You are on page 1of 21

AUTORIZACIONES DE TRAB

Progresiva Nmero de Fecha de


Item Estructura Longitud Dimetro
Inicio final autorizacin recepcin
1 TMC 43+693.00 35.69 60" 349-2017 24-Apr
43+865.00 elimi 17-2017 19-Jan
2 TMC 43+975.29 12.96 36" 16-2017 19-Jan
44+085.00 eliminacion 18-2017 19-Jan
3 TMC 44+540.06 15.39 36" 130-2017 2-Mar
4 TMC 44+854.87 18.63 36" 131-2017 2-Mar
5 TMC 45+174.72 21.87 48" 133-2017 2-Mar
6 TMC 45+338.26 17.82 36" 132-2017 2-Mar
7 TMC 45+740.00 13.77 36" 350-2017 24-Apr
8 MC 45+902.00 18.5 2.00 x 2.00
9 TMC 46+225.44 19.44 36" 351-2017 24-Apr
10 TMC 46+817.45 16.2 36" 352-2017 24-Apr
11 TMC 47+585.76 22.68 36" 354-2017 24-Apr
12 TMC 47+923.30 12.96 36" 334-2017 22-Apr
13 TMC 48+659.00 12.15 36" 333-2017 22-Apr
14 TMC 48+992.13 12.15 36" 332-2017 22-Apr
15 TMC 49+256.00 16.2 36" 330-2017 22-Apr
16 TMC 49+600.45 12.98 36" 331-2017 22-Apr
17 TMC 49+761.88 14.58 36" 329-2017 22-Apr
18 TMC 49+865.98 14.58 36" 440-2017 15-May
50+013.00 eliminacion 21-2017 21-Jan
19 TMC 50+230.00 12.96 36" 439-2017 15-May
20 TMC 50+293.92 17.82 36" 435-2017 15-May
21 TMC 50+447.37 14.58 36" 438-2017 15-May
22 TMC 50+993.13 15.39 36" 437-2017 15-May
23 TMC 51+298.12 12.96 36" 436-2017 15-May
24 TMC 51+540.59 12.96 36" 434-2017 15-May
25 TMC 51+605.00 15.39 36" 384-2017 3-May
26 TMC 51+900.00 14.58 36" 386-2017 3-May
27 TMC 52+093.02 14.58 36" 387-2017 3-May
28 TMC 52+360.00 13.34 36" 388-2017 3-May
29 TMC 52+630.00 12.15 36" 389-2017 3-May
30 TMC 52+997.00 12.15 36" 390-2017 3-May
31 TMC 53+339.77 21.87 60" 433-2017 15-May
32 TMC 53+733.81 14.58 36" 435-2017 15-May
33 TMC 53+970.94 19.44 72" 391-2017 3-May
34 TMC 54+262.28 12.15 36" 432-2017 15-May

35 MC 54+544.00 18.6 2.00 x 2.00 530-2017 2-Jun

36 TMC 54+783.00 17.01 36" 392-2017 3-May


37 MC 55+330.00 10 1.20 x 1.20
38 TMC 55+629.00 14.58 36" 393-2017 3-May
39 TMC 56+549.00 16.2 36" 82-2017 15-Feb
40 TMC 56+829.00 15.39 36" 441-2017 16-May
41 TMC 57+062.61 19.44 36" 442-2017 16-May

42 TMC 57+367.50 18.63 36" 632-2017 7-Jul

43 TMC 57+897.00 15.39 36" 444-2017 16-May

44 TMC 58+284.00 12.96 36" 633-2017 7-Jul

45 TMC 58+638.50 11.34 36" 609-2017 27-Jun


46 TMC 58+907.50 13.34 36" 447-2017 15-May

47 TMC 59+245.00 12.96 36" 634-2017 7-Jul

48 TMC 59+902.00 17.01 36" 449-2017 16-May


AUTORIZACIONES DE TRAB
Progresiva Nmero de Fecha de
Item Estructura Longitud Dimetro
Inicio final autorizacin recepcin

