You are on page 1of 23

0 04.05.2017 FIRST ISSUE A.K M.

M TAD

REV DATE DESCRIPTION PRD. CHD. APPD.

PROJECT :
Oman Electrical Transmission Co.S.A.O.C
Construction of new 132/33kv Grid Substation at Samad and Sinaw
With Associated 132kv Overhead transmission Lines
CLIENT :

OMAN ELECTRICITY TRANSMISSION COMPANY S.A.O.C.


P.O BOX 1224, P.C: 131
AL-HAMRIYA, SULTANATE OF OMAN.

CLIENT'S CONSULTANT:

Atlas International Engineering Consultants


P.O.Box:
P.O.Box: P.O.Box:
1542,
1542, P.O.Box:
1542,
PC-130
PC-130 1542,
PC-130PC-130
Muscat. Sultanate of Oman
Tel: +968 24283635 , Fax: +968 24283636

CONTRACTOR:
Inabensa
P.O. Box - 148, P.C - 102, Al Khuwair, Muscat,
Sultanate of Oman
Tel: +968 24403750, Fax: +968 24692308

CONTRACTOR CONSULTANT: Job No.: 367491 OM01

Mott MacDonald & Company LLC


MBD Business Centre
MBD, Greater Muttrah Muscat
PO Box 587, Postal code - 112
Sultanate of Oman
Tel: +968 2485 2000, Fax: +968 24815850
TOWER SUPPLIER :
Arabian International Co.
For steel Structure
P.O. Box : 41017 Jeddah 21531
Document TITLE:
Oman Electrical Transmission Co.S.A.O.C
Construction of new 132/33kv Grid Substation at Samad and Sinaw
With Associated 132kv Overhead transmission Lines
DETAILED DESIGN CALCULATION for "SA Support Structures Surge Arrester (S1)"
PREPARED AMIRA KASSEM CHECKED MARWA MAMDOUH

DATE 04.05.2017 APPROVED Tariq Abu Dahab

SCALE N/A CAD FILE N/A

This document issued for the party which commissioned it and for specific purposes connected with captioned project
Document No.: SHEETS REVISION
only. It should not be relied upon by any other party and used for any other purpose. We accept no responsibility for the
consequences of this document being relied upon by any other party, or being used for any other purpose, or containing COM/102/2015/OHL/10005. 23 0
any error or omission in data supplied to us by other parties.
Oman Electrical Transmission Co.S.A.O.C
Construction of new 132/33kv Grid Substation at Samad and Sinaw
With Associated 132kv Overhead transmission Lines

DOCUMENT TITLE DETAILED DESIGN CALCULATION FOR SA Support Structures Surge Arrester (S1) 04.05.2017
DOCUMENT NO. COM/102/2015/OHL/10005. REV.0 Page : 2

Page No. Rev. No. Date Page No. Rev. No. Date Page No. Rev. No. Date
1 0 04.05.2017
2 0 04.05.2017
3 0 04.05.2017
4 0 04.05.2017
5 0 04.05.2017
6 0 04.05.2017
7 0 04.05.2017
8 0 04.05.2017
9 0 04.05.2017
10 0 04.05.2017
11 0 04.05.2017
12 0 04.05.2017
13 0 04.05.2017
14 0 04.05.2017
15 0 04.05.2017
16 0 04.05.2017
17 0 04.05.2017
18 0 04.05.2017
19 0 04.05.2017
20 0 04.05.2017
21 0 04.05.2017
22 0 04.05.2017
23 0 04.05.2017

APPENDIX "A" 4 Pages


APPENDIX "B" 12 Pages

0 04.05.2017 First Issue AMIRA KASSEM MARWA MAMDOUH Tariq A. Dahab

Rev. Date Description Originated Checked Approved By


Oman Electrical Transmission Co.S.A.O.C
Construction of new 132/33kv Grid Substation at Samad and Sinaw
With Associated 132kv Overhead transmission Lines

DOCUMENT TITLE DETAILED DESIGN CALCULATION FOR SA Support Structures Surge Arrester (S1) 04.05.2017
DOCUMENT NO. COM/102/2015/OHL/10005. REV.0 Page : 3

