You are on page 1of 15

/07@3= ! *30=?

<3839>
/;453<0 " )>07A

,<;132?<3& %("/"#%",')+.)+( page 1 of 7


-3@6=6;9& #$

)!&'+&'% )*("$#,*$
&+, #!,"+* -.%%( 0!(0%-
'*-.!((%$ '* *+,)!( '*$/-.,'!( %*0',+*)%*.

CLIENT: EQUIPOS Y CONTROLES INDUSTRIALES S.A.


END CLIENT: OLEODUCTO BICENTENARIO
P.O. NO.: FIC-000784
CAM REF.: 1941425
ITEM: ALL

01-07-2009 General revision

E.B. P.S.
data Redatto Approvato Descrizione
date Prepared Approved Description
/07@3= ! *30=?<3839>
/;453<0 " )>07A

Procedure: 9G-V-09-PAINTING page 2 of 7


Revision: 06

1. SCOPE
1.1 This specification defines the cycle of painting for carbon steel external surfaces
of valves installed in normal industrial environment.

2. QUALIFICATION REQUIREMENTS

2.1 Grove Facility:


Personnel qualification shall be based on the relevant working experience, tests
performed and dedicated training.

2.2 Applicator:
Applicator and Personnel qualification shall be in accordance with Supplier
Approval Process of Grove Facility.

3. SURFACE PREPARATION

3.1 Surfaces to be coated shall be free from the followings:

3.1.1 Rough weld, weld splatter, weld heat oxides, slag, sharp edges etc.

3.2 Prior to carry out the blasting operations described below, all surfaces shall be
degreased and cleaned by means of “CUT THRU” ecological detergent

3.3 The blasting operations shall not be performed if the ambient humidity is greater
than 85% and the steel temperature is less than 3°C above the dew point.

3.4 Steel grit (various size) or mineral abrasive (various mesh) can be used for
blast media.

3.5 Metallic surfaces to be coated shall be prepared as follows:

3.5.1 Preparation by grit blasting; the final surface shall be in accordance with ISO
8501-1 / SIS 05-59-00 grade of cleanliness Sa 2.5.
Minimum anchor profile: 35 microns (ISO 8503 ).

3.5.2 The abrasive shall be clean and free of oil, moisture, and chemicals such
as chloride, sulfate (salts) etc. Silica sand shall not be used as blasting
abrasive.

3.5.3 Surfaces must be completely clean and dry prior to painting which shall be
performed within four (4) hours after surface preparation completion.
/07@3= ! *30=?<3839>
/;453<0 " )>07A

Procedure: 9G-V-09-PAINTING page 3 of 7


Revision: 06

3.6 Valve end connections:


Machined Raised Face Gasket faces outside the RTJ Groove shall be blasted
per this document.
Machined Raised Face flanges, Bevels ends and Hubs Contact Sealing surfaces
shall be fully protected from blasting and coating.
Bore valves shall be fully protected from blast media damages or ingress by
complete coverage.

3.7 Bare stem valves ( where applicable ):


Top of the valves adapter plates mounting faces to operators shall be blasted per
this document except stems and its cavity that shall be protected from blast media
damages or ingress by adequate coverage.

3.8 Valve components (where applicable):


Stem grease fittings, body grease fittings, drain and vent plug connections,
bleed valves, body relief valves and safety valves shall be protected from blast
media damages or ingress by adequate coverage.

3.9 Manual operated valves shall have the associated gear operators or levers
blasted per this document.

3.10 Gear boxes (when applicable).


Grease fittings, stem hand-wheels and gaps around the circumference of the
indicator plates shall be protected from blast media damages or ingress.
When separated from the valves, the bottom of operator mounting surface,
shall be blasted per this document except the cavity of the stem that shall be
protected from blast media damages or ingress by adequate coverage.

3.11 Levers (where applicable):


The levers of small size valves (i.e. ø 1/2”÷4”) shall be disassembled to allow
blasting and coating per this document.
Stems and its cavity shall be protected from blast media damages or ingress

3.12 Special items (when applicable):


External threaded parts of Cadmium plated, Zinc plated ,Teflon coated studs
joining valve body to closures, valve adapter plate to gearbox and any other
external threaded surface previously coated shall be protected from blasting.