49 TMC 60+270.00 10.53 36" 605-2017 27-Jun

50 TMC 60+506.00 10.53 36" 451-2017 16-May

60+930.00 exist. Elimi 296-2017 19-Apr

51 TMC 61+260.00 13.77 36" 635-2017 7-Jul

52 TMC 61+598.54 13.77 36" 607-2017 27-Jun

53 MC 62+030.00 14.2 2.00 x 2.00 463-2017 19-May

54 TMC 62+179.20 15.396 36" 636-2017 7-Jul

55 TMC 62+252.30 14.58 36" 455-2017 16-May


56 TMC 62+503.37 20.25 36" 456-2017 16-May
57 TMC 62+775.45 17.82 36" 457-2017 16-May

58 TMC 62+857.00 16.2 36" 608-2017 27-Jun

59 TMC 62+970.00 17.82 36" 543-2017 2-Jun


60 TMC 63+295.50 11.34 36" 542-2017 2-Jun
61 TMC 63+564.69 16.2 48" 541-2017 2-Jun
62 TMC 63+800.00 12.15 36" 540-2017 2-Jun

63 TMC 64+042.00 20.25 72" 556-2017 7-Jun

64 TMC 64+056.00 23.49 72" 557-2017 7-Jun

65 TMC 64+300.00 11.34 36" 537-2017 2-Jun

66 TMC 64+590.00 10.53 36" 536-2017 2-Jun

67 TMC 65+082.57 12.15 36" 535-2017 2-Jun


68 TMC 65+681.00 12.15 36" 534-2017 2-Jun

69 TMC 66+071.68 15.39 36" 637-2017 7-Jul


70 TMC 66+179.00 17.01 36" 533-2017 2-Jun

71 TMC 66+354.00 19.44 72" 472-2017 24-May

72 TMC 66+550.00 13.77 36" 551-2017 3-Jun


73 TMC 66+800.00 13.77 36" 550-2017 3-Jun
74 TMC 67+114.00 18.63 72" 212-2017 22-Mar
75 TMC 67+400.00 14.58 36" 548-2017 3-Jun

76 MC 67+610.00 13.7 1.00 x 1.00 543-2017 3-Jun


77 TMC 67+940.00 12.15 36" 547-2017 3-Jun
78 TMC 68+318.50 21.06 48" 546-2017 3-Jun

79 MC 69+082.00 15.7 1.00 x 1.00 463-2017 19-May

80 TMC 69+410.00 12.96 36" 545-2017 3-Jun


81 TMC 69+800.00 13.34 36" 288-2017 19-Apr
82 TMC 70+193.00 11.34 36" 289-2017 19-Apr
83 MC 70+491.00 20.2 2.00 x 2.00 240-2017 19-Apr
84 TMC 70+933.90 21.87 36" 299-2017 20-Apr
85 TMC 71+300.00 12.15 36" 300-2017 20-Apr

86 TMC 71+657.50 16.2 36" 638-2017 7-Jul


87 TMC 71+943.00 13.34 36"
88 TMC 72+284.48 12.15 36"
AUTORIZACIONES DE TRAB
Progresiva Nmero de Fecha de
Item Estructura Longitud Dimetro
Inicio final autorizacin recepcin