INDEX

S/N DESCRIPTION PAGE

1 DESIGN PARAMETERS 4 -5

MATERIAL, STRUCTURAL DESIGN CRITERIA AND PERMISSIBLE STRESSES


2 6-7

LOADING CASES &LOADING TREES


3 8-10

STRUCTURAL DESIGN SUMMARY


4 11-13

FOUNDATION REACTION
5 14-15

6 BASE PLATE DESIGN & ANCHOR BOLTS 16 -18

7 DESIGN DRAWING 19-20

8 References 21-23
Oman Electrical Transmission Co.S.A.O.C
Construction of new 132/33kv Grid Substation at Samad and Sinaw
With Associated 132kv Overhead transmission Lines

DOCUMENT TITLE DETAILED DESIGN CALCULATION FOR SA Support Structures Surge Arrester (S1) 04.05.2017
DOCUMENT NO. COM/102/2015/OHL/10005. REV.0 Page : 4

1-DESIGN PARAMETERS
Oman Electrical Transmission Co.S.A.O.C
Construction of new 132/33kv Grid Substation at Samad and Sinaw
With Associated 132kv Overhead transmission Lines

DOCUMENT TITLE DETAILED DESIGN CALCULATION FOR SA Support Structures Surge Arrester (S1) 04.05.2017
DOCUMENT NO. COM/102/2015/OHL/10005. REV.0 Page : 5

1.0 Over Load Capacity Factors

REFRERNCE DOCUMENT: 132/33kvV SAMAD GRID STATION ESTIMATION OF LOADS ON GANTRY AND SUPPORTS FOR OUTDOOR
EQUIPMENTS DOC.NO :SMD/102/2015/1010,REV B

For Support Structure


Normal Condition = 1.5
short-circuit Condition = 1

2.0 Surge Arrester (S1)

Refer to Dwg No. 1768 Dr ( E )

Equipment

Length ( Complete Ass.)


2397
mm
Approx. net weight
63
Kg
Width
208
mm

3.0 Support Structures

Refer to Loading Diagram Dwg. No.SMD/102/2015/C/4068

Support Structure
S1 (SA)

Height
2500
mm
Oman Electrical Transmission Co.S.A.O.C
Construction of new 132/33kv Grid Substation at Samad and Sinaw
With Associated 132kv Overhead transmission Lines

DOCUMENT TITLE DETAILED DESIGN CALCULATION FOR SA Support Structures Surge Arrester (S1) 04.05.2017
DOCUMENT NO. COM/102/2015/OHL/10005. REV.0 Page : 6

2-MATERIAL, STRUCTURAL DESIGN CRITERIA


AND
PERMISSIBLE STRESSES
Oman Electrical Transmission Co.S.A.O.C
Construction of new 132/33kv Grid Substation at Samad and Sinaw
With Associated 132kv Overhead transmission Lines

DOCUMENT TITLE DETAILED DESIGN CALCULATION FOR SA Support Structures Surge Arrester (S1) 04.05.2017
DOCUMENT NO. COM/102/2015/OHL/10005. REV.0 Page : 7

1.0 MATERIAL

1.1 Structural steel for angle & plate

1.2 Bolts

Bolts shall conform / equivalent to ISO 898 Gr 8.8


a) Shear stress in effective area =0.62X FU= 0.62 x 800 = 496 Mpa.

b) Single Shear strength through Body for M16 =496 x area of bolt=496x201 =99.696 =100 KN.

c) Single Shear strength through Body for M20 = 496*314.2=155.8=156 KN

d) Bearing on bolt for Steel grade S275 JR = 1.5* Fu = 615 MPa

e) Bearing on bolt for Steel grade S355JR = 1.5*Fu = 735 MPa

1.3 Galvanizing ,
i) Galvanizing shall be as per BS 729, Zinc coating 915 gm/m (127 m)

2.1 Limiting value for effective slenderness ration KL/r for compression member shall be as following:
Refer to Tender Document ATLAS INTERNATIONAL ENGINEERING CONSULTANTS
Volume 3-Technical SPEC. for Overhead Transmission Line clause 7.2.10

Leg members, ground wire peak members, and main members of

Cross arms in compression 120

For other members carrying calculated stress 200

For redundant members 250

For Tension members 350

2.2 Min. Thickness


Refer to Refer to Tender Document ATLAS INTERNATIONAL ENGINEERING CONSULTANTS
Volume 3-Technical SPEC. for Overhead Transmission Line Appedix7A4

