You are on page 1of 33

PNPM - Mandiri Perdesaan

INPUT DATA

DATA UMUM

No. Uraian Keterangan

1 Desa : Master
2 Kecamatan : Master
3 Kabupaten : Malang
4 Propinsi : Jawa Timur
5 Fasilitator Kecamatan Master
6 Fasilitator Teknik Master
7 Ketua TPK Master
8 PjOK Master
9 NIP NIP. 19590808 198003 1 009

Nama Kegiatan, Sub Kegiatan dan Volume

No. Uraian Keterangan

I Program : PNPM MPd Th 2014

II Nama Kegiatan : Perkerasan Jalan

III Sub Kegiatan


1 : Perkerasan Telford : (1252 x 3.0) M
2 : Jembatan-1 : (2.0 x 5.0) M
3 : Jembatan-2 : (5 x 3) M
4 : Jembatan-3 : (4 x 3) M
5 : Grg2 Plat-1 : (0.75 x 0.75) - 7 M
6 : Grg2 Plat-2 : (1.0x1.0) - 5 M
7 : Grg2 Plat-3 : (1.0x1.0) - 4 M
8 : Grg2 Buis Bt-1 : (dia.40) - 6 M
9 : Grg2 Buis Bt-2 : (dia.30) - 5 M
10 : Grg2 Buis Bt-3 : (dia.30) - 4 M
11 : Talud Jalan-1 : (30 x 0,5) M
12 : Talud Jalan-2 : (150 x 2) M
13 : Talud Jalan-3 : (150 x 1) M
14 : Saluran Tepi-1 : (800 x 0.5) M
15 : Saluran Tepi-2 : (1000 x 0.7) M
PNPM - Mandiri Perdesaan

DAFTAR HARGA MATERIAL - ALAT - TENAGA

Desa : Master
Kecamatan : Master
Kabupaten : Malang
Nama Kegiatan : Perkerasan Jalan

No. Material / Alat / Tenaga Satuan Harga Satuan

1 Batu Gunung M3 Rp 82,000


2 Batu Pecah 2/3 M3 Rp 135,000
3 Pasir Urug M3 Rp 72,000
4 Sirtu M3 Rp 77,000
5 Tanah Urug M3 Rp 60,000
6 Pasir Pasang M3 Rp 82,000
7 Semen - 40 KG Zak Rp 44,000
8 Semen - 50 KG Zak Rp 53,000
9 Buis Beton, dia. 20 Buah Rp 25,000
10 Buis Beton, dia. 30 Buah Rp 40,000
11 Buis Beton, dia. 40 Buah Rp 45,000
12 Buis Beton, dia. 50 Buah Rp 65,000
13 Buis Beton, dia. 60 Buah Rp 77,500
14 Besi, dia. 8 Batang Rp 32,000
15 Besi, dia. 10 Batang Rp 42,000
16 Besi, dia. 12 Batang Rp 52,000
17 Papan begesting 2/20-2 m Lembar Rp 15,000
18 Bambu Batang Rp 9,000
19 Kawat bendrat Kg Rp 15,000
20 Paku usuk Kg Rp 15,000
21 Papan Proyek Unit Rp 200,000
22 Prasasti Unit Rp 500,000

21 Roll meter - 50 M Buah Rp 80,000


22 Meteran - 5 M Buah Rp 12,500
23 Benang Roll Rp 10,000
24 Linggis Buah Rp 40,000
25 Ganco Buah Rp 30,000
26 Cangkul Buah Rp 40,000
27 Sekop Buah Rp 30,000
28 Amer - 5 Kg Buah Rp 85,000
29 Palu - 2 Kg Buah Rp 25,000
30 Cetok Buah Rp 15,000
31 Ondrong Buah Rp 15,000
32 Ember Buah Rp 7,500
33 Kereta Dorong Buah Rp 350,000
34 Sewa WalMob./Demob. Wales HR Rp 500,000
35 Mobilisasi/Demob. Wales LS Rp 2,000,000
36 Sewa Mollen HR Rp 175,000

37 Pekerja HOK Rp 20,250


38 Kepala Kelompok HOK Rp 26,250
39 Tukang Pecah Batu HOK Rp 26,250
40 Tukang HOK Rp 26,250
41 Mandor HOK Rp 30,000
PNPM - Mandiri Perdesaan