89 TMC 72+472.69 13.77 36" 639-2017 7-Jul

90 TMC 72+620.87 17.82 36" 301-2017 20-Apr


91 MC 72+939.00 12.5 1.00 x 1.00 302-2017 20-Apr
92 TMC 73+400.00 12.96 36" 303-2017 20-Apr
93 TMC 73+580.00 11.34 36" 304-2017 20-Apr
94 TMC 74+000.00 11.34 36" 305-2017 20-Apr
95 TMC 74+370.00 12.96 36" 306-2017 20-Apr
96 MC 74+648.00 11 1.50 x 1.50 307-2017 20-Apr
97 MC 74+754.00 12.2 1.00 x 1.00
98 MC 74+824.00 10.97 1.00 x 1.00
99 TMC 75+100.00 12.96 36" 310-2017 20-Apr
100 TMC 75+335.00 13.77 36" 311-2017 20-Apr
101 TMC 75+630.00 10.53 36" 312-2017 20-Apr
102 TMC 75+962.00 12.15 36" 314-2017 20-Apr
103 TMC 76+271.00 11.34 36" 315-2017 20-Apr
104 TMC 76+623.67 11.34 36"
105 TMC 76+880.00 10.53 36" 185-2017 16-Mar
106 TMC 77+215.00 14.58 36" 234-2017 25-Mar
107 TMC 77+596.00 12.15 36" 235-2017 25-Mar
108 TMC 77+893.00 12.15 36" 236-2017 25-Mar
109 TMC 78+300.00 13.77 36" 186-2017 16-Mar
110 TMC 78+608.00 12.15 36" 237-2017 25-Mar
111 TMC 79+080.00 11.34 36" 187-2017 18-Mar
112 TMC 79+491.50 17.82 36" 164-2017 10-Mar
113 TMC 79+780.00 13.34 36" 188-2017 16-Mar
114 MC 80+039.00 14.63 1.50 x 1.50
115 TMC 80+293.98 11.34 36" 259-2017 8-Apr
116 TMC 80+600.00 12.96 36" 223-2017 25-Mar
117 TMC 80+900.00 13.34 36" 260-2017 8-Apr
118 TMC 81+200.00 13.77 36" 224-2017 25-Mar
119 TMC 81+453.07 11.34 36" 261-2017 8-Apr
120 TMC 81+792.66 12.15 36" 262-2017 8-Apr
121 TMC 82+060.00 11.34 36" 225-2017 25-Mar
122 TMC 82+308.49 11.34 36" 263-2017 8-Apr
123 TMC 82+479.20 11.34 36" 264-2017 8-Apr
124 TMC 82+700.00 11.34 36" 226-2017 25-Mar
125 TMC 82+997.50 12.15 36" 265-2017 8-Apr
126 TMC 83+312.63 15.39 36" 169-2017 11-Mar
127 TMC 83+560.00 12.96 36" 227-2017 25-Mar
128 TMC 83+896.25 17.01 36" 170-2017 11-Mar
129 TMC 84+885.00 12.15 36" 241-2017 4-Apr
130 TMC 85+647.25 15.39 36" 13-2017 12-Jan
131 TMC 85+900.00 10.53 36" 242-2017 4-Apr
132 TMC 86+160.00 11.34 36" 243-2017 4-Apr
133 TMC 86+406.00 13.76 36" 244-2017 4-Apr
134 TMC 86+650.52 14.58 36" 245-2017 4-Apr
135 TMC 86+939.57 15.39 36" 246-2017 4-Apr
136 TMC 87+200.00 16.2 36" 247-2017 4-Apr
137 MC 87+456.00 13.17 1.20 x 1.20
138 TMC 87+529.68 15.39 36" 248-2017 4-Apr
139 TMC 87+900.00 12.15 36" 249-2017 4-Apr
140 TMC 88+244.76 12.96 36" 274-2017 11-Apr
141 TMC 88+381.00 13.77 36" 275-2017 11-Apr
142 TMC 88+700.05 12.96 36" 276-2017 11-Apr
143 TMC 88+920.28 12.15 36" 412-2017 11-May
AUTORIZACIONES DE TRAB
Progresiva Nmero de Fecha de
Item Estructura Longitud Dimetro
Inicio final autorizacin recepcin
144 TMC 89+780.47 12.15 36" 413-2017 11-May
145 TMC 90+138.50 13.34 36" 414-2017 11-May
146 TMC 90+609.50 11.34 36" 415-2017 11-May
147 TMC 90+800.00 12.15 36" 416-2017 11-May
148 TMC 91+104.31 12.96 36" 417-2017 11-May
149 TMC 91+500.00 13.77 36" 418-2017 11-May
150 TMC 91+695.00 12.96 36" 419-2017 11-May
151 TMC 92+000.00 12.15 36" 420-2017 11-May
152 TMC 92+200.00 13.77 36" 421-2017 11-May