Main Leg, Cross arm chord 6mm


Other member, GW Peak carrying stresses 5mm
Redundant 5mm
Oman Electrical Transmission Co.S.A.O.C
Construction of new 132/33kv Grid Substation at Samad and Sinaw
With Associated 132kv Overhead transmission Lines

DOCUMENT TITLE DETAILED DESIGN CALCULATION FOR SA Support Structures Surge Arrester (S1) 04.05.2017
DOCUMENT NO. COM/102/2015/OHL/10005. REV.0 Page :8

3 - LOADING CASES & LOADING TREES


REFRERNCE DOCUMENT:
132/33kvV SAMAD GRID STATION
ESTIMATION OF LOADS ON
GANTRY AND SUPPORTS FOR OUTDOOR EQUIPMENTS
DOC.NO :SMD/102/2015/E/1010,REV B
Oman Electrical Transmission Co.S.A.O.C
Construction of new 132/33kv Grid Substation at Samad and Sinaw
With Associated 132kv Overhead transmission Lines

DOCUMENT TITLE DETAILED DESIGN CALCULATION FOR SA Support Structures Surge Arrester (S1) 04.05.2017
DOCUMENT NO. COM/102/2015/OHL/10005. REV.0 Page : 9

LIST OF LOADING CASES

CASE
DESCRIPTION F.O.S
NO.

SUPPORT STRUCTURE

Surge Arrester SA (S1)

1 Normal Condition (S1) 1.5

2 Short Circuit Condition (S1) 1


Oman Electrical Transmission Co.S.A.O.C
Construction of new 132/33kv Grid Substation at Samad and Sinaw
With Associated 132kv Overhead transmission Lines

DOCUMENT TITLE DETAILED DESIGN CALCULATION FOR SA Support Structures Surge Arrester (S1) 04.05.2017
DOCUMENT NO. COM/102/2015/OHL/10005. REV.0 Page : 10

SA SUPPORT STRUCTURE SURGE ARRESTER (S1)


1699
429
164
Transverse Wind on Tower = 6000 N/m

Case No. (1 . N_T)


N.C + T. Wind

1133
286
464
Transverse Wind on Tower = 3000N/m

Case No. (2 . SC_T)


S.C .C+ T. Wind

*ALL LOADS ARE IN NEWTONS.


**ALL FORCES ARE INCLUDING FOS.
Oman Electrical Transmission Co.S.A.O.C
Construction of new 132/33kv Grid Substation at Samad and Sinaw
With Associated 132kv Overhead transmission Lines

DOCUMENT TITLE DETAILED DESIGN CALCULATION FOR SA Support Structures Surge Arrester (S1) 04.05.2017
DOCUMENT NO. COM/102/2015/OHL/10005. REV.0 Page :11

4 - STRUCTURAL DESIGN SUMMARY


Oman Electrical Transmission Co.S.A.O.C
Construction of new 132/33kv Grid Substation at Samad and Sinaw
With Associated 132kv Overhead transmission Lines

DOCUMENT TITLE DETAILED DESIGN CALCULATION FOR "S1 SUPPORT STRUCTURE" DATE : 04.05.17
DOCUMENT NO. COM/102/2015/OHL/10005 REV.0 PAGE : 12