BACK UP SHEET

Desa : Master
Kecamatan : Master
Kabupaten : Malang
Sub Kegiatan: Perkerasan Telford

Sketsa Perhitungan

I. MATERIAL

A. Pengadaan Batu, lebar perkerasan 3.0 m


(kebutuhan per 50 meter atau per patok)
Lihat Gambar Desain
Batu onderlag 10/15, dipasang berdiri
(L1 - (0.15 x 2)) x T x P x K = 2.70 x 0.15 x 50.00 x 1.20
= 24.30 m3

Batu Tepi 15/20, dipasang berdiri


(a x 2) x T x P x K = 0.15 x (2) x 0.20 x 50.00 x 1.20
= 3.60 m3

Jumlah = 27.90 m3

B. Pengadaan Pasir urug, tebal : 5 cm


(kebutuhan per 50 meter atau per patok)
= 2.70 x 0.05 x 50.00 x 1.20
L1 x T x P x K = 8.10 m3

C. Pengadaan Sirtu, tebal : 5 cm


(kebutuhan per 50 meter atau per patok)
L1 x T x P x K = 3.00 x 0.03 x 50.00 x 1.20
= 5.40 m3

D. Pengadaan Tras (tanah urug), tebal : 0,15 cm lebar 50 cm


dibuat miring/segitiga (kebutuhan per 50 meter atau per patok) :
(2 x (1/2xL2)) x T x P x K = 0.50 x 0.15 x 50.00 x 1.20
= 4.50 m3

Total kebutuhan :
Panjang jalan : 1252 : 50 = 25.04 patok

Batu = 25.04 x 27.900 = 698.62 m3


Psr. Urug = 25.04 x 8.100 = 202.82 m3
Sirtu = 25.04 x 5.400 = 135.22 m3
Tnh Urug = 25.04 x 4.500 = 112.68 m3

II. TENAGA KERJA

A. Penebangan
Jumlah Pohon (T) dari Po s/d P2 = 0.00 phn
= (T) : 10 = 0.00 HOK
Sketsa Perhitungan

B. Pembersihan
Lebar badan jalan rata-rata (L) = 1.00 m
Panjang jalan (P) = 1252 m
= (P x L) : 10 = 125.20 HOK

C. Pemecahan batu
Upah borongan per RIT
1 RIT= 3,5 m3 Rp. 40,000
1 M3 = Rp. 11,429

1 HOK = tukang, Rp. 26,250


= 26,250 : 11,429 x 1 HOK
= 2.30 m3

Kebutuhan tenaga per patok (50 m)


= V : 2.30
27.90 : 2.30 = 12.15 HOK

Untuk panjang (P) : 1252.0 M


= 12.15 x = 304.16 HOK

D. Pemasangan batu
Lebar perkerasan jalan = 3.00 m
Kebutuhan tenaga per patok (50 m)
= A : 4.00
= 150 : 4.00 = 37.50 HOK

Untuk panjang (P) : 1252.0 M


= 37.50 x 50 = 939.00 HOK

E. Hamparan Pasir urug


Kebutuhan tenaga per patok (50 m)
= V : 2.00
= 8.10 : 2.00 = 4.05 HOK

Untuk panjang (P) 1252.0


= 4.05 x 50 = 101.41 HOK

F. Hamparan Sirtu
Kebutuhan tenaga per patok (50 m)
= V : 2.00
5.40 : 2.00 = 2.70 HOK

Untuk panjang (P) : 1252.0 M


= 2.70 x 50 = 67.61 HOK

G. Hamparan Tanah Urug


Kebutuhan tenaga per patok (50 m)
= V : 2.00
4.50 : 2.00 = 2.25 HOK

Untuk panjang (P) : 1252.0 M


= 2.25 x 50 = 56.34 HOK
Sketsa Perhitungan

III. ALAT BERAT

Pemadatan permukaan dengan mesin gilas


Lebar perkerasan (L) = 3.00 m
Panjang jalan (P) = 1252.00 m

= (P x L) : 400 9.39 Hr

IV. REKAPITULASI

Link dari Link ke RAB


perhitungan selisih pembulatan diisi manual otomatis
volume di atas tot. volume swadaya PNPM
BAHAN A. Pengadaan Batu 698.62 0.38 699.00 0.00 699.00
B. Pengadaan Psr urug 202.82 0.18 203.00 0.00 203.00
C. Pengadaan Sirtu 135.22 (0.22) 135.00 0.00 135.00
D. Pengadaan Tanah Urug 112.68 0.32 113.00 0.00 113.00

