L&T Construction

Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

(A)

ii

iii

iv

(B)

7
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

(C)
1
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

2a
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

2b
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

3
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

5
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

7
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

8
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

9
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

10

11
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

12
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

13

14
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

14a

14b

14c

14d
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

15

15a
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology i
receiving sumps cum pumping stations, Providing Sewer Network System in entire city i
construction of Conventional Manholes & Precast Manholes, House Sewer connections an
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

References:

Manual on Sewerage & Sewage Treatment, Third Edition- Revised and Updated, CPHEEO, Jap

Manual on Water Supply & Treatment, Third Edition- Revised and Updated, CPHEEO, Ministry

Metcalf & Eddy, G.Tchobanglous, F.L Burton ad H.D. Stensel. (2003). Wastewater Engineering,
Education, p 139, ISBN: 0070418780

"Water Measurement Manual" by U.S Department of the Interior Bureau of Reclamation in asso

Tender Document, Addendum & Prebid clarifications for Nellore District

Design Criteria
Influent Parameters
Average Sewage flow entering the treatment plant

Assumed Peak Factor

Peak Flow

pH

Total Suspended Solids (TSS)

Chemical Oxygen Demand (COD)


Biological Oxygen Demand (BOD)5 @20 deg C

Total Kjeldahl Nitrogen (TKN)


L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

Total Phosphorous (T-P)

Fecal Coliform

Effluent Parameters
pH
Biological Oxygen Demand (BOD)5 @20 deg C

Chemical Oxygen Demand (COD)

Total Suspended Solids (TSS)

Fecal coliforms

Total Nitrogen (as N-Total)

Total Phosphorous

Sludge Generation Details (As per Technology Provider's Advance BEP)

Sludge Generation

Solid Consistency

PROCESS DESIGN CALCULATION


Inlet Chamber
Quantity of Flow (Ave)

Peak Flow

Assumed Detention period


L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

Volume of the Inlet Chamber

Assumed Depth of flow

Area Required for Inlet Chamber

Breadth of the chamber

Length of the chamber

Provide Inlet Chamber of size 5.1 m Length x 3.4 m Width x 2.5 m LD + 0.5 m Freeboard

Fine Screen Chamber

Mechanical Fine Screen Chamber

No. Screen
Average Design Flow / screen
Peak Design Flow / screen
Velocity ahead of screen(Va) at average flow, Maximum
Velocity ahead of screen(Va) at peak flow, Maximum
Consider Design velocity at peak flow
Channel approach velocity at Average f/s)- Minimum
Clear spacing between bars, (o)as per NIT
Thickness of flat ( t )

Clear area of Screen Channel, Ac= (Q / Vp)


Total Screen area , At =A * (( o + t ) / o))
Assume liquid depth in channel
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

Screen Width required


Say

Total width of opening, Wo =W / (o+t)


Say
Total no of bars, ( Wo + 1 )
Provided open screen area

Assume Angle of inclination as per NIT


Slant length of screen in submerged portion = (1.0 / SIN (RADIAN(75))
Effective open screen Area
Velocity through screen at average flow

Velocity through screen at peak flow

Head loss thru screen in normal condition, h1=0.0729(Vs2-Va2)

Clogging / Choking Considered


Velocity through screen at clogged screen, Vs
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

Head loss on 50% clogging, h2=0.0729 (Vs2-Va2)


Head loss on 50% clogged screen

Construction Width of Screen chamber :


Effective screen width required

Side margin required for the screen as per screen vendor


(Approx. 0.15m on either side)

Total construction width of screen chamber

Construction Length of the screen chamber :


Upstream length of screen, 1.5 x W
Downstream Length of screen, 2 x W
Space required for belt conveyor and operation platform
Total length of screen chamber
Say, Length of screen

Construction Depth of Screen chamber:


Liquid depth
Free board
Provide Mechanical Fine Screen Chamber of size 6.0 m L x 1.67m W + 1.0m L.D + 0.50 m

Manual Fine Screen Channel (Standby)


L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

No. Screen
Average Design Flow / screen
Peak Design Flow / screen
Velocity ahead of screen(Va) at average flow, Maximum
Velocity ahead of screen(Va) at peak flow, Maximum
Consider Design velocity at peak flow
Channel approach velocity at Average f/s)- Minimum
Clear spacing between bars, (o)as per NIT
Thickness of flat ( t )

Clear area of Screen Channel, Ac= (Q / Vp)


Total Screen area , At =A * (( o + t ) / o))
Assume liquid depth in channel
Screen Width required
Say

Total width of opening, Wo =W / (o+t)


Say
Total no of bars, ( Wo + 1 )
Provided open screen area
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

Assume Angle of inclination as per NIT

Slant length of screen in submerged portion =


(1.0 / SIN (RADIAN(75))

Effective open screen Area


Velocity through screen at average flow

Velocity through screen at peak flow

Head loss thru screen in normal condition, h1=0.0729(Vs2-Va2)

Clogging / Choking Considered


Velocity through screen at clogged screen, Vs
Head loss on 50% clogging, h2=0.0729 (Vs2-Va2)
Head loss on 50% clogged screen

Construction Width of Screen chamber :


Effective screen width required

Side margin considered for the screen (Approx. 0.1 m on either side)

Total construction width of screen chamber


L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

Construction Length of the screen chamber :


Upstream length of screen 1.5 x W
Downstream Length of screen 2 x W
Space required for belt conveyor and operation platform
Total length of screen chamber
Say, Length of screen

Construction Depth of Screen chamber:


Liquid depth
Free board
Provide Manual Fine Screen Chamber of size 6.0 m L x 1.35m W + 1.0m L.D + 0.50 m FB

Mechanical Detritor
No. of Grit chamber

Peak Flow (Qpeak)

Grit particle size to be removed

Grit particle specific gravity

Settling Velocity

Surface overflow rate (A)

Total Plan area of Grit channel = Qpeak/(Q/A)

One side of square detritor

Provide 02 Nos of Mechanical Detritor of size of 11.50 m x 11.50 m x 0.90 m SWD + 0.5 m
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

Detritor outlet channel


Design Flow (Q)

Width of channel considered

Depth of flow in channel

Length of channel provided

Provide detritor outlet channel of size 5.0m L x 1.60m W x 0.70 m LD + 0.5 m Freeboard

Parshall Flume
Peak Design Flow (Q)

Ref : Parshall flume design as per "Water Measurement Manual" by U.S Department of the
Interior Bureau of Reclamation in association with United Sates Development of
Agriculture.