153 TMC 92+813.00 14.58 36" 640-2017 7-Jul


154 TMC 93+050.00 12.96 36" 423-2017 11-May
155 TMC 93+249.00 14.58 36" 424-2017 11-May
156 TMC 93+505.00 15.39 36" 425-2017 11-May
157 TMC 93+872.00 15.39 36" 426-2017 11-May
158 TMC 94+100.00 14.58 36" 427-2017 11-May
159 TMC 94+332.00 17.82 36" 428-2017 11-May
160 TMC 94+735.00 14.58 36" 429-2017 11-May
161 TMC 94+897.00 16.2 36" 97-2017 25-Feb
162 TMC 95+595.50 14.58 36" 96-2017 25-Feb
163 MCA 43+656.64 43+715.26 35.00 271-2017 11-Apr
164 MCA 45+153.15 45+162.52 13.00 358-2017 24-Apr

MCCBS 46+475.00 46+492.63 721-2017 30-Aug

165 MCCBS 46+695.00 46+719.17 24.17 107-2017 28-Feb


166 MCCBS 46+994.64 47+015.00 20.36 108-2017 28-Feb
167 MCCBS 48+230.00 48+264.38 34.38 109-2017 28-Feb
168 MCCBS 48+825.00 48+841.83 16.83 110-2017 28-Feb
169 MCA 49+595.57 49+601.47 5.90 77-2017 15-Feb
170 MCCBS 49+863.78 49+911.03 47.25 359+-2017 24-Apr
171 MCCBS 49+995.00 50+015.00 20.00 360-2017 24-Apr
172 MCA 51+289.29 51+301.10 11.81 357-2017 24-Apr

173 MCCBS 52+080.97 52+109.91 28.94 475-2017 25-May

174 MCC 53+332.34 53+352.09 15.00 476-2017 25-May

175 MCCBS 53+825.00 53+839.64 14.64 477-2017 25-May

176 MCABS 53+948.05 53+980.65 32.60 479-2017 25-May

177 MCA 54+537.57 54+550.99 13.42 481-2017 25-May

178 MCA 54+776.74 54+782.19 5.45 482-2017 25-May

179 MCA 54+960.00 55+029.18 69.18 483-2017 25-May

180 MCC 55+450.00 55+490.19 40.19 365-2017 27-Apr


181 MCC 55+902.48 55+932.68 30.20 366-2017 27-Apr
182 MCA 56+824.25 56+829.73 5.48 364-2017 27-Apr

MCCBS 57+780.00 57+804.10 722-2017 30-Aug

MCCBS 58+000.00 58+009.47 9.47 723-2017 30-Aug

183 MCA 58+281.85 58+286.00 4.15


184 MCCBS 58+575.00 10.15 369-2017 27-Apr

185 MCCBS 59+070.00 59+070.00 20.00 478-2017 25-May


AUTORIZACIONES DE TRAB
Progresiva Nmero de Fecha de
Item Estructura Longitud Dimetro
Inicio final autorizacin recepcin
186 MCCBS 59+480.00 59+533.38 53.38 371-2017 27-Apr

