1. Overview....................................................................................................................................2
1.1 Scope....................................................................................................................................2
1.2 Structure...............................................................................................................................2
1.3 Schematic diagram...............................................................................................................3
1.4 Operation flow chart............................................................................................................3
2. Operation...................................................................................................................................4
2.1. Create Existing & Manual project..................................................................................4
2.2 Traffic Data Collection...................................................................................................5
2.3 Traffic map for Capesso using Atoll and ArcGIS...........................................................5
2.4 Using Capesso run ACP.....................................................................................................19
2.5 Simulation in Atoll............................................................................................................27
3. Contact.....................................................................................................................................29
4. Appendix..................................................................................................................................29
1. Overview
1.1 Scope
In frame Swap and New Expansion Modernization XX vender Project , GSM &
UMTS get Co-Antenna solution. GSM 900、UMTS 900、DCS 1800、UMTS 2100 will
use one Co-Antenna . So , GU system will be same Azimuth and Height for each
sector after planning . Besides , GSM 900 & UMTS 900 will have same Electronic tilt
.
1.2 Structure
For this part , kindly refer to “3.4 Setting up Simulation Projects” of <<Operation Guide to
Planning RF Parameters by Using the Capesso in UMTS>> .
Download address : http://3ms.huawei.com/hi/group/1008601/files.html .
Max power(dBm) and pilot power (dBm) : setting based on real condition
Total power (dBm) : set 40 dBm in simulation , have great influence on ECIO.
Focus zone : only sites in focus zone will be optimized when ACP .
Antenna: need to create new antenna for each type with different electronic tilt.
For example :
CVVPX310R-BT1-G-0; CVVPX310R-BT1-G-1; CVVPX310R-BT1-G-2; CVVPX310R-BT1-G-
3; CVVPX310R-BT1-G-4; CVVPX310R-BT1-G-5; CVVPX310R-BT1-G-6; CVVPX310R-BT1-
G-7; CVVPX310R-BT1-G-8; CVVPX310R-BT1-G-9; CVVPX310R-BT1-G-10. CVVPX310R-
BT1-W-0; CVVPX310R-BT1-W-1; CVVPX310R-BT1-W-2; CVVPX310R-BT1-W-3;
CVVPX310R-BT1-W-4; CVVPX310R-BT1-W-5; CVVPX310R-BT1-W-6; CVVPX310R-BT1-
W-7; CVVPX310R-BT1-W-8; CVVPX310R-BT1-W-9; CVVPX310R-BT1-W-10. CVVPX310R-
BT1-D-0; CVVPX310R-BT1-D-1; CVVPX310R-BT1-D-2; CVVPX310R-BT1-D-3;
CVVPX310R-BT1-D-4; CVVPX310R-BT1-D-5; CVVPX310R-BT1-D-6; CVVPX310R-BT1-D-
7; CVVPX310R-BT1-D-8; CVVPX310R-BT1-D-9; CVVPX310R-BT1-D-10.
Period: the most busy hour for each cell in one week
Data measurement :
2G: table 1:
SDCCH GPRS EDGE
TCH(H) TCH(F)
Traffic Payload Payload
Traffic(Erl) Traffic(Erl)
Traffic(Erl) (Mbit) (Mbit)
3G: table 2
Overview
Figure 2.3.1
Tool : Atoll
Input : Traffic data (G900 CS traffic 、G900 PS traffic 、D1800 CS traffic 、
D1800 PS traffic 、U2100 CS traffic 、 U2100 PS traffic) ;
Detail Operation :
Kindly refer to for part “3.5.1 Preparing Traffic Data” of <<Operation Guide to
Planning RF Parameters by Using the Capesso in UMTS>>
Download address : http://3ms.huawei.com/hi/group/1008601/files.html .
Tool : ArcGIS
Input : Traffic map by Atoll of each system
Output: Unitary traffic CS/PS map
[Map for Capesso=Sum (G900,G1800,U2100) / Unitary Factor]
Figure 2.3.3
Detailed Operation :
1. Add“ PIXELTYPE FLOAT” to Initial Map :
For the traffic map by Atoll , open “hdr” document > add “PIXELTYPE
FLOAT” to each traffic map
3. Define projection
Arc toolbox > Data Management Tools > Projections and Transformations >
Define Projection
Figure 2.3.7
Figure 2.3.10
Figure 2.3.11
Figure 2.3.12
Figure 2.3.13
Figure 2.3.14
4. Combine map
Arc toolbox > Spatial Analyst Tools > Map Algebra > Raster Calculator.
Figure 2.3.15
The way to make “Total traffic PS Map” is same with “Total traffic CS Map”.
Total traffic PS Map = Traffic PS_G900 + Traffic PS_G1800 + Traffic PS_U2100
.
5. Delete extremum
Figure 2.3.18
Figure 2.3.19
Figure 2.3.20
Figure 2.3.21
Figure 2.3.23
Figure 2.3.24
Figure 2.3.25
Figure 2.3.25 , set map resolution same with resolution when simution in Atoll .
Figure 2.3.26 Add“ datatype R32”
For this part , you can also refer to “3.5.1 Preparing Traffic Data” of <<Operation
Guide to Planning RF Parameters by Using the Capesso in UMTS>> .
Download address : http://3ms.huawei.com/hi/group/1008601/files.html .
Figure 2.4.6
Figure 2.4.7
Figure 2.4.15
Figure 2.5.2
Figure 2.5.3
3. Contact
www.symena.com
supportsg@aircom.com.sg
support@symena.com
license@symena.com
Florian.Keclik@symena.com
Christopher.Millhouse@symena.com
4. Appendix
<< Operation Guide to Planning RF Parameters by Using the Capesso in UMTS >>
Download address : http://3ms.huawei.com/hi/group/1008601/files.html .
Operation_Guide_t CapessoBlue5.5.1-
o_Planning_RF_Parameters_by_Using_the_Capesso_in_UMTS-20130425-v1.0.docx