You are on page 1of 109

PT.

Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. SINAR HARAPAN BERSATU (CK17I-0201) Update :

Tgl Terbit SPK : 04 Oktober 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Dinding dan Atap tebal 100mm 1510.45 m2 32.11 %

2 Panel Lantai tebal 100mm 573.55 m2 9.07 %

3 Mesin Bitzer, Fan Coil & Accessories 2.00 Set 32.70 %

4 Mesin Bitzer, Fan Coil & Accessories 1.00 Set 11.51 %

5 Mesin Bitzer, Fan Coil & Accessories 1.00 Set 3.64 %

6 Automatic Sliding Door uk. 2500x3000 + Acc 3.00 Unit 6.90 %

7 Dock Shelter uk. 2800x2800 + Acc 2.00 Unit 2.10 %

8 Sectional Door uk. 2100x2500 + Acc 2.00 Unit 1.98 %

2095.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. KEISI INDONESIA - HOLIDAY INN (CK17E-0105) Update :

Tgl Terbit SPK : 05 Juni 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Dinding dan Atap tebal 100mm 396.90 m2 21.87 %

2 Panel Lantai tebal 100mm 87.50 m2 8.04 %

3 Manual Swing Door uk. 900x2000x100mm 12.00 Unit 22.05 %

4 Mesin CDU Emerson & Acc (Chiller) 9.00 Unit 39.33 %

5 Mesin CDU Emerson & Acc (Freezer) 2.00 Unit 8.71 %

507.40 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : DARPIEN SUTIONO (CK17G-0157) Update :

Tgl Terbit SPK : 14 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Dinding dan Atap tebal 100mm 692.00 m2 44.03 %

2 Panel Lantai tebal 100mm 230.00 m2 11.79 %

3 Manual Sliding Door uk. 1500x2000x100mm 1.00 Unit 3.53 %

4 Mesin Bitzer, Fan Coil & Acc 1.00 Unit 40.65 %

924.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. REJEKI JAYA (CK17H-0173) Update :

Tgl Terbit SPK : 24 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Dinding dan Atap tebal 100mm 426.50 m2 35.20 %

2 Panel Lantai tebal 100mm 184.50 m2 11.84 %

3 Manual Sliding Door uk. 2500x4000x100mm 1.00 Unit 4.59 %

4 Mesin Compressor, Evaporator + Condensing 1.00 Unit 43.10 %

5 Material Instalasi 611.00 m2 5.27 %

1224.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : BP. ERICKO (UD17H-0072) Update :

Tgl Terbit SPK : 24 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Dinding dan Atap tebal 100mm 426.50 m2 35.20 %

2 Panel Lantai tebal 100mm 184.50 m2 11.84 %

3 Manual Sliding Door uk. 2500x4000x100mm 1.00 Unit 4.59 %

4 Mesin Compressor, Evaporator + Condensing 1.00 Unit 43.10 %

5 Material Instalasi 611.00 m2 5.27 %

1224.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : ALFRED SURYA (CK17J-0207) Update :

Tgl Terbit SPK : 06 Oktober 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Dinding dan Atap tebal 100mm 237.60 m2 58.16 %

2 Lantai tebal 100mm 70.80 m2 23.10 %

3 Material Accessories 308.40 m2 10.41 %

4 Manual Sliding Door uk. 1300x2000x100mm 1.00 Unit 8.33 %

617.80 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. PROSPEKTA BUMA GEMILANG (CK17J-0219) Update :

Tgl Terbit SPK : 18 Oktober 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Dinding dan Atap tebal 100mm 77.70 m2 20.23 %

2 Lantai tebal 100mm 17.50 m2 3.22 %

3 Material Accessories 95.20 m2 3.02 %

4 Condensing Unit DANFOSS OP MPUE068MLW04E 1.00 Unit 39.41 %

5 Condensing Unit DANFOSS OP MPUE034MLW04 1.00 Unit 20.86 %

6 Manual Sliding Door uk. 900x2000x100mm + Acc 2.00 Unit 13.25 %

194.40 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : CV. GIOVANNI SUKSES MAKMUR (CK17J-0215) Update :

Tgl Terbit SPK : 12 Oktober 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Atap tebal 75mm 460.32 m2 86.52 %

2 Accessories Gantungan Ceiling & Siku 1.00 Lot 13.48 %

461.32 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : CV. SARI RASA NUSANTARA (CK17K-0230) Update :

Tgl Terbit SPK : 06 November 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Plafon tebal 100mm + Material Instalasi 61.00 m2 100.00 %

61.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. NATURAL HIJAU SEMESTA - MARUNDA (CK17F-0121) Update :

Tgl Terbit SPK : 11 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 551.32 m2 14.43 %

2 Ceiling Panel 150mm 650.41 m2 17.03 %

3 PU Slab 150mm 650.41 m2 8.99 %

4 Auto Sectional Door uk. 1500x2400x150mm 6.00 set 9.16 %

5 Manual Sliding Door uk. 1500x2400x150mm 3.00 set 1.75 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.29 %

7 Manual Dock Shelter uk. 1500x2400mm 5.00 set 8.54 %

8 5.00 set 1.27 %


Plastic Stripe Curtain

9 4.00 set 34.90 %


Compressor, Condensor & Evaporator (coldroom)

10 1.00 set 3.64 %


Compressor, Condensor & Evaporator (anteeroom
551.32 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. TIMURJAYA DAYATAMA - MINAHASA (CK17G-0152) Update :

Tgl Terbit SPK : 14 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 336.16 m2 15.70 %

2 Ceiling Panel 150mm 243.04 m2 11.35 %

3 PU Slab 150mm 243.04 m2 5.99 %

4 Auto Sectional Door uk. 1500x2400x150mm 3.00 set 8.17 %

5 Manual Sliding Door uk. 1500x2400x150mm 2.00 set 2.08 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.52 %

7 Manual Dock Shelter uk. 1500x2400mm 3.00 set 9.15 %

8 3.00 set 1.36 %


Plastic Stripe Curtain

9 3.00 set 40.09 %


Compressor, Condensor & Evaporator (coldroom)

10 1.00 set 5.58 %


Compressor, Condensor & Evaporator (anteeroom
336.16 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. NIAGATAMA RAHARJA - PAMEKASAN (CK17G-0151) Update :

Tgl Terbit SPK : 11 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 336.16 m2 15.70 %

2 Ceiling Panel 150mm 243.04 m2 11.35 %

3 PU Slab 150mm 243.04 m2 5.99 %

4 Auto Sectional Door uk. 1500x2400x150mm 3.00 set 8.17 %

5 Manual Sliding Door uk. 1500x2400x150mm 2.00 set 2.08 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.52 %

7 Manual Dock Shelter uk. 1500x2400mm 3.00 set 9.15 %

8 3.00 set 1.36 %


Plastic Stripe Curtain

9 3.00 set 40.09 %


Compressor, Condensor & Evaporator (coldroom)

10 1.00 set 5.58 %


Compressor, Condensor & Evaporator (anteeroom
336.16 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. KALIMAS KHARISMA - BANJARMASIN (CK17G-0153) Update :

Tgl Terbit SPK : 11 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 336.16 m2 15.70 %

2 Ceiling Panel 150mm 243.04 m2 11.35 %

3 PU Slab 150mm 243.04 m2 5.99 %

4 Auto Sectional Door uk. 1500x2400x150mm 3.00 set 8.17 %

5 Manual Sliding Door uk. 1500x2400x150mm 2.00 set 2.08 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.52 %

7 Manual Dock Shelter uk. 1500x2400mm 3.00 set 9.15 %

8 3.00 set 1.36 %


Plastic Stripe Curtain

9 3.00 set 40.09 %


Compressor, Condensor & Evaporator (coldroom)

10 1.00 set 5.58 %


Compressor, Condensor & Evaporator (anteeroom
336.16 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. KUNCIMAS NIAGATAMA - BANYUWANGI (CK17G-0155) Update :

Tgl Terbit SPK : 11 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 336.16 m2 15.70 %

2 Ceiling Panel 150mm 243.04 m2 11.35 %

3 PU Slab 150mm 243.04 m2 5.99 %

4 Auto Sectional Door uk. 1500x2400x150mm 3.00 set 8.17 %

5 Manual Sliding Door uk. 1500x2400x150mm 2.00 set 2.08 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.52 %

7 Manual Dock Shelter uk. 1500x2400mm 3.00 set 9.15 %

8 3.00 set 1.36 %


Plastic Stripe Curtain

9 3.00 set 40.09 %


Compressor, Condensor & Evaporator (coldroom)

