AVANCE DE ALCANTARILLAS - JULIO 2017

INFORMACIN DE LA ALCANTARILLA CUERPO


MCA - Solado TMC Concreto Losa Inf. y
PROGRESIVA REAL (REPLANTEO) PROGRESIVA PREVISTA (PROYECTO) Excavacin
- C. Arena
Acero Encofrado
Muros
Item SENTIDO ENTRADA SALIDA
KM Long. TIPO SECCIN B x H KM Long. TIPO SECCIN B x H IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER

01 43+693.00 35.69 TMC 60" 43+693.00 35.69 TMC 60" I-D Alero Muro Armado 100% 100% 100% 100%

02 43+975.29 12.96 TMC 36" 43+980.00 11.39 TMC 36" I-D Caja Alero 100% 100% 100% 100%

03 44+540.06 15.39 TMC 36" 44+542.00 14.63 TMC 36" I-D Alero Alero 100% 100% 100% 100%

04 44+854.87 18.63 TMC 36" 44+855.00 18.68 TMC 36" I-D Alero Alero 100% 100% 100% 100%

05 45+174.72 21.87 TMC 48" 45+176.00 21.11 TMC 48" I-D Alero Muro Armado 100% 100% 100% 100%

06 45+338.26 17.82 TMC 36" 45+346.00 28.40 TMC 36" I-D Alero Muro Armado 100% 100% 100% 100%

07 45+740.00 13.77 TMC 36" 45+740.00 13.01 TMC 36" I-D Caja Alero 100% 100% 100% 100%

08 45+902.00 18.50 MC 2.00 x 2.00 45+900.00 18.50 MC 2.00 x 2.00 I-D Alero MSR 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
09 46+225.44 19.44 TMC 36" 46+228.00 16.25 TMC 36" I-D Caja Alero 100% 100% 100% 100%

10 46+817.45 16.20 TMC 36" 46+820.00 15.44 TMC 36" I-D Alero Alero 100% 100% 100% 100%

11 47+585.76 22.68 TMC 36" 47+586.00 19.49 TMC 36" I-D Alero Alero 100% 100% 100% 100%

12 47+923.30 12.96 TMC 36" 47+920.00 12.20 TMC 36" I-D Alero Alero 100% 100% 100% 100%

13 48+659.00 12.15 TMC 36" 48+660.00 13.01 TMC 36" I-D Caja Alero 100% 100% 100% 100%

14 48+992.13 12.15 TMC 36" 48+993.00 12.20 TMC 36" I-D Caja Alero 100% 100% 100% 100%

15 49+256.00 16.20 TMC 36" 49+258.00 15.44 TMC 36" I-D Alero Alero 100% 100% 100% 100%

16 49+600.45 12.98 TMC 36" 49+600.00 13.01 TMC 36" I-D Caja Muro Armado 100% 100% 100% 100%

17 49+761.88 14.58 TMC 36" 49+761.00 13.01 TMC 36" I-D Caja Alero 100% 100% 100% 100%

18 49+865.98 14.58 TMC 36" 49+870.00 14.63 TMC 36" I-D Alero Muro Armado 100% 100% 100% 100%

19 50+230.00 12.96 TMC 36" 50+230.00 13.01 TMC 36" I-D Alero Alero 100% 100% 100% 100%

20 50+293.92 17.82 TMC 36" 50+295.00 15.44 TMC 36" I-D Alero Alero 100% 100% 100% 100%

21 50+447.37 14.58 TMC 36" 50+447.00 13.82 TMC 36" I-D Caja Alero 100% 100% 100% 100%

22 50+993.13 15.39 TMC 36" 50+994.00 14.63 TMC 36" I-D Alero Alero 100% 100% 100% 100%

23 51+298.12 12.96 TMC 36" 51+300.00 13.82 TMC 36" I-D Caja Muro Armado 100% 100% 100% 100%

24 51+540.59 12.96 TMC 36" 51+544.00 13.82 TMC 36" I-D Caja Alero 100% 100% 100% 100%

25 51+605.00 15.39 TMC 36" 51+607.00 15.44 TMC 36" I-D Alero Alero 100% 100% 100% 100%

26 51+900.00 14.58 TMC 36" 51+900.00 15.44 TMC 36" I-D Caja Alero 100% 100% 100% 100%

27 52+093.02 14.58 TMC 36" 52+094.00 14.63 TMC 36" I-D Alero Muro Armado 100% 100% 100% 100%

28 52+360.00 13.34 TMC 36" 52+360.00 11.39 TMC 36" I-D Caja Alero 100% 100%

29 52+630.00 12.15 TMC 36" 52+630.00 11.39 TMC 36" I-D Caja Alero 100%

30 52+997.00 12.15 TMC 36" 52+990.00 13.01 TMC 36" I-D Caja Alero 100% 100% 100% 100%

31 53+339.77 21.87 TMC 60" 53+336.00 21.92 TMC 60" I-D Alero Muro Ciclopeo 100% 100% 100% 100%

32 53+733.81 14.58 TMC 36" 53+734.00 13.82 TMC 36" I-D Caja Muro Gavion 100% 100% 100% 100%

33 53+970.94 19.44 TMC 72" 53+971.00 17.06 TMC 72" I-D Alero Muro Armado 100% 100% 100% 100%

