You are on page 1of 26

Huawei Technologies Co., Ltd. provides customers with comprehensive technical support and service.

For
any assistance, please contact our local office or company headquarters.

Huawei Technologies Co., Ltd.


Address: Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China
Website: http://www.huawei.com
Email: support@huawei.com

Copyright © Huawei Technologies Co., Ltd. 2007. All rights reserved.


No part of this document may be reproduced or transmitted in any form or by any means without prior
written consent of Huawei Technologies Co., Ltd.

Trademarks and Permissions

and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.

Notice
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute the warranty of any kind, express or implied.

Huawei Technologies Proprietary


Precautions
注意事项

NOTE
This document aims to providing simple and distinctive guidelines for hardware installation. For details on the
installation operation steps, refer to the Installation Guide delivered in the form of CD-ROM along with the
equipment.
This document does not describe operations for the pre-delivery installation of the subrack, internal cables and
so on. Instead, this document describes only the operations for on-site installation.
本手册用于为设备硬件安装提供简明快捷的操作指导,如需参考安装操作步骤的详细完整描述,请参阅随设备
发货的光盘中的《安装指南》。
本手册对于出厂前已经完成的安装操作,如子架安装、内部线缆安装等不进行介绍,仅对现场安装涉及的操作
进行介绍。

CAUTION
Electrostatic Discharge 静电
Before touching the device, or holding the boards and IC
chips, wear the anti-static wrist s trap to prevent the
electrostatic discharge of the human body from
damaging the sensitive components. Ensure that the
other end of the anti-static wrist st rap is well grounded.
在接触设备,手拿插板、单板、IC芯片等之前,为防止人
体静电损坏敏感元器件,必须佩戴防静电手腕,并将防静
电手腕的另一端良好接地。

CAUTION

Power Cable 电源线


Do not install or remove a live line. Transient contact between the core of the power cable and the conductor
might generate electric arc or spark, which can cause fire or damage to the human body. Before installing or
removing the power cable, turn off the power switch.
严禁电源线带电安装、拆除。电源线在接触导体的瞬间,会产生电火花或电弧,可导致火灾或人身伤害。在进
行电源线的安装、拆除操作之前,必须关掉电源开关。

CAUTION
Laser 激光
When handling optical fibers, do not stand close to or look into the optic al fiber outlet directly with naked eyes.
进行光纤的安装、维护等各种操作时,严禁肉眼靠近或直视光纤出口。
Tools for Installation
安装工具

Tape Measure Cross Screwdriver Straight Screwdriver


长卷尺 十字螺丝刀 一字螺丝刀

Adjustable Wrench Socket Wrench Paper Knife


活动扳手 套筒扳手 裁纸刀

Ratchet Crimp Tool Cable Cutter Wire Stripper


压线钳 断线钳 剥线钳

Coax Stripper Network Cable Crimping Pliers Diagonal Pliers


同轴电缆剥线器 网线钳 斜口钳

Torque Spanner Cable Tester Multimeter


力矩扳手 网线测试仪 万用表

Electric Soldering Iron Solder Wire Adhesive Insulating Tape


电烙铁 焊锡丝 绝缘胶带
Contents目录
Installing and Routing Cables
安装和布放电缆
Cabling Holes on the Top and at the Bottom of the Cabinet
1 机柜顶部和底部走线孔说明 1
Connection of Power Cables
2 机柜和子架电源线接线关系 2
Cabinet Power Terminal and Subrack Power Terminal
3 机柜和子架电源端子座 4
Installing and Routing Power Cables
4 安装和布放电源线 6
Installing and Routing the Network Management Cable
5 安装和布放网管电缆 11
Installing and Routing External Alarm Cables
6 安装和布放外部告警电缆 13
Installing and Routing Cabinet Indicator Alarm Cable
7 安装和布放机柜指示灯告警电缆 14