MCCBS 60+140.00 60+165.22 25.22 724-2017 30-Aug

187 MCA 60+267.50 60+272.50 5.00

MCCBS 60+476.00 60+513.50 37.50 725-2017 30-Aug

MCCBS 60+602.00 60+648.54 46.54 726-2017 30-Aug

MCCBS 60+670,00 60+719,26 727-2017 30-Aug


188 MCA 61+595.08 61+600.28 5.20
189 MCCBS 62+385.00 62+415.00 30.00 372-2017 27-Apr

MCCBS 62+879,00 62+889,72 728-2017 30-Aug

190 MCA 62+971.86 62+975.56 3.70

MCCBS 63+742.35 63+769.73 27.38 729-2017 30-Aug

191 MCCBS 64+550.32 64+592.56 42.24 373-2017 27-Apr


192 MCABS 64+587.52 64+592.48 4.96 489-2017 25-May

193 MCA 64+768.00 64+816.35 48.35 487-2017 25-May


194 MCCBS 65+100.00 65+129.99 29.99 374-2017 27-Apr
195 MCCBS 66+460.00 66+488.89 28.89 375-2017 27-Apr
196 MCC 66+805.00 66+844.55 39.55 368-2017 27-Apr
197 MCCBS 67+305.00 67+359.47 54.47 376-2017 27-Apr
198 MCA 67+604.98 67+609.06 4.08
199 MCCBS 73+425.00 73+484.39 59.39 320-2017 20-Apr
200 MCCBS 73+665.00 73+680.00 15.00 321-2017 20-Apr
201 MCA 75+627.56 75+632.44 4.88 313-2017 20-Apr

202 MCCBS 76+611.71 76+627.04 15.33 579-2017 12-Jun

MCCBS 76+652.50 76+660.00 730-2017 30-Aug

203 MCCBS 76+660.00 76+690.00 30.00 322-2017 20-Apr

MCCBS 76+690.00 76+699.93 731-2017 30-Aug

204 MCCBS 76+805.00 76+900.00 95.00 316-2017 20-Apr


205 MCCBS 77+085.00 77+111.70 26.70 317-2017 20-Apr
206 MCCBS 79+815.00 79+825.00 10.00 318-2017 20-Apr

207 MCC 80+024.33 80+065.36 41.03 575-2017 12-Jun


208 MCCBS 82+325.00 82+355.00 30.00 319-2017 20-Apr
209 MCCBS 82+380.00 82+412.50 32.50

210 MCCBS 82+450.00 82+490.00 40.00 574-2017 12-Jun

211 MCCBS 82+585.00 82+680.00 95.00


212 MCCBS 82+795.00 82+895.03 100.03
213 MCCBS 82+927.50 82+952.50 25.00
214 MCCBS 83+180.17 83+211.30 31.13
215 MCCBS 83+400.00 83+415.00 15.00
216 MCCBS 84+305.00 84+341.06 36.06
217 MCCBS 84+745.00 84+760.00 15.00

218 MCA 84+883.14 84+888.86 5.72 587-2017 21-Jun


AUTORIZACIONES DE TRAB
Progresiva Nmero de Fecha de
Item Estructura Longitud Dimetro
Inicio final autorizacin recepcin