34 54+262.28 12.15 TMC 36" 54+263.00 12.20 TMC 36" I-D Caja Alero 100% 100% 100% 100%
INFORMACIN DE LA ALCANTARILLA CUERPO
MCA - Solado TMC Concreto Losa Inf. y
PROGRESIVA REAL (REPLANTEO) PROGRESIVA PREVISTA (PROYECTO) Excavacin
- C. Arena
Acero Encofrado
Muros
Item SENTIDO ENTRADA SALIDA
KM Long. TIPO SECCIN B x H KM Long. TIPO SECCIN B x H IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER

35 54+544.00 18.60 MC 2.00 x 2.00 54+544.00 18.60 MC 2.00 x 2.00 I-D Alero Muro Armado 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

36 54+783.00 17.01 TMC 36" 54+780.00 14.63 TMC 36" I-D Alero Muro Armado 100% 100% 100% 100%

37 55+330.00 10.00 MC 1.20 x 1.20 55+330.00 10.00 MC 1.20 x 1.20 I-D Alero Alero 100% 100% 100% 100% 100%

38 55+629.00 14.58 TMC 36" 55+629.00 13.82 TMC 36" D-I Alero Alero 100% 100% 100% 100%

39 56+549.00 16.20 TMC 36" 56+549.00 14.63 TMC 36" I-D Alero Alero 100% 100% 100% 100%
40 56+829.00 15.39 TMC 36" 56+829.00 14.63 TMC 36" I-D Alero Muro Armado 100% 100% 100% 100%

41 57+062.61 19.44 TMC 36" 57+065.20 13.82 TMC 36" D-I Alero Alero 100% 100% 100% 100%

42 57+367.50 18.63 TMC 36" 57+368.00 16.25 TMC 36" D-I Caja Alero 100% 100% 100% 100%
43 57+897.00 15.39 TMC 36" 57+897.00 15.44 TMC 36" D-I Alero Alero 100% 100% 100% 100%

44 58+284.00 12.96 TMC 36" 58+286.00 12.20 TMC 36" D-I Caja Muro Armado 100% 100% 100% 100%
45 58+638.50 11.34 TMC 36" 58+637.00 11.39 TMC 36" D-I Caja Alero 100% 100% 100% 100%
46 58+907.50 13.34 TMC 36" 58+908.00 11.39 TMC 36" I-D Caja Alero 100% 100% 100% 100%

47 59+245.00 12.96 TMC 36" 59+245.00 11.39 TMC 36" I-D Caja Alero 100% 100% 100% 100%
48 59+902.00 17.01 TMC 36" 59+902.00 19.49 TMC 36" D-I Alero Alero 100% 100% 100% 100%

49 60+270.00 10.53 TMC 36" 60+270.00 9.77 TMC 36" D-I Caja Muro Armado 100% 100% 100% 100%
50 60+506.00 10.53 TMC 36" 60+496.00 11.39 TMC 36" D-I Caja Alero 100% 100% 100% 100%
51 61+260.00 13.77 TMC 36" 61+258.00 11.39 TMC 36" D-I Caja Alero 100% 100% 100% 100%
52 61+598.54 13.77 TMC 36" 61+604.00 13.82 TMC 36" D-I Alero Muro Armado 100% 100% 100% 100%

53 62+030.00 14.20 MC 2.00 x 2.00 62+030.00 14.20 MC 2.00 x 2.00 I-D Alero Alero 85% 100% 100% 100% 100% 100% 100% 100% 100% 100%
54 62+179.20 15.40 TMC 36" 62+180.00 11.39 TMC 36" D-I Caja Alero 100% 100% 100% 100%
55 62+252.30 14.58 TMC 36" 62+255.00 15.44 TMC 36" D-I Alero Alero 100% 100% 100% 100%

56 62+503.37 20.25 TMC 36" 62+499.00 16.25 TMC 36" D-I Alero Alero 100% 100% 100% 100%

57 62+775.45 17.82 TMC 36" 62+777.00 18.68 TMC 36" D-I Alero Alero 100% 100% 100% 100%

58 62+857.00 16.20 TMC 36" 62+860.00 16.25 TMC 36" D-I Alero Alero 100% 100% 100% 100%
59 62+970.00 17.82 TMC 36" 62+970.00 17.87 TMC 36" D-I Alero Muro Armado 100% 100% 100% 100%

60 63+295.50 11.34 TMC 36" 63+260.00 11.39 TMC 36" I-D Caja Alero 100% 100% 100% 100%

61 63+564.69 16.20 TMC 48" 63+564.00 16.25 TMC 48" I-D Alero Alero 100% 100% 100% 100%

62 63+800.00 12.15 TMC 36" 63+800.00 12.20 TMC 36" D-I Caja Alero 100% 100% 100% 100%

63 64+042.00 20.25 TMC 72" 64+042.00 20.30 TMC 72" D-I Alero Muro Gavion 100% 100% 100% 100%
64 64+056.00 23.49 TMC 72" 64+059.00 21.92 TMC 72" D-I Alero Muro Gavion 100% 100% 100% 100%
65 64+300.00 11.34 TMC 36" 64+300.00 11.39 TMC 36" D-I Caja Alero 100% 100% 100% 100%

66 64+590.00 10.53 TMC 36" 64+590.00 10.58 TMC 36" D-I Caja Muro Armado 100% 100% 100% 100%

67 65+082.57 12.15 TMC 36" 65+083.00 12.20 TMC 36" I-D Caja Alero 100% 100% 100% 100%

68 65+681.00 12.15 TMC 36" 65+681.00 11.39 TMC 36" I-D Caja Alero 100% 100% 100% 100%

69 66+071.68 15.39 TMC 36" 66+073.00 11.39 TMC 36" D-I Caja Alero 100% 100% 100% 100%
70 66+179.00 17.01 TMC 36" 66+180.00 14.63 TMC 36" D-I Alero Alero 100% 100% 100% 100%

71 66+354.00 19.44 TMC 72" 66+355.00 30.83 TMC 72" D-I Alero Alero 100% 100% 100% 100%

72 66+550.00 13.77 TMC 36" 66+550.00 13.82 TMC 36" D-I Caja Alero
73 66+800.00 13.77 TMC 36" 66+800.00 13.82 TMC 36" D-I Caja Alero 100% 100% 100% 100%

74 67+114.00 18.63 TMC 72" 67+114.00 16.25 TMC 72" D-I Alero Alero 100% 100% 100% 100%

75 67+400.00 14.58 TMC 36" 67+400.00 14.63 TMC 36" D-I Caja Alero 100% 100% 100% 100%
INFORMACIN DE LA ALCANTARILLA CUERPO
MCA - Solado TMC Concreto Losa Inf. y
PROGRESIVA REAL (REPLANTEO) PROGRESIVA PREVISTA (PROYECTO) Excavacin
- C. Arena
Acero Encofrado
Muros
Item SENTIDO ENTRADA SALIDA
KM Long. TIPO SECCIN B x H KM Long. TIPO SECCIN B x H IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER

76 67+610.00 13.70 MC 1.00 x 1.00 67+610.00 13.70 MC 1.00 x 1.00 D-I Alero Muro Armado 100% 100% 100% 100% 50% 50% 30% 30%
77 67+940.00 12.15 TMC 36" 67+940.00 11.39 TMC 36" D-I Caja Alero 100% 100% 100% 100%

78 68+318.50 21.06 TMC 48" 68+319.00 15.44 TMC 48" D-I Alero Alero 100% 100% 100% 100%

79 69+082.00 15.70 MC 1.00 x 1.00 69+082.00 15.70 MC 1.00 x 1.00 D-I Alero Alero 100% 100% 100% 100% 100% 0% 100% 0% 0%
80 69+410.00 12.96 TMC 36" 69+430.00 14.63 TMC 36" D-I Caja Alero 100% 100% 100% 100%

81 69+800.00 13.34 TMC 36" 69+800.00 11.39 TMC 36" D-I Caja Alero 100% 100% 100% 100%

82 70+193.00 11.34 TMC 36" 70+200.00 11.39 TMC 36" D-I Caja Alero 100% 100% 100% 100%

83 70+491.00 20.20 MC 2.00 x 2.00 70+491.00 20.20 MC 2.00 x 2.00 D-I Alero MSR 100%
84 70+933.90 21.87 TMC 36" 70+933.40 19.49 TMC 36" D-I Alero MSR 100%
85 71+300.00 12.15 TMC 36" 71+300.00 13.82 TMC 36" D-I Caja Alero
86 71+657.50 16.20 TMC 36" 71+657.00 13.82 TMC 36" D-I Caja Alero
87 71+943.00 13.34 TMC 36" 72+000.00 11.39 TMC 36" D-I Caja Alero
88 72+284.48 12.15 TMC 36" 72+286.00 11.39 TMC 36" D-I Caja Alero
89 72+472.69 13.77 TMC 36" 72+474.00 11.39 TMC 36" D-I Caja Alero
90 72+620.87 17.82 TMC 36" 72+627.00 13.82 TMC 36" D-I Alero Alero
91 72+939.00 12.50 MC 1.00 x 1.00 72+939.00 12.50 MC 1.00 x 1.00 D-I Alero Alero 100% 100% 100% 100% 100%
92 73+400.00 12.96 TMC 36" 73+400.00 13.01 TMC 36" D-I Caja Alero 100% 100% 100% 100%

93 73+580.00 11.34 TMC 36" 73+580.00 12.20 TMC 36" D-I Caja Alero 100% 100% 100% 100%

94 74+000.00 11.34 TMC 36" 74+000.00 12.20 TMC 36" D-I Caja Alero 100% 100% 100% 100%

95 74+370.00 12.96 TMC 36" 74+370.00 13.82 TMC 36" D-I Caja Alero 100% 100% 100% 100%

96 74+648.00 11.00 MC 1.50 x 1.50 74+648.00 11.00 MC 1.50 x 1.50 D-I Alero Alero 100% 100% 100% 100% 100%
97 74+754.00 12.20 MC 1.00 x 1.00 74+754.00 12.20 MC 1.00 x 1.00 D-I Caja Alero 100% 100% 100% 100% 100% 100%
98 74+824.00 10.97 MC 1.00 x 1.00 74+824.00 10.97 MC 1.00 x 1.00 D-I Caja Alero 100% 100% 100% 100% 100%
99 75+100.00 12.96 TMC 36" 75+100.00 13.82 TMC 36" D-I Caja Alero 100% 100% 100% 100%

100 75+335.00 13.77 TMC 36" 75+370.00 13.82 TMC 36" D-I Caja Alero 100% 100% 100% 100%

101 75+630.00 10.53 TMC 36" 75+630.00 10.58 TMC 36" D-I Caja Muro Armado 100% 100% 100% 100%

102 75+962.00 12.15 TMC 36" 75+980.00 13.01 TMC 36" D-I Caja Alero 100% 100% 100% 100%

103 76+271.00 11.34 TMC 36" 76+240.00 11.39 TMC 36" D-I Caja Alero 100% 100% 100% 100%

