LIGHTING SYSTEM INSPECTION


CHECKLIST
Date ___________
State Project # _________________

Control System ____________

1. Line Voltage: φΑ -G ________ φΒ -G ________ φΑ - φΒ _______

2. Control System ID_____________

3. Conductors Numbered__________

4. Main CB Rating_______________

5. Feeder CB Rating______________

6. Control CB Rating______________

7. Selector Switch Label and Operation____________

8. Damaged Galvanizing____________________

9. Grounding Electrode Conductor______________

10. Main Bonding Jumper_________________

11. Photocontrol Operation________________________

12. Clean Enclosure_______________

13. Certificate of Inspection________________

14. Meg Circuits: #1 φΑ -G ________ #2 φΑ -G ________ #3 φΑ -G ________


φΒ -G ________ φΒ -G ________ φΒ -G ________
φΑ - φΒ _______ φΑ - φΒ _______ φΑ - φΒ _______

#4 φΑ -G ________ #5 φΑ -G ________ #6 φΑ -G ________


https://webcache.googleusercontent.com/search?q=cache:E4K1QiF-RAAJ:https://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrative… 1/3
12/27/2017 LIGHTING SYSTEM INSPECTION CHECKLIST
φΒ -G ________ φΒ -G ________ φΒ -G ________
φΑ - φΒ _______ φΑ - φΒ _______ φΑ - φΒ _______

15. Amperage: #1 φΑ ____ φΒ ____ #2 φΑ ____ φΒ ____ #3 φΑ ____ φΒ ____

#4 φΑ ____ φΒ ____ #5 φΑ ____ φΒ ____ #6 φΑ ____ φΒ ____

16. Verify Wire Size_________________

17. Verify Lights on Correct Circuits_______________________

18. Print Pocket with As-Built Plans in Panel_______________________

Page 2

State Project #__________________ Control System _________________


Page 2 of 2

LIGHT STANDARDS
1. Proper ID’s_________________

2. Breakaway Fuseholders, Proper Line/Load Connections____________________

3. Foundation Elevations_______________________

4. Breakaway Bases___________________________

5. Conductor ID’s in Base______________________

HIGH MOUNT STANDARDS


1. Verify ID’s___________________________

2. Portable Drive and case Turned Over to Traffic Services_____________

3. Operation of Lowering Device: HM1___HM2___HM3___HM4___HM5___HM6___

4. Connection at Carrier Ring: HM1___HM2___HM3___HM4___HM5___HM6___

5. Door Secure and Not Removable_____________________

6. Wire Mesh at Base_______________________

7. Lay of Cable on Winch_______________________

8. Luminaires Level and Secure_______________________

9. Grounding________________

10. Verify Rating of CB________________

https://webcache.googleusercontent.com/search?q=cache:E4K1QiF-RAAJ:https://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrative… 2/3
12/27/2017 LIGHTING SYSTEM INSPECTION CHECKLIST
11. Date Code on Lamps________________
JUNCTION BOXES
1. Verify Cleanness____________________

2. Verify Conductor ID’s___________________

3. Verify Location, Elevation and Cover Secure_______________

4. Ground Rod Connections_________________

5. Insulation of Joints and Splices______________

6. Sealing of Conduits_______________________

GENERAL: Two-week Burn-in Test From: ____________ To: ____________