TENAGA 1. Penebangan 0.00 0.00 0.00 0.00 0.00


2. Pembersihan 125.20 (0.20) 125.00 0.00 125.00
3. Pemecahan batu 304.16 (0.16) 304.00 0.00 304.00
4. Pemasangan batu 939.00 0.00 939.00 0.00 939.00
5. Hamparan Pasir urug 101.41 (0.41) 101.00 0.00 101.00
6. Hamparan Sirtu 67.61 0.39 68.00 0.00 68.00
7. Hamparan Tnh Urug 56.34 (0.34) 56.00 0.00 56.00
8. Galian 0.00 0.00 0.00 0.00 0.00
9.Timbunan 0.00 0.00 0.00 0.00 0.00

A. Pekerja 1,289.56 (0.72) 1,289.00 0.00 1,289.00


B. Kepala Kelompok 55.40 0.40 55.00 0.00 55.00
C. Tukang Pecah Batu 304.16 0.16 304.00 0.00 304.00

ALAT A. Wales 9.39 (0.39) 9.00 0.00 9.00


Jangan dihapus
Di-isi manual
Panjang Lebar Perkerasan
Perkerasan (P) (L1)
1252.0 3.0
Tebal Pasur Tebal Sirtu
0.05 0.03
Ukuran Batu Pokok
0.10 0.15
Ukuran Batu Tepi
0.15 0.20
Lebar Bahu Tebal Bahu
0.5 0.15

jila berm jalan tidak dihitung maka


angka

4.50 diganti NOL

di-Input dari hasil survey


di-Input dari hasil survey

di-Input dari harga survey

di-Input dari harga survey


PNPM - Mandiri Perdesaan Lembar : 1/2

SURVEI ANTAR PATOK

Kabupaten : Malang Bahan untuk perkerasan : Batu Gunung Panjang Jalan : 1252 Meter
Kecamatan : Master Labar dan tebal perkerasan : 3.0 x 0.15 Dimensi Saluran : 30/50 x 50 Cm
Desa : Master Lebar badan jalan (termasuk bahu) : 4.0 Meter Jenis Gorong-gorong : Buis Beton

Nomor Patok 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Jarak antar patok 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50


Jarak komulatif 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000
Arah trase jalan 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90
Tanjakan (%) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Panjang tanjakan 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Keadaan di sekitarnya R-R R-R S-S S-S S-S S-S R-R R-R R-R R-R R-R R-R R-R R-R R-R R-R R-R R-R R-R R-R
Keadaan jalan lama Grasak Grasak T.Biasa T.Biasa T.Biasa T.Biasa Grasak Grasak Grasak Grasak Grasak Grasak Grasak Grasak Grasak Grasak Grasak Grasak Grasak Grasak

Jumlah pohon - - - - - - - - - - - - - - - - - - - -
Penebasan (P x L) -x- -x- -x- -x- -x- -x- -x- -x- -x- -x- -x- -x- -x- -x- -x- -x- -x- -x- -x- -x-
Pembersihan (P x L) 50x1.0 50x1.0 50x1.0 50x1.0 50x1.0 50x1.0 50x1.0 50x1.0 50x1.0 50x1.0 50x1.0 50x1.0 50x1.0 50x1.0 50x1.0 50x1.0 50x1.0 50x1.0 50x1.0 50x1.0

Jenis galian - - - - - - - - - - - - - - - - - - - -
Volume galian - - - - - - - - - - - - - - - - - - - -
Volume timbunan - - - - - - - - - - - - - - - - - - - -
Jarak dari sumber timbunan - - - - - - - - - - - - - - - - - - - -
Saluran (KR, KN, 2, 0) KR 0 KN 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Bangunan yang ada - - - - - - - - - - - - - - - - - - - -
Letak dan jenis bangunan baru P0+0 P4+30M P6+0
gorong2
- - - gorong2
- gorong2
- - - - - - - - - - - -
(jarak dari patok)
Ukuran bangunan baru □80.100-5M - - Ǿ30-5M - □100.2x100-5M - - - - - - - - - - -
Jarak dari sumber BT. GEBAL drop drop
Jarak dari sumber PS. URUG drop drop
Jarak dari sumber SIRTU drop drop
Kebutuhan gebalan rumput - - - - - - - - - - - - - - - - - - - -
Jarak dari sumber gebalan - - - - - - - - - - - - - - - - - - - -
Jenis dan kebutuhan vegetasi - - - - - - - - - - - - - - - - - - - -

