You are on page 1of 11

FIELDPRO REPORT

Well Name: ELS-90


Well Location: EL SALTO
Formation Name: -
Design Date 30-11-2017

11 December 2017, 11:10:09


Well Name: ELS-90 Report Date 11/12/2017
Well Location: EL SALTO Design Date: 30-11-2017
Formation Name: - Ancillary: CPVEN
Service Information

Customer Company Name: -


Customer Representative:
Service Company Name: CPVEN
Service Representative: AQUILES CARRERA
Well Name: ELS-90
Well Location: EL SALTO
Service Type: REV. 7"
Design Date: 30-11-2017

Well Summary

MD TVD
(ft) (ft)
Well Depth: 6660.00 5856.96
Shoe Depth: 6659.00 5856.75
Float Collar Depth: 6615.00 5847.33
Cement Top: 1338.75 1338.75
Previous Shoe Depth: 1500.00 1500.00

Surface Temperature: 80F


BH Static Temperature: 166F
BH Circulating Temperature: 123F

Open/Cased Hole Description

Hole MD TVD Hole Pore Pressure Frac Pressure


Type (ft) (ft) Diam
(in)
(psi) (psi/ft) (ppg) (psi) (psi/ft) (ppg)
Cased 1500.00 1500.00 12.61 667.50 0.44 8.6 1185.000 0.79 15.2
Open 6659.00 5856.75 10.00 2606.25 0.45 8.6 4626.832 0.79 15.2
Open 6660.00 5856.96 10.00 2606.35 0.44 8.6 4627.000 0.79 15.2

Centralizer Summary

Interval
Top MD: 1350.00 ft
Bottom MD: 6657.00 ft
Length: 5307.00 ft
Standoff
Minimum Standoff Required: 0.0 %
Minimum Standoff Achieved: 26.7 % at 1390.00 ft

From MD To MD Spacing Number of Type Description


(ft) (ft) (ft) Centralizers
1350.00 3590.00 80.00 29 Bow Spring Soft 7 X 8-1/2
3590.00 3670.00 80.00 1 Rigid SOLIDO DE ALUMINIO

FIELDPRO Modules v. 2017.0.56.734: Cementing Simulation C:/.../ELS-90 REV 9.625.INC


Well Name: ELS-90 Report Date 11/12/2017
Well Location: EL SALTO Design Date: 30-11-2017
Formation Name: - Ancillary: CPVEN
From MD To MD Spacing Number of Type Description
(ft) (ft) (ft) Centralizers
3670.00 6550.00 120.00 24 Rigid SOLIDO DE ALUMINIO