104 76+623.67 11.34 TMC 36" 76+605.00 12.20 TMC 36" I-D Caja Muro Gavion
105 76+880.00 10.53 TMC 36" 76+880.00 10.58 TMC 36" D-I Caja Muro Armado 100% 100%

106 77+215.00 14.58 TMC 36" 77+200.00 16.25 TMC 36" D-I Caja Alero 100% 100% 100% 100%
107 77+596.00 12.15 TMC 36" 77+600.00 13.01 TMC 36" D-I Caja Alero
108 77+893.00 12.15 TMC 36" 77+920.00 13.82 TMC 36" D-I Caja Alero
109 78+300.00 13.77 TMC 36" 78+300.00 13.82 TMC 36" D-I Caja Alero
110 78+608.00 12.15 TMC 36" 78+600.00 11.39 TMC 36" D-I Caja Alero
111 79+080.00 11.34 TMC 36" 79+080.00 11.39 TMC 36" D-I Caja Alero
112 79+491.50 17.82 TMC 36" 79+493.00 17.06 TMC 36" D-I Alero Muro Gavion
113 79+780.00 13.34 TMC 36" 79+780.00 11.39 TMC 36" D-I Caja Alero
114 80+039.00 14.63 MC 1.50 x 1.50 80+039.00 14.63 MC 1.50 x 1.50 D-I Alero Muro Ciclopeo 100%
115 80+293.98 11.34 TMC 36" 80+300.00 11.39 TMC 36" I-D Caja Alero
116 80+600.00 12.96 TMC 36" 80+600.00 13.01 TMC 36" D-I Caja Alero
INFORMACIN DE LA ALCANTARILLA CUERPO
MCA - Solado TMC Concreto Losa Inf. y
PROGRESIVA REAL (REPLANTEO) PROGRESIVA PREVISTA (PROYECTO) Excavacin
- C. Arena
Acero Encofrado
Muros
Item SENTIDO ENTRADA SALIDA
KM Long. TIPO SECCIN B x H KM Long. TIPO SECCIN B x H IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER

117 80+900.00 13.34 TMC 36" 80+900.00 11.39 TMC 36" D-I Caja Alero
118 81+200.00 13.77 TMC 36" 81+200.00 13.82 TMC 36" D-I Caja Alero
119 81+453.07 11.34 TMC 36" 81+500.00 11.39 TMC 36" D-I Caja Alero
120 81+792.66 12.15 TMC 36" 81+800.00 12.20 TMC 36" D-I Caja Alero 30%
121 82+060.00 11.34 TMC 36" 82+060.00 11.39 TMC 36" D-I Caja Alero 100%
122 82+308.49 11.34 TMC 36" 82+300.00 11.39 TMC 36" D-I Caja Alero 25%
123 82+479.20 11.34 TMC 36" 82+500.00 10.58 TMC 36" D-I Caja Muro Gavion
124 82+700.00 11.34 TMC 36" 82+700.00 11.39 TMC 36" D-I Caja Alero 100%
125 82+997.50 12.15 TMC 36" 83+000.00 12.20 TMC 36" D-I Caja Alero 30%
126 83+312.63 15.39 TMC 36" 83+311.00 15.44 TMC 36" D-I Alero Muro Gavion 100%
127 83+560.00 12.96 TMC 36" 83+560.00 13.01 TMC 36" D-I Caja Alero 100%
128 83+896.25 17.01 TMC 36" 83+896.00 17.06 TMC 36" D-I Alero Muro Gavion 100% 100% 100% 100%

129 84+885.00 12.15 TMC 36" 84+885.00 13.82 TMC 36" D-I Alero Muro Armado 100% 100% 100% 100%
130 85+647.25 15.39 TMC 36" 85+646.00 14.63 TMC 36" D-I Alero Alero 100% 100% 100% 100%
131 85+900.00 10.53 TMC 36" 85+900.00 10.58 TMC 36" D-I Caja Muro Armado 100% 100%
132 86+160.00 11.34 TMC 36" 86+160.00 12.20 TMC 36" D-I Caja Alero 100% 100%

133 86+406.00 13.76 TMC 36" 86+408.00 17.87 TMC 36" D-I Alero Alero 100% 100% 100% 100%

134 86+650.52 14.58 TMC 36" 86+650.00 13.01 TMC 36" D-I Alero Alero 100% 100% 100% 100%

135 86+939.57 15.39 TMC 36" 86+940.00 16.25 TMC 36" D-I Alero Alero 100% 100% 100% 100%
136 87+200.00 16.20 TMC 36" 87+200.00 16.25 TMC 36" D-I Alero Muro Armado 100% 100% 100% 100%
137 87+456.00 13.17 MC 1.20 x 1.20 87+456.00 13.17 MC 1.20 x 1.20 D-I Muro Gavion Muro Gavion 100% 75% 100% 75% 100% 75% 100% 75% 100% 75%
138 87+529.68 15.39 TMC 36" 87+530.00 15.44 TMC 36" D-I Alero Alero 100% 100% 100% 100%

139 87+900.00 12.15 TMC 36" 87+900.00 12.20 TMC 36" D-I Alero Muro Armado 100% 100% 100% 100%

140 88+244.76 12.96 TMC 36" 88+240.00 15.44 TMC 36" D-I Alero Muro Armado 100% 100% 100% 100%