Peak Design Flow (Q)

Selected flume width as per Figure 8-9, Parshall flume dimension, Page 8-30

Flume width (W) for 50.58 cft/sec

Dimention of parshall flume for 4 ft throat width as per the enclosed chart:

Throat width of flume (W)

Sloping convergent length towards throat (A)

Width at the beginning of convergent section (D)

Width at the end of divergent section (C)

Width of channel width before convergent section (P)


L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

Length of wing wall at convergent section (M)

Length of convergent section (B)

Length of the throat (T)

Far end Width of divergent section (G)


L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

Channel Depth (E)

K constant

Z, - Constant

Free board

Hence, from the above,

Throat width (W)

Channel Depth (E)

Length of flume (M+B+T+G)

However Provide Length

Provide Parshall flume of size 10.0m Length x 1.22m Throat Width x 1.0m(LD) + 0.5m F.B

Sequential Batch Reactor (SBR)


As per Technology Provider's (C-tech) Design

SBR outlet channel to CCT


Design Flow (Q)

Velocity through channel

Area of the chnnael


L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

Depth of flow in channel

Width of the channel

Length of channel provided

Provide SBR outlet channel of size 10.0m L x 1.2m W x 1.20 m LD + 0.5 m Freeboard

Chlorine Contact Tank


No. of Tanks

Quantity of Flow (Ave)

Hydraulic Retention Time

Volume of CCT req

Assume liquid depth

Area Required for the Tank

Assumed Length to Breadth Ratio

Breadth of the Tank

Length of the Tank

Thickness of baffle wall assumed

C/C distance of baffle wall

No. of Baffles (shortest wall) req.

Width of Baffle opening

Total width of Baflle

Hence length of tank required

Provide Chlorine Contact Tank of size 34 m x 12.5 m x 3 m SWD + 0.5 m Freeboard


L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

CCT Outlet Chamber


No. of Tanks

Quantity of Flow

Assume depth of flow

Length of tank

Breadth of tank

Provide Outlet chamber of size 12.5m L x 3.00m W x 1.8m LD + 0.5m F.B


L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

Chlorine Tonner
No. of chlorinators

Average Flow

Dosage rate

Required capacity

Provide

No. of tonners

Provide capacity of chlorinators

Qty of chlorinator

Provide quantity of tonners

Thickener Feed Sump


No. of Tank

Total Sludge Generation

Solid Consistency of thickened sludge

Volume of Sludge

Provide Hydraulic Retention Time

Volume of the tank required

Assume Liquid depth

Area of tank required


L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

Length of tank required

Breadth of the tank required

Provide Thickener Feed Sump of size 7.9 m Length x 7.9 m Width x 2m L.D + 0.5m F.B
No of operating pump

Hours of operation considered

Capacity of each thickener feed pump

Provided

Qty

Type

Gravity Sludge Thickener


No. of thickener

Total Sludge Generation

Solids loading Rate (25-35 kg/m2/day)

Area of the each thickener required

Diameter of the tank

Provide Side water depth

Selected Free Board

Check for hydraulic loading rate:

Hyadraulic loading rate (As per CPHEEO Manual on Sewerage & Sewage Treatment Systems Part : A,
Chapter 6, Pg. no.6-20)

Area of thickener provided


L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

Volume of sludge feed flow / thickener

Hydraulic loading rate

Loading rate less than 12 m3/m2 are likely to give too much solids to permit this loading
hence, it is necessary to dilute the sludge with plant effluent.

Quantity of dilution water required @ 4 times of feed flow (Approx.)

Provide

Provide 3 Nos (2W+1S) Dilution water pumps each of 82 m 3/hr capacity @ 12 m head

Sludge Flow to thickener (Thickener feed flow + Dilution flow)

Hydraulic loading rate provided

Provide 02 Nos of Gravity Sludge Thickener of size 12.3 m dia x 3.5 m SWD + 0.5 m Free

Quantity of overflow from thickener:

Quantity of sludge generation

Solid Consistency of thickened sludge

Volume of Sludge

Hence overflow from thickener


L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

Thickened Sludge Collection Sump


No. of tanks

Quantity of sludge generation

Solid Consistency of thickened sludge

Volume of Sludge

Hydraulic Retention time

Volume of tank required

Assume Liquid depth

Length of tank required

Breadth of the tank required

Provide Thickened Sludge Collection Sump of size 5.2 m Length x 5.2 m Width x 2.5m L.D

Air Blower for Sludge Sump:

Volume of sludge tank

Air mixing rate

Capacity of Air blower

Selected Blower capacity

Provide 2 Nos of air blower of each capacity 82 m3/hr @ 0.3 kg/cm2

Centrifuge
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

No. Of operating Centrifuge

Volume of thickened sludge

Hours of operation considered

Capacity of centrifuge required

Capacity of centrifuge provided

Capacity of feed pump provided

Head

Type

Quantity

Centrifuge capacity

Quantity

Type

Quantity of Dewatered sludge:

Quantity of sludge generation

Efficicency of centrifuge as per manufacterer

Qty. of dewatered sludge

Quantity of centrate volume:

Quantity of sludge generation


L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

Solid Consistency of dewatered sludge

Volume of Sludge

Hence centrate flow

Poly dosing tank


Dosing tank

Quantity of sludge

Poly dosing rate

Quantity of ploy required

Strength of poly electrolyte

Volume of poly soln.

Volume required per tank

Assume liquid depth

Area required

Length & Breadth of the tank required

Provide 02 Nos of Poly dosing tank of each size 2.3 m Length x 2.3 m Width x 1.7m L.D +

Poly dosing pump


Qty of operating pumps

Operating Hours
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore Municipal Corporation.

Title : Design Calculations of Sewage Treatment Plant of Capacity 55 MLD STP, Allipuram.

Capacity of dosing pump

Provide pump capacity @ 70% operating speed

Provide pump capacity

Head

Quantity
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV


gy including
ty including LE160315-P-WW-SW-BE-2001
s and Allied
DESIGNED CHECKED APPROVED SHEET

GJ

CPHEEO, Japan International Cooperation Agency, Nov 2013

EEO, Ministry of Urban Development, New Delhi, May 1999

Engineering, Treatment and Reuse, Fourth Edition, McGraw Hill

mation in association with United Sates Development of Agriculture.