Installing and Routing Fibers


安装和布放光纤
1 The Open Corrugated Pipe
开口波纹管说明
15

2 Installing and Routing External Fibers


安装布放外部光纤
16

3 Installing and Routing Fibers between Subracks


安装和布放子架间光纤
18

4 Installing and Routing Fibers for DCM


安装和布放DCM光纤
19

Installing the DCM frame


20
安装DCM插框
Installing the Orderwire Phone
21
安装公务电话

Installing the CRPC Frame


22
安装CRPC插框
Installing and Routing Cables
安装和布放电缆

1 Cabling Holes on the Top and at the Bottom of the Cabinet


机柜顶部和底部走线孔说明

Cabling holes on the top of the cabinet


机柜顶部走线孔

Back
M8 grouding bolt
Left Right
M8 接地螺栓
Front

Cable hole Power cable hole Cable hole


走线孔 电源线走线孔 走线孔

Cabling holes at the bottom of the cabinet


机柜底部走线孔

Fixing hole
机柜固定孔

Back

Left Right

Front

Cable hole Power cable hole Cable hole


走线孔 电源线走线孔 走线孔

Fixing hole
机柜固定孔

NOTE
Lead the optical fibers and signal cables into the cabinet through the cable hole at the top and bottom of
cabinet.
光纤和信号线在进入机柜时,均从机柜顶部或底部的走线孔走线。

1
Installing and Routing Cables
安装和布放电缆

2 Connection of Power Cables


机柜和子架电源线接线关系

A-RTN2(+) B-RTN1(+)

A-RTN1(+) B-RTN2(+)

A-NEG1(-) B-NEG2(-)
A-NEG2(-) B-NEG1(-)

-48 V -48 V 1 2 3 4 5 6 1 2 3 4 5 6 -48 V -48 V

Subrack D
Office power supply Office power supply
子架D

0V 0V 0V 0V

Office ground
机房接地排
Subrack C
子架C

Subrack B
子架B

Subrack A
子架A

NOTE
According to the current of the power supply equipment in the equipment room,when the current of each
power input is 63 A,four power inputs are required.
根据机房供电设备提供电流的不同,当单路供电电流是63A时,使用本图的机柜电源盒,接入主备共4路电
源。

2
Installing and Routing Cables
安装和布放电缆

2 Connection of Power Cables(with the Junction Box)


机柜和子架电源线接线关系(分线盒)

A-RTN(+) B-RTN(+)

A-NEG(-) B-NEG(-)

-48 V 1 2 3 4 5 6 1 2 3 4 5 6 -48 V

Office power supply SubrackD Office power supply


子架D
0V 0V

Office ground
SubrackC 机房接地排
子架C

SubrackB
子架B

SubrackA
子架A

NOTE
According to the current of the power supply equipment in the equipment room,when the current of each
power input is 100 A-128A,two power inputs are required.
根据机房供电设备提供电流的不同,当单路供电电流是100A~128A时,使用本图的机柜电源盒,接入主备共
2路电源。

3
Installing and Routing Cables
安装和布放电缆

3 Cabinet Power Terminal and Subrack Power Terminal


机柜和子架电源端子座

RTN2(+) NEG1(-)
Subrack power Subrack power
RTN1(+) NEG2(-)
output terminals output terminals
子架电源输出端子 子架电源输出端子

PGND of cabinet power terminal


机柜电源端子座保护地线

Cabinet power terminal


机柜电源端子座
1 2 3 4 5 6 1 2 3 4 5 6

Subrack power terminal


子架电源接口

4
Installing and Routing Cables
安装和布放电缆

3 Cabinet Power Terminal and Subrack Power Terminal(with the Junction Box)
机柜和子架电源端子座(分线盒)

Subrack power Junction Box RTN(+) NEG(-)


output terminals 分线盒
子架电源输出端子

Cabinet power terminal


机柜电源端子座

Subrack power terminal


子架电源接口

5
Installing and Routing Cables
安装和布放电缆

4 Installing and Routing Power Cables-Upward Cabling Mode


安装和布放电源线-电源线和保护地线上走线

Cabling frame
走线架
PGND cable
保护地线 1

BGND -48 V Power cable


电源地线 -48 V 电源线
2

RTN1(+) RTN2(+) NEG1(-) NEG2(-)

