TR of ZSS
Scope matrix finalization for E&I of HWT
Technical offer evaluation for belt watch panel
TS of LT drive
rescheduled
Cable routing for Ore & Flux ckt is completed and after that same will be
shown in conveyor drwg
Technical discussion and scope matrix with L&T for stacker done.
Metal detector offer evaluation will be done in next week by 21/12/2018
S.No Area Sub area Team Member Related to
1 RMHS BED Manoj TSK
2 RMHS Misc Manoj TSK
3 RMHS Misc Manoj TSK
4 RMHS Misc Manoj TSK
5 RMHS Calc Debabrata TSK
6 RMHS TS Debabrata TSK
7 RMHS Mech GA Debabrata TSK
8 RMHS Scope Matrix Yogesh TSK
9 RMHS GA Drawings Yogesh TSK
10 RMHS GA Drawings Yogesh TSK
11 RMHS Assignment Drawings Yogesh TSK
12 RMHS Datasheet Yogesh TSK
13 RMHS Technical Evaluation Yogesh TSK
14 RMHS TS Vikash Kumar TSK
15 RMHS TS Vikash Kumar TSK
16 RMHS Drawing Vikash Kumar TSK
17 RMHS TR Vikash Kumar TSK
18 RMHS Layout RAJA TSK
19 RMHS Layout/ Profile RAJA TSK
20 RMHS Mech GA RAJA TSK
21 RMHS Report RAJA TSK
22 RMHS Technical Specification DJ TSK
23 RMHS Technical specification DJ TSK
24 RMHS Technical offer DJ TSK
25 RMHS Technical specification Shashikant TSK
26 RMHS Technical specification Shashikant/Sahendra TSK
27 RMHS Drawing Review DJ/Shashikant/Sahendra TSK
28 RMHS Technical specification Sahendra TSK
29 RMHS Technical specification Shashikant/Sahendra TSK
30 RMHS BOQ Supriya TSJ
31 RMHS Drawing Supriya Joda MHS-RLS
32 RMHS Report Supriya TSMC
33 RMHS TS R.V. Singh TSK
34 RMHS TS R.V. Singh TSK
35 RMHS Misc R.V. Singh KIM
36 RMHS Misc R.V. Singh Noumundi
37 RMHS Misc R.V. Singh Others
38 RMHS Misc R.V. Singh Others
39 RMHS TS Saumen TSJ
40 RMHS SPEC. Saumen TSJ
41 RMHS Layout Saumen TSJ
42 RMHS SPEC. Saumen TSJ
43 RMHS Pellet Plant Kundan TSJ-Pellet
44 RMHS Pellet Plant Kundan TSJ-Pellet
45 RMHS Pellet Plant Kundan TSJ-Pellet
46 RMHS RMGP-TSJ Kundan TSJ
Weekly Plan
Per
Activities
Discussion with TKII regarding vibrating screens and Hammer Mill
Finalisation of trestle position of CC-2A,3A, CO-27 , 28 and CC-27
Preparation of TS of Brakes
Preparation of TS of Motor
Calculation for Brakes.
Preparation of TS of Brakes
Review of Mech GA drawings
Preparation of Scope matrix for D&E offer of TKIL
Preparation Mech GA and datasheet for SLC-1 Conveyor
Preparation Mech GA and datasheet for SRC-1 Conveyor
Marking of trestles for CC-27 conveyor after review from structural & layout team R1 Copy
Revision of datasheet for Reversible shuttle conveyor to sent to vendors
Scrutiny of Technical offer of D&E by TKIL
Technical discussion with TKII regarding stacker reclaimer
Technical discussion with FLS regarding Stacke reclaimer
Revision of CO-27 GA drwaing
TR preparation of weigh feeder
Review of Layout for Proposed Revert Mix Granualation Plant & Mill Scale Briquetting Plant
Preparation of Layout for Hybrid Wagon Tippler as per finalized option and sent to Layout for approval.
Incorporation of Observations in Mech GA of Conv. RF-1A
Preparation of weekly MIS - VP(E&P) for IL-2 Communication meeting.
TR Bin weighing
TR Hooter
Technical offer evaluation for belt watch panel
Preparation of BOQ for lighting system for SMS and send for RFQ
Preparation of Typical drawing for lighting system for RMHS and BOQ
TS preparation and send for RFQ for lighting system(SLDB cum LT trafo ,MCBDB,POWER RECEPTACLE)
TS preparation and send for RFQ for Vibration monitoring system
LT and HT feeder load list and its cable route finalisation
Preparation of BOQ on SP-5 location for Option-1
Comment on submitted drawings by vendor
Study of documents received for TSMC
Technical evaluation of Metal Detector , Internal & external scraper
Technical Specification of suspended magnet
Study,review and checking of MHS mechanical drawing of KIM.
Noumundi project layout study and profile study.
Study of conveyor calculation
Study of RLS
Review & release of final TS for SP1 & SP2 connectivity project
Preparation of mechanical BOQ for alternate coke supply to G-BF project
Survey Requirement drawings preparation for LD slag WLS
Preparation of mechanical BOQ for SP1 & SP2 connectivity project
Checking of design capacitied for the pellet conveyor OC-4 and PC-5 as per requirement for 7MTPA pellet plant capacities
Basic layout study for drive base frame preparation for pellet plant augumenated conveyor as per assignment#1
Study and validation of Material handling concern raised by O &M team for pellet plant, total 24 Nos. of material handling
Drawing study of RMGP plant, review of BE document of RMGP plant
Start Date Finish Date Compliance
12/6/2017 12/6/2017 Completed
12/4/2017 12/7/2017 WIP
12/7/2017 12/8/2017 WIP
12/5/2017 12/12/2017 WIP
12/4/2017 12/7/2017 Completed
12/6/2017 12/7/2017 Completed
12/7/2017 12/8/2017 Completed
11/29/2017 12/4/2017 Completed
12/4/2017 12/7/2017 Completed
12/5/2017 12/8/2017 Completed
11/27/2017 12/7/2017 Not Completed
12/5/2017 12/6/2017 Completed
12/6/2017 12/7/2017 Completed
12/4/2017 12/5/2017 Completed
12/8/2017 12/8/2017 Completed
12/4/2017 12/4/2017 Completed
12/4/2017 12/8/2017 Completed
12/4/2017 12/4/2017 Completed
12/5/2017 12/7/2017 Completed
12/7/2017 12/7/2017 Completed
12/8/2017 12/8/2017 Completed
12/4/2017 12/8/2017 completed
12/4/2017 12/8/2017 completed
12/4/2017 12/8/2017 WIP
12/4/2017 12/8/2017 completed
12/4/2017 12/8/2017 completed
12/4/2017 12/8/2017 completed
12/4/2017 12/8/2017 Under Review
12/4/2017 12/8/2017 WIP
12/4/2017 12/6/2017 Completed
12/7/2017 12/7/2017 Completed
12/8/2017 12/8/2017 Completed
Started 12/10/2017 In progress
Started 12/8/2017 In progress
Started On going In progress
Started 12/8/2017 In progress
12/4/2017 12/8/2017 In progress
12/4/2017 12/8/2017 In progress
12/4/2017 12/4/2017 Completed
12/4/2017 12/5/2017 Completed
12/6/2017 12/7/2017 Completed
12/8/2017 12/8/2017 WIP
12/4/2017 12/6/2017 Completed
12/4/2017 12/8/2017 In progress
12/4/2017 12/6/2017 WIP
12/4/2017 12/8/2017 Completed
Remarks
Shakti on CB
Calculation in progress
TR Bin weighing
TR Hooter
Technical Offer evaluation of Weigh feeder
TS for Lighting of RMHS O&F circuit & SMS
TS for 6.6 kV HV MCC Extension
Review of MCC and PCC load list based on latest PFD
Technical Offer evaluation of ZSS
TS for LT MCCExtension
TS for 415 V PCC Extension
Technical evaluation of Metal Detector , Internal & external scraper
Technical Specification of suspended magnet
Study,review and checking of MHS mechanical drawing of KIM.
