Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
(A)
ii
iii
iv
(B)
7
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
(C)
1
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
2a
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
2b
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
3
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
5
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
7
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
8
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
9
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
10
11
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
12
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
13
14
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
14a
14b
14c
14d
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
15
15a
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
References:
Manual on Sewerage & Sewage Treatment, Third Edition- Revised and Updated, CPHEEO, Jap
Manual on Water Supply & Treatment, Third Edition- Revised and Updated, CPHEEO, Ministry
Metcalf & Eddy, G.Tchobanglous, F.L Burton ad H.D. Stensel. (2003). Wastewater Engineering,
Education, p 139, ISBN: 0070418780
"Water Measurement Manual" by U.S Department of the Interior Bureau of Reclamation in asso
Design Criteria
Influent Parameters
Average Sewage flow entering the treatment plant
Peak Flow
pH
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
Fecal Coliform
Effluent Parameters
pH
Biological Oxygen Demand (BOD)5 @20 deg C
Fecal coliforms
Total Phosphorous
Sludge Generation
Solid Consistency
Peak Flow
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
Provide Inlet Chamber of size 5.1 m Length x 3.4 m Width x 2.5 m LD + 0.5 m Freeboard
No. Screen
Average Design Flow / screen
Peak Design Flow / screen
Velocity ahead of screen(Va) at average flow, Maximum
Velocity ahead of screen(Va) at peak flow, Maximum
Consider Design velocity at peak flow
Channel approach velocity at Average f/s)- Minimum
Clear spacing between bars, (o)as per NIT
Thickness of flat ( t )
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
No. Screen
Average Design Flow / screen
Peak Design Flow / screen
Velocity ahead of screen(Va) at average flow, Maximum
Velocity ahead of screen(Va) at peak flow, Maximum
Consider Design velocity at peak flow
Channel approach velocity at Average f/s)- Minimum
Clear spacing between bars, (o)as per NIT
Thickness of flat ( t )
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
Side margin considered for the screen (Approx. 0.1 m on either side)
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
Mechanical Detritor
No. of Grit chamber
Settling Velocity
Provide 02 Nos of Mechanical Detritor of size of 11.50 m x 11.50 m x 0.90 m SWD + 0.5 m
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
Provide detritor outlet channel of size 5.0m L x 1.60m W x 0.70 m LD + 0.5 m Freeboard
Parshall Flume
Peak Design Flow (Q)
Ref : Parshall flume design as per "Water Measurement Manual" by U.S Department of the
Interior Bureau of Reclamation in association with United Sates Development of
Agriculture.
Selected flume width as per Figure 8-9, Parshall flume dimension, Page 8-30
Dimention of parshall flume for 4 ft throat width as per the enclosed chart:
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
K constant
Z, - Constant
Free board
Provide Parshall flume of size 10.0m Length x 1.22m Throat Width x 1.0m(LD) + 0.5m F.B
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
Provide SBR outlet channel of size 10.0m L x 1.2m W x 1.20 m LD + 0.5 m Freeboard
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
Quantity of Flow
Length of tank
Breadth of tank
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
Chlorine Tonner
No. of chlorinators
Average Flow
Dosage rate
Required capacity
Provide
No. of tonners
Qty of chlorinator
Volume of Sludge
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
Provide Thickener Feed Sump of size 7.9 m Length x 7.9 m Width x 2m L.D + 0.5m F.B
No of operating pump
Provided
Qty
Type
Hyadraulic loading rate (As per CPHEEO Manual on Sewerage & Sewage Treatment Systems Part : A,
Chapter 6, Pg. no.6-20)
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
Loading rate less than 12 m3/m2 are likely to give too much solids to permit this loading
hence, it is necessary to dilute the sludge with plant effluent.