219 MCA 85+897.50 85+902.50 5.00 588-2017 21-Jun

220 MCCBS 86+100.00 86+125.00 25.00 589-2017 21-Jun

221 MCA 87+197.50 87+202.50 5.00 590-2017 21-Jun

222 MCABS 87+853.88 87+936.64 82.76 591-2017 21-Jun

223 MCA 88+230.25 88+251.35 21.10


224 MCA 88+378.32 88+383.68 5.36

225 MCCBS 88+710.00 88+734.23 24.23 592-2017 21-Jun

226 MCCBS 89+515.00 89+594.61 79.61 578-2017 12-Jun

227 MCCBS 89+674.07 89+726.41 52.34 577-2017 12-Jun

228 MCCBS 89+945.00 89+978.95 33.95 576-2017 12-Jun

229 MCA 90+136.00 90+141.00 5.00


230 MCCBS 90+920.00 90+939.97 19.97 118-2017 1-Mar

231 MCCBS 91+094.35 91+150.53 56.18 594-2017 21-Jun


232 MCCBS 91+290.00 91+305.56 15.56 116-2017 1-Mar

233 MCCBS 91+339.75 91+376.24 36.49 596-2017 21-Jun

234 MCCBS 91+530.00 91+549.98 19.98 286-2017 12-Apr

MCCBS 91+684.52 91+713.34 732-2017 30-Aug

235 MCA 91+692.50 91+697.50 5.00


236 MCA 93+246.55 93+251.45 4.90 285-2017 12-Apr
237 MSR 45+891.53 45+949.49 35.00 239-2017 22-Apr
238 MSR 64+022.67 64+074.31 13.00 240-2017 22-Apr

239 MSR 64+668.00 64+829.91 161.91 491-2017 25-May

240 MSR 70+463.55 70+543.88 80.33 492-2017 25-May

241 MSR 70+821.07 70+966.24 145.17 492-2017 25-May

242 MSR 79+472.99 79+510.54 37.55 492-2017 25-May

243 MSR 83+275.03 83+323.77 48.74 492-2017 25-May

244 MSR 83+888.52 83+917.66 29.14 492-2017 25-May

SD 71+665.00 71+790.00 125.00 561-2017 8-Jun

SD 82+710.00 82+760.00 560-2017 8-Jun

SD 83+370.00 83+420.00 50.00 559-2017 8-Jun

SD 83+905.00 84+000.00 95.00 584-2017 16-Jun

SD 84+905.00 84+940.00 35.00 563-2017 8-Jun

SD 84+720.00 84+800.00 80.00 557-2017


AUTORIZACIONES DE TRAB
Progresiva Nmero de Fecha de
Item Estructura Longitud Dimetro
Inicio final autorizacin recepcin

SD 84+838.00 84+880.00 42.00 562-2017 8-Jun

SD 86+425.00 86+560.00 135.00 564-2017 8-Jun

SD 86+945.00 87+120.00 175.00 565-2017 8-Jun

86+921.00 733-2017 30-Aug

245 SD 87+380.00 87+430.00 50


246 SD 87+500.00 87+540.00 40
247 SD 87+540.00 87+600.00 60

248 SD 87+800.00 87+895.00 95 567-2017 8-Jun

249 SD 87+910.00 88+220.00 310


250 SD 88+500.00 88+600.00 100
251 SD 88+640.00 88+690.00 50

252 SD 92+980.00 93+300.00 320 629-2017 7-Jul

253 SD 93+540.00 93+640.00 100 628-217 7-Jul

254 SD 93+875.00 94+096.80 221.8 627-2017 7-Jul

255 SD 94+380.00 94+600.00 220 626-2017 7-Jul

256 SD 95+370.00 95+440.00 70 625-2017 7-Jul

257 SD 95+620.00 95+835.00 215 624-2017 7-Jul


AUTORIZACIONES DE TRABAJO - OBRAS DE ARTE
Nmero de Fecha de Nmero de Fecha de
Partidas Aprobadas Partidas Aprobadas
autorizacin recepcin autorizacin recepcin

505.D-503.H-505.E-504-4-
515.A

503.E-515-A
503.E-515-A
501.E-507.A2-515.a-700.A- 501.E-502.A-503.E-505.A-
603-2017 27-Jun 443-2017 15-May
502.A-905.A 507.A2
503.E-515-A
501.E-507.A2-515.a-700.A- 445-2017 15-May 503.E-515-A
502.A-905.A
501.E-502.A-503.E-505.A- 446-2017 15-May 503.E-515-A
507.A2
503.E-515-A
501.E-507.A2-515.a-700.A- 448-2017 15-May 503.E-515-A
502.A-905.A
503.E-515-A
AUTORIZACIONES DE TRABAJO - OBRAS DE ARTE
Nmero de Fecha de Nmero de Fecha de
Partidas Aprobadas Partidas Aprobadas
autorizacin recepcin autorizacin recepcin
501.E-502.A-503.E-505.A- 450-2017 15-May 503.E-515-A
507.A2
501.E-502.A-503.E-505.A- 451-2017 15-May 503.E-515-A
507.A2

