Baseline conditions at Green Wood City


Storm Water Drainage
. From Design report

The storm water drain is being designed to carry 6.25 mm rain fall per hour. Also,
suitable provisions are contemplated in our scheme to ensure better recharging of
underground water table in the area. RCC Hume pipe drain with minimum 400 mm dia
is proposed in this area.

Project status
All most all rain water pipe are laid as per the design given by Mr. Soni.
Green areas as park are lower from the nearest road ranging 400 mm to 1000
mm.
Road levels are at 216.8 in Block A, B,C & D
As per the drawing provided outfall of B,C & D block is at 213.8 i.e. (-) 3000 from
internal roads.
invert level at out fall of Block A is 214.3 i.e. (-) 2500 from level of internal roads
Invert Level of proposed HUDA storm water drain was not known at the time of
meeting at site.
It is presumed that

Level of Park at marked as Green (10) is 215.8 & MH -24 IL 214.7


Level of Park at marked as Green (4) is 215.8 & MH -51 IL 215.22
Level of Park at marked as Green near primary school is 215.8 & MH -85 IL 213.8
Level of Park at marked as Green (14) is 215.8 & MH -113 IL 215.3
Level of Park at marked as Green (21) is 215.8 & & MH 145 IL 214.32

Concept of Proposed Mitigation for rain water harvesting (RWH)


As catchment is primarily is a part of residential layout, expected contamination in
runoff would be floating materials like traces of Mineral Oil, organic substrate, dry
leaves etc, some grit particles of up to 2 ~4 mm size, & silt. Thus, following components
are required for continuous self-cleaning de silting system with required capacity of
injection well.

Bar Screens > Grit seller> Hydro cycle > tube settling system. > injection well

Project Management Consortium Environment


design arm of Dass Rasayanic Services,
441 Sector 16 Sikandra Avas Yojna Sikandra Agra; Ph +91-562-2641866, 4052776
Email. info@ wateronline.co.in; Visit www.wateronline.co.in
An ISO 9001 & 140001 certified design &
development Organization

Parameter selected for design of RWH


1. Rainfall intensity 6.25 mm /hr. (as per the carrying capacity of storm drains).
2. Settling velocity of .05 M/hr.
3. Runoff coefficient of 0.75 as catchment area considered is having mixed
formation of paved & unpaved area.
4. No residential area is considered for calculation
5. For Block A catchment area at green 14 is total 26743.41 Sq M
6. For Block A catchment area at green 21 is total 43470.42 Sq M
7. For Block B, C & D catchment area at green 10 is total 33361.13 Sq M
8. For Block B, C & D catchment area at green 4 is total 30032.314 Sq M
9. For Block B, C & D catchment area at green at primary school is total
30618.32 Sq M
Based on above following systems are required

Location Catchment Unit Maximum Unit


area discharge*

Area Name Green 4 33361.13 Sq M 156.38 Cu M/hr

Area Name green 10 30032.314 Sq M 140.78 Cu M/hr

Area Name Green primary


school 31618.32 Sq M 148.21 Cu M/hr

Area Name Green 14 26743.41 Sq M 125.36 Cu M/hr

Area Name Green 21 43470.42 Sq M 203.77 Cu M/hr

Project Management Consortium Environment


design arm of Dass Rasayanic Services,
441 Sector 16 Sikandra Avas Yojna Sikandra Agra; Ph +91-562-2641866, 4052776
Email. info@ wateronline.co.in; Visit www.wateronline.co.in
An ISO 9001 & 140001 certified design &
development Organization

In all 5 systems are required

3 systems should be able to handle of 150 Cu m/hr

1 System should be able to handle 125 Cu M/hr.

1 System of 200 Cu M/hr.

Needs revalidation as par catchment area.

Dinkar Saxena Ankit Sachdeva

Chartered Engineer (India); M/128465/1 B.Tech. (Environmental Eng.)

M.I.E., C. Eng., FIPHE, PGDM,

E.M.S. Auditor (IEMA, U.K.)

Project Management Consortium Environment


design arm of Dass Rasayanic Services,
441 Sector 16 Sikandra Avas Yojna Sikandra Agra; Ph +91-562-2641866, 4052776
Email. info@ wateronline.co.in; Visit www.wateronline.co.in