Professional Documents
Culture Documents
CALCULO DE DOTACIONES
DOTACIONES MEDIDOR 1
Si : VCDTc = 3/4*C.D
VCDTc = 3/4 * 6800.00 l/dia
V Tc =
CD 5100.00 l/dia
V Tc =
CD 5.10 m3/dia
/ = 2/5 / =
2/3
L*A*H = 5.10 m3
L*2L/5*2L/3 = 5.10 m3
L= 2.67 m
L = 2.67 m 2.65 m
A = 1.07 m 1.05 m
H = 1.78 m 1.80 m
2.65 m
4. TUBERIA DE ALIMENTACIN DE LA RED PBLICA A LA CISTERNA
=_/_
12
2"
_=^2/^5 .
Donde:
hf = Perdida de carga D = Tuberia
Q = Caudal en m3/s B = Constante
Para B
0.0033 P' FG
B= 0.0014 P' Pvc
0.0035 P' Acero
Sabemos que :
B= 0.0014
Q= 0.000 m3/s
D( 1 1/2") = 0.044 m
Lequ. Total = 4.08 m
HF alim = 0.00 m
Por lo Tanto:
Medidor = 1 1/2"
limentacion = 1 1/2"
c) Verificacion por velocidad
Pero :
V 1 1/2" = 0.15 m/s
1.406
0.8
11.5 m.c.a
2.9 m.c.a
1.2 m.c.a
m.c.a
0.0381 50 mm
1.55 m
0.65 m
^5 .
= Tuberia
= Constante
0.00 m OK Cumple
abla de velocidades Mximas y Mnimas se tiene:
)/(^ )
OK Cumple
DIAMETRO DE TUBERIAS-METODO HUNTER
Tramo AB BC CD DE EF FG GH HI IJ JK KL LM MN NO OP PQ Total
Unidades de Hunter (UH) 285.00 285.00 285.00 285.00 285.00 285.00 147.00 147.00 45.00 38.00 38.00 38.00 16.00 14.00 14.00 14.00
Q (lt/s) 3.075 3.075 3.075 3.075 3.075 3.075 2.050 2.050 1.830 0.880 0.880 0.880 0.460 0.420 0.420 0.120
Q (lt/min) 184.5 184.5 184.5 184.5 184.5 184.5 123 123 109.8 52.8 52.8 52.8 27.6 25.2 25.2 7.2
Velocidad 1.517 1.517 1.517 1.517 1.517 2.697 1.798 1.798 1.605 1.737 1.737 1.737 0.908 0.829 1.474 0.947
Velocidad max 3.050 3.050 3.050 3.050 3.050 3.050 3.050 3.050 3.050 3.050 3.050 3.050 3.050 3.050 3.050 3.050
Dimero interior a usar (pulg) 2 2 2 2 2 1 1/2 1 1/2 1 1/2 1 1/2 1 1 1 1 1 3/4 1/2
Longitud (m) 11.62 1.05 5.62 9.00 20.80 0.57 9.89 1.97 5.20 4.63 4.42 5.33 8.12 4.05 7.40 2.00
Cantidad 0 2 0 2 1 1 1 1 2 2 1 1 1 1 2 2
Codo a 90 Long. Equivalente 1.074 1.074 1.074 1.074 1.074 1.295 1.295 1.295 1.295 0.852 0.852 0.852 0.852 0.852 0.648 0.443
Subtotal 0 2.148 0 2.148 1.074 1.295 1.295 1.295 2.59 1.704 0.852 0.852 0.852 0.852 1.296 0.886
Cantidad 0 0 0 0 0 1 1 1 0 2 0 1 1 0 3 1
Tee Giro a 90 Long. Equivalente 4.091 4.091 4.091 4.091 4.091 4.091 3.109 3.109 3.109 2.045 2.045 2.045 2.045 2.045 1.554 1.064
Subtotal 0 0 0 0 0 4.091 3.109 3.109 0 4.09 0 2.045 2.045 0 4.662 1.064
Cantidad 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0
Codo a 45 Long. Equivalente 0.363
Subtotal 0.363
Cantidad 1 1 1
Compuerta Long. Equivalente 0.432 0.326 0.326
Subtotal 0.432 0.326 0.326
Vlvula
Cantidad
Check Long. Equivalente
Subtotal
Longitud adicional 0.432 2.148 0 2.148 1.074 5.386 4.404 4.404 2.916 5.794 0.852 2.897 2.897 0.852 6.647 1.95
Longitud total 12.05 3.198 5.62 11.148 21.874 5.956 14.294 6.374 8.116 10.424 5.272 8.227 11.017 4.902 14.047 3.95
Sf gradiente (m) 0.04 0.04 0.04 0.04 0.04 0.16 0.07 0.07 0.06 0.10 0.10 0.10 0.03 0.02 0.10 0.06
Prdida de carga por friccin hf 0.4716 0.1251 0.2199 0.4362 0.8559 0.9821 1.0475 0.4671 0.4740 1.0690 0.5406 0.8437 0.3087 0.1145 1.3827 0.2410 9.5796
Altura del aparato ms desfavorable 2 2
Presin de salida 2 2
Prdida de carga en medidores 2.90 0.95 3.85
Presin minima=He+Ps+sumhf 34.38 17.430 CUMPLE,
DISEO TANQUE HIDRONEUMATICO
DATOS:
Aparatos Sanitarios TOTAL ALTURA ESTATICA:
TIENDA COM. CLINICA LONGITUD DE TUBERIA:
1NIVEL 31 41 72 PERDIDAS DE CARGA:
RESTAURANT GIMNASIO OFICINAS
2NIVEL 10 21 55 86
AUDITORIO Y CINE
3NIVEL 67 67
DEPARTAMENTOS
4NIVEL 83 83
DEPARTAMENTOS
5NIVEL 83 83
DEPARTAMENTOS
6NIVEL 0
TOTAL APARATOS= 391
16.422 lt/s
Q(caudal)=
259.4676 G.P.M
2724 GALONES
Vol=
10313 LITROS
4 N de tanques hidroneumaticos
32 m.c.a
46.04 PSI
8.51378063
Diseo de Bomba
Caudal de diseo
Qtanque hidroneumatico = 16.422 lt/s
Qtanque hidroneumatico = 0.016 m3/s
Calculo de diametro economico
=( 0.066^3 ")" ^(1/7)
D= 0.0536 m
Diametros 2 "
Hallamos Velocidades
V2" = 8.10 m/s
Diametros de tuberias
Tub Impulcion = 2"
Tub Succion = 2"
Altura Estatica
He = 20.8 m
Altura Bombeo
Hb = hs + hfs + hi + hfi +Ps
Hb = 33.14 m
Potencia de la Bomba
= (_)/76
Eficiencia de de bonba = 9%
P= 8.00 Hp