10 1.00 set 5.58 %


Compressor, Condensor & Evaporator (anteeroom
336.16 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. DINAMIKA DAYA SEGARA - PASURUAN (CK17G-0147) Update :

Tgl Terbit SPK : 11 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 294.89 m2 16.26 %

2 Ceiling Panel 150mm 185.10 m2 10.21 %

3 PU Slab 150mm 185.10 m2 5.39 %

4 Auto Sectional Door uk. 1500x2400x150mm 2.00 set 6.43 %

5 Manual Sliding Door uk. 1500x2400x150mm 1.00 set 1.23 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.61 %

7 Manual Dock Shelter uk. 1500x2400mm 2.00 set 7.20 %

8 2.00 set 1.07 %


Plastic Stripe Curtain

9 3.00 set 45.94 %


Compressor, Condensor & Evaporator (coldroom)

10 1.00 set 5.67 %


Compressor, Condensor & Evaporator (anteeroom
294.89 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. PUJI ANUGERAH ALAMI - MAGELANG (CK17G-0148) Update :

Tgl Terbit SPK : 11 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 294.89 m2 16.26 %

2 Ceiling Panel 150mm 185.10 m2 10.21 %

3 PU Slab 150mm 185.10 m2 5.39 %

4 Auto Sectional Door uk. 1500x2400x150mm 2.00 set 6.43 %

5 Manual Sliding Door uk. 1500x2400x150mm 1.00 set 1.23 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.61 %

7 Manual Dock Shelter uk. 1500x2400mm 2.00 set 7.20 %

8 2.00 set 1.07 %


Plastic Stripe Curtain

9 3.00 set 45.94 %


Compressor, Condensor & Evaporator (coldroom)

10 1.00 set 5.67 %


Compressor, Condensor & Evaporator (anteeroom
294.89 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. WAHANA WINGS SURYA- KUDUS (CK17G-0149) Update :

Tgl Terbit SPK : 11 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 294.89 m2 16.26 %

2 Ceiling Panel 150mm 185.10 m2 10.21 %

3 PU Slab 150mm 185.10 m2 5.39 %

4 Auto Sectional Door uk. 1500x2400x150mm 2.00 set 6.43 %

5 Manual Sliding Door uk. 1500x2400x150mm 1.00 set 1.23 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.61 %

7 Manual Dock Shelter uk. 1500x2400mm 2.00 set 7.20 %

8 2.00 set 1.07 %


Plastic Stripe Curtain

9 3.00 set 45.94 %


Compressor, Condensor & Evaporator (coldroom)

10 1.00 set 5.67 %


Compressor, Condensor & Evaporator (anteeroom
294.89 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. INTIDAYA RAJAWALI MULIA - REMBANG (CK17G-0150) Update :

Tgl Terbit SPK : 14 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 336.16 m2 15.70 %

2 Ceiling Panel 150mm 243.04 m2 11.35 %

3 PU Slab 150mm 243.04 m2 5.99 %

4 Auto Sectional Door uk. 1500x2400x150mm 3.00 set 8.17 %

5 Manual Sliding Door uk. 1500x2400x150mm 2.00 set 2.08 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.52 %

7 Manual Dock Shelter uk. 1500x2400mm 3.00 set 9.15 %

8 3.00 set 1.36 %


Plastic Stripe Curtain

9 3.00 set 40.09 %


Compressor, Condensor & Evaporator (coldroom)

10 1.00 set 5.58 %


Compressor, Condensor & Evaporator (anteeroom
336.16 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. TEKAD KARYA PUTERA - JEMBER (CK17F-0129) Update :

Tgl Terbit SPK : 20 September 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 219.47 m2 17.91 %

2 Ceiling Panel 150mm 101.08 m2 8.25 %

3 PU Slab 150mm 101.08 m2 4.35 %

4 Auto Sectional Door uk. 1500x2400x150mm 1.00 set 4.76 %

5 Manual Sliding Door uk. 1500x2400x150mm 1.00 set 1.81 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.91 %

7 Manual Dock Shelter uk. 1500x2400mm 1.00 set 5.33 %

8 3.00 set 48.29 %


Compressor, Condensor & Evaporator (coldroom)

9 1.00 set 8.39 %


Compressor, Condensor & Evaporator (anteeroom
219.47 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. CIPTA GAGAS LESTARI - MADIUN (CK17F-0130) Update :

Tgl Terbit SPK : 20 September 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 294.89 m2 16.26 %

2 Ceiling Panel 150mm 185.10 m2 10.21 %

3 PU Slab 150mm 185.10 m2 5.39 %

4 Auto Sectional Door uk. 1500x2400x150mm 2.00 set 6.43 %

5 Manual Sliding Door uk. 1500x2400x150mm 1.00 set 1.23 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.61 %

7 Manual Dock Shelter uk. 1500x2400mm 2.00 set 7.20 %

8 2.00 set 1.07 %


Plastic Stripe Curtain

9 3.00 set 45.94 %


Compressor, Condensor & Evaporator (coldroom)

10 1.00 set 5.67 %


Compressor, Condensor & Evaporator (anteeroom
294.89 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. BAHAGIA SUMBER ABADI - SOLO (CK17F-0131) Update :

Tgl Terbit SPK : 20 September 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 294.89 m2 16.26 %

2 Ceiling Panel 150mm 185.10 m2 10.21 %

3 PU Slab 150mm 185.10 m2 5.39 %

4 Auto Sectional Door uk. 1500x2400x150mm 2.00 set 6.43 %

5 Manual Sliding Door uk. 1500x2400x150mm 1.00 set 1.23 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.61 %

7 Manual Dock Shelter uk. 1500x2400mm 2.00 set 7.20 %

8 2.00 set 1.07 %


Plastic Stripe Curtain

9 3.00 set 45.94 %


Compressor, Condensor & Evaporator (coldroom)

10 1.00 set 5.67 %


Compressor, Condensor & Evaporator (anteeroom
294.89 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. FAJARMULA ABADI - PURWOKERTO (CK17F-0133) Update :

Tgl Terbit SPK : 20 September 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 294.89 m2 16.26 %

2 Ceiling Panel 150mm 185.10 m2 10.21 %

3 PU Slab 150mm 185.10 m2 5.39 %

4 Auto Sectional Door uk. 1500x2400x150mm 2.00 set 6.43 %

5 Manual Sliding Door uk. 1500x2400x150mm 1.00 set 1.23 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.61 %

7 Manual Dock Shelter uk. 1500x2400mm 2.00 set 7.20 %

8 2.00 set 1.07 %


Plastic Stripe Curtain

9 3.00 set 45.94 %


Compressor, Condensor & Evaporator (coldroom)

10 1.00 set 5.67 %


Compressor, Condensor & Evaporator (anteeroom
294.89 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. DINAMIKA DAYA SEGARA - MALANG (CF17F-0134) Update :

Tgl Terbit SPK : 20 September 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 294.89 m2 16.26 %

2 Ceiling Panel 150mm 185.10 m2 10.21 %

3 PU Slab 150mm 185.10 m2 5.39 %

4 Auto Sectional Door uk. 1500x2400x150mm 2.00 set 6.43 %

5 Manual Sliding Door uk. 1500x2400x150mm 1.00 set 1.23 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.61 %

7 Manual Dock Shelter uk. 1500x2400mm 2.00 set 7.20 %

8 2.00 set 1.07 %


Plastic Stripe Curtain

9 3.00 set 45.94 %


Compressor, Condensor & Evaporator (coldroom)

10 1.00 set 5.67 %


Compressor, Condensor & Evaporator (anteeroom
294.89 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. CITRAUTAMA DISTRIBUSINDORAYA - BATAM (CK17F-0122) Update :

Tgl Terbit SPK : 11 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 336.16 m2 15.70 %

2 Ceiling Panel 150mm 243.04 m2 11.35 %

3 PU Slab 150mm 243.04 m2 5.99 %

4 Auto Sectional Door uk. 1500x2400x150mm 3.00 set 8.17 %

5 Manual Sliding Door uk. 1500x2400x150mm 2.00 set 2.08 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.52 %

7 Manual Dock Shelter uk. 1500x2400mm 3.00 set 9.15 %

8 3.00 set 1.36 %


Plastic Stripe Curtain

9 3.00 set 40.09 %


Compressor, Condensor & Evaporator (coldroom)