: 55000 m3/day

: 0.637 m3/sec

: 2.25

: 123750 m3/day

: 1.432 m3/sec

: 7.0-8.5

: 250 mg/Lit

: 500 mg/Lit

: 225 mg/Lit

: 45 mg/Lit
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV


gy including
ty including LE160315-P-WW-SW-BE-2001
s and Allied
DESIGNED CHECKED APPROVED SHEET

GJ

: 5 mg/Lit

: 1x 10^6 MPN/100ml

: 6.5 - 9.0 -

: < 10 mg/Lit

: < 50 mg/Lit

: < 10 mg/Lit

: <100 MPN/100 ml

: < 10 mg/Lit

: <2 mg/Lit

As per Technology provider's


: 8255 kg/day Advance BEP

: 0.8 %

: 55000.00 m3/day

: 123750.00 m3/day

: 1.432 m3/sec

: 30.00 sec for peak flow


Public Health and Municipal Engineering
Department

DOCUMENT NO. REV


gy including
ty including LE160315-P-WW-SW-BE-2001
s and Allied
DESIGNED CHECKED APPROVED SHEET

GJ

: 42.97 m3

: 2.50 m

: 17.19 m2
As per width of screen chamber
: 5.10 m considering wall thick of 0.2m

: 3.40 m

m Freeboard

: 2 Nos Nos Each 50% of peak flow

: 0.318 m3/sec
: 0.716 m3/sec
: 0.6 m/sec
: 1.2 m/sec
: 1.05 m/sec
: 0.3 m/sec
: 6 mm As per NIT

: 6 mm

: 0.68 m2
: 1.364 m2
: 1.00 m
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV


gy including
ty including LE160315-P-WW-SW-BE-2001
s and Allied
DESIGNED CHECKED APPROVED SHEET

GJ

: 1.364 m
: 1370 mm
: 1.370 m

: 114.17 Nos
: 152.00 Nos
: 153.00 Nos
: 912.00 m2
0.91 m2

: 75 Degree As per NIT

: 1.04 m
: 0.94 m2
: 0.34 m/sec
Hence Ok
: 0.76 m/sec
Hence Ok

: 0.0384 m
: 38.43 mm
: 50 %
: 1.517 m/sec
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV


gy including
ty including LE160315-P-WW-SW-BE-2001
s and Allied
DESIGNED CHECKED APPROVED SHEET

GJ

: 0.087 m
: 87.39 mm
: < 300 mm Hence OK

: 1.370 m

: 0.30 m

: 1.670 m

: 2.06 m
: 2.74 m
: 1.20 m
: 6.00 m
: 6.00 m

: 1.00 m
: 0.50 m
L.D + 0.50 m FB
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV


gy including
ty including LE160315-P-WW-SW-BE-2001
s and Allied
DESIGNED CHECKED APPROVED SHEET

GJ

: 1 No Each 50% of peak flow

: 0.318 m3/sec
: 0.716 m3/sec
: 0.6 m/sec
: 1.2 m/sec
: 1.00 m/sec
: 0.3 m/sec
: 10 mm As per NIT

: 6 mm

: 0.72 m2
: 1.146 m2
: 1.00 m
: 1.146 m
: 1150 mm
: 1.150 m

: 71.88 Nos
: 96.00 Nos
: 97.00 Nos
: 960.00 m2
0.96 m2
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV


gy including
ty including LE160315-P-WW-SW-BE-2001
s and Allied
DESIGNED CHECKED APPROVED SHEET

GJ

: 75 Degree As per NIT

: 1.04 m

: 0.99 m2
: 0.32 m/sec
Hence Ok
: 0.72 m/sec
Hence Ok

: 0.0350 m
: 35.05 mm
: 50 %
: 1.441 m/sec
: 0.079 m
: 78.50 mm
: < 300 mm Hence OK

: 1.150 m

: 0.20 m

: 1.350 m
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV


gy including
ty including LE160315-P-WW-SW-BE-2001
s and Allied
DESIGNED CHECKED APPROVED SHEET

GJ

: 1.73 m
: 2.30 m
: 1.20 m
: 5.23 m
: 6.00 m

: 1.00 m
: 0.50 m
+ 0.50 m FB

: 2 Nos Each 100% peak flow

: 123750 m3/day

: 0.15 mm

: 2.65

: 0.018 m/sec
As per Latest CPEHEEO
: 960.000 m3/m2/day MANAUAL 2013, Table 5.6, Pg: 5-
41

: 128.91 m2

: 11.50 m

SWD + 0.5 m Freeboard


Public Health and Municipal Engineering
Department

DOCUMENT NO. REV


gy including
ty including LE160315-P-WW-SW-BE-2001
s and Allied
DESIGNED CHECKED APPROVED SHEET

GJ

: 1.432 m3/sec

: 1.60 m

: 0.70 m

: 5.00 m

Freeboard

: 1.432 m3/sec

: 50.58 cft/sec

: 4.00 feet

: 1.219 m

: 1.829 m

: 1.937 m

: 1.524 m

: 2.711 m
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV


gy including
ty including LE160315-P-WW-SW-BE-2001
s and Allied
DESIGNED CHECKED APPROVED SHEET

GJ

: 0.457 m

: 1.788 m

: 0.610 m

: 0.914 m
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV


gy including
ty including LE160315-P-WW-SW-BE-2001
s and Allied
DESIGNED CHECKED APPROVED SHEET

GJ

: 0.914 m

: 0.076 m

: 0.000 m

: 0.229 m

: 0.500 m

: 1.22 m

: 0.91 m

: 3.77 m

: 10.00 m

D) + 0.5m F.B

: 2979 m3/hr Decant Flow

0.828 m3/sec

: 0.60 m/sec

1.38 m2
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV


gy including
ty including LE160315-P-WW-SW-BE-2001
s and Allied
DESIGNED CHECKED APPROVED SHEET

GJ

: 1.20 m

: 1.20 m

: 10 m

eeboard

: 1 No.

: 55000 m3/day
Minutes for Ave As per Clause 5.9.2 of CPHEEO
: 30.00 flow Manual 2013

: 1145.83 Cum

: 3.00 m

: 381.94 m2

: 2.50

: 12.50 m

: 31.25 m

: 0.20 m

: 3.10 m c/c

: 10.08 Nos

: 1.50 m

: 2.02 m

: 34.00 m

eboard
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV


gy including
ty including LE160315-P-WW-SW-BE-2001
s and Allied
DESIGNED CHECKED APPROVED SHEET

GJ

: 1 No.