PNPM - Mandiri Perdesaan Lembar : 2/2

SURVEI ANTAR PATOK

Kabupaten : Malang Bahan untuk perkerasan : Batu Gunung Panjang Jalan : 1252 Meter
Kecamatan : Master Labar dan tebal perkerasan : 3.0 x 0.15 Dimensi Saluran : 30/50 x 50 Cm
Desa : Master Lebar badan jalan (termasuk bahu) : 4.0 Meter Jenis Gorong-gorong : Buis Beton

Nomor Patok 20 21 22### 23 21' 22' 23'

Jarak antar patok 50 50 50 50 50 2


Jarak komulatif 1050 1100 1150 1200 1250 1252
Arah trase jalan 90 90 90 180 180 180
Tanjakan (%) 0.0 0.0 0.0 0.0 0.0 0.0
Panjang tanjakan 0 0 0 0 0 0
Keadaan di sekitarnya R-R R-R R-R R-R R-R R-R
Keadaan jalan lama Grasak T.Biasa T.Biasa Grasak Grasak Grasak

Jumlah pohon - 4.0 4.0 - - -


Penebasan (P x L) -x- -x- -x- -x- -x- -x-
Pembersihan (P x L) 50x1.0 50x1.0 50x1.0 50x1.0 50x1.0 2x1.0

Jenis galian - - - - - -
Volume galian - - - - - -
Volume timbunan - - - - - -
Jarak dari sumber timbunan - - - - - -
Saluran (KR, KN, 2, 0) 2 KR KR 2 2 2
Bangunan yang ada - - - - - -
Letak dan jenis bangunan baru P21-23 P22+10
- talud gorong2
- - -
(jarak dari patok)
Ukuran bangunan baru - 0.5-100M Ǿ30-5M - - -
Jarak dari sumber BT. GEBAL drop drop
Jarak dari sumber PS. URUG drop drop
Jarak dari sumber SIRTU drop drop
Kebutuhan gebalan rumput - - - - - -
Jarak dari sumber gebalan - - - - - -
Jenis dan kebutuhan vegetasi - - - - - -
30/50 x 50 Cm

20

50
1000
90
0.0
0
R-R
Grasak

-
-x-
50x1.0

-
-
-
-
2
-

-
drop
drop
drop
-
-
-

30/50 x 50 Cm
PNPM - Mandiri Perdesaan Lembar

VOLUME ANTAR PATOK

Kabupaten : Malang Kecamatan : Master Desa : Master Rencana panjang jalan : 1252 Meter

Nomor Patok 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Penebangan pohon - - - - - - - - - - - - - - - - - - - -

Penebasan - - - - - - - - - - - - - - - - - - - -

Pembersihan 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
Galian tanah biasa - - - - - - - - - - - - - - - - - - - -

Galian tanah keras - - - - - - - - - - - - - - - - - - - -

Galian lumpur/rawa - - - - - - - - - - - - - - - - - - - -

Timbunan - - - - - - - - - - - - - - - - - - - -

Pengadaan batu gebal 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90

Pengadaan pasir 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10

Pengadaan sirtu 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40

Pengadaan tanah urug 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50

Penghamparan pasir 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10 8.10

Penghamparan sirtu 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40

Penghamparan tanah urug 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50

Galian batu - - - - - - - - - - - - - - - - - - - -

Pemecahan batu 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90 27.90

Pemasangan batu 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150

Penimbrisan - - - - - - - - - - - - - - - - - - - -
Gorong -gorong - - - - - - - 1 - - - 1 - - - - - - - -

Gebalan rumput - - - - - - - - - - - - - - - - - - - -

Vegetasi lain ( jenis ) - - - - - - - - - - - - - - - - - - - -

PNPM - Mandiri Perdesaan Lembar

VOLUME ANTAR PATOK

Kabupaten : Malang Kecamatan : Master Desa : Master Rencana panjang jalan : 1252 Meter

Nomor Patok 20 21 22### 23 21' 22' 23'