10 1.00 set 5.58 %


Compressor, Condensor & Evaporator (anteeroom
336.16 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. DIAN LESTARI PERDANA - PADANG (CK17F-0119) Update :

Tgl Terbit SPK : 15 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 336.16 m2 15.70 %

2 Ceiling Panel 150mm 243.04 m2 11.35 %

3 PU Slab 150mm 243.04 m2 5.99 %

4 Auto Sectional Door uk. 1500x2400x150mm 3.00 set 8.17 %

5 Manual Sliding Door uk. 1500x2400x150mm 2.00 set 2.08 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.52 %

7 Manual Dock Shelter uk. 1500x2400mm 3.00 set 9.15 %

8 3.00 set 1.36 %


Plastic Stripe Curtain

9 3.00 set 40.09 %


Compressor, Condensor & Evaporator (coldroom)

10 1.00 set 5.58 %


Compressor, Condensor & Evaporator (anteeroom
336.16 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. NIAGATAMA KENCANA - PEKANBARU (CK17F-0120) Update :

Tgl Terbit SPK : 11 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 294.89 m2 16.26 %

2 Ceiling Panel 150mm 185.10 m2 10.21 %

3 PU Slab 150mm 185.10 m2 5.39 %

4 Auto Sectional Door uk. 1500x2400x150mm 2.00 set 6.43 %

5 Manual Sliding Door uk. 1500x2400x150mm 1.00 set 1.23 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.61 %

7 Manual Dock Shelter uk. 1500x2400mm 2.00 set 7.20 %

8 2.00 set 1.07 %


Plastic Stripe Curtain

9 3.00 set 45.94 %


Compressor, Condensor & Evaporator (coldroom)

10 1.00 set 5.67 %


Compressor, Condensor & Evaporator (anteeroom
294.89 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. JAMBI DISTRIBUTION RAYA - JAMBI (CK17F-0123) Update :

Tgl Terbit SPK : 11 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 294.89 m2 16.26 %

2 Ceiling Panel 150mm 185.10 m2 10.21 %

3 PU Slab 150mm 185.10 m2 5.39 %

4 Auto Sectional Door uk. 1500x2400x150mm 2.00 set 6.43 %

5 Manual Sliding Door uk. 1500x2400x150mm 1.00 set 1.23 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.61 %

7 Manual Dock Shelter uk. 1500x2400mm 2.00 set 7.20 %

8 2.00 set 1.07 %


Plastic Stripe Curtain

9 3.00 set 45.94 %


Compressor, Condensor & Evaporator (coldroom)

10 1.00 set 5.67 %


Compressor, Condensor & Evaporator (anteeroom
294.89 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. PROSPECT MOTOR (CK16L-0148) Update :

Tgl Terbit SPK : 18 Januari 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 9171.99 m2 31.62 %

2 Ceiling Panel 150mm 6335.00 m2 21.84 %

3 Floor Panel 150mm 6479.99 m2 10.90 %

4 Wall Panel 100mm 3359.02 m2 9.46 %

5 Ceiling Panel 100mm 1823.20 m2 5.13 %

6 Floor Panel 100mm 1920.00 m2 3.10 %

7 Accessories 1.00 Lot 4.70 %

8 Manual Sliding Door uk. 2500x4000mm 20.00 Unit 3.23 %

9 Sectional Door uk. 2800x3000mm 12.00 Unit 2.25 %

10 Sectional Door uk. 2000x2000mm 16.00 Unit 2.93 %

11 2.00 Unit 0.12 %


Swing Door uk. 900x1900mm
12 2.00 Unit 0.12 %
Emergency Exit Door uk. 900x1900mm

13 2.00 Unit 0.94 %


High Speed Doors uk. 2000x4000mm

14 6.00 Unit 1.84 %


Hydraulic Dock Leveler uk. 1830x2119mm

15 6.00 Unit 0.85 %


Dock Shelter uk. 3500x3500mm

16 8.00 set 0.96 %


Dock Shelter uk. 2700x2600mm
9171.99 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. UNITED TRACTORS (CK17C-0061) Update :

Tgl Terbit SPK : 03 April 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Atap & Dinding tebal 100mm 309.20 m2 24.05 %

2 Panel Lantai tebal 100mm 120.00 m2 7.94 %

3 Manual Sliding Door uk. 2000x2000mm + Acc 1.00 Unit 4.72 %

4 Manual Sliding Door uk. 2200x2000mm + Acc 1.00 Unit 4.30 %

5 Mesin Bitzer, Fancil & Accessories 2.00 Unit 58.99 %

309.20 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. ADILMART (CK17I-0203) Update :

Tgl Terbit SPK : 04 Oktober 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Manual Swing Door uk. 1100x2200x100mm 2.00 Unit 4.77 %

2 Manual Sliding Door uk. 2000x2500mm 3.00 Unit 9.75 %

3 Panel Dinding tebal 125mm 305.20 m2 25.86 %

4 Panel Atap tebal 125mm 106.68 m2 9.04 %

5 Panel Dinding tebal 75mm 168.20 m2 13.24 %

6 Panel Atap tebal 75mm 395.80 m2 32.76 %

7 PU Slab Tebal Lantai 125mm 70.50 m2 4.58 %

1051.38 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. PRISTINE PRIMA LESTARI (CK17I-0199) Update :

Tgl Terbit SPK : 28 September 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Dinding + Plafon tebal 7,5cm 1010.00 m2 39.38 %

2 PU Slab Tebal Lantai 100mm 48.00 m2 1.41 %

3 Swing Door uk. 900x2000x40mm 5.00 Unit 3.19 %

4 Swing Door uk. 1800x2000x40mm 7.00 Unit 9.89 %

5 Sliding Door uk. 1500x2000x40mm 5.00 Unit 8.33 %

6 Sliding Door uk. 1500x2000x100mm 3.00 Unit 9.32 %

7 Jendela Fix uk. 3000x1000x80mm 6.00 Unit 3.36 %

8 Jendela Fix uk. 1800x1000x80mm 2.00 Unit 0.64 %

9 Jendela Fix uk. 1200x1000x80mm 6.00 Unit 1.36 %

10 Curving 155.00 Btg 8.76 %

11 Mangkok Curving R50 69.00 Pcs 0.47 %


12 Material Instalasi 1230.00 m2 5.63 %

13 Panel Dinding + Plafon tebal 100mm 172.00 m2 8.26 %

2718.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. PRISTINE PRIMA LESTARI (CK17I-0200) Update :

Tgl Terbit SPK : 28 September 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 CNP (Material Support Plaffon) 12.00 Btg 100.00 %

12.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : TUNAI (AL) (CK17C-0063) Update :

Tgl Terbit SPK : 07 April 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel 150mm uk. 1165x6300mm 177.00 Lbr 35.80 %

2 Panel 150mm uk. 1200x2400mm 215.00 Lbr 12.19 %

3 Panel 75mm uk. 1165x6300mm 64.00 Lbr 11.40 %

4 Manual Sliding Door uk. 1500x3000mm 1.00 Unit 0.89 %

5 Personal Swing Door uk. 1500x3000mm 1.00 Unit 0.68 %

6 Manual Sectional Door uk. 3000x3000mm 2.00 Unit 2.62 %

7 Dock Shelter uk. 3200x3200mm 2.00 Unit 2.76 %

8 Mesin Pendingin type S6F-30.2Y 2.00 Unit 33.65 %

464.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : CV. SARI RASA NUSANTARA (CK17C-0059) Update :

Tgl Terbit SPK : 03 April 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Insulation (Atap + Dinding) 46.35 m2 36.54 %

2 100mm (PU) - Lantai 11.25 m2 3.99 %

3 Cornis 10.00 Btg 10.92 %

4 Swing Door uk. 900x2000 x100mm 2.00 Pcs 48.54 %

69.60 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : CV. SARI RASA NUSANTARA (CK17C-0059) Update :

Tgl Terbit SPK : 03 April 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 100mm 1162.00 m2 16.10 %

