Material Submittal Summary and Forecast

Balance Material Submittals From H.O


SEF Material ON OR ON OR ON OR ON OR ON OR
Balance
Trade Total SEF Submitte submittal BEFORE BEFORE BEFORE BEFORE BEFORE
SEF Total
d Received 11.04.201 13.04.201 20.04.201 27.04.202 04.05.201
7 8 9 0 7
HVAC 46 40 6 20 6 6 4 4 6 26
Electrical 34 33 1 16 10 - 4 4 - 18
Plumbing 27 26 1 11 - 3 2 4 7 16
Fire Fighting 12 12 0 7 - 2 3 - - 5
Total 120 112 8 54 16 11 13 12 13 66

PLUMBING FIRE FIGHTING


Submittal from Submittal from
S.No. Description of Materials Head Office S.No. Description of Materials Head Office
(Forecast Date) (Forecast Date)
1 PIPE CLAMPS 13-Apr 1 SPRINKLER SYSTEM & FIRE FIGHTING VALVES
13-Apr
2 WATER SUPPLY PIPES & FITTINGS 13-Apr 2 CLEAN AGENT FIRE SUPRESSION SYSTEM 13-Apr
3 HOT WATER PIPE (COPPER) 13-Apr 3 PRESSURE REDUCING VALVE STATION 20-Apr
4 NATURAL GAS 20-Apr 4 FOAM SYSTEM FOR THE GENERATOR ROOM 20-Apr
5 PLUMBING VALVES 20-Apr 5 PRE-ACTION SYSTEM FOR LIFT MACHINE ROOM
20-Apr
6 WATER HAMMER ARRESTOR 27-Apr
7 MANHOLE COVER & FRAMES/CHANNEL GRATING
27-Apr
8 CATCH BASIN 27-Apr
9 GRAY WATER RECYCLING SYSTEM 27-Apr
10 CONDENSATE DRAIN PIPE INSULATION 4-May
11 GULLY TRAP 4-May
12 SAND TRAP 4-May
13 MOTORIZED VALVE 4-May
14 UPVC H/L (DRAINAGE, VENT, RAIN WATER)
4-May
PIPES & FTGS
15 IDENTIFICATION LABLES 4-May
16 WATER SUPPLY PIPES INSULATION 4-May
HVAC ELECTRICAL
Submittal
from Head Submittal from
S.No. Description of Materials Office S.No. Description of Materials Head Office
(Forecast (Forecast Date)
Date)
1 CHILLED WATER VALVES 11-Apr 1 CABLE TRAYS , TRUNKING & ACCESSORIES 11-Apr
2 GENERAL EXHAUST FANS 11-Apr 2 BUS BAR AND ACCESSORIES 11-Apr
3 PRESSURIZATION FANS 11-Apr 3 GENERATOR 11-Apr
4 SMOKE EXHAUST FANS 11-Apr 4 LIGHTING CONTROL SYSTEM 11-Apr
5 PARKING VENTILATION VARIABLE SPEED FANS
11-Apr 5 CCTV SYSTEM 11-Apr
6 AUTOMATIC AIR VENT 11-Apr 6 VIDEO INTERCOME 11-Apr
7 VRF UNIT 13-Apr 7 SECURITY INTERCOME 11-Apr
8 WATER COOLED CENTRIFUGAL CHILLER 13-Apr 8 GATE BARRIER SYSTEM 11-Apr
9 PRESSURIZATION UNIT 13-Apr 9 ACCESS CONTROL SYSTEM 11-Apr
10 DX-SPLIT UNIT 13-Apr 10 PUBLIC ADDRESS SYSTEM 11-Apr
11 FLEXIBLE PIPE CONNECTION 13-Apr 11 ATS PANEL 20-Apr
12 BTU METER 13-Apr 12 AIR CRAFT WARNING LIGHT SYSTEM 20-Apr
13 COOLING TOWER 20-Apr 13 HVAC STARTER PANELS, MCC 20-Apr
14 MOTORIZED SMOKE FIRE DAMPER 20-Apr 14 L.V PANELS,SMDB,DB,CAPACITOR BANKS 20-Apr
15 GRILLES, DIFFUSERS & LOUVERS 20-Apr 15 WIRING ACCESSORIES 27-Apr
16 BASIN SWEEPING SYSTEM 20-Apr 16 IDENTIFICATION LABELS 27-Apr
17 BMS SYSTEM 27-Apr 17 HEAT RESISTANCE CABLE 27-Apr
18 SOUND ATTENUTORS 27-Apr 18 FLOOR BOXES 27-Apr
19 ECOLOGY UNITS 27-Apr
20 CHILLED WATER TREATEMENT / CHEMICAL27-Apr
DOSING SYSTEM
21 ALUMINIUM CLADDING 4-May
22 VIBRATION ISOLATORS (FOR AC EQUIPMENT)
4-May
23 INERTIA BASE 4-May
24 FIRE STOP MATERIAL 4-May
25 REFRIGRANT PIPING 4-May
26 IDENTIFICATION LABELS 4-May