Penebangan pohon - - - - - -

Penebasan - - - - - -

Pembersihan 50 50 50 50 50 2
Galian tanah biasa - - - - - -

Galian tanah keras - - - - - -

Galian lumpur/rawa - - - - - -

Timbunan - - - - - -

Pengadaan batu gebal 27.90 27.90 27.90 27.90 27.90 1.12

Pengadaan pasir 8.10 8.10 8.10 8.10 8.10 0.32

Pengadaan sirtu 5.40 5.40 5.40 5.40 5.40 0.22

Pengadaan tanah urug 4.50 4.50 4.50 4.50 4.50 0.18

Penghamparan pasir 8.10 8.10 8.10 8.10 8.10 0.32

Penghamparan sirtu 5.40 5.40 5.40 5.40 5.40 0.22

Penghamparan tanah urug 4.50 4.50 4.50 4.50 4.50 0.18


Galian batu - - - - - -

Pemecahan batu 27.90 27.90 27.90 27.90 27.90 1.12

Pemasangan batu 150 150 150 150 150 6

Penimbrisan - - - - - -

Gorong -gorong - - - - - -

Gebalan rumput - - - - - -

Vegetasi lain ( jenis ) - - - - - -


Lembar

Target
volume

0.00

0.00

1000.0 1252 -252.00

0.00

0.00

0.00

0.00

558.00 698.62 -140.62

162.00 202.82 -40.82

108.00 135.22 -27.22

90.00

162.00 202.82 -40.82

108.00 135.22 -27.22

90.00

0.00

558.00 698.62 -140.62

3000.0 3756 (756.00)

0.00
2.00

0.00

0.00

Lembar

Target
volume

0.00

0.00

1252.0

0.00

0.00

0.00

0.00 dari B-JALAN SELISIH

698.62 698.62 0.00

202.82 202.82 0.00

135.22 135.22 0.00

112.68 112.68 0.00

202.82

135.22

112.68
0.00

698.62

3756.0

0.00

2.00

0.00

0.00
PNPM - Mandiri Perdesaan Lembar : 1/2

MANDAYS ANTAR PATOK

Kabupaten : Malang Kecamatan : Master Desa : Master Rencana panjang jalan : 1252 Meter

Nomor Patok 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Penebangan pohon 10 - - - - - - - - - - - - - - - - - - - -

Penebasan 10 - - - - - - - - - - - - - - - - - - - -

Pembersihan 10 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

Galian tanah biasa 0.5 - - - - - - - - - - - - - - - - - - - -

Galian tanah keras 0.4 - - - - - - - - - - - - - - - - - - - -

Galian lumpur/rawa 0.75 - - - - - - - - - - - - - - - - - - - -

Timbunan 1 - - - - - - - - - - - - - - - - - - - -

Pengadaan batu 1 - - - - - - - - - - - - - - - - - - - -

Pengadaan pasir 1 - - - - - - - - - - - - - - - - - - - -

Pengadaan sirtu 1 - - - - - - - - - - - - - - - - - - - -

Pengadaan t. urug 1 - - - - - - - - - - - - - - - - - - - -

Penghamparan psr 2 4.05 4.05 4.05 4.05 4.05 4.05 4.05 4.05 4.05 4.05 4.05 4.05 4.05 4.05 4.05 4.05 4.05 4.05 4.05 4.05

Penghamparn sirtu 2 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70

Penghamp. t.urug 2 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25

Galian batu 0.2 - - - - - - - - - - - - - - - - - - - -

Pemecahan batu 2.30 12.15 12.15 12.15 12.15 12.15 12.15 12.15 12.15 12.15 12.15 12.15 12.15 12.15 12.15 12.15 12.15 12.15 12.15 12.15 12.15

Pemasangan batu 4 37.50 37.50 37.50 37.50 37.50 37.50 37.50 37.50 37.50 37.50 37.50 37.50 37.50 37.50 37.50 37.50 37.50 37.50 37.50 37.50

Penimbrisan 20 - - - - - - - - - - - - - - - - - - - -
Gorong -gorong - - - - - - - - - - - - - - - - - - - -

Gebalan rumput 50 - - - - - - - - - - - - - - - - - - - -

Vegetasi lain - - - - - - - - - - - - - - - - - - - -
Kepala Kelompok : 51.50 Tukang Pecah : 242.94 Pekerja :

PNPM - Mandiri Perdesaan Lembar : 2/2

MANDAYS ANTAR PATOK


Kabupaten : Malang Kecamatan : Master Desa : Master Rencana panjang jalan : 1252 Meter