2 Ceiling Panel 100mm 392.00 m2 5.43 %

3 Wall Panel 75mm 1754.00 m2 21.36 %

4 Ceiling Panel 75mm 1304.00 m2 15.88 %

5 Wall Panel 150mm 209.00 m2 3.33 %

6 Ceiling Panel 150mm 133.00 m2 2.12 %

7 Floor Insulation 171.00 m2 2.08 %

8 Parts for Wall and Ceiling Panel 4954.00 m2 16.64 %

9 Manual Single Sliding Door uk. 2000x3000x100 1.00 Unit 0.92 %

10 Manual Single Sliding Door uk. 1200x2200x50mm 5.00 Unit 3.69 %

11 Manual Single Sliding Door uk. 1200x2400x100 2.00 Unit 1.72 %


12 Manual Single Sliding Door uk. 2000x2400x100 3.00 Unit 2.69 %

13 Manual Single Sliding Door uk. 1200x2200x100 1.00 Unit 0.90 %

14 Manual Single Sliding Door uk. 1200x2400x50mm 2.00 Unit 1.56 %

15 Manual Single Swing Door uk.900x2200x50mm 1.00 Unit 0.24 %

16 Manual Single Swing Door uk.800x1200x50mm 1.00 Unit 0.22 %

17 Manual Double Swing Door uk. 1740x2150x50m 1.00 Unit 0.48 %

18 Polycarbonate Window uk. 900x900x6mm 10.00 Unit 3.19 %

19 Locket uk. 800x600x50mm 3.00 Unit 0.60 %

20 Accessory 1.00 Lot 0.85 %

10110.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. SURI NUSANTARA - CIKAMPEK (CK17I-0196) Update :

Tgl Terbit SPK : 19 September 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 783.00 m2 17.91 %

2 Ceiling Panel 150mm 216.00 m2 4.94 %

3 Floor Insulation 150mm 216.00 Btg 3.74 %

4 Material Instalasi 1.00 Lot 9.49 %

5 Lampu LED 16.00 Unit 2.97 %

6 Sliding Door uk. 2000x3000x100mm 1.00 Unit 1.98 %

7 Wall Panel 100mm 429.30 m2 9.55 %

8 Ceiling Panel 100mm 144.00 m2 3.20 %

9 Floor Insulation 100mm 144.00 Btg 2.14 %

10 Automatic Sectional Door uk. 2000x2700mm 1.00 Unit 1.24 %

11 Dock Shelter uk. 2000x2700mm 1.00 Unit 1.08 %


12 Compressor Set S6F30.2 (Cold Storage) 2.00 Unit 35.41 %

13 Evaporator (Cold Storage) 2.00 Unit 4.36 %

14 Compressor Set ZX075E (Antee Room) 1.00 Unit 1.25 %

15 Evaporator (Antee Room) 1.00 Unit 0.75 %

1958.30 0 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. CHAROEN POKHPAND JAYA FARM - FLORES (CK17I-0184) Update :

Tgl Terbit SPK : 26 September 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Insulation Panel PU tebal 75mm 519.90 m2 16.77 %

2 Insulation Panel PU tebal 50mm 3113.30 m2 83.23 %

3633.20 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. MULTIBRATA ANUGERAH UTAMA - CIKANDE (CK17H-0169) Update :

Tgl Terbit SPK : 21 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Sandwich Panel area Wall Clading 4489.26 m2 87.89 %

2 Sandwich Panel area Cover Chainlink 618.57 m2 12.11 %

5107.83 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. TIRTA ALAM SEGAR (CK17H-0171) Update :

Tgl Terbit SPK : 21 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Material Panel Dinding & Atap 253.90 m2 26.82 %

2 Manual Sliding Door uk. 2000x2150mm 1.00 Unit 4.95 %

3 Manual Sliding Door uk. 2000x3000mm 1.00 Unit 5.41 %

4 Jendela Fix uk.3000x1150mm 1.00 Unit 1.82 %

5 PVC Curtain 3000x3000mm 1.00 Unit 0.71 %

6 Mesin Bitzer, Fan Coil & Accessories 2.00 lot 60.29 %

259.90 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. KOBE BOGA UTAMA (CK17G-0159) Update :

Tgl Terbit SPK : 27 Juli 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Manual Swing Door uk. 900x2000x40mm 18.00 Unit 7.20 %

2 Double Personal Door uk. 1800x2000x40mm 12.00 Unit 5.60 %

3 Emergency Door uk. 900x2000x40mm 3.00 Unit 1.20 %

4 Single Fix Windows uk. 1200x1000x8mm 77.00 Unit 8.98 %

5 Cornis 196.00 Btg 3.27 %

6 Mangkok Cornis 135.00 pcs 0.20 %

7 Panel Ceiling 2074.72 m2 28.01 %

8 Panel Dinding 3404.35 m2 40.06 %

9 Material Instalasi 5479.07 m2 5.48 %

11399.14 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. KOBE BOGA UTAMA (CK17G-0159 (SI-1)) Update :

Tgl Terbit SPK : 11 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 High Speed Door uk. T.3000 x L.2000mm 2.00 Unit 100.00 %

2.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. CPI - SALATIGA (CK17I-0187) Update :

Tgl Terbit SPK : 20 September 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Insulation Panel PU T.75mm 225.60 m2 92.11 %

2 Material Instalasi Insulation Panel 225.60 m2 7.89 %

451.20 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. CPJF - PURWOKERTO (CK17I-0186) Update :

Tgl Terbit SPK : 20 September 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Insulation Panel PU T.50mm 122.00 m2 100.00 %

122.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. CPI - SALATIGA (CK17I-0187) Update :

Tgl Terbit SPK : 22 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Insulation Panel PU T.75mm 21.60 m2 89.41 %

2 Material Instalasi Insulation Panel 21.60 m2 10.59 %

43.20 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : BEST WORLD PERKASA LTD (CK17J-0226) Update :

Tgl Terbit SPK : 09 November 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Atap & Dinding : Tebal 100mm 28.50 m2 57.50 %

2 Lantai Tb. 100mm 6.00 m2 8.87 %

3 Personal Swing Door uk. 900 x 2,000mm + Acc 1.00 Unit 33.63 %

35.50 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. SAKTI ABADI KILAT (CK17J-0227) Update :

Tgl Terbit SPK : 09 November 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel 100 mm 1271.58 m2 48.94 %

2 Panel 100 mm 426.00 m2 10.06 %

3 Material Accessories 1.00 Lot 3.21 %

4 Mesin Evaporator 8.00 Unit 8.40 %

5 Condensing Unit EMERSON ZXL 075 TFD 450/451 8.00 Unit 22.39 %

6 Material Instalasi 1.00 Lot 3.50 %

7 Manual Sliding Door uk 2,200mm x 3,000mm 2.00 Unit 3.50 %

1717.58 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. ANUGERAH PHARMINDO LESTARI (CK17J-0228) Update :

Tgl Terbit SPK : 09 November 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Controller + Bulb 1.00 Lot 14.50 %

2 Alarm 1.00 Lot 10.30 %

3 Material Instalasi 1.00 Lot 75.19 %

3.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. KARYA TANI PERKASA (CK17K-0234) Update :

Tgl Terbit SPK : 15 November 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Manual Sliding Door uk. 2,100 x 2,800 x 150mm + 2.00 Unit 100.00 %

2.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. KARTIKA EKA DHARMA (CK17J-0223) Update :

Tgl Terbit SPK : 24 Oktober 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Ice Flake Evaporator (Snowkey) F80SF 8T 1.00 Set 100.00 %

1.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. CALBEE WINGS FOOD (CK17H-0172) Update :

Tgl Terbit SPK : 23 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel tbl 100mm uk. 17,6 x 34 x 5 868.00 m2 31.03 %

2 Ceiling Panel tbl 100mm uk. 17,6 x 34 x 5 1795.20 m2 64.17 %

3 Manual Sliding Door uk. 2500 x 3500 x 100 3.00 Set 4.80 %

2666.20 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. CHAROEN POKPHAND INDONESIA (CK17H-0175) Update :

Tgl Terbit SPK : 23 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Insulation Panel PU Tebal 75mm 175.00 m2 82.74 %

2 Aluminium Curving R50 @6M 15.00 btg 7.47 %

3 Material Instalasi 175.00 m2 9.80 %

365.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : BEST WORLD ENGINEERING SDN.BHD (CK17E-0096) Update :

Tgl Terbit SPK : 19 Mei 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Atap & Dinding tebal 100mm 65.50 m2 63.31 %