Centralizer Details

MD Type Description Standoff Lateral Midpoint Midpoint


(ft) (%) Force MD Standoff
(lbf) (ft) (%)
1350.00 Bow Spring Soft 7 X 8-1/2 26.71 0 1390.00 27
1430.00 Bow Spring Soft 7 X 8-1/2 26.71 0 1470.00 50
1510.00 Bow Spring Soft 7 X 8-1/2 50.00 0 1550.00 50
1590.00 Bow Spring Soft 7 X 8-1/2 50.00 0 1630.00 44
1670.00 Bow Spring Soft 7 X 8-1/2 42.78 984 1710.00 42
1750.00 Bow Spring Soft 7 X 8-1/2 46.93 418 1790.00 45
1830.00 Bow Spring Soft 7 X 8-1/2 47.06 401 1870.00 45
1910.00 Bow Spring Soft 7 X 8-1/2 47.19 384 1950.00 46
1990.00 Bow Spring Soft 7 X 8-1/2 47.31 367 2030.00 47
2070.00 Bow Spring Soft 7 X 8-1/2 48.89 152 2110.00 49
2150.00 Bow Spring Soft 7 X 8-1/2 49.65 48 2190.00 49
2230.00 Bow Spring Soft 7 X 8-1/2 49.65 48 2270.00 49
2310.00 Bow Spring Soft 7 X 8-1/2 49.65 48 2350.00 49
2390.00 Bow Spring Soft 7 X 8-1/2 49.65 48 2430.00 49
2470.00 Bow Spring Soft 7 X 8-1/2 49.65 48 2510.00 49
2550.00 Bow Spring Soft 7 X 8-1/2 49.65 48 2590.00 49
2630.00 Bow Spring Soft 7 X 8-1/2 49.65 48 2670.00 48
2710.00 Bow Spring Soft 7 X 8-1/2 47.50 341 2750.00 46
2790.00 Bow Spring Soft 7 X 8-1/2 47.43 350 2830.00 46
2870.00 Bow Spring Soft 7 X 8-1/2 47.81 299 2910.00 47
2950.00 Bow Spring Soft 7 X 8-1/2 47.96 279 2990.00 47
3030.00 Bow Spring Soft 7 X 8-1/2 48.11 258 3070.00 47
3110.00 Bow Spring Soft 7 X 8-1/2 48.15 252 3150.00 47
3190.00 Bow Spring Soft 7 X 8-1/2 48.22 242 3230.00 47
3270.00 Bow Spring Soft 7 X 8-1/2 48.51 203 3310.00 48
3350.00 Bow Spring Soft 7 X 8-1/2 48.75 171 3390.00 48
3430.00 Bow Spring Soft 7 X 8-1/2 48.65 184 3470.00 48
3510.00 Bow Spring Soft 7 X 8-1/2 48.97 141 3550.00 48
3590.00 Bow Spring Soft 7 X 8-1/2 49.08 125 3630.00 45
3670.00 Rigid SOLIDO DE ALUMINIO 41.67 139 3730.00 40
3790.00 Rigid SOLIDO DE ALUMINIO 41.67 136 3850.00 40
3910.00 Rigid SOLIDO DE ALUMINIO 41.67 112 3970.00 41
4030.00 Rigid SOLIDO DE ALUMINIO 41.67 19 4090.00 41
4150.00 Rigid SOLIDO DE ALUMINIO 41.67 100 4210.00 41
4270.00 Rigid SOLIDO DE ALUMINIO 41.67 62 4330.00 40
4390.00 Rigid SOLIDO DE ALUMINIO 41.67 139 4450.00 39
4510.00 Rigid SOLIDO DE ALUMINIO 41.67 168 4570.00 39
4630.00 Rigid SOLIDO DE ALUMINIO 41.67 177 4690.00 39
4750.00 Rigid SOLIDO DE ALUMINIO 41.67 216 4810.00 37
4870.00 Rigid SOLIDO DE ALUMINIO 41.67 422 4930.00 36
4990.00 Rigid SOLIDO DE ALUMINIO 41.67 422 5050.00 38
5110.00 Rigid SOLIDO DE ALUMINIO 41.67 97 5170.00 40

FIELDPRO Modules v. 2017.0.56.734: Cementing Simulation C:/.../ELS-90 REV 9.625.INC


Well Name: ELS-90 Report Date 11/12/2017
Well Location: EL SALTO Design Date: 30-11-2017
Formation Name: - Ancillary: CPVEN
MD Type Description Standoff Lateral Midpoint Midpoint
(ft) (%) Force MD Standoff
(lbf) (ft) (%)
5230.00 Rigid SOLIDO DE ALUMINIO 41.67 165 5290.00 39
5350.00 Rigid SOLIDO DE ALUMINIO 41.67 268 5410.00 37
5470.00 Rigid SOLIDO DE ALUMINIO 41.67 351 5530.00 36
5590.00 Rigid SOLIDO DE ALUMINIO 41.67 437 5650.00 35
5710.00 Rigid SOLIDO DE ALUMINIO 41.67 516 5770.00 34
5830.00 Rigid SOLIDO DE ALUMINIO 41.67 590 5890.00 33
5950.00 Rigid SOLIDO DE ALUMINIO 41.67 657 6010.00 32
6070.00 Rigid SOLIDO DE ALUMINIO 41.67 718 6130.00 31
6190.00 Rigid SOLIDO DE ALUMINIO 41.67 771 6250.00 30
6310.00 Rigid SOLIDO DE ALUMINIO 41.67 818 6370.00 30
6430.00 Rigid SOLIDO DE ALUMINIO 41.67 856 6490.00 29
6550.00 Rigid SOLIDO DE ALUMINIO 41.67 888

Pipe and Wellbore Volumes

Surface Line Length: 100.00 ft


Surface Line ID: 1.76 in
Surface Line Volume: 0.30 bbls
Pipe Volume Above Collar: 260.51 bbls
Pipe Volume Below Collar: 1.51 bbls
Annulus Volume in Cased Hole: 0.00 bbls
Annulus Volume in Drilled Hole: 416.08 bbls
RatHole Volume: 0.10 bbls
Total Wellbore Volume: 678.50 bbls

Fluid Quantities

Fluid Name Scheduled Scheduled Scheduled Scheduled Mixed Mixed Mixed


Total Water Cement Excess Total Water Cement
(bbls) (bbls) (94lb sk) (%) (bbls) (bbls) (94lb sk)
LODO BASE AGUA 260.81 --- --- 50.00 ---
CLAV-1 50.00 --- --- 20.00 ---
LECHADA LLENADO 162.70 115.72 549.89 5.1 299.60 213.09 1012.60
LECHADA DE COLA 111.75 67.15 528.83 5.1 190.57 114.51 901.79
CE-111 50.00 41.16 --- --- 50.00 41.16 ---

Fluid Placement

Top MD(ft) Bottom MD(ft) Height(ft)


LODO BASE AGUA 0.0 528.7 528.7 Pipe
LODO BASE AGUA 528.7 1544.7 1016.1 Pipe
LODO BASE AGUA 1544.7 6626.6 5081.9 Pipe
LECHADA DE COLA 4429.7 6659.0 2229.3 Annulus
LECHADA LLENADO 1335.9 4429.7 3093.8 Annulus
CE-111 868.6 1335.9 467.3 Annulus
CLAV-1 401.3 868.6 467.3 Annulus

FIELDPRO Modules v. 2017.0.56.734: Cementing Simulation C:/.../ELS-90 REV 9.625.INC


Well Name: ELS-90 Report Date 11/12/2017
Well Location: EL SALTO Design Date: 30-11-2017
Formation Name: - Ancillary: CPVEN
Top MD(ft) Bottom MD(ft) Height(ft)
LODO BASE AGUA 0.0 401.3 401.3 Annulus

Pressures at Critical Depths for Final Placement

Critical Depth Meas. Vert. Pore Pressure Hydrostatic Frac Pressure


Depth Depth Pressure
(ft) (ft)
(psi) (ppg) (psi) (ppg) (psi) (ppg)
Prev. Casing Shoe 1500.00 1500.00 668 8.57 774 9.93 1185 15.21
Well Bottom 6660.00 5856.96 2606 8.57 3991 13.12 4627 15.21
User Spec. MD 1 6659.00 5856.75 2606 8.57 3991 13.12 4627 15.21
User Spec. MD 2 6660.00 5856.96 2606 8.57 3991 13.12 4627 15.21
User Spec. MD 3 1500.00 1500.00 668 8.57 774 9.93 1185 15.21