141 88+381.00 13.77 TMC 36" 88+380.00 14.63 TMC 36" D-I Alero Muro Armado 100% 100% 100% 100%
142 88+700.05 12.96 TMC 36" 88+700.00 13.01 TMC 36" D-I Caja Muro Gavion 100% 100% 100% 100%

143 88+920.28 12.15 TMC 36" 88+920.00 12.20 TMC 36" D-I Caja Alero 100% 0% 100% 0%
144 89+780.47 12.15 TMC 36" 89+780.00 12.20 TMC 36" D-I Caja Alero
145 90+138.50 13.34 TMC 36" 90+138.00 13.01 TMC 36" D-I Alero Muro Armado 100% 100% 100% 100%
146 90+609.50 11.34 TMC 36" 90+610.00 12.20 TMC 36" D-I Caja Muro Gavion 100% 100% 100%
147 90+800.00 12.15 TMC 36" 90+800.00 13.01 TMC 36" D-I Caja Alero 100% 100% 100% 100%
148 91+104.31 12.96 TMC 36" 91+103.00 14.63 TMC 36" D-I Alero Muro Ciclopeo 100% 100% 100% 100%
149 91+500.00 13.77 TMC 36" 91+500.00 13.01 TMC 36" D-I Caja Alero
150 91+695.00 12.96 TMC 36" 91+700.00 13.01 TMC 36" D-I Alero Muro Armado 100% 100% 100% 100%

151 92+000.00 12.15 TMC 36" 92+000.00 12.20 TMC 36" D-I Caja Alero 100% 100% 100% 100%

152 92+200.00 13.77 TMC 36" 92+200.00 14.63 TMC 36" D-I Caja Alero 100% 100% 100% 100%

153 92+813.00 14.58 TMC 36" 92+819.00 13.01 TMC 36" D-I Caja Muro Gavion 100% 100% 100% 100%
154 93+050.00 12.96 TMC 36" 93+050.00 12.20 TMC 36" D-I Caja Muro Gavion 100% 100% 100% 100%

155 93+249.00 14.58 TMC 36" 93+249.00 13.82 TMC 36" D-I Alero Muro Armado 100% 100% 100% 100%

156 93+505.00 15.39 TMC 36" 93+500.00 14.63 TMC 36" D-I Alero Alero 100% 100% 100% 100%

157 93+872.00 15.39 TMC 36" 93+872.00 15.44 TMC 36" D-I Alero Alero 100% 100% 100% 100%

158 94+100.00 14.58 TMC 36" 94+100.00 14.63 TMC 36" D-I Alero Alero 100% 100% 100% 100%
INFORMACIN DE LA ALCANTARILLA CUERPO
MCA - Solado TMC Concreto Losa Inf. y
PROGRESIVA REAL (REPLANTEO) PROGRESIVA PREVISTA (PROYECTO) Excavacin
- C. Arena
Acero Encofrado
Muros
Item SENTIDO ENTRADA SALIDA
KM Long. TIPO SECCIN B x H KM Long. TIPO SECCIN B x H IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER

159 94+332.00 17.82 TMC 36" 94+332.00 17.87 TMC 36" D-I Alero Alero 100% 100% 100% 100%
160 94+735.00 14.58 TMC 36" 94+740.00 14.63 TMC 36" D-I Alero Alero 100% 100% 100% 100%

161 94+897.00 16.20 TMC 36" 94+896.00 17.06 TMC 36" D-I Alero Alero 100% 100% 100% 100%

162 95+595.50 14.58 TMC 36" 95+596.00 14.63 TMC 36" D-I Alero Alero 100% 100% 100% 100%

= EJECUTADAS DURANTE EL MES


= EN EJECUCION
= EJECUTADAS MES ANTERIOR
2017

CABEZAL
Encofrado Encofrado
Concreto Losa superior Colocacin de Tubera Relleno Excavacin Vac. Zapata Vac. Elevacion Relleno Emboquillado
Zapata Elevacin

IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
CABEZAL
Encofrado Encofrado
Concreto Losa superior Colocacin de Tubera Relleno Excavacin Vac. Zapata Vac. Elevacion Relleno Emboquillado
Zapata Elevacin

IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100%


100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100%


100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 45% 60%
100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100%
CABEZAL
Encofrado Encofrado
Concreto Losa superior Colocacin de Tubera Relleno Excavacin Vac. Zapata Vac. Elevacion Relleno Emboquillado
Zapata Elevacin

IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER

100% 100% 100% 100% 100% 100%


100% 100% 100% 100% 100% 100%

0% 0%
100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100%


100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100%


100% 100% 100% 100% 100% 100%
CABEZAL
Encofrado Encofrado
Concreto Losa superior Colocacin de Tubera Relleno Excavacin Vac. Zapata Vac. Elevacion Relleno Emboquillado
Zapata Elevacin

IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER

100% 100% 100% 100%


100% 100% 100% 100%
100% 100% 100% 100%
100% 100%
100% 100%
100% 100% 100% 100%
100% 100% 100% 100%

100% 100% 100% 100%


100% 100% 100% 100%
100% 75% 100% 100% 100% 50% 50%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%

100% 100% 100% 100%


100% 100% 100% 100% 100% 100%
100% 0% 100% 0%

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 20% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
CABEZAL
Encofrado Encofrado
Concreto Losa superior Colocacin de Tubera Relleno Excavacin Vac. Zapata Vac. Elevacion Relleno Emboquillado
Zapata Elevacin

IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
TALUD DE EXCAVACION EN ALCANTARILLA
PROGRESIVA REAL (REPLANTEO) Talud de
Altura excavacion
Item maxima de recomendado
KM TIPO SECCIN B x H
excavacion
H:V
01 43+693.00 TMC 60" 10 1:2
02 43+980.00 TMC 36" - V
03 44+542.00 TMC 36" - V
04 44+855.00 TMC 36" - V
05 45+176.00 TMC 48" - V
06 45+346.00 TMC 36" - V
07 45+740.00 TMC 36" - V
08 45+900.00 MC 2.00 x 2.00 - V
09 46+228.00 TMC 36" - V
10 46+820.00 TMC 36" - V
11 47+586.00 TMC 36" 4 1:3
12 47+920.00 TMC 36" - V
13 48+660.00 TMC 36" - V
14 48+993.00 TMC 36" - V
15 49+258.00 TMC 36" - 1:3
16 49+600.00 TMC 36" - V
17 49+761.00 TMC 36" - V
18 49+870.00 TMC 36" - V
19 50+230.00 TMC 36" - V
20 50+295.00 TMC 36" - V
21 50+447.00 TMC 36" - V
22 50+994.00 TMC 36" - V
23 51+300.00 TMC 36" - V
24 51+544.00 TMC 36" - V
25 51+607.00 TMC 36" - V
26 51+900.00 TMC 36" - V
27 52+094.00 TMC 36" - V
28 52+360.00 TMC 36" - V
29 52+630.00 TMC 36" - V
30 52+990.00 TMC 36" - V
31 53+336.00 TMC 60" 6 1:3
32 53+734.00 TMC 36" 4.5 1:3
33 53+971.00 TMC 72" - V
34 54+263.00 TMC 36" - V
35 54+544.00 MC 2.00 x 2.00 - V
36 54+780.00 TMC 36" - V
37 55+330.00 MC 1.20 x 1.20 - V
38 55+629.00 TMC 36" - V
39 56+549.00 TMC 36" - V
40 56+829.00 TMC 36" 4 1:4
41 57+065.20 TMC 36" - V
42 57+368.00 TMC 36" - V
43 57+897.00 TMC 36" - V
44 58+286.00 TMC 36" - V
45 58+637.00 TMC 36" - V
46 58+908.00 TMC 36" - V
47 59+245.00 TMC 36" - V
48 59+902.00 TMC 36" - V
49 60+270.00 TMC 36" - V
50 60+496.00 TMC 36" - V
51 61+258.00 TMC 36" - V
52 61+604.00 TMC 36" - V
53 62+030.00 MC 2.00 x 2.00 - V
54 62+180.00 TMC 36" - V
55 62+255.00 TMC 36" - V
56 62+499.00 TMC 36" - V
57 62+777.00 TMC 36" 3.5 1:4
58 62+860.00 TMC 36" 2.5 1:4
59 62+970.00 TMC 36" - V
60 63+260.00 TMC 36" - V
61 63+564.00 TMC 48" - V
62 63+800.00 TMC 36" - V
63 64+042.00 TMC 72" 4 1:3
64 64+059.00 TMC 72" 4 1:3
65 64+300.00 TMC 36" - V
66 64+590.00 TMC 36" - V
67 65+083.00 TMC 36" - V
68 65+681.00 TMC 36" - V
69 66+073.00 TMC 36" - V
70 66+180.00 TMC 36" - V
71 66+355.00 TMC 72" 9 1:2
72 66+550.00 TMC 36" - V
73 66+800.00 TMC 36" - V
74 67+114.00 TMC 72" - V
75 67+400.00 TMC 36" - V
76 67+610.00 MC 1.00 x 1.00 - V
77 67+940.00 TMC 36" - V
78 68+319.00 TMC 48" - V
79 69+082.00 MC 1.00 x 1.00 - V
80 69+430.00 TMC 36" - V
81 69+800.00 TMC 36" - V
82 70+200.00 TMC 36" - V
83 70+491.00 MC 2.00 x 2.00 - V
84 70+933.40 TMC 36" - V
85 71+300.00 TMC 36" - V
86 71+657.00 TMC 36" - V
87 72+000.00 TMC 36" - V
88 72+286.00 TMC 36" - V
89 72+474.00 TMC 36" - V
90 72+627.00 TMC 36" - V
91 72+939.00 MC 1.00 x 1.00 - V
92 73+400.00 TMC 36" - V
93 73+580.00 TMC 36" - V
94 74+000.00 TMC 36" - V
95 74+370.00 TMC 36" - V
96 74+648.00 MC 1.50 x 1.50 - V
97 74+754.00 MC 1.00 x 1.00 - V
98 74+824.00 MC 1.00 x 1.00 - V
99 75+100.00 TMC 36" - V
100 75+370.00 TMC 36" - V
101 75+630.00 TMC 36" - V
102 75+980.00 TMC 36" - V
103 76+240.00 TMC 36" - V
104 76+605.00 TMC 36" - V
105 76+880.00 TMC 36" - V
106 77+200.00 TMC 36" - V
107 77+600.00 TMC 36" - V
108 77+920.00 TMC 36" - V
109 78+300.00 TMC 36" - V
110 78+600.00 TMC 36" - V
111 79+080.00 TMC 36" - V
112 79+493.00 TMC 36" - V
113 79+780.00 TMC 36" - V
114 80+039.00 MC 1.50 x 1.50 - V
115 80+300.00 TMC 36" - V
116 80+600.00 TMC 36" - V
117 80+900.00 TMC 36" - V
118 81+200.00 TMC 36" - V
119 81+500.00 TMC 36" - V
120 81+800.00 TMC 36" - V
121 82+060.00 TMC 36" - V
122 82+300.00 TMC 36" - V
123 82+500.00 TMC 36" - V
124 82+700.00 TMC 36" - V
125 83+000.00 TMC 36" - V
126 83+311.00 TMC 36" - V
127 83+560.00 TMC 36" - V
128 83+896.00 TMC 36" - V
129 84+885.00 TMC 36" - V
130 85+646.00 TMC 36" - V
131 85+900.00 TMC 36" - V
132 86+160.00 TMC 36" - V
133 86+408.00 TMC 36" - V
134 86+650.00 TMC 36" - V
135 86+940.00 TMC 36" - V
136 87+200.00 TMC 36" - V
137 87+456.00 MC 1.20 x 1.20 - V
138 87+530.00 TMC 36" - V
139 87+900.00 TMC 36" - V
140 88+240.00 TMC 36" - V
141 88+380.00 TMC 36" - V
142 88+700.00 TMC 36" - V
143 88+920.00 TMC 36" - V
144 89+780.00 TMC 36" - V
145 90+138.00 TMC 36" - V
146 90+610.00 TMC 36" - V
147 90+800.00 TMC 36" - V
148 91+103.00 TMC 36" - V
149 91+500.00 TMC 36" - V
150 91+700.00 TMC 36" - V
151 92+000.00 TMC 36" - V
152 92+200.00 TMC 36" - V
153 92+819.00 TMC 36" - V
154 93+050.00 TMC 36" - V
155 93+249.00 TMC 36" - V
156 93+500.00 TMC 36" - V
157 93+872.00 TMC 36" - V
158 94+100.00 TMC 36" - V
159 94+332.00 TMC 36" - V
160 94+740.00 TMC 36" - V
161 94+896.00 TMC 36" - V
162 95+596.00 TMC 36" - V
CONTROL DE MUROS C.A. Y C.C - JULIO 2017

DATOS DE
GEOMETRIA
REPLANTEO
ESTRUCTURA Zapata Elevacin
Tuberia HDPE
KM ( Inicio) Excavacin Solado Encofrado Acero Concreto Encofrado Acero Concreto Relleno
corrugada 4"

MCA 43+656.64 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
MCA 45+153.15 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
MCCBS 46+695.00 100% 100% 100% 100% 100% 100% 100%
MCCBS 46+994.64 100% 100% 100% 100% 100% 100% 100%
MCCBS 48+230.00 100% 100% 100% 100% 100% 100% 100%
MCCBS 48+825.00 100% 100% 100% 100% 100% 100% 100%
MCA 49+595.57 100% 100% 100% 100% 100% 100% 100% 100%
MCCBS 49+863.78 100% 100% 100% 100% 100% 100% 100%
MCCBS 49+995.00 100% 100% 100% 100% 100% 100% 100%
MCA 51+289.29 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
MCCBS 52+080.97 100% 100% 100% 100% 100% 100% 100%
MCC 53+332.34 100% 100% 100% 100% 100% 100% 100%
MCCBS 53+825.00
MCABS 53+948.05 100%
MCA 54+537.57 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
MCA 54+776.74 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
MCA 54+960.00 100% 100% 100% 100% 15% 60% 60%
MCC 55+450.00 100% 100% 100% 100% 100% 100% 100%
MCC 55+902.48 100% 100% 100% 100% 100% 100% 100%
MCA 56+824.25 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
MCA 58+281.85 100%
MCCBS 58+575.00 100% 100% 100% 100% 100% 100% 100%
MCCBS 59+070.00 100% 100% 60% 85%
DATOS DE
GEOMETRIA
REPLANTEO
ESTRUCTURA Zapata Elevacin
Tuberia HDPE
KM ( Inicio) Excavacin Solado Encofrado Acero Concreto Encofrado Acero Concreto Relleno
corrugada 4"
MCCBS 59+480.00 100% 100% 100% 100% 100% 100% 100%
MCA 60+267.50 0%
MCA 61+595.08 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
MCCBS 62+385.00 100% 100% 100% 100% 100% 100% 100%
MCA 62+971.86 100% 100% 100% 50% 100% 100% 100% 100% 100% 100%
MCCBS 64+550.32 100% 100% 100% 100%
MCABS 64+587.52 100%
MCA 64+768.00 100% 100% 50% 50% 20%
MCCBS 65+100.00 100% 100% 100% 50%
MCCBS 66+460.00 100% 100% 100% 50%
MCC 66+805.00 100% 100% 100% 50%
MCCBS 67+305.00 100% 100% 100%
MCA 67+604.98 0%
MCCBS 73+425.00 100% 100% 100% 100% 100%
MCCBS 73+665.00 100% 100% 100% 100% 100%
MCA 75+627.56 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
MCCBS 76+611.71 0%
MCCBS 76+660.00 100% 100% 100% 100% 100% 100% 100%
MCCBS 76+805.00 100% 100% 100% 100% 100%
MCCBS 77+085.00 100% 100% 100% 100% 100% 100% 100%
MCCBS 79+815.00 0%
MCC 80+024.33 100%
MCCBS 82+325.00 100%
MCCBS 82+380.00 100%
MCCBS 82+450.00 100%
MCCBS 82+585.00 100% 100% 100%
MCCBS 82+795.00 100%
DATOS DE
GEOMETRIA
REPLANTEO
ESTRUCTURA Zapata Elevacin
Tuberia HDPE
KM ( Inicio) Excavacin Solado Encofrado Acero Concreto Encofrado Acero Concreto Relleno
corrugada 4"
MCCBS 82+927.50 100% 100% 100%
MCCBS 83+180.17 0%
MCCBS 83+400.00 0%
MCCBS 84+305.00 100%
MCCBS 84+745.00 0%
MCA 84+883.14 0%
MCA 85+897.50 0%
MCCBS 86+100.00 100% 100% 100%
MCA 87+197.50 0%
MCABS 87+853.88 100% 100% 100% 100% 100%
MCA 88+230.25 0%
MCA 88+378.32 0%
MCCBS 88+710.00 100% 100% 100%
MCCBS 89+515.00 100% 100% 100% 50% 100%
MCCBS 89+674.07 100% 100% 100% 100% 50%
MCCBS 89+945.00 100% 100% 100% 100% 100% 100% 100%
MCA 90+136.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
MCCBS 90+920.00 100% 100% 100% 100% 100% 100% 100%
MCCBS 91+094.35 0%
MCCBS 91+290.00 100% 100% 100% 100% 100% 100% 100%
MCCBS 91+339.75 100% 100% 100% 100% 100% 100% 100%
MCCBS 91+530.00 0%
MCA 91+692.50 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
MCA 93+246.55 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
DATOS DE
GEOMETRIA
REPLANTEO
ESTRUCTURA Zapata Elevacin
Tuberia HDPE
KM ( Inicio) Excavacin Solado Encofrado Acero Concreto Encofrado Acero Concreto Relleno
corrugada 4"
= EJECUTADAS DURANTE EL MES
= EN EJECUCION
= CUENTAN CON DICHAS PARTIDAS
= EJECUTADAS MES ANTERIOR
DE MUROS C.A. Y C.C - JULIO 2017

