21 KM Pipeline
Inspection of Top coat Application (Dry / Cured coating ); 9 Spools & 1 Random Pipes; Paint @ 11 KM To
System - APCS-2C 16.5 KM.

Inspection of surface preparation & Prior to primer application of damage areas for F14- 21 KM Pipeline
15C-2203-11/12/13/14-001, F14-SC-8391-24/25/26/27/28/29. Paint System - APCS-2C at @ 11 KM To
BGP F14 Steam Sleeper Area. From 07-Jan'18 to 09-Jan'18. 16.5 KM.

In-process inspection of primer coat OR First coat application of damage areas for F14-
POSCO
15C-2203-11/12/13/14-001, F14-SC-8391-24/25/26/27/28/29. Paint System - APCS-2C at LAYDOWN
BGP F14 Steam Sleeper Area. From 07-Jan'18 to 09-Jan'18.

Inspection of surface preparation & Prior to primer application of damage areas for F14-
400S-8386-10/09/08/07/06/05-001. Paint System - APCS-11C at BGP F14 Steam Sleeper
Area. From 07-Jan'18 to 09-Jan'18.

In-process inspection of primer coat OR First coat application of damage areas for F14-
400S-8386-10/09/08/07/06/05-001. Paint System - APCS-11C at BGP F14 Steam Sleeper
Area. From 07-Jan'18 to 09-Jan'18.
KGP

RFI Description

Inspection for Surface Preparation prior to application of primer coat touch up at Weld joint area for Guide
Support Installated for 8" Molten Sulfur Pipeline / Coating System APCS 1C (Primer coat application only). /
. ( Partially balance areas where Guide Supports were not installled ) ( Date : 07-JAN- to 09-JAN-2018 ).

In process Inspection for primer coat / touch up application at Weld joint area for Guide Supporta
Installated for 8" Molten Sulfur Pipeline / Coating System APCS 1C (Primer coat application only) ( Partially
balance areas where Guide Supports were not installled ).
( Date : 07-JAN- to 09-JAN-2018 ).

Verification and Visual Inspection of Abrasives for Material : 1. Copper Slag : 5 Bags ( 10
Tons ).
WGP

Location Location
Description RFI Description Description

Inspection for Surface Preparation prior to application of primer coat touch up at Flanges F14 SLEEPER
WGP TANK "B" ( Faces & Edges) on Tank B ( Roof & Shell ) / Coating System APCS 2A AREA

In process Inspection of primer coat touch up application at Flanges BGP PAINTING


WGP TANK "B" ( Faces & Edges) on Tank B ( Roof & Shell ) / Coating System APCS 2A SHOP

BGP PAINTING
SHOP

BGP PAINTING
SHOP

BGP LIVE PLANT


AREA

BGP LIVE PLANT


AREA

BGP LOADING
SHELTER
BGP SLEEPER
AREA

BGP PIPERACK -
B
BGP

Location
RFI Description Description

Completion insulation of pipe line, Drawing numbers: F14-SF-0881J-04,5,6,7,8,9,10-


001,F14-SF-0882J-04,5,6,7,8,9,10-001,F14-SF-2034J-04,5,6,7,8,9,10-001 Rev- 21 KM PIPELINE
00C,00D,00E,00F Prior to Cladding (MW- 50 MM) (SAIC-N-2015) Excluding welding joints, KGP
supports,Flanges

Inspection of surface preparation & Prior to primer application of Random Pipes & spools; Coating
System -APCS-2C

In-process inspection of primer coat OR First coat application of Random Pipes & spools; Coating
System -APCS-2C

Final coating Inspection and testing of weld joint for HT PKG # F17-U-0602 A/B-HT-001. a)
Visual & b) Dry Film Thickness (DFT). Coating System APCS-113A

Inspection of surface preparation & Prior to primer application of damage areas for F14-
SF-2034J-16/17/18/19/20/21-001, F14-SF-0866J-02/03/04/05/06/07/08-001, F14-SF-
0858J-02/03/04/05/06/07/08-001. Paint System - APCS-2C at BGP F14 Pipe Rack-A. From
08-Jan'18 to 10-Jan'18.

In-process inspection of primer coat OR First coat application of damage areas for F14-SF-
2034J-16/17/18/19/20/21-001, F14-SF-0866J-02/03/04/05/06/07/08, F14-SF-0858J-
02/03/04/05/06/07/08. Paint System - APCS-2C at BGP F14 Pipe Rack-A. From 08-Jan'18
to 10-Jan'18.