Fluid Pumping and Mixing Schedule

# Fluid Name/Stage Fluid Pumping Mixing Mixing Stage Time with Cumul
Volume Rate Rate Rate Units Time Cement Time
(bbls) (bpm) (min) (min) (min:sec)
1 CLAV-1 50.00 5.00 --- --- 10.00 0.00 10:00
2 CE-111 50.00 5.00 --- --- 10.00 0.00 20:00
3 LECHADA LLENADO 162.70 4.00 13.52 (94lb sk)/min 40.67 40.67 60:40
4 LECHADA DE COLA 111.75 5.00 23.66 (94lb sk)/min 22.35 63.03 83:01
5 LODO BASE AGUA 200.00 7.00 --- --- 28.57 91.60 111:35
6 LODO BASE AGUA 40.00 4.00 --- --- 10.00 101.60 121:35
7 LODO BASE AGUA 20.81 2.00 --- --- 10.41 112.00 132:00

Rigid Top Plug Before Stage # 5


Wiper Plug Before Stage # 1

Critical Pumping Rates

Fluid Hole Pipe Pump Fluid Reynolds Qmin Qmax Mud Mud
Diam. OD Rate Velocity numbers turb plug Erosion Erosion
(in) (in) (bpm) (ft/min) (bpm) (bpm) (Minimum (Actual
Pressure Pressure
Required) Applied)
(psi) (psi)
LECHADA 10.50 7.00 4.00 67.227 108 48.43 3.82 9.83 23.15
LLENADO
LECHADA DE 10.50 7.00 5.00 84.034 182 39.41 3.48 9.83 37.68
COLA
CLAV-1 10.50 7.00 5.00 84.034 31205 0.48 0.02 9.83 7.25
CE-111 10.50 7.00 5.00 84.034 217 23.69 3.30 9.83 24.46
LODO BASE 12.61 9.63 0.00 0.000 0 27.37 4.29 11.50 0.00
AGUA

FIELDPRO Modules v. 2017.0.56.734: Cementing Simulation C:/.../ELS-90 REV 9.625.INC


Well Name: ELS-90 Report Date 11/12/2017
Well Location: EL SALTO Design Date: 30-11-2017
Formation Name: - Ancillary: CPVEN

Reynolds Number for Turbulent Flow: 3000


Reynolds Number for Plug Flow: 100
Drilling Fluid Erodability: 300

Simplified Reservoir Parameters

# TVD Pore Pore Pore Pore Frac Frac Frac Frac Excess
(ft) Pressure Pressure Press. at Pressure Pressure Pressure Press. at Pressure volume
Gradient Gradient Mid- at Layer Gradient Gradient Mid- at Layer (%)
(psi/ft) (ppg) Layer Top (psi) (psi/ft) (ppg) Layer Top (psi)
(psi) (psi)
1 0 0.450 8.66 337.5 0.0 0.790 15.21 592.5 0.0 0.0
2 1500.0 0.445 8.57 1815.6 667.5 0.790 15.21 3223.2 1185.0 0.0
3 6660.0 0.445 8.57 2963.7 2963.7 0.790 15.21 5261.4 5261.4 0.0

Reservoir Type Gas Ramp-Up Time 32.4 min


Surface Temperature 80 F BH Circulating Temperature 123 F
BH Static Reservoir Temperature 166 F BH Static Reservoir Temperature Gradient 0.01291 F/ft
Pore Fluid Permability 1.0000e-3 mD Porosity 0.150
Pore Fluid Compressibility 5.00e-6 1/psi Pore Fluid Viscosity 2.000 cp
Kh/Kv 1.000
TVD to Top of OH Section 1500.0 ft TVD to Bottom of OH Section 5856.7 ft
Pore Pressure at Top of OH Section 667.5 psi Pore Pressure at Bottom of OH Section 2606.3 psi
Frac Pressure at Top of OH Section 1185.0 psi Frac Pressure at Bottom of OH Section 4626.8 psi

Reservoir Lithology

Layer # TVD (ft) Rock Type Formation Name


1 0 Sandstone
2 9000.0 Sandstone
3 10000.0 Sandstone

Thermal Properties

Rock Type Specific Gravity Specific Heat Thermal Conductivity


(Btu/lb*F) (Btu/ft*hr*F)
Sandstone 2.6500 0.2600 2.5700
Granite 2.7000 0.2000 1.7400