GEOMETRIA

Tubo de Geocompuesto
pvc-sap, d=2" de drenaje

100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100%
100% 100%
100% 100%
100% 100%
100% 100%

100% 100%

100%
100% 100%

100% 100%
100% 100%
100% 100%

100% 100%
40%
GEOMETRIA

Tubo de Geocompuesto
pvc-sap, d=2" de drenaje
100% 100%

100% 100%
100% 100%
100% 100%

100% 100%

100% 100%
100%
100% 100%
GEOMETRIA

Tubo de Geocompuesto
pvc-sap, d=2" de drenaje

100% 100%
100% 100%
100% 100%

100% 100%
100% 100%

100% 100%
100% 100%
CONTROL DE AVANCE MURO DE SUELO REFORZADO - JULIO 2017
DATOS DE REPLANTEO GEOMETRIA
Zapata Elevacin

N ESTRUCTURA Elemento de
Tuberia HDPE Geocompuesto Geotextil no Geomalla de
KM ( Inicio) KM (Fin) Longitud Excavacin Relleno Suelo reforzado
corrugada 4" de drenaje tejido clase 2 poliestes tipo I
tipo II

1 MSR 45+891.53 45+949.49 35.00 100% 100% 100% 100% 100% 100% 100%
2 MSR 64+022.67 64+074.31 13.00 100% 100% 100% 100% 100% 100% 100%
3 MSR 64+668.00 64+829.91 161.91 100% 100% 100% 100% 100% 100% 100%
4 MSR 70+463.55 70+543.88 80.33 100% 30% 30% 30% 30% 30% 30%
5 MSR 70+821.07 70+966.24 145.17 100% 80% 80% 80% 80% 80% 80%
6 MSR 79+472.99 79+510.54 37.55
7 MSR 83+275.03 83+323.77 48.74
8 MSR 83+888.52 83+917.66 29.14

= EJECUTADAS DURANTE EL MES


= EJECUTADAS MES ANTERIOR
= EN EJCUCION MENOS 50%
CONTROL DE EJECUCIN DE SUBDRENES - JULIO 201

INFORMACIN DE LOS SUBDRENES

PROGRESIVA REPLANTEO PROGRESIVA PROYECTO


Longitud de
Item LONG. LADO LONG. LADO N Descargas
Descarga

De Km A Km De Km A Km

1 71+665.00 71+790.00 125.00 LI 71+665 71+790 125.00 LI 4 53.56


2 82+710.00 82+760.00 50.00 LD 82+710 82+760 50.00 LD 2 25.8
3 83+370.00 83+420.00 50.00 LD 83+370 83+420 50.00 LD 2 25.91
5 83+905.00 84+000.00 95.00 LD 83+905 84+000 95.00 LD 2 28.01
6 84+720.00 84+800.00 80.00 LI 84+720 84+800 80.00 LI 3 38.73
8 84+838.00 84+880.00 42.00 LI 84+838 84+880 42.00 LI 2 27.89
9 84+905.00 84+940.00 35.00 LI 84+905 84+940 35.00 LI 1 13.92
12 86+425.00 86+560.00 135.00 LD 86+425 86+560 135.00 LD 5 69.31
14 86+945.00 87+120.00 175.00 LD 86+945 87+120 175.00 LD 6 77.62
17 87+540.00 87+600.00 60.00 LD 87+540 87+600 60.00 LD 2 27.03
18 87+800.00 87+895.00 95.00 LD 87+800 87+895 95.00 LD 3 43.99
19 87+910.00 88+220.00 310.00 LD 87+910 88+220 310.00 LD 10 125.66
21 88+640.00 88+690.00 50.00 LD 88+640 88+690 50.00 LD 2 27.03