Inspection of primer coat prior to top coat application of damage areas for F17-60S-0920-
26/27/28-001, F17-60C-2164-01/02/03-001. Paint System - APCS-2C at BGP F17 Loading
Shelter.
Inspection of primer coat prior to top coat application of damage areas for F17-SF-0881J-
16/17/18/19/20/21-001, F17-SF-0882J-16/17/18/19/20/21-001, F17-SF-2034J-
41/40/39/38/37/36. Paint System - APCS-2C at BGP Sleeper Area.

Inspection of Repair/Touch-up of F17-400S-2130-01/02/03-001. Coating System: APCS-


11C at Pipe Rack - B
KGP

RFI Description

INSPECTION OF SURFACE PREPARATION ON LINE # 8"SF-2032F to SF-2032G from 17km


TO 18.5km (STRAIGHT LINE ONLY) EXCLUDING LOOPS & WELD JOINTS.
WGP

Location Location
Description RFI Description Description

Inspection of primer Coat prior to Mid Coat touch up application at Flanges BGP SLEEPER
WGP TANK "B" ( Faces & Edges) on Tank B ( Roof & Shell ) / Coating System APCS 2A AREA

BGP SLEEPER
WGP TANK "C" Inspection for Equipment : Air Compressor / Equipment Number : AQKD-160010 AREA

BGP PAINTING
WGP TANK "C" Verification and Visual inspection for Abrasive materials ( GMA GARNET-10 BAGS / 250 KG ) SHOP

Inspection for Surface Preparation prior to application of primer coat touch up at Nozzle Weld BGP PAINTING
WGP TANK "C" joints of Tank C ( Roof & Shell Nozzle Modification work ) / Coating System APCS 2A SHOP

In process Inspection of primer coat touch up application at at Nozzle Weld joints of Tank C BGP PAINTING
WGP TANK "C" ( Roof & Shell Nozzle Modification work ) / Coating System APCS 2A SHOP

BGP LIVE PLANT


AREA
BGP

Location
RFI Description Description

Inspection of surface preparation & Prior to primer application of HT PKG # F17-P-003-04-


HT-025 , F17-P-003-04-HT-026 & F17-P-003-04-HT-029 including weld joints, welded 21 KM Pipeline
supports and jumpovers. Paint System - APCS-2C at Loop - 4 to Loop 6. From 09-Jan'18 to @2.3-2.5 KM
11-Jan'18.

In-process inspection of primer coat OR First coat application of HT PKG # F17-P-003-04-


HT-025 & F17-P-003-04-HT-026 &F17-P-003-04-HT-029 including weld joints, welded 21 KM Pipeline
supports and jumpovers. Paint System - APCS-2C at Loop - 4 to Loop 6. From 09-Jan'18 to @2.3-2.5 KM
11-Jan'18.

Pre Cleaning Inspection of Vendor Spools (2 No.s) SRLF-V-5422-0081-D-0255-001 Rev-00


(Excluding Flanges) at BGP Paint Shop. Coating System: APCS-113C.

Inspection of Coat and Tape Wrap Application of Surface Preparation, Paste application, Tape
Wrap application, Outer wrap application for Vendor Spools (2 No.s) SRLF-V-5422-0081-D-0255-
001 Rev-00 (Excluding Flanges) at BGP Paint Shop. Coating System: APCS-113C.

Inspection of APCS-113C tape wrap application of Vendor Spools (2 No.s) SRLF-V-5422-0081-D-


0255-001 Rev-00 (Excluding Flanges) at BGP Paint Shop.

Inspection of Repair/Touch-up of F14-SF-2034J-11-001 to 13-001, F14-SF-0858J-


11/12/13/14/15/16/17-001, F14-SF-0866J-11/12/13/14/15/16/17-001, F14-SF-0880J-
01/02/03/04/05-001, F14-SF-0899J-01/02/03/04/05-001. Coating System -APCS-2C at F14
Pump Area.
KGP

RFI Description

Inspection for Surface Preparation prior to application of primer coat touch up at Weld Joints for Perforated
Cable Tray Supports / Coating System APCS 1C (Primer Coat application only for Galvanized Repair) @ Near
Sect. Van-1 ( Date : 09-JAN- to 11-JAN-2018 ).

