You are on page 1of 5

TEST REPORT FOR TRANSFORMER

Doc. No. L&T/RFCL/A747/ ELE/TF 04 Date-

PROJECT : REVIVAL OF RAMAGUNDAM FERTILIZER PLANT


WORK : 220 KV SWITCHYARD PACKAGE Sheet No 1 of 5

TESTING FORMAT FOR


TRANSFORMER

PROJECT :REVIVAL OF RAMAGUNDAM FERTILIZER PLANT

NAME OF WORK :220 KV SWITCHYARD PACKAGE

JOB NO :A747

LOA NO : SKS/A747/LOA/T/0015/1016/2016 – 17/05 dtd. 09/11/2016

DOC NO : L&T/RFCL/A747/ELE/TF 04

OWNER :M/S RAMAGUNDAM FERTILESERS AND CHEMICALS LTD.

CONSULTANT :M/S ENGINEERS INDIA LTD.

CONTRACTOR :M/S L&T

Test Performed by: Witnessed by: Witnessed by:


Name: Name: Name:
Signature: Signature: Signature:
TEST REPORT FOR TRANSFORMER
Doc. No. L&T/RFCL/A747/ ELE/TF 04 Date-

PROJECT : REVIVAL OF RAMAGUNDAM FERTILIZER PLANT


WORK : 220 KV SWITCHYARD PACKAGE Sheet No 2 of 5

1. Equipment Details

Serial Number :
Rating MVA :
No Load HV :
Voltage LV :
Current HV :
Current LV :
Phase :
Impedance Voltage :
Manufacturing Year :
Manufactured By :

2. Location &Feeder Name :

3. General Inspection :

4. Insulation Resistance Test : (All Values in GΏ)

Measured values
Ref
1 minute 10 minute PI
HV-E
LV-E
HV-LV

5. Ratio Test:

Tap Applied Primary Side Measured Secondary Side


position
RY YB BR ry Yb Br rn Yn bn
1

17

Test Performed by: Witnessed by: Witnessed by:


Name: Name: Name:
Signature: Signature: Signature:
TEST REPORT FOR TRANSFORMER
Doc. No. L&T/RFCL/A747/ ELE/TF 04 Date-

PROJECT : REVIVAL OF RAMAGUNDAM FERTILIZER PLANT


WORK : 220 KV SWITCHYARD PACKAGE Sheet No 3 of 5

6.Magnetizing Current Test:

Tap Applied Voltage in Primary Side Measured Current in Primary Values in(mA)
position

RY YB BR R Y B
1

17

7.Magnetic Core Balance in Normal Tap:

Primary side Secondary side


Ref
RY YB BR ry yb br
R

8.Vector Group Dyn11:

Measured Voltage:

1. 1U2V=1U2W

2. 1W2N > 1W2W

3. 1U1N = 2U2N + 1N2N

Test Performed by: Witnessed by: Witnessed by:


Name: Name: Name:
Signature: Signature: Signature:
TEST REPORT FOR TRANSFORMER
Doc. No. L&T/RFCL/A747/ ELE/TF 04 Date-

PROJECT : REVIVAL OF RAMAGUNDAM FERTILIZER PLANT


WORK : 220 KV SWITCHYARD PACKAGE Sheet No 4 of 5

9.Winding Resistance Test:

Primary Side in mΏ Secondary side in mΏ


Tap
RN YN BN rn yn bn
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

10.Functional Checks:

1 Alarms Check
2 Tripping Check

Test Performed by: Witnessed by: Witnessed by:


Name: Name: Name:
Signature: Signature: Signature:
TEST REPORT FOR TRANSFORMER
Doc. No. L&T/RFCL/A747/ ELE/TF 04 Date-

PROJECT : REVIVAL OF RAMAGUNDAM FERTILIZER PLANT


WORK : 220 KV SWITCHYARD PACKAGE Sheet No 5 of 5

11. GENERAL CHECK:

DESCRIPTION SETTING VALUE REMARKS

OTI ALARM

OTI TRIP

WTI ALARM

WTI TRIP

BUCHOLZ ALARM

BUCHOLZ TRIP

MOG ALARM

PRV TRIP

13.Remarks:

Test Performed by: Witnessed by: Witnessed by:


Name: Name: Name:
Signature: Signature: Signature: