Document Review Record

Project Title: Khasab Primary DRR Title: SCADA IO LIST


Substation
Parsons Job No.: WPL10581 Origin: GLOBAL
In Transmittal No.: 19/2015-PM-TRE-0230 Date Received: 05/12/2016
DRR No 19/2015-PM-DRR-0230 Revision: 01

To: Sanjeevi Kumar


Date Returned:

These comments and/or approval by the Owners Representative in no way relieve the Contractor from his obligations to ensure conformance with the
requirements of the Contract. Any Contract deviations found subsequent to approval are to be corrected by the Contractor to the satisfaction of the
Owners Representative.

375218451.docB Page 1 of 2
Document Review Record

DOCUMENT NUMBER: REVISION CODE: DRAWING ISSUE DATE DOCUMENT TITLE: APPROVAL CODE:
1.0 19-2015-KPSS-E-1151-010- A
04 05/12/2016 11KV SCADA IO LIST
A4
ITEM/ RAEC/WPOE COMMENTS GCMS / DEC RESPONSE RAEC/WPOE RESOLUTION
PAGE Date: 11.12.2016 Date: Date:

1. No Comments

2.

3.

Enter the appropriate approval code from the list below against the reviewed document.

Code A Final. Document accepted. Do not re-submit except modified.


Code B Revise. Incorporate comments. Work may proceed.
Code C Review not Required.
Rejected. Incorporate comments and re-issue for review. Work
Code D
may NOT proceed.

Document reviewed and comments noted above.

Project Engineer

375218451.docB Page 2 of 2