1 Route the power cables and the PGND cable in the upper cabling frame. Connect the PGND cable to the
grounding bolt at the top of the cabinet. Route the cabinet power cables to the DC input terminals on the DC
power distribution box (PDB) panel through the power cable hole at the top of the cabinet.
电源线和保护地线在上走线架布放,保护地线接至机柜顶部的接地螺柱上,电源线穿过机柜顶部的电源线走线
孔布放至直流配电盒端子位置。
2 Plug the cord end terminals of the power cables, from top downwards, wit h the fluted sides facing the front of
the cabinet, into the input terminals marked with RTN(+) and NEG(-) re spectively on the DC PDB panel.
电源线的冷压端子带凹槽一侧朝向机柜正面,向下插入标有“RTN(+)”和“NEG(-)”的直流配电盒端子座中。

6
Installing and Routing Cables
安装和布放电缆

4 Installing and Routing Power Cable-Downward Cabling Mode


安装和布放电源线-电源线和保护地线下走线

BGND -48 V Power cable


电源地线 -48 V 电源线
2

Cabling area
走线区

RTN1(+) RTN2(+) NEG1(-) NEG2(-)

Support
支架

PGND cable(green and yellow)


保护地线(黄绿色)
1

1 Lead the power cables and the PGND cable into the cabinet through the lower enclosure frame. Lead the
PGND cable along the cabinet cabling area to the grounding bolt at the top of the cabinet through the power
cable hole at the top of the cabinet. Lead the power cables along the cabinet cabling area to the input
terminals on the DC PDB panel at the top of the cabinet.
电源线和保护地线由机柜下围框引入机柜,保护地线沿机柜的走线区布放并穿过走线孔接至机柜顶部的接地螺
栓上,电源线沿机柜的走线区布放至机柜顶部。
2 Plug the cord end terminals of the power cables, from top downwards, wit h the fluted sides facing the front of
the cabinet, into the input terminals marked with RTN(+) and NEG(-) re spectively on the DC PDB panel.
电源线的冷压端子带凹槽一侧朝向机柜正面,向下插入标有“RTN(+)”和“NEG(-)”的直流配电盒端子座中。

7
Installing and Routing Cables
安装和布放电缆

4 Installing and Routing Power Cables-Upward Cabling Mode(with the Junction Box)
安装和布放电源线-电源线和保护地线上走线(分线盒)

Cabling frame
走线架

PGND cable(green and yellow)


保护地线(黄绿色)

2 1

BGND cable -48V Power cable


电源地线 -48V电源线
3

RTN(+) NEG(-) RTN(+) NEG(-)

RTN(+) NEG(-)

1 Route the power cables and the PGND cable in the upper cabling frame. Connect the PGND cable to the
grounding bolt at the top of the cabinet.
电源线和保护地线在上走线架布放,保护地线接至机柜顶部的接地螺柱上。
2 Cut out a power cable routing hole from the rodent-proof mesh at the cabi net top. Lead the power grounding
cables and –48 V power cables to the input cable terminals in areas A and B of the junction box.
剪掉机柜顶部部分防鼠网作为电源线走线口,将电源地线和–48V电源线引入到分线盒A区域和B区域输入线缆
端子座的位置。
3 Plug the cord end terminals of the power cables, from top downwards, wit h the fluted sides facing the front of
the cabinet, into the input terminals marked with RTN(+) and NEG(-) re spectively on the DC PDB panel.
电源线的冷压端子带凹槽一侧朝向机柜正面,向下插入标有“RTN(+)”和“NEG(-)”的直流配电盒端子座中。

8
Installing and Routing Cables
安装和布放电缆

4 Installing and Routing Power Cable-Downward Cabling Mode(with the Junction Box)
安装和布放电源线-电源线和保护地线下走线(分线盒)

2
1

BGND cable -48V Power cable


电源地线 3 -48V电源线

Cabling area
RTN(+) NEG(-) RTN(+) NEG(-)
走线区

RTN(+) NEG(-)

Support
支架

PGND cable(green and yellow)


保护地线(黄绿色)