3.13 Valve stainless steel components ( where applicable ):


Stainless steel components shall be protected from blasting.
/07@3= ! *30=?<3839>
/;453<0 " )>07A

Procedure: 9G-V-09-PAINTING page 4 of 7


Revision: 06

4. COATING OPERATIVE INSTRUCTIONS

4.1 The coating operations shall not be performed if the ambient humidity is greater
than 85% and the steel temperature is less than 3°C above the dew point.

4.2 The paint manufacturer’s recommendations shall be strictly followed for the
storing, mixing, thinning, straining and over coating times between coats.

4.3 Stripe coat shall be carried out for each coat of the system and prior to the
subsequent spray application on all surfaces inaccessible to spray ( i.e. bolting,
mounting flanges, body gaps etc. )
Note: visual coating irregularities shall be accepted only on those areas subject
to stripe coat.

4.4 Coating shall be sprayed, by means of conventional spray equipment


suitable for work, as a continuous film free from saggings or pinholes.

4.5 Valve end connections.


Machined Raised Face Gasket faces outside the RTJ Groove and Back Face
of the Hub end surfaces shall be entirely coated per this document.

4.6 The internal holes area of the line assembly mounting flanges (where applicable)
shall be stripe coated but this area, due to geometric configuration, will be not
subject to D.F.T. measurements neither others types of checks.

4.7 The last 40-50 mm. of the valve pup piece ends ( where applicable ) shall beleft
unpainted.

4.8 Bare stem valves ( where applicable ):


Top of the valves adapter plates mounting faces to operators shall be coated per
this document except stems and its cavity that shall be protected from paint
ingress.
Note: contact surfaces shall not be subject to D.F.T. measurements.

4.9 Valve components.


Stem grease fitting shall be coated per this document excluded head connection.
Body grease fittings, relief valves, blow down valves, safety valves shall be
coated per this document excluded its small holes that shall be protected from
paint ingress.
Drain and vent plug connections shall be coated per this document excluded its
threaded parts or small drain holes that shall be protected from paint ingress.
/07@3= ! *30=?<3839>
/;453<0 " )>07A

Procedure: 9G-V-09-PAINTING page 5 of 7


Revision: 06

4.10 Special items (where applicable):


External threaded parts of Cadmium plated, Zinc plated ,Teflon coated studs
joining valve body to closures, valve adapter plate to gearbox and any other
external threaded surface previously protected from blasting shall be coated
per this document.

4.11 Valve stainless steel components ( where applicable ):


Stainless steel components shall be coated per this document.

4.12 Manual operated valves shall have the associated gear operators or levers
entirely coated per this document.
When separated from the valves, the bottom of gear operator mounting surface,
shall be coated except the cavity of the stem that shall be adequately protected
from paint ingress

4.13 Gear box components (where applicable):


Grease fitting shall be coated per this document excluded head connection.

5. VALVE COATING SYSTEM (STANDARD)

5.1 Application of Farbex: EPOXY PRIMER “EPOFARB ZPA”


Numbers of layers: 1 (One ).
Dry film thickness: 40 microns min.

5.2 Application of Farbex: EPOXY TOP COAT “EPOFARB 9006”


Numbers of layers: 1 (One ).
Dry film thickness: 40 microns min.

5.3 Total dry film thickness: 80 microns min.


Note: if the final thickness will be less than the minimum required, the step 5.2
shall be repeated.

5.4 Final colour: ALUMINIUM RAL 9006 (Standard colour).

5a. ALTERNATIVE COATING SYSTEM


(SPECIFICALLY CONFIRMED AND AGREED)
COLOURS
PRIMER TOP COAT
(to be confirmed)
FARBEX Epofarb ZPA Epofarb Ral colours
AMERON Amercoat 71 Amerlock 2 Limited colours
CARBOLINE Carboguard 193LF Carboguard 890 Ral colours
INTERNATIONAL Intergard 269 Intergard 475HS Off white
/07@3= ! *30=?<3839>
/;453<0 " )>07A

Procedure: 9G-V-09-PAINTING page 6 of 7


Revision: 06

6. COATING REPAIRS

6.1 Coating repairs shall not be performed if the ambient humidity is greater than 85%
and the steel temperature is less than 3°C above the dew point.