Nomor Patok 20 21 22### 23 21' 22' 23'

Penebangan pohon 10

Penebasan 10 - - - - - -

Pembersihan 10 5.00 5.00 5.00 5.00 5.00 0.20

Galian tanah biasa 0.5 - - - - - -

Galian tanah keras 0.4 - - - - - -

Galian lumpur/rawa 0.75 - - - - - -

Timbunan 1 - - - - - -

Pengadaan batu 1 - - - - - -

Pengadaan pasir 1 - - - - - -

Pengadaan sirtu 1 - - - - - -

Pengadaan t. urug 1 - - - - - -

Penghamparan psr 2 4.05 4.05 4.05 4.05 4.05 0.16

Penghamparn sirtu 2 2.70 2.70 2.70 2.70 2.70 0.11

Penghamp. t.urug 2 2.25 2.25 2.25 2.25 2.25 0.09


Galian batu 0.2 - - - - - -

Pemecahan batu 2.30 12.15 12.15 12.15 12.15 12.15 0.49

Pemasangan batu 4 37.50 37.50 37.50 37.50 37.50 1.50

Penimbrisan 20 - - - - - -

Gorong -gorong - - - - - -

Gebalan rumput 50 - - - - - -

Vegetasi lain - - - - - -
Kepala Kelompok : 64.48 Tukang Pecah : 304.16 Pekerja :
dari B-JALAN 55.40 304.16
9.08 0.00
Lembar : 1/2

Target
volume

0.00

0.00

100.00 125.20 -25.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

81.00 101.41 -20.41

54.00 67.61 -13.61

45.00

0.00

242.94 304.16 -61.22

750.00 939.00 -189.00

0.00
1.1527
0.00
0.00

0.00

0.00
1030.0 1289.6 -259.56

Lembar : 2/2

Target
volume

0.00

0.00

125.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

101.41

67.61

56.34
0.00

304.16

939.00

0.00

0.00

0.00

0.00
1289.6
1,290
0.00
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA

Propinsi : Jawa Timur No. RAB


Kabupaten : Malang Program
Kecamatan : Master Jenis Kegiatan
Desa : Master Ukuran / Dimensi

Volume
Harga
Kategori
Uraian Dana Satuan Satuan
Total Swadaya Biaya
PNPM MP (Rp )

BAHAN
1 Batu Gunung 699.0 0.0 699.0 M3 I.a 82,000
2 Pasir Urug 203.0 0.0 203.0 M3 I.a 72,000
3 Sirtu 135.0 0.0 135.0 M3 I.a 77,000
4 Tanah Urug 113.0 0.0 113.0 M3 I.a 60,000
5 Papan Proyek 1.0 0.0 1.0 Unit I.a 200,000
6 Prasasti 1.0 0.0 1.0 Unit I.a 500,000
Sub Total 1 )
PERALATAN
1 Roll meter-50 M 0.0 0.0 0.0 Buah II.a 80,000
2 Meteran-5 M 0.0 0.0 0.0 Buah II.a 12,500
3 Tali Tampar 2.0 0.0 2.0 Roll II.a 10,000
4 Linggis 0.0 0.0 0.0 Buah II.a 40,000
5 Ganco 0.0 0.0 0.0 Buah II.a 30,000
6 Cangkul 1.0 0.0 1.0 Buah II.a 40,000
7 Sekop 1.0 0.0 1.0 Buah II.a 30,000
8 Amer - 5 Kg 1.0 0.0 1.0 Buah II.a 85,000
9 Palu - 2 Kg 0.0 0.0 0.0 Buah II.a 25,000
10 Cetok 0.0 0.0 0.0 Buah II.a 15,000
11 Ember 0.0 0.0 0.0 Buah II.a 7,500
12 Kereta Dorong 1.0 0.0 1.0 Buah II.a 350,000
13 Sewa Wales 9.0 0.0 9.0 HR II.b 500,000
14 Mob./Demob. Wales 1.0 0.0 1.0 LS II.b 2,000,000
Sub Total 2)
UPAH
1 Pekerja 1,289.0 0.0 1,289.0 HOK III.a 20,250
2 Kepala Kelompok 55.0 0.0 55.0 HOK III.a 26,250
3 Tukang Pecah Batu 304.0 0.0 304.0 HOK III.a 26,250
1648 0 1648 Sub Total 3)
TOTAL BIAYA