Crushing & washing plant : Comment on GA & Load data drg for Transfer House & Conveyors as per submission
Comment on submitted drawings by vendor
Conveyor profile for Dry BF slag transportation
Checking of design capacitied for the pellet conveyor HL01GL62, HL01GL63, HL01GL64, HL01GL65 as per requirement for 7MTP
Layout working on it
technical discussion done with vendor and TR will be sent in next week
completed
completed
completed
completed
completed
completed
Study and checking as per revised requirment received from pellet plant
on dated 23.11.2017
S.No Area Sub area Team Member Related to
1 RMHS BED Manoj TSK
2 RMHS Mech GA Manoj TSK
3 RMHS Misc Manoj TSK
4 RMHS Misc Manoj TSK
5 RMHS Misc Manoj TSK
6 RMHS Schedule RAJA TSK
7 RMHS T.O.P RAJA TSK
8 RMHS Mech GA RAJA TSK
9 RMHS Mech GA RAJA TSK
10 RMHS Mech GA RAJA TSK
11 RMHS Report RAJA TSK
12 RMHS Report Debabrata TSK
13 RMHS Review Debabrata TSK
14 RMHS TS Debabrata TSK
15 RMHS TS Vikash Kumar TSK
16 RMHS TS Vikash Kumar TSK
17 RMHS P&ID Vikash Kumar TSK
18 RMHS TS Vikash Kumar TSK
19 RMHS SR Yogesh TSK
20 RMHS GA Drawings Yogesh TSK
21 RMHS TOP Yogesh TSK
22 RMHS GA Drawings Yogesh TSK
23 RMHS Datasheet Yogesh TSK
24 RMHS Technical Specs Yogesh TSK
25 RMHS MDL Sameer TSK
26 RMHS MDL Sameer TSK
27 RMHS MDL Sameer TSK
Technical
28 RMHS Shashikant/Sahendra TSK
Specification
Technical
29 RMHS DJ TSK
specification
30 RMHS Technical offer DJ TSK
Technical
31 RMHS Shashikant TSK
specification
Technical
32 RMHS Shashikant/Sahendra TSK
specification
33 RMHS Drawing Review DJ/Shashikant/Sahendra
34
RMHS Technical Offer DJ TSK
Technical
35 Shashikant/Sahendra
RMHS specification TSK
36 RMHS Layout Saumen TSJ
43 RMHS TS RV TSK
44 RMHS Misc RV Others
TS of Sampler
Conveyor Power & Tension calculation for SP1 & SP2 connectivity project
Preparation of Basic mechanical drawings with load data for estimation of civil & structural BOQ for SP1 & SP2 connectivity
Crushing & washing plant : Comment on GA & Load data drg for Transfer House & Conveyors as per submission
Comment on submitted drawings for Belt feeder, Skirt sealing by vendor
Checking of Technical offer from vendor
Checking of design capacitied for the pellet conveyor HL01GL62, HL01GL63, HL01GL64, HL01GL65 as per requirement for 7
plant capacities
Rationalization of pulley shaft dia for pellet conveyor as per assigment#1 augumentation requirement
Preparation of pulley schedule as per revised standard for pellet plant conveyor augmentation assignment#1
Start Date Finish Date Compliance
11/24/2017 11/24/2017 Completed
11/20/2017 11/22/2017 WIP
11/21/2017 11/23/2017 Completed
11/22/2017 11/24/2017 WIP
11/22/2017 11/23/2017 Completed
11/20/2017 11/20/2017 Completed
11/20/2017 11/20/2017 Completed
11/20/2017 11/21/2017 Completed
11/22/2017 11/23/2017 Completed
11/20/2017 11/23/2017 WIP
11/24/2017 11/24/2017 Completed
11/21/2017 11/23/2017 WIP
11/20/2017 11/22/2017 Not Started
11/22/2017 11/24/2017 Completed
11/20/2017 11/21/2017 Completed
11/23/2017 11/24/2017 Completed
11/21/2017 11/22/2017 Completed
11/23/2017 11/24/2017 Completed
10/31/2017 11/21/2017 Completed
11/21/2017 11/23/2017 Not Completed
11/23/2017 11/24/2017 In progress
11/20/2017 11/22/2017 Completed
11/15/2017 11/23/2017 Completed
11/15/2017 11/22/2017 Completed
11/20/2017 11/21/2017 completed
11/22/2017 11/23/2017 completed
11/24/2017 11/24/2017 under progress
11/20/2017 11/24/2017 Completed
Due to absence
Depends on Drg Availability
Study and checking as per revised requirment received from pellet plant on
dated 23.11.2017
S.No Area Sub area Team Member Related to
1 RMHS BED Manoj TSK
2 RMHS Discussion Manoj TSK
3 RMHS Mech GA Manoj TSK
4 RMHS TS Manoj TSK
5 RMHS Mech GA RAJA TSK
9 RMHS Report Debabrata TSK
10 RMHS Review Debabrata TSK
11 RMHS TS Debabrata TSK
12 RMHS TS Vikash Kumar TSK
13 RMHS TS Vikash Kumar TSK
14 RMHS TS Vikash Kumar TSK
15 RMHS SR Yogesh TSK
38 RMHS TS RV TSK
Preparation of final conveyor profile drawings as per site survey for Battery connectivity project
Reply of DEC resolution on our comments for SP1&SP2 connectivity project
Conveyor calculation for Battery for connectivity project
Load data calculation for civil assignment drg. for Battery for connectivity project
Crushing & washing plant : Comment on GA & Load data drg for Transfer House & Conveyors as per submission
Study,review and checking of C&W plant with water utility system of KIM
Discussion, role responsibility , calculation and way forward for Noumundi projects.
Calculation regarding Bucket elevator, conveyor augumentation calculation at kolkata office
Component list preparation for pellet plant augumentation assignment part-2
Review, finalization and release of component list for TSJ pellet plant assignment no-2
Knowledge sharing bulket elevetor, conveyor component selection Layout
Start Date Finish Date Compliance
11/17/2017 11/17/2017 Completed
11/16/2017 11/17/2017 Completed
11/13/2017 11/17/2017 Completed
11/13/2017 11/15/2017 WIP
11/13/2017 11/17/2017
11/13/2017 11/15/2017 Completed
11/15/2017 11/16/2017 WIP
11/17/2017 11/17/2017 Completed
11/13/2017 11/17/2017 Completed
11/13/2017 11/17/2017 Completed
11/13/2017 11/17/2017 WIP
10/31/2017 11/16/2017 In Progress
11/17/2017
11/13/2017 Completed
11/14/2017 11/16/2017 Completed
11/13/2017 11/17/2017 Completed
11/13/2017 11/17/2017 In Progress
11/14/2017 11/15/2017 Completed
11/14/2017 11/14/2017 Completed
Started On going
11/15/2017 11/17/2017 Completed
11/15/2017 11/17/2017 Completed
11/13/2017 11/14/2017 Completed
11/15/2017 11/17/2017 Completed
11/15/2017 11/17/2017 Completed
Remarks
R1-24-11-2017
R1-22-11-17
Final Commercial offer awaited from party.
