Task

1 RAW MILL
1.1 Horomill eccentrics will be adjusted to a better balance.
Bucket elevator 228BE01 belt will be replaced and additionals buckets will be
1.3 added to increase capacity
1.6 Belt weighfeeder damaged pulley 226WF01 will be replaced
1.7 Bucket elevator 228 BE01 inlet chute will be improved
Homo silo compressed air modification to permit to install the steel structure
1.8 missing
2 PREHEATER TOWER
2.1
Reinstallation of the airblasters according to the observed builtups and as per
agreed position:
- 3 in the inlet of cyclone 5
- 2 in the inlet of the cyclone 4
- 1 in the splash box from Cyclone 4 to Precalciner
- 1 in the chute between C3 and C4
2 + 2 (repace 2 existing) additional airblasters as well as the required
accessories for all the 7 new position will be delivered
Delivery and installation of a new flap valve in the cyclone 3 chute between
2.2 cyclone 3 and cyclone 4.
2.3 Replacement of the flap of the cyclone 5 flap valve between the cyclone 5 and
the smoke box. Concrete will be installed in the back of the flap.
Bucket elevator 322 BE01 boot level and rotation sensors will be replaced if
2.4 necessary and put into service
2.5 Flap valve from TAD decanting box to smoke box : An access to this valve will be
installed
2.6 Flap valve from C3 to C5 : Installation of an access to this valve
2.9
Control of buckets torque on 322BE01 & 322 BE05

Finalizing activated carbon line connection


2.10
2.12
Bucket elevator 322 BE05 tensioning system guides will be review and corrected.
2.13 Inspection of the parts where high temperature in C5 has been observed and
correction if necessary
2.14
Inspection of the C4 flap 323 VV41
2.16
Install the washer in the meal pipe
2.17
Repair leak in different door

2.18
Change the provisional door C5
3 FIILTER

Repair valve 324DB21


3.3
4 KILN

Kiln thrust roller


4.1

Tyre 2 adjustment in order to have the proper displacement of the tyre.


4.2
4.7 Inspection fo the roller 4D and 1D to improve the operating conditions.
Outlet joint to be adjusted
4.8

Kiln supports water valves to be reversed


4.9

Verification and correction of the oil leakages in the girthgear casing


4.10

Replacement of one air hose on hydraulic piston at the inlet joint


4.11
4.12 Modification of the inlet & outlet piping for kiln rollers cooling
4.13 Check of the girth gear pinion contact
4.14 Connection of compressed air in the inspection sight glasses
4.16 323 FA01 cooling motor to be replace
4.17 Install a new cooling fan for kiln inlet joint.
4.18 Change the Wearing sector and the bush of the bearing ( 4D)
5 COOLER
Improve of the cyclones 328 CY01 and 328 CY02 discharge to 328 DG09 in
5.2 order to avoid blockages and have a proper tightness
Cooler TAD hood temporary inspection door will be replaced with a new plate.
5.4
5.11 Clinker outlet chute inspection and repair where necessary
To review motor system 329PA01
5.12

To repear leak in the door 1 and 2 cooler


5.14

Change the gauge at the burner


5.15
6 SOLID FUEL
Repair/modify of the solid fuel gates to permit a proper calibration on line for kiln
6.1 and precalciner
6.3 Rotary valve shaft 623RA01 inspected and replaced or repaired if necessary
Priority Punch-List Position Duration Supervisor

2 226 HR01 Francisco M.

1 228 BE01 Adalberto L.

2 226 WF01 Francisco M.


1 228 BE01 Adalberto L.

2 N/A Adalberto L.

323 CY51
Punch List 28
1 323 CY41 Luis C. + Mayela
Pt 54

1 323 VV31bis Luis C.

1 323 VV51 Luis C.

1 322 BE01 Adalberto L.

1 323 VV45 Luis C.

1 323 VV31bis Luis C.


322BE01
1 Adalberto L.
322 BE05
Punch-List 23
1 324 MO01 Luis C.
Pt. 72

1 322 BE05 Adalberto L.

2 323 CY51 Luis C.


1 323 VV41 Luis C.

Punch List 28
1 Pt 46, 182, 237
Luis C.

Punch List 28
1 Pt 58,203, 265,268, 318, Luis C.
319,417
Punch List 28
1 Pt 202, 315, 320
Luis C.

Punch-List 23
1 Pt. 57
324DB21 Luis C.

Punch-List 27
1 326 TH01 Francisco M.
Pt. 18
Punch-List 27
1 326 KP20 Francisco M.
Pt. 23, 25
1 4D & 1D Francisco M.
Punch-List 27
1 Francisco M.
Pt. 31
Punch-List 27
2 Antonio R.
Pt. 24
Punch-List 27
1 Francisco M.
Pt. 17
Punch-List 27
1 Antonio R.
Pt. 30
2 Antonio R.
1 Francisco M.
2 Francisco M.
2 323FA01MT10 Francisco M.
2 N/A Francisco M.
1 Francisco M.

328 CY01
1 Francisco M.
328 CY02

2 Francisco M.

1 Francisco M.
Punch-List 24
1 Francisco M.
Pt. 33
Punch-List 21
1 Luis C.
Pt. 22
Punch-List 21
1 Luis C.
Pt. 23
323 RA01
1 326 RA01
Francisco M.

1 623 RA01 Luis C.


Ressources

Helper (Meca)
Mechanical

Electrical
Welder
Comment

2 shifts

2 shifts

2 shifts

N/A
TBD

2 pipe fitters & 2 pipe helpers

1 pipe fitters

2 pipe fitters & 2 pipe helpers

TBD

N/A
Helper (Elec)

Refractorist

Crane

Titan