: 2979.00 m3/hr Ctech Decant flow

: 0.83 m3/sec

: 1.80 m

: 12.50 m

: 3.00 m
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV


gy including
ty including LE160315-P-WW-SW-BE-2001
s and Allied
DESIGNED CHECKED APPROVED SHEET

GJ

: 2 Nos

: 55000 m3/day

: 10 mg/lit

: 22.92 kg / hr

: 23.0 kg/hr

: 8250.00 kg / 15 days

: 9.17 Nos

: 23.0 kg /hr

: 2 2 (1W+1S)

: 10.0 Nos

: 2 Nos

: 8255 kg/day

: 0.8%

: 982.74 m3/day

: 3.00 Hours

: 122.84 m3

: 2.00 m

: 61.42 m2
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV


gy including
ty including LE160315-P-WW-SW-BE-2001
s and Allied
DESIGNED CHECKED APPROVED SHEET

GJ

: 7.90 m

: 7.90 m

+ 0.5m F.B
: 2 Nos

: 24 Hours

: 20.47 m3/hr

: 25.00 m3/hr

: 3 (2W+1S)

: Screw type

2 Nos

: 8255 kg/day

: 35 kg/m2/day

: 117.93 m2

: 12.30 m

: 3.50 m

: 0.5 m

: 20- 25 m3/m2/day

: 118.82 m2
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV


gy including
ty including LE160315-P-WW-SW-BE-2001
s and Allied
DESIGNED CHECKED APPROVED SHEET

GJ

: 491.37 m3/day

: 4.14 m3/m2/day

: 1965.48 m3/day

: 81.89 m3/hr

: 82.00 m3/hr

: 2459.37 m3/day

: 20.70 m3/m2/day Hence Ok

+ 0.5 m Free board

: 8255 kg/day

: 4 %

: 196.55 m3/day

: 8.19 m3/hr

: 32.76 m3/hr

: 786.19 m3/day
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV


gy including
ty including LE160315-P-WW-SW-BE-2001
s and Allied
DESIGNED CHECKED APPROVED SHEET

GJ

1 No

: 8255 kg/day

: 4 %

: 196.55 m3/day

: 8.19 m3/hr

: 8 Hours

: 65.52 m3

: 2.5 m

: 5.20 m

: 5.20 m

dth x 2.5m L.D + 0.5m F.B

: 67.60 m3

: 1.2 m3/ hr /m3 of sludge volume

: 81.12 m3

: 82.00 m3/hr
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV


gy including
ty including LE160315-P-WW-SW-BE-2001
s and Allied
DESIGNED CHECKED APPROVED SHEET

GJ

: 1 Nos

: 196.55 m3/ day

: 16 Hours

: 12.28 m3/hr

: 13 m3/hr

: 13 m3/hr

: 25 mts

: Screw type

: 2 (1W+1S)

: 13 m3/hr

: 2 (1W+1S)

: Solid Bowl Type

: 8255 kg/day

: 95 %

: 7842.25 kg/day

: 8255 kg/day
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV


gy including
ty including LE160315-P-WW-SW-BE-2001
s and Allied
DESIGNED CHECKED APPROVED SHEET

GJ

: 20 %

: 39.31 m3/day

: 1.64 m3/hr

: 39.31 m3/hr

: 943.43 m3/day

: 2.00 Nos

: 8255.00 kg/day

: 2 kg/ MT of dry solids

: 16.51 kg/day

: 0.1%

: 16.510 m3

: 8.255 m3

: 1.7 m

: 5.0 m2

: 2.3 m

x 1.7m L.D + 0.5m F.B

: 1 No.

: 8 Hours
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV


gy including
ty including LE160315-P-WW-SW-BE-2001
s and Allied
DESIGNED CHECKED APPROVED SHEET

GJ

: 1031.88 LPH

: 1475 LPH

: 1500 LPH

: 4 kg/cm2

: 2 (1W+1S)
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven


Technology including receiving sumps cum pumping stations, Providing Sewer
Network System in entire city including construction of Conventional Manholes &
Precast Manholes, House Sewer connections and Allied Works, O&M for a period of
5 years complete, in Nellore Municipal Corporation.

Title : Hydraulic Design Calculations of Sewage Treatment Plant of Capacity 55 MLD


STP, Allipuram.

(A) References:

i Manual on Sewerage & Sewage Treatment, Third Edition- Revised and Updated, CPHEEO

ii Manual on Water Supply & Treatment, Third Edition- Revised and Updated, CPHEEO, Min

Metcalf & Eddy, G.Tchobanglous, F.L Burton ad H.D. Stensel. (2003). Wastewater Enginee
iii
Education, p 139, ISBN: 0070418780

"Water Measurement Manual" by U.S Department of the Interior Bureau of Reclamation in


iv
Agriculture.

v Tender Document, Addendum & Prebid clarifications for Nellore District

(B) Formulae used in hydraulic calculation are given below,

i Velocity in Open Channel : Manning's Formula


(Reference : As per CPHEEO manual on Sewerage & Sewerage treatment, Nov 2013, Cl. 3.15.4,

V = [(1/n)] * [R 2/3 S 1/2]

Where, V = Velocity in m/s

n = Manning's coefficient of roughness

For RCC Channel, n = 0.011

R = Hydraulic radius, m (Wetted area / Wetted perimeter)

S = Slope of hydraulic gradient

ii Head loss through pipe: Hazen William Formula


HL = 6.815 (V/C)1.852 (1/D)1.167

Where, HL = Head loss in m / m of pipe length


L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven


Technology including receiving sumps cum pumping stations, Providing Sewer
Network System in entire city including construction of Conventional Manholes &
Precast Manholes, House Sewer connections and Allied Works, O&M for a period of
5 years complete, in Nellore Municipal Corporation.

Title : Hydraulic Design Calculations of Sewage Treatment Plant of Capacity 55 MLD


STP, Allipuram.

C = Hazen Williams Constant

V = Velocity through Pipe

D = Inner diameter of pipe (m)

iii Head loss in Bends / appurtenances

(Reference : CPHEEO Manual on Sewerage & Sewerage treatment, Nov 2013, Cl. 3.17.2, Pg.
hb = kb (V2 / 2g)

Where, V = Velocity of flow in m3/sec.


kb = friction coefficient

g = acceleration due to gravity = 9.81 m/s2

K- Values for different fittings as per CPHEEO Manual on Sewerage & Sewerage treatment,

Type of Fitting : K-Value

Elbow 900 : 1.0

Elbow 450 : 0.75

Elbow 220 : 0.50

Sluice Gates : 0.8

Entry to pipe : 0.5

Exit to pipe : 1

iv Head loss over Rectangular Notch - Without End Contractions

(Reference : CPHEEO manual on Sewerage & Sewage Treatment, Dec 1993, Chap25, Pg 394
Q = 2/3 [Ce. √2g. be . He3/2 ]
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven


Technology including receiving sumps cum pumping stations, Providing Sewer
Network System in entire city including construction of Conventional Manholes &
Precast Manholes, House Sewer connections and Allied Works, O&M for a period of
5 years complete, in Nellore Municipal Corporation.

Title : Hydraulic Design Calculations of Sewage Treatment Plant of Capacity 55 MLD


STP, Allipuram.

Where, Ce = 0.6 and g = 9.81 are constant)


So, hb = [Q / (1.77 x b)]2/3

be = width of notch, m

H = head over notch, m

v Head loss over Rectangular Weir - Without End Contractions

(Reference : CPHEEO manual on Sewerage & Sewage Treatment, Dec 1993, Chap25, Pg 396

Q = 0.5445 Ce. √2g. b . H3/2 ]

Where, Ce = 0.864 and g = 9.81 are constant)

So, H = [Q / (1.473 x b)]2/3


be = width of notch, m

H = head over notch, m

C DESIGN CRITERIA:

Design Average Flowrate :


:
:
:

Peak Factor :

:
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven


Technology including receiving sumps cum pumping stations, Providing Sewer
Network System in entire city including construction of Conventional Manholes &
Precast Manholes, House Sewer connections and Allied Works, O&M for a period of
5 years complete, in Nellore Municipal Corporation.

Title : Hydraulic Design Calculations of Sewage Treatment Plant of Capacity 55 MLD


STP, Allipuram.

HFL of disposal Point at canal :


FGL of the STP considered :

D Head Loss Calculation

1 Head loss through pipe from outlet chamber to Disposal Point

Flow through Pipe :

:
HFL of disposal Point at canal :

Considering a free fall :

Water level in the outfall chamber :

Velocity Considered through pipe :

Area of the pipe required :

Dia of the pipe required :

Dia of the pipe provided :

Actual Velocity through pipe :

Length of the pipe :


L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven


Technology including receiving sumps cum pumping stations, Providing Sewer
Network System in entire city including construction of Conventional Manholes &
Precast Manholes, House Sewer connections and Allied Works, O&M for a period of
5 years complete, in Nellore Municipal Corporation.

Title : Hydraulic Design Calculations of Sewage Treatment Plant of Capacity 55 MLD


STP, Allipuram.

By using Hazen Williams Formula:

By using Hazen Williams coefficient RCC pipe :

Head loss per metre length of pipe using Hazen Williams formula :

Head loss in full length of pipe :

Entrance loss in pipe :

Exit loss :

No of bends considered :

Head loss due to bends considering 90 degree bends :

Total losses :

However considered pipe losses :

TWL in outlet chamber :

2 Outlet chamber of CCT

TWL in outlet chamber :

Considering a free fall :

Lip of weir :

Length of weir :

Head over the weir, H = [Q / (1.473 x b)]2/3 :

Head over the weir considered :

TWL over the weir :

Liquid depth of chamber considered :


L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven


Technology including receiving sumps cum pumping stations, Providing Sewer
Network System in entire city including construction of Conventional Manholes &
Precast Manholes, House Sewer connections and Allied Works, O&M for a period of
5 years complete, in Nellore Municipal Corporation.

Title : Hydraulic Design Calculations of Sewage Treatment Plant of Capacity 55 MLD


STP, Allipuram.

IL of Outlet Chamber :

3 Chlorine Contact Tank

TWL in over the weir of outlet chamber :

Design flow :
:
Head loss through open channel:

Channel depth :

Channel width (Baffle Opening) :

Channel Length :

Head Loss as per Manning's Formula V = [(1/n)] * [R 2/3


S1/2]

Coefficient of roughness 'n' :

Cross sectional area :

Wetted perimeter :

Hydraulic Radius, R :

Velocity :

Cross sectional area :

Wetted perimeter :

Slope, S = (V*n/R^(2/3))^ 2 :

Head loss :

Head loss due to bends in CCT


L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven


Technology including receiving sumps cum pumping stations, Providing Sewer
Network System in entire city including construction of Conventional Manholes &
Precast Manholes, House Sewer connections and Allied Works, O&M for a period of
5 years complete, in Nellore Municipal Corporation.

Title : Hydraulic Design Calculations of Sewage Treatment Plant of Capacity 55 MLD


STP, Allipuram.

No. of Bends :

K, Coefficient :
Head loss per bend, hb = kb (V2 / 2g) :

Total head loss due to bends :

Total losses in CCT :

Losses considered :

TWL in CCT :

Liquid depth of CCT :

IL of CCT :

4 Head loss through SBR outlet channel

TWL in CCT :

Design flow through channel :


:
Width of channel :

Depth of flow in channel :

Length of channel provided :

Head Loss as per Manning's Formula V = [(1/n)] * [R 2/3 S 1/2]

Coefficient of roughness 'n' :

Cross sectional area :

Wetted perimeter :
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven


Technology including receiving sumps cum pumping stations, Providing Sewer
Network System in entire city including construction of Conventional Manholes &
Precast Manholes, House Sewer connections and Allied Works, O&M for a period of
5 years complete, in Nellore Municipal Corporation.

Title : Hydraulic Design Calculations of Sewage Treatment Plant of Capacity 55 MLD


STP, Allipuram.

Hydraulic Radius, R :

Velocity, V :

Cross sectional area :

Wetted perimeter :

Slope, S = (V*n/R^(2/3))^ 2 :

Head loss :

Head loss considered :

TWL at the SBR outlet channel :

IL of the channel :

5 Sequential Batch Reactor

TWL in outlet channel of SBR :

Depth of MWL at SBR channel from bottom of the tank :

IL of outlet channel / SBR Reactor :

Depth of Biological Blanket in SBR :

BWL in SBR :

Decanting Depth :

TWL in SBR :

TWL in SBR inlet channel :

Lip of weir in Splitter box :


L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven


Technology including receiving sumps cum pumping stations, Providing Sewer
Network System in entire city including construction of Conventional Manholes &
Precast Manholes, House Sewer connections and Allied Works, O&M for a period of
5 years complete, in Nellore Municipal Corporation.

Title : Hydraulic Design Calculations of Sewage Treatment Plant of Capacity 55 MLD


STP, Allipuram.

TWL in Inlet to Splitter box (MWL) :

6 Parshall flume

TWL in SBR splitter box :

Design Flow (Q) :

As per per "Water Measurement Manual" by U.S Department of the Interior


Bureau of Reclamation", Equation No.8-3, Page No. 8-32,
ha - Depth of flow in upstream leg of the flume at one third point in ft.

The free flow discharge equations for the Standard parshall flume
(Q) : C ha^n

As per Table 8-6, Page 8-32; For throat width of 4 feet parshall flume;

C = Co-efficient :

n = Exponent(n) :
ha : (Q / C)(1/1.58) :

As per Page 8-33, the ratio of submergence head(h a) to measuring head(hb) :

Hence, measuring head (hb) :

Head loss through parshall flume (ha-hb) :

Consider head loss :


L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven


Technology including receiving sumps cum pumping stations, Providing Sewer
Network System in entire city including construction of Conventional Manholes &
Precast Manholes, House Sewer connections and Allied Works, O&M for a period of
5 years complete, in Nellore Municipal Corporation.