Provide
Provide 3 Nos (2W+1S) Dilution water pumps each of 82 m 3/hr capacity @ 12 m head
Provide 02 Nos of Gravity Sludge Thickener of size 12.3 m dia x 3.5 m SWD + 0.5 m Free
Volume of Sludge
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
Volume of Sludge
Provide Thickened Sludge Collection Sump of size 5.2 m Length x 5.2 m Width x 2.5m L.D
Centrifuge
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
Head
Type
Quantity
Centrifuge capacity
Quantity
Type
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
Volume of Sludge
Quantity of sludge
Area required
Provide 02 Nos of Poly dosing tank of each size 2.3 m Length x 2.3 m Width x 1.7m L.D +
Operating Hours
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.
Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
Head
Quantity
Public Health and Municipal Engineering
Department
GJ
: 55000 m3/day
: 0.637 m3/sec
: 2.25
: 123750 m3/day
: 1.432 m3/sec
: 7.0-8.5
: 250 mg/Lit
: 500 mg/Lit
: 225 mg/Lit
: 45 mg/Lit
Public Health and Municipal Engineering
Department
GJ
: 5 mg/Lit
: 1x 10^6 MPN/100ml
: 6.5 - 9.0 -
: < 10 mg/Lit
: < 50 mg/Lit
: < 10 mg/Lit
: <100 MPN/100 ml
: < 10 mg/Lit
: <2 mg/Lit
: 0.8 %
: 55000.00 m3/day
: 123750.00 m3/day
: 1.432 m3/sec
GJ
: 42.97 m3
: 2.50 m
: 17.19 m2
As per width of screen chamber
: 5.10 m considering wall thick of 0.2m
: 3.40 m
m Freeboard
: 0.318 m3/sec
: 0.716 m3/sec
: 0.6 m/sec
: 1.2 m/sec
: 1.05 m/sec
: 0.3 m/sec
: 6 mm As per NIT
: 6 mm
: 0.68 m2
: 1.364 m2
: 1.00 m
Public Health and Municipal Engineering
Department
GJ
: 1.364 m
: 1370 mm
: 1.370 m
: 114.17 Nos
: 152.00 Nos
: 153.00 Nos
: 912.00 m2
0.91 m2
: 1.04 m
: 0.94 m2
: 0.34 m/sec
Hence Ok
: 0.76 m/sec
Hence Ok
: 0.0384 m
: 38.43 mm
: 50 %
: 1.517 m/sec
Public Health and Municipal Engineering
Department
GJ
: 0.087 m
: 87.39 mm
: < 300 mm Hence OK
: 1.370 m
: 0.30 m
: 1.670 m
: 2.06 m
: 2.74 m
: 1.20 m
: 6.00 m
: 6.00 m
: 1.00 m
: 0.50 m
L.D + 0.50 m FB
Public Health and Municipal Engineering
Department
GJ
: 0.318 m3/sec
: 0.716 m3/sec
: 0.6 m/sec
: 1.2 m/sec
: 1.00 m/sec
: 0.3 m/sec
: 10 mm As per NIT
: 6 mm
: 0.72 m2
: 1.146 m2
: 1.00 m
: 1.146 m
: 1150 mm
: 1.150 m
: 71.88 Nos
: 96.00 Nos
: 97.00 Nos
: 960.00 m2
0.96 m2
Public Health and Municipal Engineering
Department
GJ
: 1.04 m
: 0.99 m2
: 0.32 m/sec
Hence Ok
: 0.72 m/sec
Hence Ok
: 0.0350 m
: 35.05 mm
: 50 %
: 1.441 m/sec
: 0.079 m
: 78.50 mm
: < 300 mm Hence OK
: 1.150 m
: 0.20 m
: 1.350 m
Public Health and Municipal Engineering
Department
GJ
: 1.73 m
: 2.30 m
: 1.20 m
: 5.23 m
: 6.00 m
: 1.00 m
: 0.50 m
+ 0.50 m FB
: 123750 m3/day
: 0.15 mm
: 2.65
: 0.018 m/sec
As per Latest CPEHEEO
: 960.000 m3/m2/day MANAUAL 2013, Table 5.6, Pg: 5-
41
: 128.91 m2
: 11.50 m
GJ
: 1.432 m3/sec
: 1.60 m
: 0.70 m
: 5.00 m
Freeboard
: 1.432 m3/sec
: 50.58 cft/sec
: 4.00 feet
: 1.219 m
: 1.829 m
: 1.937 m
: 1.524 m
: 2.711 m
Public Health and Municipal Engineering
Department
GJ
: 0.457 m
: 1.788 m
: 0.610 m
: 0.914 m
Public Health and Municipal Engineering
Department
GJ
: 0.914 m
: 0.076 m
: 0.000 m
: 0.229 m
: 0.500 m
: 1.22 m
: 0.91 m
: 3.77 m
: 10.00 m
D) + 0.5m F.B
0.828 m3/sec
: 0.60 m/sec
1.38 m2
Public Health and Municipal Engineering
Department
GJ
: 1.20 m
: 1.20 m
: 10 m
eeboard
: 1 No.
: 55000 m3/day
Minutes for Ave As per Clause 5.9.2 of CPHEEO
: 30.00 flow Manual 2013
: 1145.83 Cum
: 3.00 m
: 381.94 m2
: 2.50
: 12.50 m
: 31.25 m
: 0.20 m
: 3.10 m c/c
: 10.08 Nos
: 1.50 m
: 2.02 m
: 34.00 m
eboard
Public Health and Municipal Engineering
Department
GJ
: 1 No.
: 0.83 m3/sec
: 1.80 m
: 12.50 m
: 3.00 m
Public Health and Municipal Engineering
Department
GJ
: 2 Nos
: 55000 m3/day
: 10 mg/lit
: 22.92 kg / hr
: 23.0 kg/hr
: 8250.00 kg / 15 days
: 9.17 Nos
: 23.0 kg /hr
: 2 2 (1W+1S)
: 10.0 Nos
: 2 Nos
: 8255 kg/day
: 0.8%
: 982.74 m3/day
: 3.00 Hours
: 122.84 m3
: 2.00 m
: 61.42 m2
Public Health and Municipal Engineering
Department
GJ
: 7.90 m
: 7.90 m
+ 0.5m F.B
: 2 Nos
: 24 Hours
: 20.47 m3/hr
: 25.00 m3/hr
: 3 (2W+1S)
: Screw type
2 Nos
: 8255 kg/day
: 35 kg/m2/day
: 117.93 m2
: 12.30 m
: 3.50 m
: 0.5 m
: 20- 25 m3/m2/day
: 118.82 m2
Public Health and Municipal Engineering
Department
GJ
: 491.37 m3/day
: 4.14 m3/m2/day
: 1965.48 m3/day
: 81.89 m3/hr
: 82.00 m3/hr
: 2459.37 m3/day
: 8255 kg/day
: 4 %
: 196.55 m3/day
: 8.19 m3/hr
: 32.76 m3/hr
: 786.19 m3/day
Public Health and Municipal Engineering
Department
GJ
1 No
: 8255 kg/day
: 4 %
: 196.55 m3/day
: 8.19 m3/hr
: 8 Hours
: 65.52 m3
: 2.5 m
: 5.20 m
: 5.20 m
: 67.60 m3
: 81.12 m3
: 82.00 m3/hr
Public Health and Municipal Engineering
Department
GJ
: 1 Nos
: 16 Hours
: 12.28 m3/hr
: 13 m3/hr
: 13 m3/hr
: 25 mts
: Screw type
: 2 (1W+1S)
: 13 m3/hr
: 2 (1W+1S)
: 8255 kg/day
: 95 %
: 7842.25 kg/day
: 8255 kg/day
Public Health and Municipal Engineering
Department
GJ
: 20 %
: 39.31 m3/day
: 1.64 m3/hr
: 39.31 m3/hr
: 943.43 m3/day
: 2.00 Nos
: 8255.00 kg/day
: 16.51 kg/day
: 0.1%
: 16.510 m3
: 8.255 m3
: 1.7 m
: 5.0 m2
: 2.3 m
: 1 No.
: 8 Hours
Public Health and Municipal Engineering
Department
GJ
: 1031.88 LPH
: 1475 LPH
: 1500 LPH
: 4 kg/cm2
: 2 (1W+1S)
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
(A) References:
i Manual on Sewerage & Sewage Treatment, Third Edition- Revised and Updated, CPHEEO
ii Manual on Water Supply & Treatment, Third Edition- Revised and Updated, CPHEEO, Min
Metcalf & Eddy, G.Tchobanglous, F.L Burton ad H.D. Stensel. (2003). Wastewater Enginee
iii
Education, p 139, ISBN: 0070418780
(Reference : CPHEEO Manual on Sewerage & Sewerage treatment, Nov 2013, Cl. 3.17.2, Pg.
hb = kb (V2 / 2g)
K- Values for different fittings as per CPHEEO Manual on Sewerage & Sewerage treatment,
Exit to pipe : 1
(Reference : CPHEEO manual on Sewerage & Sewage Treatment, Dec 1993, Chap25, Pg 394
Q = 2/3 [Ce. √2g. be . He3/2 ]
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
be = width of notch, m
(Reference : CPHEEO manual on Sewerage & Sewage Treatment, Dec 1993, Chap25, Pg 396
C DESIGN CRITERIA:
Peak Factor :
:
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
:
HFL of disposal Point at canal :
Head loss per metre length of pipe using Hazen Williams formula :
Exit loss :
No of bends considered :
Total losses :
Lip of weir :
Length of weir :
IL of Outlet Chamber :
Design flow :
:
Head loss through open channel:
Channel depth :
Channel Length :
Wetted perimeter :
Hydraulic Radius, R :
Velocity :
Wetted perimeter :
Slope, S = (V*n/R^(2/3))^ 2 :
Head loss :
No. of Bends :
K, Coefficient :
Head loss per bend, hb = kb (V2 / 2g) :
Losses considered :
TWL in CCT :
IL of CCT :
TWL in CCT :
Wetted perimeter :
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Hydraulic Radius, R :
Velocity, V :
Wetted perimeter :
Slope, S = (V*n/R^(2/3))^ 2 :
Head loss :
IL of the channel :
BWL in SBR :
Decanting Depth :
TWL in SBR :
6 Parshall flume
The free flow discharge equations for the Standard parshall flume
(Q) : C ha^n
As per Table 8-6, Page 8-32; For throat width of 4 feet parshall flume;
C = Co-efficient :
n = Exponent(n) :
ha : (Q / C)(1/1.58) :
Value of K ;
ha + K :
TWL in channel at upstream leg of the flume at one third point (at ha) :
IL in channel at upstream leg of the flume at one third point (at ha) :
Wetted perimeter :
Hydraulic Radius, R :
Velocity, V :
Wetted perimeter :
Slope, S = (V*n/R^(2/3))^ 2 :
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
Head loss :
8 Detritor
Freefall considered :
Length of weir :
IL of grit chamber :
No. of gate :
IL of distribution chamber :
No. of gates :
No. Screen :
Design Flow / screen :
