Commissioning Service Department

Commissioning Standard Test Formats


Description: BUS SECTION FINAL TRIP TEST Record No.:
Bay no.: D220 Drawing ref.: Sheet: 1 of 1
Contractor: Contract no.: Substation No :

Protection Protection Panel Phase CB INST.


LEDs on Relay SAS HMI Alarm
Operated Indication Segregation Operation IN/OUT
OC START + OC TRP R-PH 86BS OPTD
TRIP TRIP CB
TRIP 86BS CBF + OC TRIP Y-PH + CB CLOSE LOCK OUT IN/OUT
REQ650 INST. OPTD INIT
RYB BY BY CLOSE
CHECKED
+ OC TRIP B-PH + CBF INITATION TC1 TC2 BLK
INST. OC + CBF INITIATION + 50 PROT OPTD
OK OK OK OK OK OK OK OK OK OK

OC START + OC TRP R-PH 86BS OPTD


TRIP TRIP CB
TRIP 86BS CBF + OC TRIP Y-PH + CB CLOSE LOCK OUT IN/OUT
REQ650 OPTD INIT
RYB BY BY CLOSE
CHECKED
DELAYED + OC TRIP B-PH + CBF INITATION TC1 TC2 BLK
IDMT OC + CBF INITIATION + 51 PROT OPTD
OK OK OK OK OK OK OK OK OK OK

86BS OPTD
TRIP TRIP CB
TRIP 86BS CBF EF START + CB CLOSE LOCK OUT IN/OUT
REQ650 BY BY CLOSE
INST. OPTD INIT + EF TRIP + CBF INITATION CHECKED
TC1 TC2 BLK
INST. EF + 50N PROT OPTD
OK OK OK OK OK OK OK OK OK

86BS OPTD
TRIP TRIP CB
TRIP 86BS CBF EF START + CB CLOSE LOCK OUT IN/OUT
REQ650 BY BY CLOSE
DELAYED OPTD INIT + EF TRIP + CBF INITATION CHECKED
TC1 TC2 BLK
IDMT EF + 51N PROT OPTD
OK OK OK OK OK OK OK OK OK

86B2A OPTD + 86B2B OPTD


TRIP TRIP CB
86B2A 86CBF 86B2B CBF CBF INITIATION + 86CBF OPTD + CBF INIT.
REQ650 BY BY CLOSE
OPTD OPTD OPTD INIT + CBF OPTD + CBF OPTD + CB CLOSE TC1 TC2 BLK
CBF LOCKOUT
OK OK OK OK OK OK OK OK OK

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date: