1. SCOPE
1.1 This specification defines the cycle of painting for carbon steel external surfaces
of valves installed in normal industrial environment.
2. QUALIFICATION REQUIREMENTS
2.2 Applicator:
Applicator and Personnel qualification shall be in accordance with Supplier
Approval Process of Grove Facility.
3. SURFACE PREPARATION
3.1.1 Rough weld, weld splatter, weld heat oxides, slag, sharp edges etc.
3.2 Prior to carry out the blasting operations described below, all surfaces shall be
degreased and cleaned by means of “CUT THRU” ecological detergent
3.3 The blasting operations shall not be performed if the ambient humidity is greater
than 85% and the steel temperature is less than 3°C above the dew point.
3.4 Steel grit (various size) or mineral abrasive (various mesh) can be used for
blast media.
3.5.1 Preparation by grit blasting; the final surface shall be in accordance with ISO
8501-1 / SIS 05-59-00 grade of cleanliness Sa 2.5.
Minimum anchor profile: 35 microns (ISO 8503 ).
3.5.2 The abrasive shall be clean and free of oil, moisture, and chemicals such
as chloride, sulfate (salts) etc. Silica sand shall not be used as blasting
abrasive.
3.5.3 Surfaces must be completely clean and dry prior to painting which shall be
performed within four (4) hours after surface preparation completion.
/07@3= ! *30=?<3839>
/;453<0 " )>07A
3.9 Manual operated valves shall have the associated gear operators or levers
blasted per this document.
4.1 The coating operations shall not be performed if the ambient humidity is greater
than 85% and the steel temperature is less than 3°C above the dew point.
4.2 The paint manufacturer’s recommendations shall be strictly followed for the
storing, mixing, thinning, straining and over coating times between coats.
4.3 Stripe coat shall be carried out for each coat of the system and prior to the
subsequent spray application on all surfaces inaccessible to spray ( i.e. bolting,
mounting flanges, body gaps etc. )
Note: visual coating irregularities shall be accepted only on those areas subject
to stripe coat.
4.6 The internal holes area of the line assembly mounting flanges (where applicable)
shall be stripe coated but this area, due to geometric configuration, will be not
subject to D.F.T. measurements neither others types of checks.
4.7 The last 40-50 mm. of the valve pup piece ends ( where applicable ) shall beleft
unpainted.
4.12 Manual operated valves shall have the associated gear operators or levers
entirely coated per this document.
When separated from the valves, the bottom of gear operator mounting surface,
shall be coated except the cavity of the stem that shall be adequately protected
from paint ingress
6. COATING REPAIRS
6.1 Coating repairs shall not be performed if the ambient humidity is greater than 85%
and the steel temperature is less than 3°C above the dew point.
6.2.1 Check the surfaces in order to identify all coating damages, signs of improper
application or bare steel.
6.2.2 Remove any foreign matters from the surfaces and proceed with degreasing
using solvent.
6.2.3 Remove any painting defect from the area to be repaired using sand paper
( i.e. no. 120÷180 ).
6.2.4 Blow with dry compressed air to remove any residual dust.
6.2.5 Surround the defective surfaces overlapping the well adhesive coating and
proceed with the paint application, steps 5.1-5.2 properly mixed as per the
enclosed paint Manufacturer’s instructions by means of spray equipment,
brush or roller until the required thickness is reached.
Note: the final appearance of the coating repairs carried out by means of
brush or roller may vary from spray application due to aluminium pigments
contained on the top coat.
7.1 HANDLING
7.1 Handling of the coated surfaces shall be carried out after achievement of
adequate curing to allow the handling of the valves avoiding coating damages.
/07@3= ! *30=?<3839>
/;453<0 " )>07A
10. ATTACHMENTS
(") The alternative products data sheets will be attached only if required
Company with Quality System Certified Valves & Measurement
Cameron Italy S.r.l.
=== ISO 9001 === Grove Facility
Via Italo Betto, 11
API Licenses
27058 Voghera (PV)
no. 6D-0001 - no. 6A-0199 – 6DSS-0003
Italy
Tel:+39-0383-6911
Fax: +39-0383-691709
www.c-a-m.com
CLIENTE
CLIENT
MATRICOLA
SERIAL No.
CONTROLLO SPESSORE
THICKNESS CHECK
CONTROLLO VISIVO
VISUAL CHECK
La validita’ di questo documento e’ verificata/convalidata dalle firme sul CERTIFICATION PACKAGE COVER (QCD-331_Rev.0-01/04/’04) .
The validity of this document is verified/validated by signatures on the CERTIFICATION PACKAGE COVER (QCD-331_Rev.0-01/04/’04) .