6.2 Damaged or defective painted surfaces shall be repaired as follows:

6.2.1 Check the surfaces in order to identify all coating damages, signs of improper
application or bare steel.

6.2.2 Remove any foreign matters from the surfaces and proceed with degreasing
using solvent.

6.2.3 Remove any painting defect from the area to be repaired using sand paper
( i.e. no. 120÷180 ).

6.2.4 Blow with dry compressed air to remove any residual dust.

6.2.5 Surround the defective surfaces overlapping the well adhesive coating and
proceed with the paint application, steps 5.1-5.2 properly mixed as per the
enclosed paint Manufacturer’s instructions by means of spray equipment,
brush or roller until the required thickness is reached.
Note: the final appearance of the coating repairs carried out by means of
brush or roller may vary from spray application due to aluminium pigments
contained on the top coat.

7.1 HANDLING

7.1 Handling of the coated surfaces shall be carried out after achievement of
adequate curing to allow the handling of the valves avoiding coating damages.
/07@3= ! *30=?<3839>
/;453<0 " )>07A

Procedure: 9G-V-09-PAINTING page 7 of 7


Revision: 06

8. STANDARD FINAL ACCEPTANCE


8.1 Dry Film Thickness check:
In accordance with SSPC-PA2 (see steps 4.6 & 4.8).

8.2 Final color:


In accordance with steps 5.4.

8.3 Visual check:


Coated surfaces shall have uniform appearance (see note steps 4.3 and 6.2.5).

9. ADDITIONAL FINAL ACCEPTANCE TO QCD-211


(SPECIFICALLY CONFIRMED AND AGREED)

9.1 Adhesion test


(to ASTM D3359-90 Method A)

10. ATTACHMENTS

Product data sheet of Ecological Detergent “CUT-THRU”


Product data sheet of Farbex “EPOFARB PRIMER ZPA” (")
Product data sheet of Farbex “EPOFARB 9006” (")
Standard Coating Certificate QCD 170
Coating Certificate QCD 211 (Only if required, see step 9)

(") The alternative products data sheets will be attached only if required
Company with Quality System Certified Valves & Measurement
Cameron Italy S.r.l.
=== ISO 9001 === Grove Facility
Via Italo Betto, 11
API Licenses
27058 Voghera (PV)
no. 6D-0001 - no. 6A-0199 – 6DSS-0003
Italy
Tel:+39-0383-6911
Fax: +39-0383-691709
www.c-a-m.com

CERTIFICATO DI VERNICIATURA ESTERNA


EXTERNAL PAINTING CERTIFICATE
QCD–170 (Rev.6 of 19/06/’08)
Cert. No. :
Page 1 of 1

CLIENTE
CLIENT

No. ORDINE IDS No. POS. No.


P. ORDER No. JOB No. ITEM No.

VALVOLA A DIAMETRO CLASSE FLANGIATURA


SFERA TIPO
BALL VALVE SIZE RATING END
TYPE CONNECTION

MATRICOLA
SERIAL No.

CON LA PRESENTE SI CERTIFICA CHE LE VALVOLE GROVE


FORNITE A FRONTE DELL’ORDINE IN OGGETTO SONO STATE
VERNICIATE ESTERNAMENTE SECONDO
LA SPECIFICA DI VERNICIATURA
GROVE No. : V REV. .

BY THIS LETTER WE CERTIFY THAT GROVE VALVES SUPPLIED AGAINST YOUR


SUBJECT ORDER HAVE BEEN EXTERNAL PAINTED IN ACCORDANCE
WITH GROVE PAINTING SPECIFICATION No. : V - REV. .

CONTROLLI E COLLAUDI RISULTATO


CHECK & TESTS RESULT

CONTROLLO SPESSORE
THICKNESS CHECK

CONTROLLO COLORE FINALE


FINAL COLOR CHECK

CONTROLLO VISIVO
VISUAL CHECK

La validita’ di questo documento e’ verificata/convalidata dalle firme sul CERTIFICATION PACKAGE COVER (QCD-331_Rev.0-01/04/’04) .
The validity of this document is verified/validated by signatures on the CERTIFICATION PACKAGE COVER (QCD-331_Rev.0-01/04/’04) .