Title : Hydraulic Design Calculations of Sewage Treatment Plant of Capacity 55 MLD


STP, Allipuram.

Value of K ;

ha + K :

TWL in channel at upstream leg of the flume at one third point (at ha) :

IL in channel at upstream leg of the flume at one third point (at ha) :

7 Detritor outlet channel

Design Flow (Q) :

Width of channel assuemed :

Depth of flow in channel :

Length of channel provided :

Head Loss as per Manning's Formula V = [(1/n)] * [R 2/3 S 1/2]

Coefficient of roughness 'n' :

Cross sectional area :

Wetted perimeter :

Hydraulic Radius, R :

Velocity, V :

Cross sectional area :

Wetted perimeter :

Slope, S = (V*n/R^(2/3))^ 2 :
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven


Technology including receiving sumps cum pumping stations, Providing Sewer
Network System in entire city including construction of Conventional Manholes &
Precast Manholes, House Sewer connections and Allied Works, O&M for a period of
5 years complete, in Nellore Municipal Corporation.

Title : Hydraulic Design Calculations of Sewage Treatment Plant of Capacity 55 MLD


STP, Allipuram.

Head loss :

Head loss considered :

TWL of detritor outlet channel :

Depth of flow in channel :

Invert level of channel :

8 Detritor

TWL of detritor outlet channel :

Freefall considered :

Lip of weir of the Detritor :

Flow to each unit :

Side length of square detritor :

Choosing rectangular supressed weir,

Length of weir :

Head over the weir, H = [Q / (1.473 x b)]2/3 :

Head over the weir considered :

TWL over the weir :

Liquid depth of grit chamber :

IL of grit chamber :

Losses through inlet gate

No. of gate :

Width of gate to be provided :


L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven


Technology including receiving sumps cum pumping stations, Providing Sewer
Network System in entire city including construction of Conventional Manholes &
Precast Manholes, House Sewer connections and Allied Works, O&M for a period of
5 years complete, in Nellore Municipal Corporation.

Title : Hydraulic Design Calculations of Sewage Treatment Plant of Capacity 55 MLD


STP, Allipuram.

Height of flow through gate :

Area of gate required :

Flow through each gate :

Velocity through gate :

Head loss through gates considered, H = K (V)2 / 2g, Where, K = 0.8 :


Head loss through gates considered :

9 Common inlet chamber for grit chamber

TWL of channel at detritor outlet :

Liquid depth in distribution chamber :

IL of distribution chamber :

10 Mechanical Fine Screen Channel - Downstream

No. of gates :

Width of gate to be provided :

Height of flow through gate :

Area of gate required :

Flow through each gate :

Velocity through gate :

Head loss through gates considered, H = K (V)2 / 2g, Where, K = 0.8 :


Head loss through gates considered :
TWL of screen channel, downstream :
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven


Technology including receiving sumps cum pumping stations, Providing Sewer
Network System in entire city including construction of Conventional Manholes &
Precast Manholes, House Sewer connections and Allied Works, O&M for a period of
5 years complete, in Nellore Municipal Corporation.

Title : Hydraulic Design Calculations of Sewage Treatment Plant of Capacity 55 MLD


STP, Allipuram.

Liquid depth at d/s of screen :

IL of screen channel (fine screen) :

11 Mechanical Fine Screen Channel - Upstream

No. Screen :
Design Flow / screen :
Assume liquid depth in channel :
Screen width :
Provided open screen area :

Assume Angle of inclination as per NIT :


Slant length of screen in submerged portion = (1.0 / SIN (RADIAN(75)) :
Effective open screen Area :
Velocity through screen :
Head loss through clear screen:
Head loss thru screen in normal condition, h1=0.0729(Vs2-Va2) :
:
Head loss through clogged screen:
Clogging / Choking Considered :
Velocity through screen at clogged screen, Vs :
Head loss on 50% clogging, h2=0.0729 (Vs2-Va2) :
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment Plants with any proven


Technology including receiving sumps cum pumping stations, Providing Sewer
Network System in entire city including construction of Conventional Manholes &
Precast Manholes, House Sewer connections and Allied Works, O&M for a period of
5 years complete, in Nellore Municipal Corporation.

Title : Hydraulic Design Calculations of Sewage Treatment Plant of Capacity 55 MLD


STP, Allipuram.

Head loss on 50% clogged screen :

Maximum head loss considered for design during clogged condition


(CPHEEO manual on Sewerage & Sewage Treatment, Nov 2013, Part A, :
Pg.5-31, Cl. 5.6.1.9.

TWL in screen channel upstream :


IL of Screen chamber :

12 Inlet chamber

No. of gates :

Flow to each unit :

Width of gate to be provided :

Height of flow through gate :

Area of gate required :

Flow through each gate :

Velocity through gate :

Head loss through gates considered, H = K (V)2 / 2g, Where, K = 0.8 :


Head loss through gates considered :
TWL of screen channel, downstream :
Liquid depth of chamber :

IL of Inlet chamber :
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV

LE160315-P-WW-SW-BE-2001

DESIGNED CHECKED APPROVED SHEET

GJ

Updated, CPHEEO, Japan International Cooperation Agency, Nov 2013

ated, CPHEEO, Ministry of Urban Development, New Delhi, May 1999

Wastewater Engineering, Treatment and Reuse, Fourth Edition, McGraw Hill

u of Reclamation in association with United Sates Development of

Nov 2013, Cl. 3.15.4, Pg 3-27)


Public Health and Municipal Engineering
Department

DOCUMENT NO. REV

LE160315-P-WW-SW-BE-2001

DESIGNED CHECKED APPROVED SHEET

GJ

2013, Cl. 3.17.2, Pg. 3-34)

ewerage treatment, Nov 2013, Table 4.2, Pg. 4-16

993, Chap25, Pg 394)


Public Health and Municipal Engineering
Department

DOCUMENT NO. REV

LE160315-P-WW-SW-BE-2001

DESIGNED CHECKED APPROVED SHEET

GJ

993, Chap25, Pg 396)

55 MLD

55000 m3/day

2291.67 m3/hr

0.637 m3/sec

2.25

123.75 MLD

123750 m3/day
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV

LE160315-P-WW-SW-BE-2001

DESIGNED CHECKED APPROVED SHEET

GJ

5156.25 m3/hr

1.432 m3/sec

12.80 m

13.20 m

AVERAGE PEAK

Peak flow as per Ctech's


2291.67 2979 m3/hr Decant flow mentioned in
advance BEP.

0.64 0.83 m3/sec


12.80 12.80 m
Full submerged condition is
0.00 0.00 m considered at canal.