Datasheet sent to Debabrata for further
evaluation
Review in progress
Review in progress
Review of final data from site survey for Coke battery connectivity project
Preparation of layout drawings Coke battery connectivity project
FLET leadership training
Visit to JSR for meeting with construction & erection team for Coke battery connectivity project
Comment on GA & Load data drg for Belt Feeder, Gear Box, Input coupling & Rod Gate
Conveyor profile feasibilty study for LG beneficiation
Training at TMDC - Effective Leadership Program
Meeting with Metso for Hybrid wagon tippler
Preparation of Control Philoshiphy of Coal Circuit
Technical evaluation of Travelling tripper and Metal Detector
Study,review and checking of C&W plant with water utility system of KIM
Pellet Plant Upgradation : Preparation of list of component modifications for RSC HA01GL22, RSC HA01GL22, and Shuttle c
JH01GL02
Training - Felt Leadership @ TSJ
Start Date Finish Date Compliance
11/6/2017 11/7/2017 Completed
11/7/2017 11/7/2017 Rescheduled
11/8/2017 11/10/2017 Completed
11/6/2017 11/10/2017
WIP
11/6/2017 11/6/2017 Completed
11/7/2017 11/7/2017 Completed
11/8/2017 11/9/2017 Completed
11/10/2017 11/10/2017 Completed
11/6/2017 11/10/2017 Complied
11/6/2017 11/10/2017 Complied
11/8/2017 11/8/2017 Complied
11/9/2017 11/9/2017 Complied
In Progress 11/7/2017 WIP
Started 11/7/2017 WIP
Started WIP
Approved
Completed by evening
First round discussion completed with Schenk
Commercial terms are yet to be agreed upon by both parties
SLC-1C,CC-27 Trestle marking Inputs provided Completed: CK-9/10,CC-5
23 RMHS SR Yogesh
24 RMHS SR Yogesh
25 RMHS Technical Study Yogesh
38 RMHS TS Saumen
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
Others
Others
Others
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSJ
TSJ
TSJ
Khondbond - Crushing & washing
plant
Joda & Noamundi
TSJ
Weekly Plan - RMHS Phase-2 Engg
Period: 30th Oct to 3rd Nov 2017
Activities
Updating MDL & Dashboard
Updating Integrated Schedule of RMHS with RMHS Phasing Priorities & preparation of revised BOQ
All existing elevators new sheeting work decission to be taken by discussing with respective
departments
Hybrid wagon trippler lay out finalization by the help of layout department
TS review for conveyor system & vibrating feeder for SP1 & SP2 connectivity
Comment on GA & Load data drg for Transfer House & Conveyors as per submission
12 RMHS TS Manoj
13 RMHS Misc Manoj
14 RMHS Misc Manoj
15 RMHS Misc Manoj
16 RMHS TS RV
17 RMHS TS RV
18 RMHS Misc RV
19 RMHS Misc RV
20 RMHS Misc RV
21 RMHS Misc RV
32 RMHS TS Shashi
33 RMHS TS shashi/sahendra
34 RMHS Leave sahendra
35 RMHS Technical discussion Shashikant/DJ
36 RMHS TS Saumen
37 RMHS Layout Saumen
38 RMHS TS Saumen
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
RM
RM
RM
TSL
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSJ
TSJ
TSJ
TSJ
Noamundi
TSJ
Weekly Plan - RMHS Phase-2 Engg
Period: 23rd Oct to 27th Oct 2017
Activities
Updating MDL & Dashboard
Resolution of problems in RMHS System which araised out of revised Material Balance
Arranging for revised drawings of FOB (Replacement of Wiremesh with steel plate)
Discussion with TRF and sharing inputs for starting preparation of GA drawings
Preparation of weekly PPT for GM review.
Resolution of problems in RMHS System which araised out of revised Material Balance
Resolution of high occupancy problems in O&F Circuit which araised out of revised Material Balance
Discussion with Mcnally Sayaji for Final scope sign up for 3rd Rod mill
Discussion with Thyssenkrupp for Final scope sign up for 2nd Barrell reclaimer
Discussion with Tenova Tekraf for Final scope sign up for 2nd Barrell reclaimer
Questionaries to the vendors regarding conveyor belt
Questionaries to the vendors regarding IDLER
Finalization of Layout for Hybrid Tippler & Conveyor Connectivity
Release of TS for RFQ for Hoists
SPECIFICATION FOR SWITCHES ( CJS)
BOQ FINALIZATION & SIGN OFF ON TS, GS & SCOPE MATRIX OF MSEL OFFER OF RM
OFFER EVALUATION OF BAG FILTER DE SYSTEM OF PC ENGG
On Leave
Start Date Finish Date Compliance
10/23/2017 10/23/2017 Completed
10/23/2017 10/27/2019
Remarks
Unplanned leave
Offer still yet to receive
In Progress
Depends on Drg Availability
Unplanned leave
Unplanned leave
Mcnally defered date of visit for finl sign off to
30/10/2017
20 RMHS TS RV TSK
Resolution of problems in RMHS System which shall araise out of revised Material Balance
Basic Engineering Calculations for Conveyors CC-1A, CC-2A, CC-3A, CC-4A, CC-5A
Festival Holiday
GA drawing preparation of CO-30,FX-1 and OF-1
Leave
8 RMHS TS Debabrata
9 RMHS TS Debabrata
17 RMHS TS RAJA
20 RMHS TS RV
21 RMHS TS RV
22 RMHS TS RV
23 RMHS Misc RV
24 RMHS TS RV
25 RMHS-KIM KIM RV
33 RMHS TS Sahendra
34 RMHS TS Shashikant
35 RMHS TS DJ
38 Saumen
10/11/2017 Completed
10/12/2017 Completed
10/11/2017 WIP Review of calculation under progress. Calculation tool has been updated fo
10/13/2017 Not started This job will start after finalisation of SP-5 location.
10/10/2017 Completed
10/13/2017 Completed
10/12/2017 Completed
10/12/2017 Completed
10/11/2017 info
10/10/2017 Completed
10/11/2017 Completed
10/12/2017 Completed
10/9/2017 Completed
10/10/2017 Completed
10/11/2017 Completed
10/13/2017 Completed
10/11/2017 Completed Comments send to NHI & Tenova Tekraf , Still Offer yet to receive
10/10/2017 In Progress
10/18/2017 In Progress
10/12/2017 Completed
10/12/2017 Completed
10/11/2017 Completed
10/10/2017 Completed
10/13/2017 Inprogress Will be completed by 18-oct.worked on layout and profile of CC-1A ,CC-2A,3
10/13/2017 Completed
10/13/2017 Completed
10/13/2017 Completed
10/13/2017 Completed
10/13/2017 In progress
10/13/2017
10/10/2017 Completed
10/13/2017 Completed
ation tool has been updated for including flat belt conv calculation. Review of calculation will be continued to next week.
ll Offer yet to receive
ut and profile of CC-1A ,CC-2A,3A and 4A conveyor.
d to next week.
S.No Area Sub area Team Member
3 RMHS TS Saumen
6 RMHS TS Debabrata
14 RMHS TS RAJA
15 RMHS TS RAJA
17 RMHS TS RV
18 RMHS TS RV
19 RMHS TS RV
20 RMHS TS RV
21 RMHS Misc RV
22 RMHS MDL Sameer
25 RMHS TS Manoj
26 RMHS TS Manoj
31 RMHS TS Sahendra
32 RMHS TS Shashikant
33 RMHS BED DJ
34 RMHS TS DJ
35 RMHS TS Shashikant
36 RMHS TSJ 14MTPA Expansion Supriya
TSJ Conveyor Profiles checking for SP1 & SP2 connectivity 10/3/2017
TSJ TS review for equipment package for SP1 & SP2 connectivity 10/4/2017
TSK Preparation of technical datasheet for cemtec rod mill offer 10/3/2017
TSK BED preparation for Fuel Ciruit and Return fines circuit In progress
10/6/2017 Completed
10/4/2017 completed
10/6/2017 completed
10/5/2017 Completed
10/4/2017 Completed
From mechanical side its completed
10/3/2017 Completed ,electrical comments to be
incorporated
CO-27 conveyor GA drawing
10/4/2017 Inprogress underprogress will be completed by 7-
oct
10/5/2017 Completed
10/5/2017 Completed
10/6/2017 Completed
10/6/2017 Completed
10/6/2017 Completed
10/6/2017 Completed
10/10/2017 In Progress
10/6/2017 Completed 3 More offers awaited
10/6/2017 Completed
10/6/2017 Completed
10/4/2017 Completed
10/6/2017 WIP
10/6/2017 Completed
10/6/2017 Completed
10/4/2017 Completed
10/5/2017 Completed
28 TS RAJA TSK
31 RMHS TS RV TSK
Modification in PFD of coke circuit DE system, concept note & BED 9/25/2017
Leave 9/25/2017
BED preparation for Fuel Ciruit and Return fines circuit 9/25/2017
Preparation of schedule of Openings for Rod and Rack & pinion gates 9/26/2017
Leave 9/29/2017
Finish Date Compliance Remarks
9/29/2017 completed
9/29/2017 completed
9/29/2017 completed
9/29/2017 completed
9/29/2017 completed
9/29/2017 completed
9/29/2017 Completed
9/28/2017 Completed
9/29/2017 Completed
9/25/2017 Completed
9/27/2017 Completed
9/29/2017 Completed
9/29/2017 Completed
9/29/2017
9/26/2017
9/29/2017
9/29/2017 Completed
9/29/2017 Completed
9/26/2017 Completed
9/25/2017 Completed
9/26/2017 WIP (60% Completed) Hold Down Pulley & Deflector Pulley Calculation delayed.
9/28/2017 Completed
9/29/2017 Completed
9/27/2017 Complete
9/27/2017 Complete
10/10/2017 In Progress
9/29/2017 Complete
10/27/2017 Completed
9/26/2017 Completed
9/29/2017
Weekly Plan
Perio
S.No Area Sub area Team Member Related to
1 RMHS TR Shashikant/DJ/Sahendra TSK
DE
17 DE System ANKUR TSK
SYSTEM
24 RMHS Supriya
36 RMHS TS RV TSK
DE
48 DE System ANKUR TSK
SYSTEM
Pulley Shaft dia calculation for Coke, Sinter, Return 9/19/2017 9/21/2017
fines, Slag circuit as per revised parameter.
WIP
Enganged in other work for cable route
survey of Fire detection building &
WIP drawing generation for the same and
preparation of TR for Barrel reclaimer
WIP Leave
Completed
Completed
WIP ON CB
WIP
ON CB
Completed
Completed
Completed
Completed
WIP
4 out of 7 PFDs prepared
Prepared survey requirement drawings
Deffered due to other for B-10/11 & B-5/6/7 connectivity
assignment as per superior project and SP-1 & SP-2 connectivity
advice project
Completed
Layout prepared based on site
visit
Completed
Completed
WIP
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
WIP
Offer yet to be received from
WIP Schade,FLS & METSO
WIP
Completed
completed
Weekly Plan Compliance - RMHS Pha
Period: 11th Sept to 15t
S.No Area Sub area Team Member Related to
1 RMHS TS Datasheet Yogesh TSK
2 RMHS TS Datasheet Yogesh TSK
Technical
3 RMHS Yogesh TSK
Evaluation
Vendor
4 RMHS Yogesh TSK
discussion
Technical
5 RMHS Yogesh TSK
Evaluation
7 RMHS TS RV TSK
8 RMHS Misc RV TSK
9 RMHS Misc RV TSK
Basic
24 RMHS engineering Vikash Kumar TSK
Stockyard
25 RMHS equipment Vikash Kumar TSK
Stockyard
26 RMHS equipment Vikash Kumar TSK
Shashikant/DJ/Sa
30 RMHS TR TSK
hendra
31 RMHS TS Sahendra TSK
Shashikant/DJ/Sa
35 RMHS Tech Offer TSK
hendra
36 RMHS BED DJ TSK
Site discussion on technical offer with TKIL for Barrel reclaimer 13 September 2017 14 September 2017
Site discussion with M/s SMB for D&E for stockyard 11 September 2017 12 September 2017
equipments
Study& Preparation of technical parameters sheet for Tenova 15 September 2017 19 September 2017
Takraf Barrel reclaimer offer
Preparation of Operation Philosophy of ORE & FLUX Circuit. Started 15 September 2017
RMHS Concept note for Dry slag loading 11 September 2017 13 September 2017
Preparation of sketch for pellet plant upgradation Project. 14 September 2017 15 September 2017
Trajectory calculation for chutes of return fines circuit 11 September 2017 15 September 2017
Pulley Shaft dia calculation with revised DBR 11 September 2017 15 September 2017
Pulley frame design and Chute profile design checking 11 September 2017 15 September 2017
Preparation of Floor plan of PJ-2 ,JH-6 junction house of O & F 9/11/2017 9/13/2017
circuit
Checking and comments on TKII technical offer 9/11/2017 9/15/2017
Technical offer evaluation of FRM-3 from TENOVA 11 September 2017 15 September 2017
Technical offer evaluation of Stacker from Flsmidth 11 September 2017 15 September 2017
Completed
Not completed
In progress
Under Progress
Completed
Under Progress
Completed
Completed
Completed
Complete
WIP
Draft completed
Calculation Completed,
Projectile to be drawn in Acad
by Draftsman.
Completed
Completed for Ore and Flux
Circuit
Design Philosophy discussed
at Kolkata. To be prepared
along with GA.
Not received for checking
Completed
Completed
Completed
Will be
completed
Inprogress completed by
20-sep
completed
Sent to Kolkata
team for
Completed comments/approv
al
Completion Date:
WIP 22/09/2017
WIP
WIP
Completed
WIP
Complete
Complete
Pulley calculation
WIP under process.
Pulley calculation
WIP under process.