1 Lead the power cables and the PGND cable into the cabinet through the lower enclosure frame. Lead the
PGND cable along the cabinet cabling area to the grounding bolt at the top of the cabinet through the power
cable hole at the top of the cabinet.
电源线和保护地线由机柜下围框引入机柜,保护地线沿机柜的走线区布放并穿过走线孔接至机柜顶部的接地螺
栓上。
2 Cut out a power cable routing hole from the rodent-proof mesh at the cabi net top. Lead the power grounding
cables and –48 V power cables to the input cable terminals in areas A and B of the junction box.
剪掉机柜顶部部分防鼠网作为电源线走线口,将电源地线和–48V电源线引入到分线盒A区域和B区域输入线缆
端子座的位置。
3 Plug the cord end terminals of the power cables, from top downwards, wit h the fluted sides facing the front of
the cabinet, into the input terminals marked with RTN(+) and NEG(-) re spectively on the DC PDB panel.
电源线的冷压端子带凹槽一侧朝向机柜正面,向下插入标有“RTN(+)”和“NEG(-)”的直流配电盒端子座中。

9
Installing and Routing Cables
安装和布放电缆

4 Installing and Routing Power Cable-Installing the Subrack Grounding Cables


安装和布放电源线-安装子架接地电缆

1 For a subrack installed above the airduct frame,connect one end of the PGND cable of this subrack to the
downward grounding screw of the subrack; connect the other end to an idle grounding screw adjacent to this
subrack on the post at the right side of the cabinet and use a screw to fix this end.
对于安装在导风框以上的子架,将子架接地线的一端连接到子架的下接地螺柱上,另一端连接至机柜右侧立柱
上相邻于子架的空闲接地螺柱上。
2 For a subrack installed under the airduct frame, connect one end of the PGND cable of this subrack to the
downward grounding screw of the subrack; connect the other end to the grounding screw on the column of
cabinet and use a screw to fix this end.
对安装在导风框以下的子架,将子架保护地线的一端安装在子架的下接地螺柱上,另一套在机柜前门接地螺柱
上并用螺丝固定。

