587.59 IZQ. 42.50 126.84
17 65+100.00 65+130.00 DER. 30.00 104.73
18 66+460.00 66+490.00 IZQ. 30.00 139.20
19 66+805.00 66+844.55 IZQ. 40.00 83.23
20 67+305.00 67+360.00 IZQ. 55.00 185.15
21 73+425.00 73+484.39 DER. 35.00 184.36
22 73+665.00 73+680.00 DER. 15.00 73.05
23 76+611.71 76+627.04 IZQ. 10.00
24 76+660.00 76+690.00 IZQ. 12.50 45.46
25 76+805.00 76+900.00 IZQ. 95.00 395.94
26 77+085.00 77+111.70 IZQ. 25.00 79.06
27 79+815.00 79+825.00 IZQ. 10.00
28 80+024.33 80+065.36 IZQ. 35.00
29 82+325.00 82+355.00 IZQ. 30.00
30 82+380.00 82+410.00 IZQ. 22.50
31 82+450.00 82+490.00 IZQ. 40.00
PROGRESIVA RELLENOS
LONGITUD
MURO (km) LADO PARA
ESTRUCTURAS

INICIO FINAL (m) (m 3)


32 82+585.00 82+680.00 IZQ. 95.00
33 82+795.00 82+895.03 IZQ. 100.00
34 82+927.50 82+952.50 IZQ. 25.00
35 83+180.17 83+211.30 IZQ. 25.00
36 83+400.00 83+415.00 IZQ. 15.00
37 84+305.00 84+341.06 IZQ. 30.00 123.34
38 84+745.00 84+760.00 IZQ. 15.00
39 86+100.00 86+125.00 IZQ. 25.00 105.25
40 88+710.00 88+735.00 IZQ. 25.00 59.43
41 89+515.00 89+594.61 DER. 80.00 260.80
42 89+674.07 89+726.41 DER. 30.00 178.79
43 89+945.00 89+978.95 DER. 35.00 110.05
44 90+920.00 90+940.00 IZQ. 20.00 68.23
45 91+094.35 91+150.53 IZQ. 50.00 269.68
46 91+290.00 91+310.81 IZQ. 20.00 67.65
47 91+339.75 91+381.34 DER. 40.00 143.93
48 91+530.00 91+550.00 IZQ. 20.00 58.40

TOTAL 1,572.50 4,713.76


OBRA : PROYECTO INTEGRACION VIAL TACNA - LA PAZ,
TRAMO: TACNA - COLLPA (FRONTERA CON BOLIVIA) SUB TRAMO: KM
43+610 @ KM 94+000
CONTRATO : 0092-2016-MTC/20

PROPIETARIO : MTC - PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL - PROVIAS NACIONAL


CONTRATISTA : INGENIEROS CIVILES Y CONTRATISTAS GENERALES S.A.
SUPERVISION : HOB CONSULTORES S.A.
TRAMO: TACNA - COLLPA (FRONTERA CON BOLIVIA ), SUBTRAMO: KM 43+610 - KM 94+000
METRADO MUROS DE CONCRETO ARMADO
502.A

PROGRESIVA
LONGITUD RELLENO PARA
MURO (km) LADO
ESTRUCTURAS

INICIO FINAL (m) (m 3)