WIP
S.No Area Sub area Team Member Related to
1 RMHS TS Datasheet Yogesh TSK
2 RMHS TS Datasheet Yogesh TSK
3 RMHS TS Yogesh TSK
Technical
4 RMHS Yogesh TSK
Evaluation
Technical
5 RMHS Yogesh TSK
Evaluation
6 RMHS PID RV TSK
7 RMHS TS RV TSK
8 RMHS Misc RV TSK
9 RMHS Misc RV TSK
10 RMHS TS Manoj TSK
11 RMHS BED Manoj TSK
12 RMHS TS Manoj TSK
Detail
28 RMHS Vikash Kumar TSK
engineering
31 RMHS Soumen
32 RMHS Raja Sirigineni
33 Utility Himanshu TSK
34 Utility Himanshu TSK
35 RMHS TR Sahendra TSK
36 RMHS TS Sahendra TSK
Evaluation of technical data sheet for NHI china Barrel offer 04 September 2017
Preparation of shutdown category list for Phase-2 expansion of RMHS 05 September 2017
Site visit & review proposed conveyor route & new wagon loading station 07 September 2017
Preparation of Floor plan of PJ-1 junction house of O & F circuit 04 September 2017
Revision In TS of Auto sampler and send to procurement for RFQ 04 September 2017
Checking and comments on FLS technical offer 04 September 2017
On Leave
On Leave
Revision of CN of Fire water system. 04 September 2017
Revision of CN of RMHS water system. 04 September 2017
Technical offer evaluation of FRM-3. 04 September 2017
TS of E&I of wagon tippler 04 September 2017
04 September 2017
Cable route servey for connecting fire fighting building with MSDS BF
TS of Bin Vibrator 04 September 2017
Procurement specification for erection of electrics and cable supply for 04 September 2017
FRM
cable route servey for fuel ckt 04 September 2017
Incorporation of comments of P&ID 04 September 2017
Phase-2 Engg
Sept to 8th Sept 2017
Finish Date Compliance
07 September 2017 Completed
07 September 2017 Completed
08 September 2017 Not Completed
Sent to vendor
05/09/2017 R1
Reviewed by Saumen
Coke oven operation team suggested about prisecter sampler ,trying to get data
from vendor.
Target completion 14/9/17
Target completion 16/9/17
nder review
7 RMHS TS RV MDL
8 RMHS TS RV MDL
DE
9 DE System ANKUR TSK
SYSTEM
10 RMHS Pellet Plant KUNDAN TSJ
36 RMHS TS DJ TSK
37 RMHS TS DJ TSK
Preparation of Operation Philosophy of ORE & FLUX Circuit. 22 August 2017 25 August 2017
TS preparation of drive component of pellet plant augmented conveyor 21 August 2017 25 August 2017
Preparation of sketch for pellet plant upgradation Project. 24 August 2017 25 August 2017
Coasting time calculation for Coal Circuit Conveyors 21 August 2017 23 August 2017
Coasting time calculation for Pellet Circuit Conveyors 24 August 2017 25 August 2017
Wagon Tippler TS to be made ready for RFQ 21 August 2017 25 August 2017
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Customer feedback on
Deferred available conv
component is awaited
Completed
Completed
Electrical comments
WIP awaited
Completed
Completed
Completed
WIP Checking in progress
Completed
Completed
Completed
Engaged in JSR for
WIP estimation of BOQ
Engaged in JSR for
WIP estimation of BOQ
Engaged in JSR for
WIP estimation of BOQ
Engaged in JSR for
WIP estimation of BOQ
Engaged in JSR for
WIP estimation of BOQ
Completed
Engaged in JSR for
WIP estimation of BOQ
Engaged in JSR for
WIP estimation of BOQ
Engaged in JSR for
WIP estimation of BOQ
Completed
Completed
Weekly Plan Compliance - RMHS
Period: 14th Aug to
S.No Area Sub area Team Member Related to
Magnetic
35 RMHS separator Vikash Kumar MDL
Preparation of assignment for extension of JH-18. (Load Data details) 14 August 2017 21 August 2017
WEBINAR on Rokcy-DEM software - Arrange & participate 17 August 2017 17 August 2017
Finalization of Belt Schedule - Lengths of HGTU to be updated 18 August 2017 18 August 2017
Revision of CN of Fire water system. Started. 18 August 2017
Feasibility of installing MVWS system in WT tunnel conveyors. Started. 18 August 2017
Assignment drawing preparation for interchangeability of WT-1 & 2 14 August 2017 18 August 2017
TS of E&I erection & commisioning for fuel circuit. 14 August 2017 18 August 2017
TS of cable supply for Fuel circuit 14 August 2017 18 August 2017
TS of PLC Augmentation for Fuel ircuit. 14 August 2017 18 August 2017
TS of bin weighing system for Fuel circuit 14 August 2017 18 August 2017
Leave 14 August 2017 14 August 2017
HMC circuit connectivity with G-BF_layout, flow dagram & sectional drg. 16 August 2017 17 August 2017
SP1 & SP2 connectivity_ WBS, TEFR, Scope final document submission to 18 August 2017 18 August 2017
project
Checking of revise drawing submitted by party for magnetic separator and 14 August 2017 14 August 2017
comments on drawing along with electrical team
Pulley shaft calculation for conveyor PC-02 14 August 2017 18 August 2017
Pulley shaft calculation for conveyor PC-03 14 August 2017 18 August 2017
Pulley shaft calculation for conveyor 511-512 BC 210 14 August 2017 18 August 2017
Pulley shaft calculation for conveyor HA 01 GL 01 14 August 2017 18 August 2017
Pulley shaft calculation for conveyor HA 01 GL 15 14 August 2017 18 August 2017
Pulley shaft calculation for conveyor JH 01 GL 11 14 August 2017 18 August 2017
Pulley shaft calculation for conveyor JH 02 GL 11 14 August 2017 18 August 2017
Drive componenet finalization for 9 Nos. of conveyor 14 August 2017 18 August 2017
Preparation of assignment for extension of JH-18. (Load Data details) 16 August 2017 17 August 2017
Checking of Spout, Sector TS & Data sheet. 16 August 2017 18 August 2017
Preparation of sketch for pellet plant upgradation Project. 18 August 2017 18 August 2017
Review of conveyor calculation and component selectionfor Pellet plant 14 August 2017 17 August 2017
upgradation project.
Compliance Remarks
Completed
Layout prepared.
Waiting for electrical
comments.
Completed
Completed
WIP
WIP
Completed
Completed
Completed
Travel length updating
WIP balance
Travel length updating
WIP balance
WIP
Completed
2/9 completed
completed
completed
wip
Completed
Completed
WIP
Completed
Reschedule
Reschedule
Reschedule
Reschedule
Reschedule
Reschedule
Reschedule
Inprogress
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
WIP (Yet to be
finalized by Manoj)
WIP (Yet to be
finalized by Manoj)
WIP
Completed
Weekly Plan Compliance - RMHS Phase-
Period: 7th Aug to 11th Au
S.No Area Sub area Team Member Related to
1 RMHS TR Sahendra TSK
2 RMHS TS Sahendra MDL
Control
3 RMHS Sahendra TSK
Philosophy
5 RMHS TS DJ TSK
Technical
6 RMHS Yogesh TSK
Datsheet
Technical
7 RMHS Yogesh TSK
Evaluation
Technical
10 RMHS Yogesh TSK
Evaluation
11 RMHS TS Debabrata MDL
12 RMHS TS Debabrata MDL
13 Debabrata MDL
14 RMHS TS Debabrata MDL
17 RMHS TS RV MDL
18 RMHS TS RV MDL
Pellet plant
37 RMHS TSJ Supriya upgradation
TS of E&I erection & commisioning for fuel circuit. 07 August 2017 11 August 2017 WIP
TS of PLC Augmentation for Fuel Circuit. 07 August 2017 11 August 2017 WIP
Preparation of technical data sheet of FBF-3. 07 August 2017 09 August 2017 Completed
Preparation of technical data sheet for Rod mill 07 August 2017 11 August 2017 Completed
(Cemtec) .