In process Inspection of primer coat touch up at Weld Joints for Perforated Cable Tray Supports / Coating
System APCS 1C (Primer Coat application only for Galvanized Repair) @ Near Sect. Van-1 ( Date : 09-JAN-
to11-JAN-2018 ).
WGP

Location Location
Description RFI Description Description

Inspection of primer Coat prior to Mid Coat touch up application at at Nozzle Weld joints of F14 SLEEPER
WGP TANK "C" Tank C ( Roof & Shell Nozzle Modification work ) / Coating System APCS 2A AREA

F14 SLEEPER
AREA

F14 SLEEPER
AREA

F14 SLEEPER
AREA

BGP PAINTING
SHOP

BGP PAINTING
SHOP

BGP PAINTING
SHOP
BGP PAINTING
SHOP

BGP LIVE PLANT


AREA

BGP LIVE PLANT


AREA

BGP LIVE PLANT


AREA

BGP LIVE PLANT


AREA
BGP

Location
RFI Description Description

Pre-Application/Installation insulation of pipe line, Drawing numbers: F14-SF-0881J-


KGP LIVE PLANT
01,2,3-001,F14-SF-0882J-01,2,3-001 Rev-00C,00D,00E,00F Prior to insulation (MW- 50 AREA
MM) (SAIC-N-2006) Excluding welding joints, supports,Flanges

Final Inspection of pipe line, Drawing numbers: F14-SF-0881J-04,5,6,7,8,9,10-001 Rev- KGP LIVE PLANT
00B,00C (SAIC-N-2016) Excluding welding joints, supports,Flanges AREA

Final Inspection of pipe line, Drawing numbers: F14-SF-0882J-04,5,6,7,8,9,10-001 Rev- KGP LIVE PLANT
00B,00C (SAIC-N-2016) Excluding welding joints, supports,Flanges AREA

Final Inspection of pipe line, Drawing numbers: F14-SF-2034J-04,5,6,7,8,9,10-001 Rev- 21 KM Pipeline


00B,00C (SAIC-N-2016) Excluding welding joints, supports,Flanges @ 0-1 KM

21 KM Pipeline
Inspection of primer coat prior to top coat application of pipe Spools; Paint System -APCS-2C @ 0-1 KM

21 KM Pipeline
Inspection of Top coat Application (Dry / Cured coating ); 48 Spools; Paint System - APCS-1E @2.3-2.5 KM

21 KM Pipeline
Inspection of Top coat Application (Dry / Cured coating ); 101 Supports; Paint System - APCS-1C @2.3-2.5 KM
Final Inspection prior to backfill: Visual Inspection of Vendor Spools (2 No.s) SRLF-V-5422-0081-D-
0255-001 Rev-00 (Excluding Flanges) at BGP Paint Shop. Coating System: APCS-113C.

Inspection of surface preparation & Prior to primer application of damage areas for F14-
15C-2203-11/12/13/14-001, F14-SC-8391-24/25/26/27/28/29. Paint System - APCS-2C at
BGP F14 Steam Sleeper Area. From 10-Jan'18 to 11-Jan'18.

In-process inspection of primer coat OR First coat application of damage areas for F14-
15C-2203-11/12/13/14-001, F14-SC-8391-24/25/26/27/28/29. Paint System - APCS-2C at
BGP F14 Steam Sleeper Area. From 10-Jan'18 to 11-Jan'18.

Inspection of surface preparation & Prior to primer application of damage areas for F14-
400S-8386-10/09/08/07/06/05-001. Paint System - APCS-11C at BGP F14 Steam Sleeper
Area From 10-Jan'18 to 11-Jan'18.

In-process inspection of primer coat OR First coat application of damage areas for F14-
400S-8386-10/09/08/07/06/05-001. Paint System - APCS-11C at BGP F14 Steam Sleeper
Area. From 10-Jan'18 to 11-Jan'18.
KGP

RFI Description

Inspection of surface preparation & Prior to primer application of Structural weld


joints on K-85 LIVE PLANT AREA. Paint System - APCS-1C followed by APCS-26.

In-process inspection of primer coat OR First coat application of Structural weld


joints on K-85 LIVE PLANT AREA. Paint System - APCS-1C followed by APCS-26.

Equipment Inspection for compressor & air filter

Inspection for Surface Preparation prior to application of primer coat touch up at Weld
Joints 8" Molten Sulfur Pipeline, LINE : G07-SF-2032A-01 TO 28
Coating System APCS 2C / Date : 10-JAN- to 12-JAN-2018 ).

In process Inspection of primer coat touch up at Weld Joints 8" Molten Sulfur Pipeline,
LINE : G07-SF-2032A-01 TO 28
Coating System APCS 2C / Date : 10-JAN- to 12-JAN-2018 ).

Inspection for Surface Preparation prior to application of primer coat touch up at Weld Joints for Perforated
Cable Tray Supports / Coating System APCS 1C (Primer Coat application only for Galvanized Repair) @ Near
Sect. Van-1 ( Date : 09-JAN- to 11-JAN-2018 ).

In process Inspection of primer coat touch up at Weld Joints for Perforated Cable Tray Supports / Coating
System APCS 1C (Primer Coat application only for Galvanized Repair) @ Near Sect. Van-1 ( Date : 09-JAN-
to11-JAN-2018 ).

You might also like