501.E-507.A2-515.a-700.A- 452-2017 15-May 503.E-515-A


502.A-905.A
501.E-502.A-503.E-505.A- 453-2017 15-May 503.E-515-A
507.A2
501.E-502.A-503.D1-515.A-
504
501.E-502.A-503.D1-515.A- 454-2017 15-May 503.E-515-A
505
503.E-515-A
503.E-515-A
503.E-515-A
501.E-502.A-503.E-505.A- 458-2017 15-May 503.E-515-A
507.A2
503.E-515-A 147-2017 6-Mar
503.E-515-A
503.E-515-A
503.E-515-A
507.B1-502.A-507.E-604.A- 501.E-502.A-700.A-503.E-
539-2017 2-Jun 531-2017 31-May
700.A-502.A-906.A 515.A
507.B1-502.A-507.E-604.A- 501.E-502.A-700.A-503.E-
538-2017 2-Jun 532-2017 2-Jun
700.A-502.A-906.A 515.A
503.E-515-A
503.E-5015.A-503.D1-
503.H1-504-540.-530.B
503.E-515-A
503.E-515-A
501.E-507.A2-515.a-700.A-
502.A-905.A
503.E-515-A
507.B1-502.A-507.E-604.A-
700.A-502.A-906.A
503.E-515.A
503.E-515.A
503.E-515.A
503.E-515.A
501.E-502.A-503.D1-515.A-
504
503.E-515.A
503.E-515.A
501.E-502.A-503.D1-515.A-
504
503.E-515.A

501.E-507.A2-515.a-700.A-
502.A-905.A
AUTORIZACIONES DE TRABAJO - OBRAS DE ARTE
Nmero de Fecha de Nmero de Fecha de
Partidas Aprobadas Partidas Aprobadas
autorizacin recepcin autorizacin recepcin
501.E-507.A2-515.a-700.A-
502.A-905.A
AUTORIZACIONES DE TRABAJO - OBRAS DE ARTE
Nmero de Fecha de Nmero de Fecha de
Partidas Aprobadas Partidas Aprobadas
autorizacin recepcin autorizacin recepcin

501.E-507.A2-700.A-502.A-
905.A

501.E-502.A-503.J-525.A-
515.A-503.J-540.B-530.B

503.J-515.A-502.A-525.A-
530.A-700A.B
501.E-502.A-503.J-525.A-
515.A-503.J-540.B-530.B
503.J-515.A-502.A-525.A-
530.A-700A.B
503.D-503.H-504.A-508.A-
515.A-525.A-530.B-700.B
501.E-502.A-503.J-525.A-
515.A-503.J-540.B-530.B

503.D-503.H-504.A-508.A- 501.E-525.A-530.B-700.B-
474/468-2017 22-May
515.A-525.A-530.B-700.B 503.D1/503.H-515.A

501.E-502.A-503.J-525.A-
515.A-503.J-540.B-530.B
501.E-502.A-503.J-525.A-
515.A-503.J-540.B-530.B

503.J-515.A-502.A-525.A-
530.A-700A.B
AUTORIZACIONES DE TRABAJO - OBRAS DE ARTE
Nmero de Fecha de Nmero de Fecha de
Partidas Aprobadas Partidas Aprobadas
autorizacin recepcin autorizacin recepcin

501.E-502.A-503.J-525.A-
515.A-503.J-540.B-530.B

501.E-502.A-503.J-525.A-
515.A-503.J-540.B-530.B
501.E-502.A-503.J-525.A-
515.A-503.J-540.B-530.B
501.E-502.A-503.J-525.A-
515.A-503.J-540.B-530.B