2 Panel Lantai tebal 100mm 13.00 m2 9.67 %

3 Manual Swing Door uk. 800x1500mm + Acc 1.00 Unit 27.02 %

79.50 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. SURI NUSANTARA JAYA - CIKARANG (CK17I-0179) Update :

Tgl Terbit SPK : 18 September 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 5740.00 m2 13.68 %

2 Ceiling Panel 150mm 5122.50 m2 12.21 %

3 Floor Insulation 150mm 5122.50 m2 9.39 %

4 Material Instalasi (Panel) 1.00 Lot 2.70 %

5 Lampu LED 104.00 Unit 1.91 %

6 Sliding Door uk. 2000x5000x100mm 3.00 Unit 1.24 %

7 Sliding Door uk. 2400x2500x100mm 3.00 Unit 0.95 %

8 Wall Panel 100mm 798.90 m2 1.81 %

9 Ceiling Panel 100mm 704.40 m2 1.59 %

10 Floor Insulation 100mm 704.40 m2 1.08 %

11 Lampu Philips 13.00 Unit 0.25 %


12 Sectional Doors uk. 2000x2700mm 2.00 Set 0.24 %

13 Sectional Doors uk. 2500x3000mm 3.00 Set 0.55 %

14 Dock Shelter uk. 2000x2000mm 2.00 Set 0.19 %

15 Dock Shelter uk. 2500x3000mm 3.00 Set 0.35 %

16 Dock Leveller uk. 2000x2500mm 2.00 Set 0.36 %

17 Mesin Compressor, Evap & Condensor (Frozen 4) 1.00 Set 15.26 %

18 Mesin Compressor, Evap & Condensor (Frozen 5) 2.00 Set 22.05 %

19 Mesin Compressor, Evap & Condensor (Antee/Loa 1.00 Set 6.34 %

20 Material Instalasi (Mesin) 1.00 Lot 7.86 %

18333.70 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : CV. PANGAN BERKAH SENTOSA (CK17G-0142) Update :

Tgl Terbit SPK : 17 Juli 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Sectional Door uk 2,100 x 2,500mm 2.00 Unit 100.00 %

2.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. KARYA CIPTA MINA JAYA (CK17D-0078) Update :

Tgl Terbit SPK : 13 April 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Automatic Sliding Door uk. 2,200 x 3,800mm 2.00 Unit 61.49 %

2 Automatic Sliding Door uk. 2,400 x 3,500mm 1.00 Unit 30.74 %

3 Heater Pintu Bagian Lantai + Thermostat 3.00 Unit 7.77 %

6.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. KARYA CIPTA MINA JAYA (CK17D-0078) SI-1 Update :

Tgl Terbit SPK : 15 Mei 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Accessories - Siku Dalam & Luar (Cold Storage - Exi 1.00 Lot 33.07 %

2 Accessories - Siku Dalam & Luar (Cold Storage - Exi 1.00 Lot 66.93 %

2.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. TRI PUTRA PANGANINDO (CK17F-0111) Update :

Tgl Terbit SPK : 21 Juli 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Material Panel Dinding & Atap Tebal 100mm - A 13.50 m2 0.88 %

2 Material Lantai PU Slab Tebal 100mm - Ante Roo 13.50 m2 0.64 %

3 Sliding Door uk 1,200 x 2,000mm - Ante Room 1.00 Set 2.59 %

4 Sectional Door uk 1,200 x 2,000mm 1.00 Set 5.56 %

5 Material Panel Dinding & Atap Tebal 150mm - AB 45.00 m2 3.07 %

6 Material Lantai PU Slab Tegal 150mm - ABF 9.00 m2 0.47 %

7 Sliding Door uk 1,200 x 2,000mm - ABF 1.00 Set 2.59 %

8 Mesin Bitzer, Fan Coil & Accessories 1.00 Set 39.41 %

9 Material Panel Dinding & Atap Tebal 100mm - Fr 55.50 m2 3.61 %

10 Material Lantai PU Slab Tebal 100mm - Freezer 13.50 m2 0.64 %

11 Sliding Door uk 1,200 x 2,000mm - Freezer Room 1.00 Set 2.59 %


12 Mesin Bitzer, Fan Coil & Accessories 1.00 Set 10.59 %

13 Material Panel Dinding & Atap Tebal 100mm - Chi 150.50 m2 9.80 %

14 Material Lantai PU Slab Tegal 100mm - Chiller R 42.50 m2 2.02 %

15 Sliding Door uk 1,200 x 2,000mm - Chiller Room 1.00 Set 2.59 %

16 Mesin Bitzer, Fan Coil & Accessories 1.00 Set 12.94 %

351.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. ANUGERAH PHARMINDO LESTARI (CK17F-0109) Update :

Tgl Terbit SPK : 15 Juni 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Insulated Panel PIR 1.00 Lot 24.72 %

2 Refrigerating Unit 1.00 Unit 40.23 %

3 Installation Material 1.00 Lot 35.05 %

3.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. ISTANA CIPTA SEMBADA (CK17A-0004) Update :

Tgl Terbit SPK : 16 Januari 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Insulation ABF 1.00 Unit 100.00 %

1.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. DJARUM (CK17A-0012) Update :

Tgl Terbit SPK : 24 Januari 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Sandwich Panel Dinding dan Plafon 1162.50 m2 80.77 %

2 Sandwich Panel Pintu Personal Single Swing 8.00 Unit 12.31 %

3 Sandwich Panel Pintu Personal Double Swing 3.00 Unit 6.92 %

1173.50 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. DJARUM (CK17A-0012) Update :

Tgl Terbit SPK : 24 Januari 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Sandwich Panel Dinding dan Plafon 1162.50 m2 80.77 %

2 Sandwich Panel Pintu Personal Single Swing 8.00 Unit 12.31 %

3 Sandwich Panel Pintu Personal Double Swing 3.00 Unit 6.92 %

1173.50 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. CHAROEN POKPHAND INDONESIA (CK17C-0047 (SI-2)) Update :

Tgl Terbit SPK : 16 Juni 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Manual Swing Door L. 900mm x T.2000mm x Tbl 1.00 Set 100.00 %

1.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. SINAR SEJAHTERA SENTOSA (CK17J-0210) Update :

Tgl Terbit SPK : 14 November 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Manual Swing Door uk. 1,200 x 2,000mm 1.00 Unit 15.49 %

2 Panel Dinding uk. 2,850 x 1,200 150mm 54.72 m2 26.07 %

3 Panel Atap uk. 4,500 x 1,200 x 150mm 43.20 m2 20.58 %

4 Panel Atap uk. 5,000 x 1,200 x 150mm 24.00 m2 11.44 %

5 PU Slab (Lantai) Tebal 150mm 41.94 m2 14.14 %

6 PU Slab (Lantai) Tebal 150mm 23.30 m2 7.87 %

7 Gantungan T-Aluminium Tebal 150mm Type : 580 2.00 Btg 4.41 %

190.16 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. MAYEKAWA INDONESIA (CK17J-0213) Update :

Tgl Terbit SPK : 12 Oktober 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Air Cooled Condensor Guntner 446 KW 1.00 Lot 21.61 %

2 Oil Separator For F6MII Horizontal + Accessories 1.00 Lot 4.94 %

3 Accumulator For F6MII Horizontal + Accessories 1.00 Lot 5.35 %

4 Control Panel 1.00 Lot 24.29 %

5 Valves and Control Equipment 1.00 Lot 17.01 %

6 Instalation Material 1.00 Lot 22.90 %

7 Miscellaneous 1.00 Lot 3.90 %

7.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : KENDY TJIPTO (CK17J-0222) Update :

Tgl Terbit SPK : 25 Oktober 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Material Panel Dinding & Atap Tebal 100mm - Fr 116.00 m2 27.69 %

2 Lantai Tb. 100mm 28.00 m2 5.10 %

3 Mesin Bitzer, Fan Coil & Accesories 1.00 Lot 58.14 %

4 Manual Sliding Door uk. 1,200x2,000 + Accessori 1.00 Unit 9.07 %

146.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. GENERASI MUTIARA BANGSA 4 (CK17J-0217) Update :

Tgl Terbit SPK : 16 Oktober 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Material Panel Dinding & Atap Tebal 100mm - Fr 31.20 m2 9.18 %