Annexture and Preparation of Datasheet for HS 08 August 2017 11 August 2017 Completed
couplings.
Annexture and Preparation of Datasheet for LS 08 August 2017 11 August 2017 Completed
couplings.
Preparation of draft technical data sheet for 07 August 2017 11 August 2017 In progress
Mcnally sayaji rod mill.
TS & Data sheet checking of Idlers. 09 August 2017 10 August 2017 Not Started.
TS & Data sheet checking of Pulley. 10 August 2017 11 August 2017 Not Started.
Load data generation for SC-17,CK-45,RF-1A. 07 August 2017 10 August 2017 WIP
TS & Data sheet checking of gearbox 08 August 2017 10 August 2017 Completed.
TS & Data sheet checking of LS and HS coupling 08 August 2017 11 August 2017 Completed.
Preparation of Operation Philosophy of ORE & 07 August 2017 11 August 2017 WIP
FLUX Circuit.
Preparation of Operation Philosophy of Fuel Started. 08 August 2017 WIP
Circuit.
Preparation of TS of Bin Vibrator. 08 August 2017 11 August 2017 WIP
Calculation for augmentation of capacity of pellet 07 August 2017 10 August 2017 Completed
conveyor HA01GL15.
Calculation for augmentation of capacity of pellet 07 August 2017 10 August 2017 Completed
conveyor HA01GL01.
Calculation for augmentation of capacity of pellet 09 August 2017 11 August 2017 Completed
conveyor 511BC210,512BC210.
Calculation for augmentation of capacity of pellet 09 August 2017 11 August 2017 Completed
conveyor KP01AP05,PC-02,PC-03.
Preparation of Annexure and Schedule for Screw 07 August 2017 08 August 2017 Completed
Take up
Preparation of Annexure and Schedule for VGTU 08 August 2017 09 August 2017 WIP
Preparation of Annexure and Schedule for HGTU 09 August 2017 11 August 2017 WIP
Preparation of schedule of Bins and Bunkers 10 August 2017 10 August 2017 Completed
Screen house design discussion with civil 07 August 2017 07 August 2017 Completed
HMC circuit connectivity with G-BF _ layout 07 August 2017 08 August 2017 Completed
preparation w.r.t survey drg.
SP1 & SP2 connectivity_ WBS, TEFR, Scope final 09 August 2017 Revised document
09 August 2017
document submission to project awating from DEC
CB to TSJ for HMC circuit connectivity with G-BF 10 August 2017 11 August 2017 Completed
Prepared first cut TS for Future Wagon Tipplers 09 August 2017 10 August 2017 Completed
will be completed by
18/8/17
will be completed by
16/8/17
will be completed by
18/8/17
8/23/2017
On Leave.
On Leave.
On Leave.
Sent for review and
approval
Technical
5 RMHS Yogesh TSK
Evaluation
23 RMHS TS RV MDL
24 RMHS TS RV MDL
25 RMHS TS RV MDL
Control
26 RMHS RV Others
Philosophy
27 RMHS TS SAMEER MDL
28 RMHS TS SAMEER MDL
29 RMHS TS SAMEER MDL
30 RMHS TS SAMEER MDL
31 RMHS TS SAMEER MDL
32 RMHS TS SAMEER MDL
33 RMHS TS SAMEER MDL
34 RMHS TS SAMEER MDL
35 RMHS PID Sahendra MDL
36 RMHS PID Sahendra MDL
37 RMHS TS Sahendra MDL
38 RMHS TS SAHENDRA MDL
39 RMHS TS Shashikant MDL
40 RMHS TS Shashikant MDL
44 RMHS TS DJ MDL
Preparation of technical data sheet for Rod mill (Cemtec). 31 July 2017 04 August 2017
Mass balance finalization of pellet plant as per 7 MTPA and 8 31 July 2017 04 August 2017
MTPA.
Finalization of list of equipment to be upgraded in 7 MTPA and 31 July 2017 04 August 2017
8 MTPA pellet plant upgradation- detail report preparation.
Mass balance of different unit of TSJ plant existing and future 31 July 2017 04 August 2017
requirement in 14 MTPA TSJ plant- balance work of last week.
Calculation for augmentation of capacity of pellet conveyor 03 August 2017 04 August 2017
JH01GL11
Calculation for augmentation of capacity of pellet conveyor 03 August 2017 04 August 2017
JH02GL11
On Leave. 31 July 2017 02 August 2017
TS & Data sheet checking of Idlers. 02 August 2017 02 August 2017
TS & Data sheet checking of Metal Detector. 03 August 2017 03 August 2017
Interview for 2 Draftsman. 03 August 2017 03 August 2017
TS & Data sheet checking of Pulley. 04 August 2017 04 August 2017
Preparation of technical recommendation of modular type bag 31 July 2017 02 August 2017
filter with kolkata environment engg. Group
Processing of PFD of DE-system of lime storage building. 01 August 2017 02 August 2017
Processing of PFD of DE-system of Sinter Circuit. 01 August 2017 02 August 2017
Solution of LDE-4 duct jamming issue at LC-16 and 17 with 01 August 2017 02 August 2017
Kolkata team.
Completion of Technical Specification of belt changing device. 02 August 2017 04 August 2017
Preparation of Annexure and Schedule for TS of Brakes. 03 August 2017 03 August 2017
Preparation of Operation Philosophy of ORE & FLUX Circuit. 03 August 2017 09 August 2017
TS for Load cell based bin weighing system. 31 July 2017 04 August 2017
Study of Automation system for Fuel handling system. 31 July 2017 04 August 2017
Completion of TS of belt feeder. 31 July 2017 01 August 2017
Battery - 7 rebuilding - coke circuit refurbishment requirement 31 July 2017 31 July 2017
finalization.
HMC circuit connectivity with G-BF. 01 August 2017 01 August 2017
CB at TSJ. 02 August 2017 04 August 2017
Calculation of Gas volume for coke circuit. 31 July 2017 04 August 2017
Preparation of SLD of DE system for coke circuit. 31 July 2017 04 August 2017
Preparation of Isomertric drawing of pressure loss calculation 31 July 2017 04 August 2017
for sinter DE.
Preparation of concept notes for OHP wrt 14 MTPA. 31 July 2017 02 August 2017
Preparation of Pre Concept Note for TSJ Expansion. 03 August 2017 04 August 2017
Revision of CN of RMHS water system. 01 August 2017 04 August 2017
Revision of CN of Fire water system. 01 August 2017 04 August 2017
Feasibility of installing MVWS system in WT tunnel conveyors. 01 August 2017 11 August 2017
Compliance Remarks
COMPLETED
COMPLETED
COMPLETED
Comments sent for Pre Bid
WIP queries .
