Professional Documents
Culture Documents
Billing 5
conducted for
Conducted on
11/12/17 6:16 AM
Prepared by
Ranjit Singh
Tech/Company
Ranjit/Techcoms ltd
Completed on
11/12/17 8:27 AM
Score
Score 10/17 - 58.82%
Evidence Cam Image of location before excavation to give perspective of where fault was,
Appendix 1
No Date
Appendix 2
No Date
00439623 -2-
Question Response Details
Appendix 15
No Date
Evidence Cam Image of reinstatement showing site left in a permanent safe state
Appendix 19
No Date
Evidence Cam Image of reinstatement showing site left in a temporary safe state
00439623 -3-
Question Response Details
Appendix 20
No Date
00439623 -4-
Breakdown of Time 'in hours' & Materials - Score (1/1) 100%
Breakdown of materials used, e.g. 2 bags asphalt , 1 tee junction, 3 elbows 25mm,
100m ruggedize, 2x bags top soil green duct 20mm
00439623 -5-
Media
Appendix 1 Appendix 2
No Date No Date
Appendix 3 Appendix 4
No Date No Date
00439623 -6-
Appendix 5 Appendix 6
No Date No Date
Appendix 7 Appendix 8
No Date No Date
00439623 -7-
Appendix 9 Appendix 10
No Date No Date
Appendix 11 Appendix 12
No Date No Date
00439623 -8-
Appendix 13 Appendix 14
No Date No Date
Appendix 15 Appendix 16
No Date No Date
00439623 -9-
Appendix 17 Appendix 18
No Date No Date
Appendix 19 Appendix 20
No Date No Date
00439623 - 10 -