10
Installing and Routing Cables
安装和布放电缆

5 Installing and Routing the Network Management Cable-Master slave mode


安装和布放网管电缆-主从模式

NM_ETH1
NM

NM_ETH2
Master subrack

ETH1
主子架
A
U

ETH2
X

NM_ETH1
STAT

PROG

AUX

NM_ETH2
Slave subrack
从子架
A
U
X

ETH1
NM_ETH1

ETH2
NM_ETH2

STAT

PROG

Slave subrack
从子架 AUX
ETH1

A
U
X
ETH2

NM_ETH1

STAT

Slave subrack PROG


NM_ETH2

从子架
AUX
A
U
X
ETH1
ETH2

STAT

PROG

AUX

11
Installing and Routing Cables
安装和布放电缆

5 Installing and Routing the Network Management Cable-Non master slave mode
安装和布放网管电缆-非主从模式

NM_ETH1
NM

NM_ETH2
Subrack D

ETH1
子架D
A
U

ETH2
X

STAT

NM_ETH1
PROG

AUX
Subrack C

NM_ETH2
子架C
A
U
X

ETH1
NM_ETH1

ETH2
NM_ETH2

STAT

Subrack B PROG

子架B AUX
ETH1

A
U
X
ETH2

NM_ETH1

STAT

Subrack A PROG
NM_ETH2

子架A
AUX
A
U
X
ETH1
ETH2

STAT

PROG

AUX

12
Installing and Routing Cables
安装和布放电缆

6 Installing and Routing External Alarm Cables


安装和布放外部告警电缆

To centralized alarm system


至集中告警系

COM ETH3 ALMO1ALMO2 ALMO3 ALMO4 SERIAL ALMI1 ALMI2 LAMP1LAMP2

SubrackD
子架D
COM ETH3 ALMO1ALMO2 ALMO3 ALMO4 SERIAL ALMI1 ALMI2 LAMP1LAMP2

SubrackC
子架C
COM ETH3 ALMO1ALMO2 ALMO3 ALMO4 SERIAL ALMI1 ALMI2 LAMP1LAMP2

SubrackB
子架B
COM ETH3 ALMO1ALMO2 ALMO3 ALMO4 SERIAL ALMI1 ALMI2 LAMP1LAMP2

SubrackA
子架A

To monitoring system
至监测系
EFI

Centralized Monitoring system


alarm system 监测系统
集中告警系统

8 8

1 1

RJ-45

13
Installing and Routing Cables
安装布放电缆

7 Installing and Routing Cabinet Indicator Alarm Cable


安装布放机柜指示灯告警电缆

EFI

COM ETH3 ALMO1ALMO2 ALMO3 ALMO4 SERIAL ALMI1 ALMI2 LAMP1LAMP2

COM ETH3 ALMO1ALMO2 ALMO3 ALMO4 SERIAL ALMI1 ALMI2 LAMP1LAMP2

COM ETH3 ALMO1ALMO2 ALMO3 ALMO4 SERIAL ALMI1 ALMI2 LAMP1LAMP2

COM ETH3 ALMO1ALMO2 ALMO3 ALMO4 SERIAL ALMI1 ALMI2 LAMP1LAMP2

To the drive interface on


the cabinet top indicator
至机柜顶部指示灯驱动接口

8 8

1 1

RJ-45

14
Installing and Routing Fibers
安装和布放光纤

1 The Open Corrugated Pipe


开口波纹管说明

Internal pipe

External pipe

NOTE
The open corrugated pipe cannot be loaded with too many optical fibers. A maximum of 60 fibers with 2 mm
diameter are recommended for an open corrugated pipe with 32 mm diameter.
开口波纹管中装载光纤的数量不能过多,32mm直径的开口波纹管推荐最大装载光纤跳线数量为2mm直径光
纤60根。
The length for the open corrugated pipe to enter the cabinet is about 10 cm.
波纹管伸入机柜部分的长度以10厘米左右为宜。

15
Installing and Routing Fibers
安装和布放光纤

2 Installing and Routing External Fibers-External Fiber in Upward Routing


安装和布放外部光纤-外部光纤上走纤

Open corrugated pipe


开口波纹管
1

Fiber trough
Fiber spool
走纤槽
盘纤架 3
2

Fiber hole
子架穿纤孔

Fiber holder
线扣

1 Lead the fibers protected by the open corrugated pipe into the cabinet through the fiber hole at the top of the
cabinet. Route the fibers to the corresponding subrack along the fiber troughs at both sides of the cabinet.
光纤在开口波纹管的保护下从机柜顶部的走纤孔引入,并沿机柜侧面的走纤槽布放至相应子架。
2 Coil the fibers round the fiber spooling frame at a side o f the corresponding subrack.
将光纤跳线在相应子架侧面的盘纤架上缠绕。
3 Pass the fibers through the fiber hole at the side of the subrack and the fiber holder at the bottom of the
subrack. Insert the fiber connectors into the corresponding optical interfaces on the board.
将光纤跳线穿过子架侧部的穿纤孔和底部的线扣,并将光纤连接器插入相应单板光接口。

NOTE
After the fiber installation, insert fiber plugs in idle interfaces and cover idle fibers with fiber caps.
光纤安装好后,对不插光纤的光口需要插上光口塞,对没有接光口的尾纤需要套上光纤帽.

16
Installing and Routing Fibers
安装和布放光纤

2 Installing and Routing External Fibers-External Fiber in Downward Routing


安装和布放外部光纤-外部光纤下走纤

Fiber trough
走纤槽

Fiber spool 3
盘纤架

Fiber hole
子架穿纤孔
Fiber holder
线扣

Support
支架

1 Open corrugated pipe


开口波纹管

1 Lead the fibers protected by the open corrugated pipe into the cabinet through the fiber hole at the bottom of
the cabinet. Route the fiber jumpers to the corresponding subrack along the fiber troughs at both sides of the
cabinet.
光纤在开口波纹管的保护下从机柜底部围框引入,沿机柜两侧的走纤槽布放至相应子架。
2 Coil the redundant fibers round the fiber spool at the side of the corresponding subrack. Pass the end fibers
through the fiber hole at the side of the subrack and the fiber holder at the bottom of the subrack.
将多余的光纤在相应子架侧面的盘纤架上缠绕,尾端的光纤穿过子架侧部的穿纤孔和底部的线扣。
3 Insert the fiber connectors into the corresponding optical interfaces on the board.
将光纤上的连接器插入相应的单板光接口。