12.80 12.80 m

0.6 1 m/sec

1.06 0.83 m2

1.16 1.03 m

1.2 1.2 m

0.56 0.73 m/sec

500 500 m
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV

LE160315-P-WW-SW-BE-2001

DESIGNED CHECKED APPROVED SHEET

GJ

As per CPHEEO Manual on


Sewerage & Sewerage
140 140 treatment, Nov 2013, T-
3.14, Pg. 3-33

0.00020 0.00033 m/m

0.10 0.16 m

0.008 0.014 m

0.016 0.027 m

3.00 3.00 Nos

0.048 0.082 m

0.17 0.29 m

0.20 0.30 m

13.00 13.10 m

13.10 13.10 m

0.10 0.10 m

13.20 13.20 m

12.50 12.50 m

0.106 0.126 m

0.110 0.150 m

13.31 13.35 m

1.80 1.80 m
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV

LE160315-P-WW-SW-BE-2001

DESIGNED CHECKED APPROVED SHEET

GJ

11.30 11.30 m

13.35 13.35 m

2291.67 2979 m3/hr


0.64 0.83 m3/sec

3.00 3.00 m

2.90 2.90 m

125.00 125.00 m

As per CPHEEO Manual on


Sewerage & Sewerage
0.014 0.014 treatment, Nov 2013, T-3.11,
Pg. 3-29

362.50 362.50 m2

1279.00 1279.00 m

0.28 0.28 m

0.002 0.002 m/s

362.50 362.50 m2

59.00 59.00 m

0.000 0.000 m/m

0.000 0.000 m
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV

LE160315-P-WW-SW-BE-2001

DESIGNED CHECKED APPROVED SHEET

GJ

9.00 9.00 Nos

1.00 1.00

0.000 0.000 m / bend

0.000 0.000 m

0.00 0.00 m

0.05 0.05 m

13.40 13.40 m

3.00 3.00 m

10.40 10.40 m

13.40 13.40 m

2291.67 2979 m3/hr


0.64 0.83 m3/sec
1.20 1.20 m

1.20 1.20 m

10.00 10.00 m

As per CPHEEO Manual on


Sewerage & Sewerage
0.014 0.014 treatment, Nov 2013, T-3.11,
Pg. 3-29

1.44 1.44 m2

22.40 22.40 m
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV

LE160315-P-WW-SW-BE-2001

DESIGNED CHECKED APPROVED SHEET

GJ

0.06 0.06 m

0.053 0.069 m/s

12.00 12.00 m2

4.80 4.80 m

0.000 0.000 m/m

0.000 0.000 m

0.005 0.100 m

13.41 13.50 m

12.30 12.30 m

13.50 13.50 m
As per Ctech's advance
1.20 1.20 m BEP.

12.30 12.30 m
As per Ctech's advance
2.60 2.60 m BEP.

14.90 14.90 m

2.40 2.40 m

17.30 17.30 m

As per Ctech's advance


17.50 17.65 m BEP.
As per Ctech's advance
17.75 17.75 m BEP.
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV

LE160315-P-WW-SW-BE-2001

DESIGNED CHECKED APPROVED SHEET

GJ

As per Ctech's advance


17.95 17.95 m BEP.

17.95 17.95 m

0.637 1.432 m3/sec

22.480 50.581 cft/sec

16 16

1.58 1.58

1.24 2.07 feet

0.38 0.63 m

70.00 70.00 %

0.26 0.44 m

0.113 0.189 m

0.12 0.20 m
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV

LE160315-P-WW-SW-BE-2001

DESIGNED CHECKED APPROVED SHEET

GJ

0.076 0.076 m

0.454 0.708 m

18.40 18.66 m

18.03 m

0.637 1.432 m3/sec

1.60 1.60 m

0.70 0.70 m

5.00 5.00 m

As per CPHEEO Manual on


Sewerage & Sewerage
0.014 0.014 treatment, Nov 2013, T-3.11,
Pg. 3-29

1.12 1.12 m2

11.40 11.40 m

0.10 0.10 m

0.182 0.409 m/s

3.50 3.50 m2

4.60 4.60 m

0.000 0.001 m/m


Public Health and Municipal Engineering
Department

DOCUMENT NO. REV

LE160315-P-WW-SW-BE-2001

DESIGNED CHECKED APPROVED SHEET

GJ

0.001 0.004 m

0.050 0.100 m

18.71 18.76 m

0.70 0.70 m

18.06 18.06 m

18.76 18.76 m

0.15 0.15 m

18.91 18.91 m

0.64 1.43 m3/sec

11.50 11.50 m

11.50 11.50 m

0.112 0.193 m

0.120 0.200 m

19.03 19.11 m

0.90 0.90 m

18.13 18.21 m

1.00 1.00 No.

1.20 1.20 m
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV

LE160315-P-WW-SW-BE-2001

DESIGNED CHECKED APPROVED SHEET

GJ

0.90 1.10 m

1.08 1.32 m2

0.64 1.43 m3/sec

0.59 1.09 m/sec

0.01 0.05 m

0.10 0.10 m

19.21 19.21 m

0.75 0.90 m

18.46 18.31 m

1.00 1.00 m

1.20 1.20 m

1.00 1.00 m

1.20 1.20 m2

0.32 0.72 m/sec

0.27 0.60 m/sec

0.00 0.01 m

0.05 0.05 m

19.26 19.26
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV

LE160315-P-WW-SW-BE-2001

DESIGNED CHECKED APPROVED SHEET

GJ

1.00 1.00 m

18.26 18.26 m

2 2 Nos
0.318 0.716 m3/sec
1.00 1.00 m
1.370 1.370 m
912.00 912.00 m2
0.91 0.91 m2

75 75 Degree
1.04 1.04 m
0.94 0.94 m2
0.34 0.76 m/sec

0.0180 0.0384 m
17.96 38.43 mm

50 50 %
0.674 1.517 m/sec
0.007 0.087 m
Public Health and Municipal Engineering
Department

DOCUMENT NO. REV

LE160315-P-WW-SW-BE-2001

DESIGNED CHECKED APPROVED SHEET

GJ

6.89 87.39 mm

0.30 0.30 m

19.56 19.56 m
18.26 18.26 m

1.00 1.00 m

0.32 0.00 m3/sec

1.20 1.20 m

1.00 1.00 m

1.20 1.20 m2

17.96 38.43 mm

14.97 32.03 m/sec

9.13 41.82 m

0.05 0.05 m

19.61 19.61
2.50 2.50 m

17.11 17.11 m
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment


DO
Plants with any proven Technology including receiving sumps
cum pumping stations, Providing Sewer Network System in
entire city including construction of Conventional Manholes & LE160315
Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore
Municipal Corporation. DESIGNED

Title : List of Civil Units of Sewage Treatment Plant of Capacity


55 MLD STP, Allipuram.

SL.No. Description of Unit Tag. No.

