You are on page 1of 2

NWRB 2005 FEES AND CHARGES

(in Php)

Pursuant to Executive Order No. 197 of 2000 and per NWRB Board Resolution No. 0010-0305 dated 21
March 2005, the National Water Resources Board on its 29th Meeting approved the following fees and
charges:

APPROVED
NATURE OF SERVICE RATES
*(In Pesos)
A. APPLICATION/FILING FEE
1. Water Permit
(a) Municipal 5,000
(b) Irrigation (1) National/Corporation 5,000
(2) Communal/Individual 500
(c) Power generation 5,000
(d) Fisheries 5,000
(e) Livestock Raising (1) Backyard 1,000
(2) Commercial 3,000
(f) Industrial 5,000
(g) Recreational 5,000
(h) Other Purposes 5,000
2. Transfer of Water Permit
(a) Municipal 5,000
(b) Irrigation (1) Communal/Individual 3,000
(2) National/Corporation 5,000
(c) Power generation 5,000
(d) Fisheries 3,000
(e) Livestock Raising (1) Backyard 1,000
(2) Commercial 3,000
(f) Industrial 5,000
(g) Recreational 5,000
(h) Other Purposes 5,000
3. Registration for Domestic Use 100
4. Registration as Well Driller & Renewal (annual)
(a) Sole Proprietor 1,000
(b) Partnership or Corporation 2,000
5. Certificate of Public Convenience (CPC)/Certificate of Public Convenience and
3,000
Necessity (CPCN)
6. Provisional Authority 3,000
7. Extension of CPC/CPCN Validity (Renewal) 3,000
8. Authority to Increase Capital Stock 2,000
9. Time Extension to Submit Annual Report of Operation 1,500
10. Authority to Charge Water Rates 2,500
11. Protests/Water Use Conflicts 3,000
12. Appeal Fee 1,000
13. Rate Adjustment/Increase 3,000
14. Sale/Transfer/Lease of Water System with CPC/CPCN 2,000
15. Donation of Water System with CPC/CPCN 2,000
16. Authority for Extension of Service 2,000
17. Re-Appraisal/Re-Evaluation of Assets 5,000

B. ANNUAL WATER CHARGES


WITHDRAWAL COST/LPS (in Php)
CLASSIFICATION Base Cost Not more than 10 More than 10 lps but not More than 50
lps exceeding 50 lps lps
a) Municipal 5,000 5.50 8.50 11.00
b) Fisheries 500 2.75 4.25 5.50
c) Livestock 500 2.75 4.25 5.50
(Backyard/Commercial)
d) Irrigation (Communal/Individual) 500 2.75 4.25 5.50
(National/Corporation) 5,000 5.50 8.50 11.00
e) Power Generation 5,000 2.75 4.25 5.50
f) Industrial 5,000 10.25 15.80 20.45
g) Recreation 5,000 10.25 15.80 20.45
h) Others 5,000 10.25 15.80 20.45
NOTE: For declared critical areas in Metro Manila, the following rates shall apply:
a) In areas adequately serviced by MWSS concessionaires: 100% of water tariff of the concessionaires
b) In areas not adequately serviced by MWSS concessionaires: 35% of water tariff of the concessionaires
i) Charge for over extraction for P 3,000 for every 1 lps or fraction thereof over extracted
non-critical areas
j) Other Charges
(j-1) Use of Water at its Natural Location for Fish Culture
(j-1-a) For surface area < 15 has. Base Cost of P500 + P110/ha.
Base Cost of P500 + P1,650 for 15 has. plus P0.65/ha. in excess of 15
(j-1-b) For surface area > 15 has.
has.
k) Waterworks Supervision
(k-1) Supervising/Regulation Fee P0.50 per P100 capital stock subscribed or paid or if no shares have been
issued, of the capital invested, or of the property and equipment,
whichever is higher.

C. OTHER CHARGES Approved Rates (in Pesos)


1. Annual Report Form 200
2. Certification Charge
a) Certification of Memorial Parks 3,500
b) Certificate of Water Availability 1,500
c) Other Technical Certification 1,000
d) Certified photocopy 50
3. CPC/CPCN Certificate 500
4. Certificate of Compliance 3,500
5. Testing and Sealing Fee of Water Meters 50

You might also like