17
Installing and Routing Fibers
安装和布放光纤

3 Installing and Routing Fibers between Subracks


安装和布放子架间光纤

1
Optical interface
光接口

Fiber spool
盘纤架

Fiber holder
线扣
Fiber hole
子架穿纤孔

1 Insert the connectors at both end of the fibers into the corresponding optical interfaces respectively on the
board. Pass the fibers through the fiber holder at the bottom of the subrack and the fiber hole at the side of the
subrack.
将光纤两端的连接器分别插入相应子架单板的光接口,并将光纤穿过相应子架底部的线扣和侧部的穿纤孔。
2 Lead the fibers to the adjacent subracks along the fiber troughs at both sides of the cabinet. Coil the
redundant fibers round the fiber spool at the side of the corresponding subrack. Pass the fibers through the
fiber hole at the side of the subrack and the fiber holder at the bottom of the subrack.
将光纤沿机柜两侧的走纤槽布放至相邻子架,将多余的光纤在相应子架侧面的盘纤架上缠绕,并将光纤穿过该
子架侧部的穿纤孔和底部的线扣。

NOTE
According to the redundant length of fibers, choose the coiling fiber spool. Coil the fibers round the big circle
of the fiber spool first and then the smaller circle. The fibers should not be rounded too tightly or too loosely.
在进行光纤盘纤时,根据光纤的长度选择不同的盘纤架。建议先将光纤在盘纤架的大圈上盘绕,然后再盘绕
小圈,盘绕以后的光纤不要太紧,也不要太松。

18
Installing and Routing Fibers
安装和布放光纤

4 Installing and Routing Fibers for DCM


安装和布放DCM光纤布放

Fiber
光纤

DCM frame
DCM插框

Fiber hole for DCM frame


DCM插框布线孔

NOTE
According to the redundant length of fibers, choose the coiling fiber spool. Coil the fibers round the big circle of
the fiber spool first and then the smaller circle. The fibers should not b e rounded too tightly or too loosely.
在进行光纤盘纤时,根据光纤的长度选择不同的盘纤架。建议先将光纤在盘纤架的大圈上盘绕,然后再盘绕小
圈,盘绕以后的光纤不要太紧,也不要太松。

19
Installing the DCM Frame
安装DCM插框

DCM

DCM frame
DCM插框
Mounting ear
挂耳
Screw
螺丝

NOTE
Each DCM requires four screws. If only one DCM need be installed in the cabinet, fix this DCM on the left
side of the DCM frame. This facilitates the distribution of fibers o n the left side of the cabinet.
每个DCM模块需要四个螺钉,如果机柜中只需安装一个DCM模块,则固定在DCM插框的左侧,以便于光纤在
机柜左侧布放。

20
Installing the Orderwire Phone
安装公务电话

Orderwire phone
公务电话

2
3
To EOW interface on the SC1
or SC2 board 1
至SC1或SC2 单板的EOW接口

Base Airduct frame


底座 导风框

1 Two small screws are delivered together with the product. Fasten two screws to fix the base of the phone on
the plane of the airduct.
利用随电话机发货的两个小螺丝,将电话底座安装在导风框上。
2 Connect the connector of the telephone wire to the EOW interface on the SC1 or SC2 board in the subrack.
将电话线一端的连接器插在子架中SC1或SC2 单板的EOW接口上。
3 Insert the other connector of the telephone wire into the interface on the phone set. Then, put the phone set
into the plastic base.
将电话线另一端插入话机的接口,最后把话机放入塑胶底座中。

21
Installing the CRPC Frame
安装CRPC插框

CRPC Frame
CRPC插框

2
Panel screws
面板螺钉

1
Mounting Ear CRPC board
挂耳 CRPC单板

1 Use two screws to fix the mounting ear on each side of the CRPC frame.
分别使用2个螺钉将挂耳紧固安装在插框两侧。
2 Use panel screws to secure the CRPC frame on the columns of the cabinet through the holes on the mounting
ears.
将面板螺钉拧入插框挂耳的孔位,使插框固定在机柜立柱上。

22

You might also like