501.E-502.A-503.J-525.A-
515.A-503.J-540.B-530.B

501.E-502.A-503.J-525.A-
515.A-503.J-540.B-530.B

503.D-503.H-504.A-508.A-
515.A-525.A-530.B-700.B
503.D-503.H-504.A-508.A-
515.A-525.A-530.B-700.B

501.E-502.A-503.J-525.A-
515.A-503.J-540.B-530.B
501.E-502.A-503.J-525.A-
515.A-503.J-540.B-530.B

501.E-502.A-503.J-525.A-
515.A-503.J-540.B-530.B

501.E-502.A-503.J-525.A-
515.A-503.J-540.B-530.B

501.E-502.A-503.J-525.A-
515.A-503.J-540.B-530.B

501.E-503.A-508.A-5.15.A-
530.A-540.B-502.A
AUTORIZACIONES DE TRABAJO - OBRAS DE ARTE
Nmero de Fecha de Nmero de Fecha de
Partidas Aprobadas Partidas Aprobadas
autorizacin recepcin autorizacin recepcin
503.D1-503.H-504-508.A-
515.A-525.A-530.B-540.B
501.E-503.A-508.A-5.15.A-
525.A
503.D1-503.H-504-508.A-
515.A-525.A
501.E-700.C-700.F-906.A-
503.D1-503.H

503.D1-503.H-504-508.A-
515.A-525.A
501.E-502.A-503.J-525.A-
515.A-503.J-540.B-530.B
501.E-502.A-503.J-525.A-
515.A-503.J-540.B-530.B
501.E-502.A-503.J-525.A-
515.A-503.J-540.B-530.B

503.D1-503.H-504-508.A-
515.A-525.A

501.E-503.A-508.A-5.15.A-
530.A-540.B-502.A

501.E-502.A-503.J-525.A-
515.A-503.J-540.B-530.B

700.E-503.K-502.C-511.A- 502.C-511.A-508.A-523.A-
464-2017 19-May
508.A-523.A-525.A-526.B 525.A-526.B-700.E
700.E-503.K-502.C-511.A- 502.C-511.A-508.A-523.A-
465-2017 19-May
508.A-523.A-525.A-526.B 525.A-526.B-700.E
700.E-503.K-502.C-511.A- 502.C-511.A-508.A-523.A-
466-2017 19-May
508.A-523.A-525.A-526.B 525.A-526.B-700.E
700.E-503.K-502.C-511.A-
508.A-523.A-525.A-526.B
700.E-503.K-502.C-511.A-
508.A-523.A-525.A-526.B
700.E-503.K-502.C-511.A-
508.A-523.A-525.A-526.B

501.E-502.A-509.B1-511.A2

501.E-502.A-509.B1-511.A2

501.E-502.A-509.B1-511.A1

501.E-502.A-509.B1-511.A2

501.E-502.A-509.B1-511.A2
AUTORIZACIONES DE TRABAJO - OBRAS DE ARTE
Nmero de Fecha de Nmero de Fecha de
Partidas Aprobadas Partidas Aprobadas
autorizacin recepcin autorizacin recepcin

501.E-502.A-509.B1-511.A2

501.E-502.A-509.B1-511.A2

501.E-502.A-509.B1-511.A3

501.E-502.A-502.B-700.F-
511.A1

501.E-502.A-509.B1-511.A2

501.E-502.A-502.B-700.F-
511.A1
501.E-502.A-502.B-700.F-
511.A1
501.E-502.A-502.B-700.F-
511.A1
501.E-502.A-502.B-700.F-
511.A1
501.E-502.A-502.B-700.F-
511.A1
501.E-502.A-502.B-700.F-
511.A1
Partidas Aprobadas

503.E-515-A
Partidas Aprobadas

502.A-507.E-700.B-503.3-
515.A
502.A-507.E-700.B-503.3-
515.A
Partidas Aprobadas
Partidas Aprobadas
Partidas Aprobadas
Partidas Aprobadas
Partidas Aprobadas