Simulation results vs. time

Time (min) Wellhead Annulus BH Pipe Free Fall Cumulative Annulus


Pressure ECD @ Reynolds Depth (ft) Volume ECD @
(psi) 6660 ft (ppg) Number (bbls) 6659 ft (ppg)
0.00 339.74 10.08 5880.40 0 0 10.09
10.00 381.43 10.06 5914.45 0 50.00 10.06
20.00 385.73 10.05 5978.39 0 100.00 10.05
30.00 192.07 10.05 4095.55 0 139.68 10.05

FIELDPRO Modules v. 2017.0.56.734: Cementing Simulation C:/.../ELS-90 REV 9.625.INC


Well Name: ELS-90 Report Date 11/12/2017
Well Location: EL SALTO Design Date: 30-11-2017
Formation Name: - Ancillary: CPVEN
Time (min) Wellhead Annulus BH Pipe Free Fall Cumulative Annulus
Pressure ECD @ Reynolds Depth (ft) Volume ECD @
(psi) 6660 ft (ppg) Number (bbls) 6659 ft (ppg)
40.00 143.00 10.07 7326.33 297.72 179.37 10.07
50.00 143.00 10.08 7654.59 736.01 219.05 10.08
60.00 143.00 9.91 276691.66 1238.06 258.73 9.92
70.00 235.07 9.92 2492.52 1578.72 307.40 9.92
80.00 235.07 10.37 2116.84 1580.26 357.07 10.37
90.00 205.76 10.88 1766.70 1079.47 420.07 10.88
100.00 205.76 11.40 1658.27 279.92 490.24 11.40
110.00 898.77 12.74 4288.76 0 560.42 12.75
120.00 1251.05 13.40 2224.85 0 606.45 13.40
130.00 1336.96 13.59 908.43 0 630.31 13.60

Simulation results vs. pumped volume

Pumped Time (min) Wellhead Annulus BH Pipe Free Fall Cumulative Annulus
Volume Pressure ECD @ Reynolds Depth (ft) Volume ECD @
(bbls) (psi) 6660 ft Number (bbls) 6659 ft
(ppg) (ppg)
0.00 0.00 339.74 10.08 5880.40 0.00 0.00 10.09
10.00 2.00 345.77 10.08 5866.10 0.00 10.00 10.08
20.00 4.00 354.15 10.07 5877.93 0.00 20.00 10.08
30.00 6.00 362.86 10.07 5881.31 0.00 30.00 10.07
40.00 8.00 371.86 10.07 5897.81 0.00 40.00 10.07
50.00 10.00 381.43 10.06 5914.45 0.00 50.00 10.06
60.00 12.00 444.45 10.06 5930.77 0.00 60.00 10.06
70.00 14.00 429.56 10.06 5952.82 0.00 70.00 10.06
80.00 16.00 414.35 10.05 5964.67 0.00 80.00 10.06
90.00 18.00 399.57 10.05 5972.87 0.00 90.00 10.05
100.00 20.00 385.73 10.05 5978.41 0.00 100.00 10.05
110.00 22.52 342.93 10.05 4079.42 0.00 110.00 10.05
120.00 25.04 292.00 10.05 4083.20 0.00 120.00 10.05
130.00 27.56 241.20 10.05 4086.08 0.00 130.00 10.05
140.00 30.08 190.47 10.05 4094.56 0.00 140.00 10.05
150.00 32.60 139.72 10.05 4092.91 0.00 150.00 10.06
160.00 35.12 143.00 10.07 7292.91 84.87 160.00 10.07
170.00 37.64 143.00 10.07 7454.72 195.21 170.00 10.07
180.00 40.16 143.00 10.07 7334.40 304.59 180.00 10.07
190.00 42.68 143.00 10.07 7214.93 411.66 190.00 10.07
200.00 45.20 143.00 10.07 7383.85 518.79 200.00 10.08
210.00 47.72 143.00 10.08 7517.96 630.60 210.00 10.08
220.00 50.24 143.00 10.08 7670.09 747.41 220.00 10.08
230.00 52.76 143.00 10.08 288392.16 869.62 230.00 10.08
240.00 55.28 143.00 10.03 293794.56 1006.23 240.00 10.04
250.00 57.80 143.00 9.98 290260.44 1133.52 250.00 9.98
260.00 60.32 143.00 9.91 274519.00 1251.62 260.00 9.91
270.00 62.47 235.07 9.89 8821.83 1333.84 270.00 9.89
280.00 64.48 235.07 9.88 8704.58 1423.55 280.00 9.89
290.00 66.50 235.07 9.88 8137.18 1499.02 290.00 9.88
300.00 68.51 235.07 9.88 7455.18 1557.77 300.00 9.89
310.00 70.52 235.07 9.93 2446.93 1582.72 310.00 9.94