Receiving Sump cum Pump H


1 Inlet Chamber

2 Coarse Screen Channel (Mechanical)

3 Coarse Screen Channel (Manual)

4 Receiving Sump

Sewage Treatment
5 Inlet Chamber
6 Fine screen channel (Mechanical)
7 Fine screen channel (Manual)
8 Detritor

9 Detritor outlet channel

10 Parshall Flume

11 SBR splitter box


12 Sequential Batch Reactor
13 SBR outlet chamber
14 Chlorine Contact Tank
15 CCT outlet channel
16 Chlorinator Room
17 Tonner Room
Sludge Handling
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment


DO
Plants with any proven Technology including receiving sumps
cum pumping stations, Providing Sewer Network System in
entire city including construction of Conventional Manholes & LE160315
Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore
Municipal Corporation. DESIGNED

Title : List of Civil Units of Sewage Treatment Plant of Capacity


55 MLD STP, Allipuram.

18 Thickener feed sump


19 Gravity Sludge Thickener
Thickened sludge collection Cum Centrifuge feed
20
sump

21 Poly Preparation Tank

22 Centrifuge House (Stilted)


i. Ground floor
ii. First floor
Utilities
23 Blower Room
24 MCC Room (Ground Floor)
25 PLC Room (First Floor)
26 Conference Hall (First Floor)
27 Laboratory Room (First Floor)
28 Office Room (First Floor)
29 Staff Room (First Floor)
30 Staff Toilet (First Floor)
31 Workshop
32 DG room
33 Double pole structure cum Transformer Yard

Note:
L&T Construction
Water & Effluent Treatment IC - Wastewater BU

Project : Construction of Decentralized Sewage Treatment


DO
Plants with any proven Technology including receiving sumps
cum pumping stations, Providing Sewer Network System in
entire city including construction of Conventional Manholes & LE160315
Precast Manholes, House Sewer connections and Allied
Works, O&M for a period of 5 years complete, in Nellore
Municipal Corporation. DESIGNED

Title : List of Civil Units of Sewage Treatment Plant of Capacity


55 MLD STP, Allipuram.
1. Dimensions of all units are indicative and are subjected to change during detailed engineering
2. Dimensions of utility structures are subject to change during detailed engineering
3. Tag numbers are assigned to the units represented in the piping & instrumentation drawing
Public Health and Municipal Engineering Department.

DOCUMENT NO. REV

LE160315-P-WW-SW-BE-2001

CHECKED APPROVED SHEET

GJ

INTERNAL UNIT SIZE IN M QTY (NOS.) MOC

ving Sump cum Pump House


3.1 (L) x 4.9 (W) x 1.42 m (L.D) + 5.81 m (F.B) 1.00 RCC
6.0 m (L) x 1.6m (W) + 1.0m (L.D) + 6.13 m (FB) 2.00 RCC
6.0 m (L) x 1.3m (W) + 1.0m (L.D) + 6.13 m (FB) 1.00 RCC
16.0 m (Dia) x 1.61 m (LD) + 2.0 m (Pump Submergence) + 7.43
m (FB)
1.00 RCC

Sewage Treatment
5.1 (L) x 3.4 (W) x 2.50 m (L.D) + 0.50 m (F.B) 1.00 RCC
6.0 m (L)x 1.67m (W) + 1.0m (L.D) + 0.50 m (FB) 2.00 RCC
6.0 m (L)x 1.35m (W) + 1.0m (L.D) + 0.50 m (FB) 1.00 RCC
11.50 m (L) x 11.50 m (W) x 0.90 m (SWD) + 0.5 m (FB) 2.00 RCC
5.0m (L) x 1.60m (W) x 0.70 m (LD) + 0.5 m (FB) 1.00 RCC
10.0m Length x 1.22m Throat Width x 1.0m(LD) + 0.5m F.B 1.00 RCC
6.0m (L) x 6.0m (W) x 3.5 m (LD) + 0.5 m (FB) 1.00 RCC
41.00 m (L) x 39.50 m (W) x 5.00 m (LD) + 0.5 m (FB) 4.00 RCC
10.0m (L) x 1.20m (W) x 1.20 m (LD) + 0.5m (FB) 1.00 RCC
34.0m (L) x 12.50m (W) x 3.00 m (LD) + 0.5m (FB) 1.00 RCC
12.50m (L) x 3.00m (W) x 1.80 m (LD) + 0.5m (FB) 1.00 RCC
6.0 m (L) x 8.0m (W) X 4.5m Ht 1.00 RCC Framed
10.0 m (L) x 8.0m (W) X 4.5m Ht 1.00 RCC Framed
Sludge Handling
Public Health and Municipal Engineering Department.

DOCUMENT NO. REV

LE160315-P-WW-SW-BE-2001

CHECKED APPROVED SHEET

GJ

7.90 m (L) x 7.90 m (W) x 2.00 m (LD) + 0.5 m (FB) 1.00 RCC
12.30 m (Dia) x 3.50 m (SWD) + 0.5 m (FB) 2.00 RCC

5.20m (L) x 5.20m (W) x 2.50 m (LD) + 0.5m (FB) 1.00 RCC

2.30m (L) x 2.30m (W) x 1.70 m (LD) + 0.5m (FB) 2.00 RCC

-
7.0 m (L) x 6.0m (W) X 4.5m Ht. 1.00 RCC (Stilted)
7.0 m (L) x 6.0m (W) X 4.5m Ht. 1.00 RCC (Stilted)
Utilities
28.0 m (L) x 8.0m (W) X 6.0m Ht. 1.00 RCC Framed
20.0 m (L) x 12.50m (W) X 4.50m Ht. 1.00 RCC Framed
4.80 m (L) x 3.80m (W) X 4.50m Ht. 1.00 RCC Framed
7.86 m (L) x 4.8m (W) X 4.50m Ht. 1.00 RCC Framed
7.80 m (L) x 4.8m (W) X 4.50m Ht. 1.00 RCC Framed
4.80 m (L) x 3.8m (W) X 4.50m Ht. 1.00 RCC Framed
4.80 m (L) x 3.8m (W) X 4.50m Ht. 1.00 RCC Framed
4.80 m (L) x 3.8m (W) X 4.50m Ht. 1.00 RCC Framed
10.0 m (L) x 8.0m (W) X 6.0m Ht. 1.00 RCC Framed
9.0 m (L) x 8.0m (W) X 4.50m Ht. 1.00 RCC Framed
15.0 m (L) x 8.0m (W) 1.00 -
Public Health and Municipal Engineering Department.

DOCUMENT NO. REV

LE160315-P-WW-SW-BE-2001

CHECKED APPROVED SHEET