You are on page 1of 2

UNIVERSITI TUN HUSSEIN ONN MALAYSIA

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING

COURSE: BFC43502 OCCUPATIONAL SAFETY AND HEALTH


SEMESTER/YEAR: SEM 1/ 2017-2018
TASK: GROUP ASSIGNMENT 1

I. Instruction:
This assignment is to be carried out in a group of MAXIMUM five (5) members.

II. Introduction:
As a contractor of an upcoming building construction project, list the requirements for OSH
that you need to do that comply with legislations. You are also required to do site
planning/layout arrangement for safety provisions to ensure safety and health of the
workers and other persons at the workplace.
III. Things to do:
Every group need to find one real building construction project and get the
details/background of the project, together with the site layout drawing (plan
view drawing of the site). Use the details/information obtained as if they were
your own upcoming project details.
Prepare a comprehensive report, maximum 20 pages (excluding appendices).
Proposed contents of the report are as follows:

1. Introduction your company and project background.


2. Requirements for OSH including site planning, administrative
arrangements and site layout. Relate these requirements to OSHA 1994 and FMA
1967, and BOWECS Regulation 1986 (see example below).
Example of the requirements

Requirements Related legislations


1. Since the construction project is Occupational Safety and Health (Safety
more than RM 20 million, we shall and Health Officer) Regulations 1997 -
provide a full-time Safety and Occupational Safety and Health (Safety
Health Officer (SHO) at the and Health Officer) Order, Section 3(a).
construction site ..
2. The project is high rise building, Part VII, Regulation 47(5), BOWECS
therefore we propose to install 1986.
rubbish chute at the height of 15m.
The chute need to be constructed
according to PE design and
certification.
3. Site layout planning sketch/draw on the existing site layout drawing the
planning/arrangement for safety provisions at the site.
4. Conclusion
5. References

Prepared by: NHA Version: Sept 2017


UNIVERSITI TUN HUSSEIN ONN MALAYSIA
FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING

IV. Outcome
A comprehensive English-written report, to be submitted in Week 7.

V. Assessment criteria (10 marks)


Safety and health issues.
Current Acts and Regulations pertinent to the OSH in real working environment.
Construction site planning, administrative arrangements and site layout.

Prepared by: NHA Version: Sept 2017