2 Lantai Tb. 100mm 5.16 m2 2.37 %

3 Manual Swing Door L. 900mm x T.2000mm x Tbl 2.00 Unit 14.48 %

4 Mesin Bitzer, Fan Coil & Accessories 1.00 Set 34.14 %

5 Manual Panel Dinding & Atap Tebal 100mm - Chil 20.53 m2 6.04 %

6 Lantai Tb. 100mm 4.23 m2 1.94 %

7 Mesin Bitzer, Fan Coil & Accessories 1.00 Set 31.85 %

65.12 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. UNIMAX POWER (CK17J-0218) Update :

Tgl Terbit SPK : 26 Oktober 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Material Panel Dinding & Atap Tebal 100mm - Chi 39.37 m2 22.19 %

2 Lantai Tb. 100mm 9.12 m2 8.97 %

3 Manual Swing Door uk. 1,000 x 2,000mm 1.00 Unit 13.51 %

4 Compressor Emerson CDU ZXL040E 1.00 Unit 55.34 %

50.49 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. BANDAR NELAYAN (CK17J-0220) Update :

Tgl Terbit SPK : 19 Oktober 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Water Proofing Membran Bakar 3mm ex Bostik 4488.00 m2 100.00 %

4488.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. SETIA ANUGERAH MEDIKA (CK17J-0221) Update :

Tgl Terbit SPK : 26 Oktober 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Condensing Unit EMERSON ZXL025E TFD 450/45 1.00 Unit 44.95 %

2 Manual Sliding Door uk. 1,000 x 2,000 x 100mm 1.00 Unit 16.99 %

3 Material Panel Dinding & Atap Tebal 100mm - Chi 54.25 m2 27.65 %

4 Lantai Tb. 100mm 12.25 m2 10.41 %

68.50 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. INTERFOOD SUKSES JASINDO (CK17K-0238) Update :

Tgl Terbit SPK : 23 November 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Material Panel Dinding & Atap Tebal 100mm 953.00 m2 35.73 %

2 PU Slab (lantai) tebal 100mm 720.00 m2 19.67 %

3 Mesin Bitzer, Fan Coil & Accessories 2.00 Set 39.16 %

4 Manual Sliding Door uk. 2500x3000x100mm + Ac 3.00 Unit 5.45 %

1678.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. APL - KELAPA GADING (CK17F-0108) Update :

Tgl Terbit SPK : 15 Juni 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Material Panel Dinding & Atap Tebal 100mm 108.00 m2 11.79 %

2 Panel Lantai tebal 100mm 36.00 m2 5.94 %

3 Swing Door uk. 900x2000x10mm 1.00 Unit 3.05 %

4 Lampu LED 5.00 Unit 0.22 %

5 Mesin Bitzer, Fan Coil & Acc 2.00 Set 40.61 %

6 Material Instalasi 1.00 Lot 38.40 %

153.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. APL - KELAPA GADING (CK17F-0108 (SI-1)) Update :

Tgl Terbit SPK : 18 Juli 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Single Sliding Door uk. 1000x1800 w/PVC Curtain 1.00 Unit 53.49 %

2 New MCCB According to capacity, include box pa 1.00 Lot 46.51 %

2.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. SUPER UNGGAS JAYA (CK17J-0225) Update :

Tgl Terbit SPK : 06 November 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Compressor Bitzer HSN74-71-75 2.00 Unit 10.16 %

2 Condensor Guntner GCVC RD 063.2/13-61-42521 2.00 Unit 1.70 %

3 Evaporator GHN 080.2H/312-END50.E 2.00 Unit 8.41 %

4 Compressor Bitzer 2x 6JE-25Y 1.00 Unit 5.54 %

5 Condensor Guntner GVV 050.2A/3 ND.E 1.00 Unit 0.71 %

6 Evaporator GHF 050.2J/27 END50.E 2.00 Unit 1.71 %

7 Compressor Bitzer 2x 4CES-6Y 1.00 Unit 2.90 %

8 Condensor GVV 045.1A/2-NW.E 1.00 Unit 0.38 %

9 Evaporator GSF 031.3F/36 ENW50.I 1.00 Unit 0.34 %

10 Evaporator GSF 040.3F/27 ENW50.I 1.00 Unit 0.39 %

11 Evaporator GSF 040.3F/36 ENW50.I 1.00 Unit 0.39 %


12 Evaporator GSF 031.3F/16 ENW50.I 1.00 Unit 0.18 %

13 Compressor Bitzer 2x 4TES-9Y 1.00 Unit 3.07 %

14 Evaporator GSF 040.3F/37 ENW50.I 2.00 Unit 0.94 %

15 Evaporator GHF 045.2H/27 ENW50.E 1.00 Unit 0.53 %

16 Evaporator GSF 031.3F/36 ENW50.I 1.00 Unit 0.41 %

17 Compressor Bitzer 2x 4TES-12Y 1.00 Unit 3.48 %

18 Condensor GVV 065.1A/3-ND.E 1.00 Unit 1.07 %

19 Evaporator GSF 031.3D/14ENW 1.00 Unit 0.25 %

20 Panel Dinding tebal 150mm 710.40 m2 7.99 %

21 Panel Dinding tebal 100mm 663.10 m2 7.12 %

22 Panel Atap tebal 100mm 181.60 m2 1.95 %

23 Panel Atap tebal 75mm 702.94 m2 7.19 %

24 PU Slab (Lantai) Tebal 150mm 301.50 m2 2.54 %

25 PU Slab (Lantai) Tebal 100mm 146.50 m2 1.16 %

26 Panel Kolom tebal 75mm 66.20 m2 0.68 %

27 Manual Sliding Door uk. 1200x2100mm 6.00 Unit 2.44 %

28 Automatic Double Sliding Door uk. 2000x2800m 1.00 Unit 1.10 %

29 Manual Double Sliding Door uk. 2000x2600mm 2.00 Unit 1.23 %


30 Sectional Door uk. 2500x4000mm 1.00 Unit 0.76 %

31 Sectional Door uk. 2000x4000mm 2.00 Unit 1.23 %

32 Panel Atap tebal 150mm 301.50 m2 3.39 %

33 Manual Swing Door uk. 1200x2100mm 1.00 Unit 0.31 %

34 Manual Swing Door uk. 1000x2100mm 3.00 Unit 0.61 %

35 Personal Swing Door uk. 900x2100mm (include a 4.00 Unit 1.02 %

36 Double Personal Swing Door uk. 2000x2600mm (i 1.00 Unit 0.62 %

37 Personal Sliding Door uk. 1000x2500mm 1.00 Unit 0.36 %

38 Personal Sliding Door uk. 1200x2200mm (include 1.00 Unit 0.46 %

39 Personal Swing Door uk. 1300x2500mm (include 1.00 Unit 0.31 %

40 Jendela Acrylic uk. 850x2610mm 1.00 Unit 0.05 %

41 Jendela Acrylic uk. 850x2230mm 1.00 Unit 0.04 %

42 Jendela Acrylic uk. 850x480mm 2.00 Unit 0.05 %

43 Jendela Acrylic uk. 850x3370mm 2.00 Unit 0.11 %

44 Jendela Acrylic uk. 850x1380mm 1.00 Unit 0.04 %

45 Evaporator GSF 040.3F/34ENW 3.00 Unit 1.63 %

46 Evaporator GSF 040.3D/24ENW 2.00 Unit 0.72 %

47 Evaporator Guntner S-GHF 050.2J/17-ENS50.E 1.00 Unit 0.45 %


48 Condensor Guntner GVV 065.1B/2-LD.E 1.00 Unit 0.79 %

49 PVC Curtain uk. 2100x2800 1.00 lot 0.03 %

50 Manual Swing Door uk. 900x2100mm 1.00 Unit 0.31 %

51 Material Instalasi 1.00 lot 8.05 %

52 Material Accessories 1.00 lot 2.72 %

3139.74 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. MUSTIKA CITA RASA (CK17D-0079) Update :

Tgl Terbit SPK : 13 April 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Material Panel 75mm 934.16 m2 70.63 %

2 Accessories 1.00 lot 8.26 %

3 Manual Sliding Door uk. 1200x2000mm (dg kac 3.00 Unit 7.98 %

4 Kaca Jendela uk. 1000x1000mm 2.00 Unit 4.25 %

5 Kaca Jendela uk. 2000x1000mm 3.00 Unit 6.38 %

6 PVC Curtain uk. 1200x2000mm 4.00 Unit 0.85 %

7 PVC Curtain uk. 1500x2000mm 1.00 Unit 0.27 %

8 PVC Curtain uk. 1600x2000mm 1.00 Unit 0.32 %

9 PVC Curtain uk. 3270x2000mm 1.00 Unit 1.06 %

950.16 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. KARYA CIPTA MINA JAYA (CK17D-0078 (SI-2)) Update :