Compression portion:
Group Group Angle Angle Steel Max Usage Max Comp. Comp Comp. L/R Comp. Comp. Length Curve No.
Label Desc. Type Size Strength Usage Control Use Control Force Control Capacity Connect. Connect. Comp. No. Of
In Member Load Shear Bearing RLX RLY RLZ L/R KL/R Member Bolts
Comp. Case Capacity Capacity Comp.
(MPa) % % (kN (kN) (kN) (kN) (m)
M1 main leg SAE 75*75*6 355 0.76 Comp 0.76 2P -2.134 2. SC_T 288.664 792 282.24 2 2 1 39.65 39.65 0.452 1 4
M2 main leg SAE 75*75*6 355 0.98 Comp 0.98 3P -2.762 2. SC_T 288.664 792 282.24 2 2 1 39.65 39.65 0.452 1 4
M3 main leg SAE 75*75*6 355 1.69 Comp 1.69 4P -4.781 1. N_T 288.664 792 282.24 2 2 1 39.65 39.65 0.452 1 4
M4 main leg SAE 75*75*6 355 1.91 Comp 1.91 5P -5.38 1. N_T 288.664 792 282.24 2 2 1 39.65 39.65 0.452 1 4
M5 main leg SAE 75*75*6 355 3.33 Tens 3.25 6P -9.171 1. N_T 288.664 792 282.24 2 2 1 39.65 39.65 0.452 1 4
M6 main leg SAE 75*75*6 355 3.5 Tens 3.44 7P -9.663 1. N_T 280.997 792 282.24 7 7 1 46.05 46.05 0.15 1 4
FBR1 Front Brac SAE 45*45*5 275 1.81 Comp 1.81 9R -0.891 2. SC_T 84.002 99 49.2 1 1 1 62.36 91.18 0.542 3 1
FBR2 Front Brac SAE 45*45*5 275 2.47 Comp 2.47 10P -1.215 1. N_T 84.002 99 49.2 1 1 1 62.36 91.18 0.542 3 1
FBR3 Front Brac SAE 45*45*5 275 3.53 Comp 3.53 11R -1.737 1. N_T 84.002 99 49.2 1 1 1 62.36 91.18 0.542 3 1
FBR4 Front Brac SAE 45*45*5 275 4.78 Comp 4.78 12P -2.352 1. N_T 84.002 99 49.2 1 1 1 62.36 91.18 0.542 3 1
FBR5 Front Brac SAE 45*45*5 275 4.95 Comp 4.95 13R -2.434 1. N_T 84.002 99 49.2 1 1 1 62.36 91.18 0.542 3 1
HT0 Horz frm Tr SAE 75*75*6 275 6 Climb 0.43 14P -0.253 2. SC_T 199.309 99 59.04 1 1 1 20.41 70.2 0.3 3 1
IN Internal SAE 45*45*5 275 0 0 16P -0.018 1. N_T 108.644 99 49.2 0.5 0.5 0.5 24.38 48.29 0.424 2 1
Oman Electrical Transmission Co.S.A.O.C
Construction of new 132/33kv Grid Substation at Samad and Sinaw
With Associated 132kv Overhead transmission Lines

DOCUMENT TITLE DETAILED DESIGN CALCULATION FOR "S1 SUPPORT STRUCTURE" DATE :04.05.17
DOCUMENT NO. COM/102/2015/OHL/10005 REV.0 PAGE : 13

Tension portion:
Group Group Angle Angle Steel Max Usage Max Tension Tension Tension Net Tension Tension
Label Desc. Type Size Strength Usage Control Use Control Force Control Section Connect. Connect.
Length Tension
In Member Load Capacity Shear Bearing No. of Bolts Tens. No. of Holes Hole Diameter
member
TENS. Case Capacity Capacity
(MPa) % % (kN (kN) (kN) (kN)

M1 main leg SAE 75*75*6 355 0.76 Comp 0.65 2XY 1.536 2. SC_T 236.075 792 282.24 0.452 4 2 1.75
M2 main leg SAE 75*75*6 355 0.98 Comp 0.86 3XY 2.035 2. SC_T 236.075 792 282.24 0.452 4 2 1.75
M3 main leg SAE 75*75*6 355 1.69 Comp 1.61 4XY 3.803 1. N_T 236.075 792 282.24 0.452 4 2 1.75
M4 main leg SAE 75*75*6 355 1.91 Comp 1.82 5XY 4.306 1. N_T 236.075 792 282.24 0.452 4 2 1.75
M5 main leg SAE 75*75*6 355 3.33 Tens 3.33 6XY 7.857 1. N_T 236.075 792 282.24 0.452 4 2 1.75
M6 main leg SAE 75*75*6 355 3.5 Tens 3.5 7XY 8.251 1. N_T 236.075 792 282.24 0.15 4 2 1.75
FBR1 Front Brac SAE 45*45*5 275 1.81 Comp 1.48 9P 0.73 2. SC_T 84.769 99 49.2 0.542 1 1 1.75
FBR2 Front Brac SAE 45*45*5 275 2.47 Comp 1.5 10R 0.737 1. N_T 84.769 99 49.2 0.542 1 1 1.75
FBR3 Front Brac SAE 45*45*5 275 3.53 Comp 2.4 11P 1.179 1. N_T 84.769 99 49.2 0.542 1 1 1.75
FBR4 Front Brac SAE 45*45*5 275 4.78 Comp 3.78 12R 1.859 1. N_T 84.769 99 49.2 0.542 1 1 1.75
FBR5 Front Brac SAE 45*45*5 275 4.95 Comp 4.25 13P 2.092 1. N_T 84.769 99 49.2 0.542 1 1 1.75
HT0 Horz frm Tr SAE 75*75*6 275 6 Climb 0.34 14YR 0.201 1. N_T 190.575 99 59.04 0.3 1 1 1.75
IN Internal SAE 45*45*5 275 0 0 16P 0 84.769 99 49.2 0.424 1 1 1.75
Oman Electrical Transmission Co.S.A.O.C
Construction of new 132/33kv Grid Substation at Samad and Sinaw
With Associated 132kv Overhead transmission Lines

DOCUMENT TITLE DETAILED DESIGN CALCULATION FOR SA Support Structures Surge Arrester (S1) 04.05.2017
DOCUMENT NO. COM/102/2015/OHL/10005. REV.0 Page :14

5 - FOUNDATION REACTIONS
Oman Electrical Transmission Co.S.A.O.C
Construction of new 132/33kv Grid Substation at Samad and Sinaw
With Associated 132kv Overhead transmission Lines

DOCUMENT TITLE DETAILED DESIGN CALCULATION FOR SA Support Structures Surge Arrester (S1) 04.05.2017
DOCUMENT NO. COM/102/2015/OHL/10005. REV.0 Page : 15

Max. Joint Support Reaction (KN) OF SA SUPPORT STRUCTURE SURGE ARRESTER (S1)

Case Force

Compression 1-N.T 10

Uplift 1-N.T 9

Long. Shear 1-N.T 0.5

Trans. Shear 1-N.T 2

Max. Joint Support Reaction Per Base (KN) OF SA SUPPORT STRUCTURE SURGE ARRESTER (S1)

Case Force

Acc. Vertical 1-N.T 10

Acc. Shear 1-N.T 9

Resultant Moment (KN.m) 2-S.T 4


Oman Electrical Transmission Co.S.A.O.C
Construction of new 132/33kv Grid Substation at Samad and Sinaw
With Associated 132kv Overhead transmission Lines

DOCUMENT TITLE DETAILED DESIGN CALCULATION FOR SA Support Structures Surge Arrester (S1) 04.05.2017
DOCUMENT NO. COM/102/2015/OHL/10005. REV.0 Page :16

6 - BASE PLATE DESIGN & ANCHOR BOLTS


Oman Electrical Transmission Co.S.A.O.C
Construction of new 132/33kv Grid Substation at Samad and Sinaw
With Associated 132kv Overhead transmission Lines

DOCUMENT TITLE DETAILED DESIGN CALCULATION FOR SA Support Structures Surge Arrester (S1) 04.05.2017
DOCUMENT NO. COM/102/2015/OHL/10005. REV.0 Page : 17

8. Design of Base Plate & Anchor Bolts for Surge Arrester Support Structure For (S1)

8.1 Design of Anchor Bolts :

Stringing Action
Max. Compression Force =C (KN) 10

Max. Uplift Force =U (KN) 9

Max. Shear Force =S (KN) 2

Material Properties

Yield Strength of Anchor Bolts =Fya ( Mpa )= 250

Ultimate Strength of Anchor Bolts =Fua ( Mpa )= 400

Yield Strength of Base Plate =Fy ( Mpa )= 275

Concrete Strength =Fc ( Mpa )= 28

No. of Thread per inch =n 7


=
Coefficient of Friction (Grouted) = Meu = = 0.55
=
No. of Anchor Bolts per One Leg =NA = 1

8.1.1. Anchor Bolt Size:

For Determination of Anchor Bolts size, Refer to ASCE STANDARD ANSI/ASCE 10-97 Design of Latticed Steel Transmission Structures page 22 clause 7.4.2

AS = [(C*S.F.*1000) / (Fya) + (S*S.F.*1000) / (Meu *0.85*Fya )] / 1

S.F. = 1

AS = ( 40 + 17.1 ) / 1

AS = 57.11

= PI/4 * (d - 0.974/n) 2

d = 0.974/n + ( AS * 4 / PI ) ^ 0.5 = 12.064 mm

( Use 30 mm ASTM A36 Mild Steel Anchor Bolts )

8.1.2. Embedment Length:

For Smooth Bar Anchor Bolts Refer to ASCE STANDARD ANSI/ASCE 10-97 Design of Latticed Steel Transmission Structures page 23 clause 7.5.2.1

Lp= 12d (Fu/58) d = nominal diameter = 30 mm

Fu = specified min. tensile strength = 400 Mpa

= 6.89 for Fu in Mpa.