FIELDPRO Modules v. 2017.0.56.734: Cementing Simulation C:/.../ELS-90 REV 9.625.INC


Well Name: ELS-90 Report Date 11/12/2017
Well Location: EL SALTO Design Date: 30-11-2017
Formation Name: - Ancillary: CPVEN
Pumped Time (min) Wellhead Annulus BH Pipe Free Fall Cumulative Annulus
Volume Pressure ECD @ Reynolds Depth (ft) Volume ECD @
(bbls) (psi) 6660 ft Number (bbls) 6659 ft
(ppg) (ppg)
320.00 72.54 235.07 10.00 2357.33 1592.44 320.00 10.01
330.00 74.55 235.07 10.09 2296.28 1595.58 330.00 10.09
340.00 76.56 235.07 10.18 2252.09 1593.52 340.00 10.19
350.00 78.58 235.07 10.29 2214.33 1588.04 350.00 10.29
360.00 80.59 235.07 10.40 2202.33 1577.88 360.00 10.40
370.00 82.60 235.07 10.51 2157.37 1566.72 370.00 10.51
380.00 84.29 205.76 10.60 1989.11 1508.67 380.00 10.60
390.00 85.72 205.76 10.66 1809.30 1408.43 390.00 10.66
400.00 87.14 205.76 10.73 1779.53 1299.85 400.00 10.73
410.00 88.57 205.76 10.80 1771.87 1190.20 410.00 10.80
420.00 89.99 205.76 10.88 1766.76 1080.18 420.00 10.88
430.00 91.42 205.76 10.95 1754.81 969.51 430.00 10.95
440.00 92.84 205.76 11.03 1739.96 857.73 440.00 11.03
450.00 94.27 205.76 11.10 1721.90 744.84 450.00 11.10
460.00 95.69 205.76 11.18 1707.49 630.83 460.00 11.18
470.00 97.12 205.76 11.25 1692.12 515.75 470.00 11.25
480.00 98.54 205.76 11.32 1681.39 400.00 480.00 11.33
490.00 99.97 205.76 11.40 1658.84 282.75 490.00 11.40
500.00 101.39 205.76 11.47 1642.15 164.15 500.00 11.48
510.00 102.82 205.76 11.55 1624.11 44.34 510.00 11.55
520.00 104.24 346.60 11.89 3382.55 0.00 520.00 11.89
530.00 105.67 478.34 12.08 4286.40 0.00 530.00 12.09
540.00 107.09 615.55 12.29 4287.79 0.00 540.00 12.30
550.00 108.52 753.81 12.51 4288.21 0.00 550.00 12.52
560.00 109.94 892.97 12.73 4288.75 0.00 560.00 12.74
570.00 111.37 1026.60 12.94 4288.98 0.00 570.00 12.95
580.00 113.39 949.25 12.90 2225.27 0.00 580.00 12.90
590.00 115.89 1068.53 13.08 2225.22 0.00 590.00 13.09
600.00 118.39 1181.72 13.28 2225.12 0.00 600.00 13.28
610.00 120.89 1287.58 13.47 2224.81 0.00 610.00 13.47
620.00 124.80 1267.98 13.46 909.03 0.00 620.00 13.46
630.00 129.84 1335.03 13.59 908.51 0.00 630.00 13.59