Total Biaya (PNPM-MP dan Swadaya)


Sumber Dana Dari PNPM - MP
Sumber Dana
Swadaya

Diketahui Diperiksa
PjOK Fasilitator Kecamatan

Master Master
NIP. 19590808 198003 1 009 FT

Tukang harian 8 jam 40,000 HOK 6/8


Pekerja harian 8 jam 35,000 HOK 6/8

Lapen :
1. Batu 3-5
2. Batu 2-3
3. Batu 1-2
4. Pasir ayak untuk beton
5. Aspal 3,5 kg
BIAYA

: 01
: PNPM MPd Th 2014
: Perkerasan Telford
: (1252 x 3.0) M

Jumlah Jumlah
Swadaya PNPM MP Jumlah Total
( Rp ( Rp )
) ( Rp )

0 57,318,000 57,318,000
0 14,616,000 14,616,000
0 10,395,000 10,395,000
0 6,780,000 6,780,000
0 200,000 200,000
0 500,000 500,000
0 89,809,000 89,809,000

0 0 0
0 0 0
0 20,000 20,000
0 0 0
0 0 0
0 40,000 40,000
0 30,000 30,000
0 85,000 85,000
0 0 0
0 0 0
0 0 0
0 350,000 350,000
0 4,500,000 4,500,000
0 2,000,000 2,000,000
0 7,025,000 7,025,000 UPAH
Harian HOK
0 26,102,250 26,102,250 27,000 20,250
0 1,443,750 1,443,750 35,000 26,250
0 7,980,000 7,980,000 35,000 26,250
0 35,526,000 35,526,000
0 132,360,000 132,360,000

aya (PNPM-MP dan Swadaya) 132,360,000 1,252 Panjang


132,360,000 3 Lebar
0 3,756 Luas
35,240 Hrg/M2
9,458 HOK/M3
Dibuat Oleh
TPK

Master
Ketua

30,000 30,000
26,250 26,000
PNPM - Mandiri Perdesaan

REKAPITULASI ANGGARAN BIAYA

Propinsi : Jawa Timur


Kabupaten : Malang Jenis Kegiatan : Perkerasan Jalan
Kegiatan : Perkerasan Telf Kegiatan : Grg2 Plat-1 Kegiatan : Grg2 Buis Bt-1 Kegiatan : Saluran Tepi-1
Ukuran : (1252 x 3.0) M Ukuran : (0.75 x 0.75) - 7 Ukuran : (dia.40) - 6 M Ukuran : (800 x 0.5) M
Jumlah 1 unit Bobot Jumlah 1 unit Bobot Jumlah 1 unit Bobot Jumlah 1 unit Bobot
No Uraian
% % % %
No. RAB 01 No. RAB 02 No. RAB 03 No. RAB 04
PNPM - MP Swadaya PNPM - MP Swadaya PNPM - MP Swadaya PNPM - MP Swadaya

I. BAHAN 89,809,000 0 67.85

II. PERALATAN 7,025,000 0 5.31

III. UPAH 35,526,000 0 26.84

JUMLAH 132,360,000 0 100.00

132,360,000 0

IV. Operasional UPK 2 %

V. Operasional TPK 3 %

JUMLAH TOTAL 132,360,000 0 0 0 0 0 0 0

Jumlah Biaya Upah 35,526,000 0 0 0 0 0 0 0

Jumlah HOK konstruksi 1,648 0


1,648 0 0 #REF! 0 #REF! 0 #REF!

Diketahui Fasilitator Kecamatan


PjOK

Master Master Master


NIP. 19590808 198003 1 009 FK FT
LASI ANGGARAN BIAYA

Kecamatan : Master
Desa : Master
Kegiatan : Talud Jalan-1
Ukuran : (30 x 0,5) M
Bobot Jumlah Total Bobot
Jumlah 1 unit
% %
No. RAB 05
PNPM - MP Swadaya PNPM - MP Swadaya

89,809,000 0 67.85

7,025,000 0 5.31

35,526,000 0 26.84

132,360,000 0 100.00

132,360,000 0

2,786,500 0

4,179,800 0

0 0 139,326,300 0

0 0 35,526,000 0

1,648 0
0 #REF! 1,648
…………………….., Pebruari 2014
TPK

Master
Ketua

You might also like