S.F. = 1.5

Lp = 360 * 1.5 = 540.257 mm

Use Total Length 750 mm


Oman Electrical Transmission Co.S.A.O.C
Construction of new 132/33kv Grid Substation at Samad and Sinaw
With Associated 132kv Overhead transmission Lines

DOCUMENT TITLE DETAILED DESIGN CALCULATION FOR SA Support Structures Surge Arrester (S1) 04.05.2017
DOCUMENT NO. COM/102/2015/OHL/10005. REV.0 Page :18

8.1.3. Design of Base Plate:

(Referring to the attached sketch for the Base Plate)

Base Plate Dimention = 150 * 150

SECTION ( 1-1)

Width at sec (1-1) b0 = 196 mm e= 8 mm

MOMENT ABOUT SECTION 1-1 DUE TO COMPRESSION FORCE

C/ 1 * e =

C/ 1 * 8 = 80 KN.mm

BASE PLATE BENDING CAPACITY = 0.75 * Fy * b0 * t / 6


t
= 3.45

( Use Base Plate Thickness 20 mm )

8.1.4. Welding Calculation:

L = Length of welding = = 300 mm

SS = Strength of welding = = 0.3 * 400 = 120 Mpa

WL = U * 1000 / SS * L * 0.707

= 9 * 1000 / 120 * 300 * 0.707 = 0.35 mm

( Use 6 mm Weld E70 All Around )


Oman Electrical Transmission Co.S.A.O.C
Construction of new 132/33kv Grid Substation at Samad and Sinaw
With Associated 132kv Overhead transmission Lines

DOCUMENT TITLE DETAILED DESIGN CALCULATION FOR SA Support Structures Surge Arrester (S1) 04.05.2017
DOCUMENT NO. COM/102/2015/OHL/10005. REV.0 Page : 19

7 - Design Drawing
Page No. 20

OMAN ELECTRICITY TRANSMISSION


COMPANY S.A.O.C
P.O.Box No.1389, P.C. 132, Al Khoudh
Sultanate of Oman
Tel : +968 24283000, Fax : +968 24815850

CLIENT'S CONSULTANT:

P.O.Box: 1542, PC-130


Muscat. Sultanate of Oman
Tel: +968 24283635 , Fax: +968 24283636

CONTRACTOR:
Inabensa
P.O. Box - 148, P.C - 102, Al Khuwair, Muscat,
Sultanate of Oman
Tel: +968 24403750, Fax: +968 24692308

TOWER SUPPLIER :
MAXIMUM JOINT SUPPORT REACTION
(KN)

JOINT LABEL CASE FORCE


COMPRESSION AP 1-N.T 10
UPLIFT AXY 1-N.T 9
TRANS. SHEAR AX 1-N.T 2
LONG. SHEAR AP 1-N.T 0.5

MAXIMUM JOINT SUPPORT REACTION Designed by: Scale: Drawing/Document Title:


PER BASE (KN) 1:100 DESIGN DRAWING FOR
Checked by: Date: ''SA SUPPORT STRUCTURE SURGE ARRESTER (S1)''
ACC.VERTICAL 1-N.T 10 27.04.2017 132 / 33 KV GRID SUBSTATION AT SAMAD

Approved by: Dwg. Size:


Drawing No.:
ACC.SHEAR 1-N.T 9 A3 Rev. Sheet No.

Document No.:
RES.MOMENT 2-SC.T 4 COM/102/2015/OHL/10005
0 Sheet 1 of 1
Oman Electrical Transmission Co.S.A.O.C
Construction of new 132/33kv Grid Substation at Samad and Sinaw
With Associated 132kv Overhead transmission Lines

DOCUMENT TITLE DETAILED DESIGN CALCULATION FOR SA Support Structures Surge Arrester (S1) 04.05.2017
DOCUMENT NO. COM/102/2015/OHL/10005. REV.0 Page :21

8 - References