WIP
Completed
Completed
Rescheduled
WIP 10-Aug
Completed
Completed
WIP 10-Aug
Prepared visit report and
Completed submitted to Chief-RMHS
for review.
Discussion with vendors
WIP completed.
Completed
Completed
WIP
On Leave
On Leave
On Leave
On Leave
On Leave
On Leave
On Leave
On Leave
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
TS Prepared.Review Under
Completed Progress.
Completed
Sent for Review.
WIP
Completed
Completed
Postponed
Completed
Completed
WIP
WIP
WIP
WIP
WIP
WIP
Weekly Compliance - RMHS Phase-2 E
Period: 24th July to 28th J
S.No Area Sub area Team Member Related to
1 U&W DE System ANKUR TSK
21 RMHS TS RV MDL
22 RMHS TS RV MDL
23 RMHS TS RV MDL
24 RMHS TS RV MDL
SYSTEM
36 RMHS CONFIGURATION DJ MDL
SYSTEM
37 RMHS CONFIGURATION DJ MDL
SYSTEM
38 RMHS CONFIGURATION DJ MDL
Preparation of SLD of DE system for coke 24 July 2017 28 July 2017 Completed.
circuit.
Final Technical Specification to be sent to
procurement for Reversible shuttle 24 July 2017 25 July 2017 In Progress
conveyor
Preparation of Annexure and schedule of 28 July 2017 28 July 2017 Format Completed
Horizontal gravity take up
System configuration drawing for sinter 24 July 2017 28 July 2017 Completed.
handling system
System configuration drawing for fuel 24 July 2017 28 July 2017 Completed.
crushing and screening handling system
System configuration drawing for pellet 24 July 2017 28 July 2017 Completed.
handling system
Specification for switches (pcs, zss, bcs, brs, 24 July 2017 28 July 2017 Completed.
cjs)
TS of Magnetic Separator 24 July 2017 28 July 2017 Completed.
Specification for level indicators 24 July 2017 28 July 2017 WIP
HT motor feeder finalisation for coal ckt at 24 July 2017 28 July 2017 Completed.
RM#10
TS of Belt Feeder( E&I part, supply & 24 July 2017 28 July 2017 Completed.
Erecrtion & Commissioning )
HT motor feeder finalisation for coal ckt at 24 July 2017 28 July 2017 Completed.
RM#10
Study and preparation of complete E&I 24 July 2017 28 July 2017 Completed.
report for A1001 BMR HT conveyor
Concept note for Coke circuit connectivity 24 July 2017 25 July 2017 Completed.
with HMC circuit & G - BF.
Battery - 7 rebuilding - refurbishment list 26 July 2017 27 July 2017 Coal circuit completed.
finalization.
Complete from MHS
SP - 1, SP - 2 connectivity - review of TEFR. 28 July 2017 28 July 2017 side, C&S comments
pending.
Review of conveyor drawings of BF#2 - 24 July 2017 24 July 2017 Completed.
Preparation of Equipment List for Coke 25 July 2017 25 July 2017 Completed.
Circuit.
Preparation of Equipment List for Pellet 26 July 2017 26 July 2017 Completed.
Circuit.
Self development - Study of Projectile 27 July 2017 27 July 2017 Completed.
Motion & Trajectory
Preparation of Equipment List for Slag & 27 July 2017 27 July 2017 Completed.
Returns fines.
Preparation of Weekly Review report for 28 July 2017 28 July 2017 Completed.
GM(D&E)
Preparation of Equipment List for Fuel, 28 July 2017 28 July 2017 Completed.
Sinter & Lime.
Pulley, Conveyor belt. Gearbox & coupling 24 July 2017 26 July 2017 Completed.
standardization at Kolkata.
Leave 27 July 2017 27 July 2017
Load data Calculation for 1 No Conveyor ( 4 28 July 2017 28 July 2017 Completed.
No of Pulleys)
Ore & Flux circuit P & ID checking. 24 July 2017 24 July 2017 Completed.
Coal circuit P & ID checking. 25 July 2017 25 July 2017 Completed.
Slag circuit P & ID checking. 26 July 2017 26 July 2017 Completed.
Development of Concept Note for Iron 24 July 2017 26 July 2017 Complied
Storage in TSJ.
Preparation of Pre Concept Note for TSJ 27 July 2017 28 July 2017 Not complied
Expansion
Site visit for freewheeling issue of downhill 26 July 2017 27 July 2017 Completed.
conv C-1
Remarks
Review in Progress.
Review in Progress.
Scope finalised
Technical
7 RMHS Manoj Others
Recommendation
Preparation of draft technical recommendation of modular type bag 17 July 2017 18 July 2017
filter to be submitted to Environment engg. Group
Preparation of Basic engg. Document of conveyor system 17 July 2017 28 July 2017
Preparation and incorporation of comments in specification of belt 18 July 2017 20 July 2017
changing device
Incorporation of comments in technical specification of tie rod and 19 July 2017 19 July 2017
fasteners
Incorporation of comments in technical specification of locking device 20 July 2017 20 July 2017
for pulley.
Selection of Gear Box, HS & LS Couplings for Coal Circuit 17 July 2017 18 July 2017
Selection of Gear Box, HS & LS Couplings for Pellet Circuit 19 July 2017 19 July 2017
Standardization of Pulley Shafts (Reduce No of types of Pulleys) 19 July 2017 20 July 2017
Finalization of Basic GA drawing for Conveyor CK-27 20 July 2017 20 July 2017
Technical Class for AET regarding Material Handling 21 July 2017 21 July 2017
Preparation of Weekly reports, Weekly plan etc 21 July 2017 21 July 2017
Annexure preparation for TS of weighfeeder and belt scale 19 July 2017 21 July 2017
Study about OC-1 conveyor ,calculation checking and necessary
recommendation for its augmentation. 17 July 2017 21 July 2017
Technical discussion with SANDVIK for phase-2 stacker reclaimer 21 July 2017 21 July 2017
Selection of HS & LS Couplings - Ore & Flux and Limestone Circuits 17 July 2017 21 July 2017
RFQ FOR TRAVELLING TRIPPER IN VERTICAL STORAGE CUM Started 20 July 2017
RECLAIMING YARD.
MEETING WITH M/S METAL KARMA FOR COVERED SHED. 18 July 2017 18 July 2017
Revision of CN of RMHS water system 10 July 2017 21 July 2017
Revision of CN of Fire water system 10 July 2017 19 July 2017
Feasibility of installing MVWS system in WT tunnel conveyors 17 July 2017 24 July 2017
Concept note for Electrical ,Instrumentation and Automation sytem- 17 July 2017 21 July 2017
P& ID for Ore & Flux handling circuit 17 July 2017 21 July 2017
P& ID for Lime Stone handling system for LCP 17 July 2017 21 July 2017
P&ID for return fines handling system 17 July 2017 21 July 2017
P& ID for Coking Coal hadling system 17 July 2017 21 July 2017
Concept note for Electrical ,Instrumentation and Automation sytem 17 July 2017 21 July 2017
Study and preparation of BMR circuit (One no HT conv augmentation) 17 July 2017 21 July 2017
Study and preparation of E&I Report of Fuel circuit 17 July 2017 21 July 2017
Review and comment on Technical offer of Stacker Reclaimer-SANDVIK 17 July 2017 21 July 2017
Calculation of Gas volume for coke circuit 17 July 2017 21 July 2017
Correction of Technical Specification work for BR & Reversible shuttle 17 July 2017 19 July 2017
conv
Rod Mill Technical specfication preparatory work 18 July 2017 21 July 2017
Completed
Completed
WIP Review under progress.