PRESIONES

FIELDPRO Modules v. 2017.0.56.734: Cementing Simulation C:/.../ELS-90 REV 9.625.INC


Well Name: ELS-90 Report Date 11/12/2017
Well Location: EL SALTO Design Date: 30-11-2017
Formation Name: - Ancillary: CPVEN
Bottomhole Fracture Pressure (psi) 4627 Bottomhole Pressure (psi) 4148
Bottomhole Pore Pressure (psi) 2606
1 2 3 4 5 6 7
6000 6000
6000

5160 5140
5160

4320 4280
4320

3480 3420
3480

2640 2560
2640

1800 1700
1800
0 28.8 57.6 86.4 115 144
Time (min)

valores de superficie
Pumping Flowrate (bpm) 2 Wellhead Pressure (psi) 1355
Return Flowrate (bpm) 2.01 Free Fall Depth (ft) 0
8 2000
10 2000

6.40 1600
8 1600

4.80 1200
6 1200

3.20 800
4 800

1.60 400
2 400

0 0
0 0
0 28.8 57.6 86.4 115 144
Time (min)

FIELDPRO Modules v. 2017.0.56.734: Cementing Simulation C:/.../ELS-90 REV 9.625.INC


Well Name: ELS-90 Report Date 11/12/2017
Well Location: EL SALTO Design Date: 30-11-2017
Formation Name: - Ancillary: CPVEN
Centralizer Placement
Standoff Static (%)
Lateral Force Static (lbf)
0

1600

3200
Depth (ft)

4800

6400

8000
0 12 24 36 48 60

Drag Torque Time channels


D/T PickUp Hookload (lbf) 72107 Lateral Force Dynamic (lbf) 0
D/T Slack off Hookload (lbf) 61345 Standoff Dynamic (%) 9.27
300000 5000
300000 100

240000 4000
240000 80

180000 3000
180000 60

120000 2000
120000 40

60000 1000
60000 20

0 0
0 0
0 40 80 120 160 200
Time (min)

FIELDPRO Modules v. 2017.0.56.734: Cementing Simulation C:/.../ELS-90 REV 9.625.INC


Well Name: ELS-90 Report Date 11/12/2017
Well Location: EL SALTO Design Date: 30-11-2017
Formation Name: - Ancillary: CPVEN
Multipanel - Annular Flow Profile
Lateral Force Static (lbf) Standoff Static (% ) Min Annular Velocity (ft/min) Annular Flow Annular Flow
Annular Flow
0 300 0 100 MD (ft) 0 500 Cross-Section Cross-Section
Profile (ft/min)
Lateral Force Dynamic (lbf)
Standoff Dynamic (% ) Max Annular Velocity (ft/min) (ft/min) (ft/min)
0 300 0 100 0 500
2078

2493

2909

3325

3740

4156

4571

4987

5402

5818

6234
0 180 360 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Multipanel - Fracture Profile - Alt + F5


Annular Flow Cross-Section (ft/min) Annular Flow Cross-Section (ft/min)

MD:
MD: 1500.0
1500.0 (ft)
(ft)

MD:
MD: 6659.0
6659.0 (ft)
(ft)

-6.0 -3.60 -1.20 1.20 3.60 6.0 -5.0 -3.00 -1.00 1.00 3.00 5.0

FIELDPRO Modules v. 2017.0.56.734: Cementing Simulation C:/.../ELS-90 REV 9.625.INC

You might also like