MUROS EN CONCRETO ARMADO


1 43+656.64 43+715.26 Izq. 35.00 413.20
2 53+948.05 53+980.65 Izq. 30.00 547.38
3 54+960.00 55+029.18 Izq. 65.00 855.62
4 64+768.00 64+816.35 Izq. 48.35
5 87+853.88 87+936.64 Izq. 85.00 992.42
MUROS EN ALCANTARILLAS
1 45+153.15 45+168.37 Izq. 13.00 166.86
2 49+595.57 49+601.47 Izq. 5.00 47.91
3 51+289.29 51+301.10 Izq. 11.81 49.08
4 54+537.57 54+550.99 Izq. 10.00 239.62
5 54+776.74 54+782.19 Izq. 10.50 33.08
6 56+824.24 56+829.72 Izq. 5.00 47.59
7 58+281.85 58+286.00 Izq. 5.00 34.18
8 60+267.50 60+272.50 Der. 5.00
9 60+503.50 60+508.50 Der. 5.00
10 61+595.08 61+600.28 Izq. 5.00 3.83
11 62+971.86 62+975.56 Izq. 5.00 4.04
12 64+587.52 64+592.48 Izq. 5.00 3.44
13 67+604.98 67+609.06 Izq. 5.00 3.12
14 75+627.56 75+632.44 Izq. 4.00 47.01
15 76+619.37 76+624.48 Izq. 5.00
16 84+883.14 84+888.86 Der. 5.00
17 85+897.50 85+902.50 Izq. 5.00 1.85
18 87+197.50 87+202.50 Izq. 5.00 6.96
19 88+230.25 88+251.35 Izq. 20.00 6.51
20 88+378.32 88+383.68 Izq 5.00 5.56
21 90+136.00 90+141.00 Izq 5.00 45.86
22 91+692.38 91+697.62 Izq 5.00 3.46
23 93+246.55 93+251.45 Izq. 5.00 71.83

TOTAL 417.66 3,630.41


|
TRAMO: TACNA - COLLPA (FRONTERA CON BOLIVIA) SUB TRAMO: KM
43+610 @ KM 94+000
CONTRATO : 0092-2016-MTC/20
PROPIETARIO : MTC - PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL - PROVIAS NACIONAL
CONTRATISTA : INGENIEROS CIVILES Y CONTRATISTAS GENERALES S.A.
SUPERVISION : HOB CONSULTORES S.A.

TRAMO: TACNA - COLLPA (FRONTERA CON BOLIVIA ), SUBTRAMO: KM 43+610 - KM 94+000

METRADO DE MURO SUELO REFORZADO TIPO 1

502.C

PROGRESIVA RELLENO PARA


LADO LONGITUD
N (km) SUELO
REFORZADO

INICIO FINAL (m) (m 3)

1 64+668.00 64+829.91 IZQ. 166.00 4,126.25

MURO EN ALCANTARILLA
1 45+904.36 45+912.22 IZQ. 6.00 361.74
2 64+036.26 64+053.23 IZQ. 6.00 456.20
3 70+477.52 70+485.85 IZQ. 6.00 175.43
4 70+924.17 70+929.13 DER. 6.00 165.58
5 79+490.73 79+495.00 DER. 6.00
6 83+309.77 83+314.46 DER. 6.00
7 83+893.55 83+898.95 IZQ. 4.00
8 92+811.00 92+815.00 IZQ. 4.00
9 93+048.00 93+052.00 IZQ. 4.00

TOTAL 107.00 5,285.20


LA PAZ, TRAMO: TACNA - COLLPA (FRONTERA CON BOLIVIA)
SUB TRAMO: KM 43+610 @ KM 94+000
CONTRATO : 0092-2016-MTC/20
PROPIETARIO : MTC - PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL - PROVIAS NACIONAL
CONTRATISTA : INGENIEROS CIVILES Y CONTRATISTAS GENERALES S.A.
SUPERVISION : HOB CONSULTORES S.A.

TRAMO: TACNA - COLLPA (FRONTERA CON BOLIVIA ), SUBTRAMO: KM 43+610 - KM 94+000

METRADO DE MURO SUELO REFORZADO TIPO 2

502.C 526.B

ELEMENTO
PROGRESIVA RELLENO PARA MURO DE
LADO LONGITUD
N (km) SUELO SUELO
REFORZADO REFORZADO
TIPO II

INICIO FINAL (m) (m 3) (m 2)

1 45+891.53 45+949.49 IZQ. 54.00 1,576.88 273.60


2 64+022.67 64+074.31 Izq. 30.00 745.69 133.20
3 70+463.55 70+543.88 DER. 50.00 1,376.33 240.00
4 70+821.07 70+966.24 DER. 156.00 3,570.75 693.60
5 79+472.99 79+510.54 DER. 30.00
6 83+275.03 83+323.77 IZQ. 40.00
7 83+888.52 83+917.66 IZQ. 20.00

TOTAL 380.00 7,269.65 1,340.40