Tgl Terbit SPK : 09 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Dinding 75mm 138.64 m2 33.64 %

2 Panel Atap 75mm 181.74 m2 44.03 %

3 Accessories - KOP U (SUS 304) 7.00 Btg 5.06 %

4 Siku Luar dan Dalam (STD Alpine) 327.00 m2 7.43 %

5 Manual Sliding Door uk. 1200x2000mm 1.00 Unit 9.84 %

655.38 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. NIAGATAMA KENCANA - PEMATANG SIANTAR (CK 17F-0124) Update :

Tgl Terbit SPK : 11 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 336.16 m2 15.70 %

2 Ceiling Panel 150mm 243.04 m2 11.35 %

3 PU Slab 150mm 243.04 m2 5.99 %

4 Auto Sectional Door uk. 1500x2400x150mm 3.00 set 8.17 %

5 Manual Sliding Door uk. 1500x2400x150mm 2.00 set 2.08 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.52 %

7 Manual Dock Shelter uk. 1500x2400mm 3.00 set 9.15 %

8 3.00 set 1.36 %


Plastic Stripe Curtain

9 3.00 set 40.09 %


Compressor, Condensor & Evaporator (coldroom)

10 1.00 set 5.58 %


Compressor, Condensor & Evaporator (anteeroom
336.16 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. SAYAP MAS UTAMA - CIANJUR (CK17F-0125) Update :

Tgl Terbit SPK : 22 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 294.89 m2 16.26 %

2 Ceiling Panel 150mm 185.10 m2 10.21 %

3 PU Slab 150mm 185.10 m2 5.39 %

4 Auto Sectional Door uk. 1500x2400x150mm 2.00 set 6.43 %

5 Manual Sliding Door uk. 1500x2400x150mm 1.00 set 1.23 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.61 %

7 Manual Dock Shelter uk. 1500x2400mm 2.00 set 7.20 %

8 2.00 set 1.07 %


Plastic Stripe Curtain

9 3.00 set 45.94 %


Compressor, Condensor & Evaporator (coldroom)

10 1.00 set 5.67 %


Compressor, Condensor & Evaporator (anteeroom
294.89 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. SAYAP MAS UTAMA - DEPOK (CK17F-0125) Update :

Tgl Terbit SPK : 11 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 294.89 m2 16.26 %

2 Ceiling Panel 150mm 185.10 m2 10.21 %

3 PU Slab 150mm 185.10 m2 5.39 %

4 Auto Sectional Door uk. 1500x2400x150mm 2.00 set 6.43 %

5 Manual Sliding Door uk. 1500x2400x150mm 1.00 set 1.23 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.61 %

7 Manual Dock Shelter uk. 1500x2400mm 2.00 set 7.20 %

8 2.00 set 1.07 %


Plastic Stripe Curtain

9 3.00 set 45.94 %


Compressor, Condensor & Evaporator (coldroom)

10 1.00 set 5.67 %


Compressor, Condensor & Evaporator (anteeroom
294.89 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. NIAGATAMA KENCANA - CILEUNYI (CK17F-0127) Update :

Tgl Terbit SPK : 11 Agustus 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Wall Panel 150mm 551.32 m2 14.43 %

2 Ceiling Panel 150mm 650.41 m2 17.03 %

3 PU Slab 150mm 650.41 m2 8.99 %

4 Auto Sectional Door uk. 1500x2400x150mm 6.00 set 9.16 %

5 Manual Sliding Door uk. 1500x2400x150mm 3.00 set 1.75 %

6 Manual Swing Door uk. 900x2000x100mm 1.00 set 0.29 %

7 Manual Dock Shelter uk. 1500x2400mm 5.00 set 8.54 %

8 5.00 set 1.27 %


Plastic Stripe Curtain

9 4.00 set 34.90 %


Compressor, Condensor & Evaporator (coldroom)

10 1.00 set 3.64 %


Compressor, Condensor & Evaporator (anteeroom
551.32 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. YUMMY FOOD UTAMA (CK17J-0224) Update :

Tgl Terbit SPK : 02 November 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Material Panel Atap & Dinding 1504.73 m2 40.15 %

2 Material Lantai 407.80 m2 8.05 %

3 Manual Sliding Door uk. 2000x2500mm 3.00 Unit 3.28 %

4 Manual Sliding Door uk. 1700x2500mm 1.00 Unit 1.09 %

5 Manual Sliding Door uk. 1200x2500mm 3.00 Unit 3.24 %

6 Compressor Bitzer 4JE-15Y + Acc 1.00 Unit 6.24 %

7 Compressor Bitzer 4GE-23Y + Acc 2.00 Unit 16.54 %

8 Compressor Bitzer 4TES-9Y + Acc 1.00 Unit 5.92 %

9 CDU Copeland ZX050E + Acc 1.00 Unit 2.72 %

10 Compressor Bitzer 4HE-18Y + Acc 1.00 Unit 6.78 %

11 CDU Copeland ZX075E + Acc 2.00 Unit 5.98 %


1927.53 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. CITARASA PRIMA INDONESIA BERSATU (CK17J-0212) Update :

Tgl Terbit SPK : 6 October 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Dinding, Atap & Accessories Tebal 150mm 118.00 M2 15.11 %

2 Lantai Tebal 150mm 30.00 M2 3.48 %

3 Mesin Bitzer, Fan Coil & Accessories 1.00 Set 77.91 %

4 Manual Swing Door Uk. 1100x2300x100mm + Acc 1.00 Unit 3.50 %

150.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. GENERASI MUTIARA BANGSA 5 (CK17K-0237) Update :

Tgl Terbit SPK : 17 November 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Dinding & Atap (Freezer Room) 30.22 M2 9.34 %

2 Panel Dinding & Atap (Chiller Room) 20.59 M2 6.13 %

3 Lantai 100mm 9.07 M2 3.94 %

4 Bitzer, Fan Coil & Accessories 1.00 Set 34.26 %

5 CDU Tecumsech, Fan Coil & Acc 1.00 Unit 31.85 %

6 Manual Swing Door Uk. 900mmx2000x100mm 2.00 Unit 14.48 %

63.88 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : CV. ROYAL GALAXY (CK17K-0240) Update :

Tgl Terbit SPK : 17 November 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Mesin, Fan Coil & Accessories 2.00 Unit 100.00 %

2.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. BALINUSA WINDUMAS (CK17K-0236) Update :

Tgl Terbit SPK : 20 November 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Dinding Tebal 200mm 308.00 M2 89.85 %

2 Manual Sliding Door Uk. 1200 x 1800mm 1.00 Unit 10.15 %

309.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : SIMON DAUD (CK17K-0229) Update :

Tgl Terbit SPK : 10 November 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Compressor Bitzer 2CC-3.2 + Heater 1.00 Unit 100.00 %

1.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : DARPIEN SUTIONO Update :

Tgl Terbit SPK : 17 November 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Dinding & Atap 200.00 M2 68.38 %

2 Lantai Tebal 75mm 50.00 M2 12.82 %

3 Material Accessories 1.00 Lot 8.55 %

4 Manual Swing Door Uk. 900x2000mm 1.00 Unit 10.26 %

252.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. ANUGERAH PHARMINDO LESTARI - YOGYAKARTA (CK17E-0085)

Tgl Terbit SPK : 16 Mei 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Ceiling PIR 64.00 M2 9.42 %

2 Panel Lantai 16.00 M2 3.56 %

3 Swing Door Uk. 900x2000x100mm 1.00 Unit 4.11 %

4 Lampu LED 2.00 Unit 0.12 %

5 Bitzer, Fan Coil & Accessories 2.00 Set 32.88 %

6 Material Instalasi 1.00 Lot 49.91 %

86.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. APL SBY-BDG (CK16K-0133) Update :

Tgl Terbit SPK : 22 November 2016

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Pembongkaran Room Sandwich Panel 1.00 Lot 6.29 %