Assume liquid depth in channel :
Screen width :
Provided open screen area :
12 Inlet chamber
No. of gates :
IL of Inlet chamber :
Public Health and Municipal Engineering
Department
LE160315-P-WW-SW-BE-2001
GJ
LE160315-P-WW-SW-BE-2001
GJ
LE160315-P-WW-SW-BE-2001
GJ
55 MLD
55000 m3/day
2291.67 m3/hr
0.637 m3/sec
2.25
123.75 MLD
123750 m3/day
Public Health and Municipal Engineering
Department
LE160315-P-WW-SW-BE-2001
GJ
5156.25 m3/hr
1.432 m3/sec
12.80 m
13.20 m
AVERAGE PEAK
12.80 12.80 m
0.6 1 m/sec
1.06 0.83 m2
1.16 1.03 m
1.2 1.2 m
500 500 m
Public Health and Municipal Engineering
Department
LE160315-P-WW-SW-BE-2001
GJ
0.10 0.16 m
0.008 0.014 m
0.016 0.027 m
0.048 0.082 m
0.17 0.29 m
0.20 0.30 m
13.00 13.10 m
13.10 13.10 m
0.10 0.10 m
13.20 13.20 m
12.50 12.50 m
0.106 0.126 m
0.110 0.150 m
13.31 13.35 m
1.80 1.80 m
Public Health and Municipal Engineering
Department
LE160315-P-WW-SW-BE-2001
GJ
11.30 11.30 m
13.35 13.35 m
3.00 3.00 m
2.90 2.90 m
125.00 125.00 m
362.50 362.50 m2
1279.00 1279.00 m
0.28 0.28 m
362.50 362.50 m2
59.00 59.00 m
0.000 0.000 m
Public Health and Municipal Engineering
Department
LE160315-P-WW-SW-BE-2001
GJ
1.00 1.00
0.000 0.000 m
0.00 0.00 m
0.05 0.05 m
13.40 13.40 m
3.00 3.00 m
10.40 10.40 m
13.40 13.40 m
1.20 1.20 m
10.00 10.00 m
1.44 1.44 m2
22.40 22.40 m
Public Health and Municipal Engineering
Department
LE160315-P-WW-SW-BE-2001
GJ
0.06 0.06 m
12.00 12.00 m2
4.80 4.80 m
0.000 0.000 m
0.005 0.100 m
13.41 13.50 m
12.30 12.30 m
13.50 13.50 m
As per Ctech's advance
1.20 1.20 m BEP.
12.30 12.30 m
As per Ctech's advance
2.60 2.60 m BEP.
14.90 14.90 m
2.40 2.40 m
17.30 17.30 m
LE160315-P-WW-SW-BE-2001
GJ
17.95 17.95 m
16 16
1.58 1.58
0.38 0.63 m
70.00 70.00 %
0.26 0.44 m
0.113 0.189 m
0.12 0.20 m
Public Health and Municipal Engineering
Department
LE160315-P-WW-SW-BE-2001
GJ
0.076 0.076 m
0.454 0.708 m
18.40 18.66 m
18.03 m
1.60 1.60 m
0.70 0.70 m
5.00 5.00 m
1.12 1.12 m2
11.40 11.40 m
0.10 0.10 m
3.50 3.50 m2
4.60 4.60 m
LE160315-P-WW-SW-BE-2001
GJ
0.001 0.004 m
0.050 0.100 m
18.71 18.76 m
0.70 0.70 m
18.06 18.06 m
18.76 18.76 m
0.15 0.15 m
18.91 18.91 m
11.50 11.50 m
11.50 11.50 m
0.112 0.193 m
0.120 0.200 m
19.03 19.11 m
0.90 0.90 m
18.13 18.21 m
1.20 1.20 m
Public Health and Municipal Engineering
Department
LE160315-P-WW-SW-BE-2001
GJ
0.90 1.10 m
1.08 1.32 m2
0.01 0.05 m
0.10 0.10 m
19.21 19.21 m
0.75 0.90 m
18.46 18.31 m
1.00 1.00 m
1.20 1.20 m
1.00 1.00 m
1.20 1.20 m2
0.00 0.01 m
0.05 0.05 m
19.26 19.26
Public Health and Municipal Engineering
Department
LE160315-P-WW-SW-BE-2001
GJ
1.00 1.00 m
18.26 18.26 m
2 2 Nos
0.318 0.716 m3/sec
1.00 1.00 m
1.370 1.370 m
912.00 912.00 m2
0.91 0.91 m2
75 75 Degree
1.04 1.04 m
0.94 0.94 m2
0.34 0.76 m/sec
0.0180 0.0384 m
17.96 38.43 mm
50 50 %
0.674 1.517 m/sec
0.007 0.087 m
Public Health and Municipal Engineering
Department
LE160315-P-WW-SW-BE-2001
GJ
6.89 87.39 mm
0.30 0.30 m
19.56 19.56 m
18.26 18.26 m
1.00 1.00 m
1.20 1.20 m
1.00 1.00 m
1.20 1.20 m2
17.96 38.43 mm
9.13 41.82 m
0.05 0.05 m
19.61 19.61
2.50 2.50 m
17.11 17.11 m
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
4 Receiving Sump
Sewage Treatment
5 Inlet Chamber
6 Fine screen channel (Mechanical)
7 Fine screen channel (Manual)
8 Detritor
10 Parshall Flume
Note:
L&T Construction
Water & Effluent Treatment IC - Wastewater BU
LE160315-P-WW-SW-BE-2001
GJ
Sewage Treatment
5.1 (L) x 3.4 (W) x 2.50 m (L.D) + 0.50 m (F.B) 1.00 RCC
6.0 m (L)x 1.67m (W) + 1.0m (L.D) + 0.50 m (FB) 2.00 RCC
6.0 m (L)x 1.35m (W) + 1.0m (L.D) + 0.50 m (FB) 1.00 RCC
11.50 m (L) x 11.50 m (W) x 0.90 m (SWD) + 0.5 m (FB) 2.00 RCC
5.0m (L) x 1.60m (W) x 0.70 m (LD) + 0.5 m (FB) 1.00 RCC
10.0m Length x 1.22m Throat Width x 1.0m(LD) + 0.5m F.B 1.00 RCC
6.0m (L) x 6.0m (W) x 3.5 m (LD) + 0.5 m (FB) 1.00 RCC
41.00 m (L) x 39.50 m (W) x 5.00 m (LD) + 0.5 m (FB) 4.00 RCC
10.0m (L) x 1.20m (W) x 1.20 m (LD) + 0.5m (FB) 1.00 RCC
34.0m (L) x 12.50m (W) x 3.00 m (LD) + 0.5m (FB) 1.00 RCC
12.50m (L) x 3.00m (W) x 1.80 m (LD) + 0.5m (FB) 1.00 RCC
6.0 m (L) x 8.0m (W) X 4.5m Ht 1.00 RCC Framed
10.0 m (L) x 8.0m (W) X 4.5m Ht 1.00 RCC Framed
Sludge Handling
Public Health and Municipal Engineering Department.
LE160315-P-WW-SW-BE-2001
GJ
7.90 m (L) x 7.90 m (W) x 2.00 m (LD) + 0.5 m (FB) 1.00 RCC
12.30 m (Dia) x 3.50 m (SWD) + 0.5 m (FB) 2.00 RCC
5.20m (L) x 5.20m (W) x 2.50 m (LD) + 0.5m (FB) 1.00 RCC
2.30m (L) x 2.30m (W) x 1.70 m (LD) + 0.5m (FB) 2.00 RCC
-
7.0 m (L) x 6.0m (W) X 4.5m Ht. 1.00 RCC (Stilted)
7.0 m (L) x 6.0m (W) X 4.5m Ht. 1.00 RCC (Stilted)
Utilities
28.0 m (L) x 8.0m (W) X 6.0m Ht. 1.00 RCC Framed
20.0 m (L) x 12.50m (W) X 4.50m Ht. 1.00 RCC Framed
4.80 m (L) x 3.80m (W) X 4.50m Ht. 1.00 RCC Framed
7.86 m (L) x 4.8m (W) X 4.50m Ht. 1.00 RCC Framed
7.80 m (L) x 4.8m (W) X 4.50m Ht. 1.00 RCC Framed
4.80 m (L) x 3.8m (W) X 4.50m Ht. 1.00 RCC Framed
4.80 m (L) x 3.8m (W) X 4.50m Ht. 1.00 RCC Framed
4.80 m (L) x 3.8m (W) X 4.50m Ht. 1.00 RCC Framed
10.0 m (L) x 8.0m (W) X 6.0m Ht. 1.00 RCC Framed
9.0 m (L) x 8.0m (W) X 4.50m Ht. 1.00 RCC Framed
15.0 m (L) x 8.0m (W) 1.00 -
Public Health and Municipal Engineering Department.
LE160315-P-WW-SW-BE-2001
GJ
engineering