Completed
Completed
In Progress
In Progress
Completed
completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Technical data sheet for gearbox not
available ,final review will be
WIP completed 24th july
Completed
WIP
Completed
Completed
Completed
WIP Revision to be in corporated.
WIP Revision to be in corporated.
WIP Revision to be in corporated.
Completed
WIP
Completed
Completed
Completed
Completed
Completed
Completed
Completed
BR TS (D&E) sent to procurement
Not Completed
In Progress
Completed
Completed
Rescheduled
Completed
Completed
Completed
Completed
Completed
Completed
Completed
S.No Area Sub area Team Member Related to
RFQ FOR TRAVELLING TRIPPER IN VERTICAL STORAGE CUM RECLAIMING YARD Started
Preparation of list of informations required for calculation of gas volume for coke 12 July 2017
circuit.
Vertical Storage
25 RMHS RV MDL
Sheds
Vertical Storage
26 RMHS RV MDL
Sheds
Vertical Storage
27 RMHS RV TSK
Sheds
Vertical Storage
28 RMHS RV TSK
Sheds
51 TSK
RMHS KPO PH-II Debabrata
SYSTEM
52 RMHS CONFIGURATION DJ MDL
53 RMHS SYSTEM
CONFIGURATION DJ MDL
54 RMHS SYSTEM
CONFIGURATION DJ MDL
55 RMHS SYSTEM
CONFIGURATION DJ MDL
56 RMHS SYSTEM
CONFIGURATION DJ MDL
Fine tuning of Technical Specification work for RSC,Flap 03 July 2017 03 July 2017
,RPG,ROD gates
SP conveyor calculation for augmentation A1001. 04 July 2017 07 July 2017
Barrel Reclaimer mechanical specfication 03 July 2017 16 July 2017
Review of Process Flow diagrams O&F track hopper. 05 July 2017 05 July 2017
Study of basic flow diagram and layout of Coal& Ore circuit 06 July 2017 06 July 2017
9.7MTPA TSJ
BMS-2 bearing failure analysis and solution 03 July 2017 07 July 2017
Fuel circuit Conveyor capacity Calculation 03 July 2017 07 July 2017
Esentiality study report finalization for 3rd Rod Mill. 03 July 2017 07 July 2017
Pellet plant circuit study as per requirement of 14MTPA plant 03 July 2017 07 July 2017
Fine tuning and preparation of annexure for TS of Skirt Board 06 July 2017 06 July 2017
Fine tuning and preparation of annexure for TS of take up 07 July 2017 07 July 2017
components
Fine tuning and preparation of annexure for TS of Take up 07 July 2017 07 July 2017
trolley
Technical discussion with kolkata utility team regarding 05 July 2017 05 July 2017
requirements from Utility for RMHS in phase-2
Approval of RMHS concept notes by Ajit Kothari Sir 07 July 2017 07 July 2017
Meeting with MND & project for finalisation of scheme 5-Jul-17 5-Jul-17
Conv. Claculation 6-Jul-17 7-Jul-17
ANNEXURE PREPARATION FOR PULLEYS 03 July 2017 03 July 2017
ANNEXURE PREPARATION FOR IDLERS 03 July 2017 03 July 2017
ANNEXURE PREPARATION FOR FOUNDATION BOLTS 04 July 2017 04 July 2017
ANNEXURE PREPARATION FOR MANUAL HOISTS 04 July 2017 04 July 2017
ANNEXURE PREPARATIONFOR TRAVELLING TRIPPERS 05 July 2017 05 July 2017
ANNEXURE PREPARATION FOR FIXED TRIPPERS 05 July 2017 05 July 2017
ANNEXURE PREPARATION FOR BULK LOADING SPROUT 05 July 2017 05 July 2017
ANNEXURE PREPARATION FOR SECTOR GATE 06 July 2017 06 July 2017
ANNEXURE PREPARATION FOR CONVEYORS BELT 06 July 2017 06 July 2017
ANNEXURE PREPARATION FOR ELECTRIC HOISTS 07 July 2017 07 July 2017
GA PREPARATION FOR TRACK HOPPER. 07 July 2017 07 July 2017
Finalization of MDL 03 July 2017 03 July 2017
Final cut calculation (Power, Tension, Belt, Pulley & Curvature) 03 July 2017 03 July 2017
-for Coal Circuit.
Report on Phase -1 design mismatch regarding BW & TPH. 04 July 2017 04 July 2017
Conveyor Power & Tension Calculation - 2 Nos (Coal Circuit 05 July 2017 05 July 2017
PPC-1,2,3&4)
Standardization of Conveyor belt & pulley dia. 06 July 2017 06 July 2017
Finalization of first cut generic checklist for checking Mech GA 07 July 2017 07 July 2017
drawings.
Power, radious, belt selection for 15 nos of conveyors. 03 July 2017 04 July 2017
Gear box, HS, LS coupling, Motor selection for CK45, CK27, 06 July 2017 07 July 2017
A1001.
CONCEPTUAL PLC SYSTEM CONFIGURATION DIAGRAM FOR 03 July 2017 07 July 2017
COKE HANDLING SYSTEM
CONCEPTUAL PLC SYSTEM CONFIGURATION DIAGRAM FOR 03 July 2017 07 July 2017
LIME & LIME STONE HANDLING SYSTEM
CONCEPTUAL PLC SYSTEM CONFIGURATION DIAGRAM FOR 03 July 2017 07 July 2017
SINTER HANDLING SYSTEM
CONCEPTUAL PLC SYSTEM CONFIGURATION DIAGRAM FOR 03 July 2017 07 July 2017
FUEL CRUSHING AND SCREENING HANDLING SYSTEM
SYSTEM CONFIGURATION DRAWING FOR ORE & FLUX 03 July 2017 07 July 2017
HANDLING SYSTEM
SPECIFICATION FOR MOTOR 03 July 2017 07 July 2017
SPECIFICATION FOR SWITCHES (PCS, ZSS, BCS, BRS, CJS 03 July 2017 07 July 2017
,proximity switch)
SPECIFICATION FOR LOAD CELLS 03 July 2017 07 July 2017
TS preparation of weigh feeder 03 July 2017 07 July 2017
Technical comments on offer of Stacker Reclaimer . 03 July 2017 07 July 2017
TS preparation of Belt scale 03 July 2017 07 July 2017
Compliance Remarks
Completed
Completed
In Progress
In Progress Comments sent
In Progress
Completed
Completed
Completed
In Progress
Completed
WIP
WIP
Completed
In progress
WIP
Completed
Completed
Inprogress
Inprogress
Completed
Completed
Under Progress
Completed
Completed
Completed
WIP
WIP
WIP
WIP
WIP
WIP
WIP
WIP
WIP
WIP
Completed
WIP
Completed
Completed
Completed
Completed
WIP
Completed
completed
completed
completed
completed
completed
rescheduled
rescheduled
rescheduled
wip
completed
rescheduled