2 Refrigerating Unit 1.00 Lot 6.29 %

3 Pengantaran Unit dari Surabaya Ke Bandung 1.00 Lot 9.43 %

4 Sandwich Panel 1.00 Lot 6.29 %

5 Tambahan Sandwich yang Rusak 0.68 Lbr 25.16 %

6 Pemasangan kabel 1.00 Lot 15.72 %

7 Penggantian Sensor Thermostat 4.00 Ntc 2.52 %

8 Pemasangan Unit Refrigerator 1.00 Lot 18.87 %

9 Test dan Commissioning Unit 1.00 Lot 9.43 %

11.68 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. BOUNTY SEGAR INDONESIA (CK17J-0209) Update :

Tgl Terbit SPK : 14 November 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Dinding tebal 50mm 2075.76 M2 15.15 %

2 Panel Dinding tebal 75mm 419.70 M2 3.27 %

3 Panel Dinding tebal 100mm 998.32 M2 8.99 %

4 Panel Dinding tebal 150mm 62.10 M2 0.60 %

5 Panel Dinding tebal 175mm 774.19 M2 7.72 %

6 Panel Atap tebal 50mm 1596.95 M2 11.66 %

7 Panel Atap tebal 75mm 106.58 M2 0.83 %

8 Panel Atap tebal 100mm 1067.32 M2 9.61 %

9 Panel Atap tebal 175mm 328.29 M2 3.28 %

10 Material Accessories 2.00 Lot 4.52 %

11 PU Slab (Lantai) tebal 100mm 1401.46 M2 6.82 %


12 PU Slab (Lantai) tebal 150mm 298.25 M2 1.81 %

13 Automatic Sliding Door uk. 2500x4500x150mm + Plastic 2.00 Unit 3.16 %

14 Sliding Door uk. 2500x3000x100mm + Plastic Curtain 2.00 Unit 1.46 %

15 Sliding Door uk. 2000x2500x100mm + Plastic Curtain 10.00 Unit 4.87 %

16 Swing Door uk. 900x2100x100mm + Plastic Curtain 10.00 Unit 2.43 %

17 Chute uk. 600x600x100mm 17.00 Unit 1.65 %

18 Plug Wall uk. 3000x3000x100mm 4.00 Unit 0.19 %

19 Automatic Sectional Door uk. 2200x2500x40mm 12.00 Unit 5.55 %

20 Dock Shelter uk. 2200x2500mm 12.00 Unit 4.96 %

21 Dock Leveller uk. 2200x2500mm 2.00 Unit 1.46 %

9201.92 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. BELINDA JAYA (CK16K-0120) Update :

Tgl Terbit SPK : 11 November 2016

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Material Panel Dinding, Atap, Lantai & Pintu 1.00 Lot 23.03 %

2 Material Mesin, Fan Coil & Acc 1.00 Lot 76.97 %

2.00 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : SSPB 1 (CK16G-0061) Update :

Tgl Terbit SPK : 25 Agustus 2016

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Atap & Dinding tebal 100mm 1027.60 m2 16.67 %

2 Panel Lantai tebal 100mm 48.00 m2 0.64 %

3 Panel Atap & Dinding tebal 125mm 932.00 m2 16.01 %

4 Panel Lantai tebal 125mm 258.00 m2 3.69 %

5 Material Accessories 2337.00 m2 2.23 %

6 Manual Sliding Door uk. 2000x2400mm 3.00 Unit 2.80 %

7 Manual Swing Door uk. 1200x2000mm 3.00 Unit 1.43 %

8 Manual Sectional Door uk. 2100x2500mm 4.00 Unit 2.80 %

9 Jendela 600x500mm 1.00 Unit 0.27 %

10 Jendela 100x100mm 1.00 Unit 0.30 %

11 Cold Storage 1&2 (S6F-30.2Y) 2.00 Unit 24.25 %


12 ABF 1&2 (S6F-30.2Y) 2.00 Unit 24.25 %

13 Ice Room (4CES-6.2Y) 1.00 Unit 4.66 %

4619.60 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : CV. ASIA AGUNG SEJAHTERA (CK17K-0248) Update :

Tgl Terbit SPK : 30 November 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Atap & Dinding tebal 100mm 56.84 m2 33.86 %

2 Panel Lantai tebal 100mm 10.64 m2 4.71 %

3 Manual Swing Door uk. 900x2000mm + Acc 1.00 Unit 15.27 %

4 Mesin Emerson, Fan Coil & Acc 1.00 Lot 46.16 %

69.48 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. MAU - LAVA (CK17K-0247) Update :

Tgl Terbit SPK : 30 November 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Roof Sandwich Area Knitting 1836.72 m2 51.18 %

2 Roof Sandwich Area Office 76.77 m2 2.14 %

3 Roof Sandwich Area Utility 87.00 m2 2.42 %

4 Wall Sandwich Area Knitting 1402.56 m2 38.58 %

5 Wall Sandwich Area Office 87.70 m2 2.41 %

6 Wall Sandwich Area Utility 118.79 m2 3.27 %

3609.54 100.00 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : PT. Masuya Graha Trikencana (CK17G-0156) Update :

Tgl Terbit SPK : 05 Desember 2017

Deadline : ..............................................................................

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Pengadaan lantai XPS tebal 200mm 1150 m2 18.4 %

2 Pengadaan Almunium Foil 1150 m2 2.3 %

3 Pengadaan XPS tebal 50mm untuk R. Ante Room 2 170 m2 0.3 %

4 Pengadaan Almunium Foil untuk R. Ante Room 2 170 m2 0.1 %

5 Pengadaan Kusen Pintu dan Jasa Pemasangan, sbb :

- Manual Sliding Door uk. 2000x3300x125mm 11 Unit 2.0 %

- Manual Sliding Door uk. 1500x2250x100mm 2 Unit 0.3 %

- Manual Swing Door uk. 1200x2050x100mm 3 Unit 0.4 %

- Manual Swing Door uk. 1000x2050x100mm 1 Unit 0.1 %

- Manual Swing Door uk. 900x2050x100mm 1 Unit 0.1 %

- Personal Swing Door uk. 800x1850x125mm 7 Unit 0.8 %


- Flip Plop uk. 1500x2050x100mm 1 Unit 0.1 %

6 Pengadaan Pintu dan Jasa Pemasangan, sbb :

- Manual Sliding Door uk. 2000x3200x125mm 1 Unit 1.4 %

- Manual Sliding Door uk. 1200x2000x100mm 2 Unit 2.0 %

- Manual Swing Door uk. 700x2000x100mm 2 Unit 1.1 %

- Sectional Door uk. 2200x2200mm 2 Unit 1.8 %

7 Pengadaan Panel untuk kolom dan Jasa Pemasangan, sbb :

- Panel uk. 4000x1165x100mm 20 Lbr 1.0 %

- Siku Luar uk. 10cm x 4cm 50 Btg 0.1 %

- Siku Luar uk. 14cm x 4cm 11 Btg 0.0 %

- Siku Dalam uk. 4cm x 4cm 80 Btg 0.1 %

8 Pergantian Pipa Drain Evap dengan pipa merk AW Rucika 21 Unit 1.4 %

9 Perbaikan Panel Atap ruang Sake dan Pengadaan Panel, sbb :

- Panel Camlock uk. 4000x1165x125mm 7 Lbr 0.03 %

10 Pengadaan Dock Shelter uk. 2200x2200 dan Jasa Pemasangan 2 Unit 1.5 %

11 Pengadaan Bordes Almunium dan Jasa Pemasangan uk. 4" x 8" 534 m 31.6 %

12 Penambahan Mesin + Evap Ruangan no.11 Frozen

- Compressor S6F 30.2 2 Unit 26.6 %

- Fan Coil 2 Unit 4.6 %


- Material Instalasi 2 Lot 1.9 %

3,404 100.0 %
PT.Alpine Cool Utama

PROGRESS PENCAPAIAN PROJECT

Nama Project : BP. AYUNG (CK17K-0245) Update :

Tgl Terbit SPK : 30 November 2017

Deadline : ………………………………………………………………….

Quantity Project Nilai Project Bobot %


Update Pencapaian
No Item Pengerjaan Hasil Bobot Kerja
Qtty Satuan Harga Satuan Sub Total Project

1 Panel Atap & Dinding tebal 100mm 138.00 m2 68.49 %

2 Panel Lantai tebal 100mm 40.00 m2 13.90 %

3 Manual Sliding Door uk. 1500x2000mm 1.00 Unit 17.62 %

179.00 100.00 %