Professional Documents
Culture Documents
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 1 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
Revision History
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 2 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
Table of Contents
1 Introduction ......................................................................................................................... 5
1.1 Test Subject ............................................................................................................................. 5
2 Test Tools ............................................................................................................................ 6
3 Visual inspection of the STCE-RMU-RTU ......................................................................... 7
4 Set-up for Functional Tests ................................................................................................ 7
4.1 Communication of processor module CPU3000 ................................................................... 8
4.2 Message display of processor module. ................................................................................. 8
4.3 Status indications at the processor module ......................................................................... 9
4.4 Verification of RTU IEC104 protocol parameters against MASTER STATION IEC 104
Interoperability list ............................................................................................................................ 10
4.5 Check the RTU parameter after a restart caused by a 24V DC power loss ....................... 13
4.5.1 Configuration ....................................................................................................................................... 13
4.5.2 Maintenance parameters (Diagnostic log) ........................................................................................ 13
4.5.3 Event Log ............................................................................................................................................. 13
4.6 Message display of processor module. ............................................................................... 14
5 Basic Functional Tests of the RTU I/O /Module .............................................................. 15
5.1 Digital Input ........................................................................................................................... 15
5.2 Analogue Input ...................................................................................................................... 15
5.3 Digital output ......................................................................................................................... 20
5.4 Check the RTU event logging after a loss of Communication ........................................... 21
6 RMU RTU Internal Alarms ................................................................................................ 22
6.1 Power Supply Failure - Available ......................................................................................... 23
6.2 Input/output card failure - Available..................................................................................... 24
6.3 Modem Reset Command....................................................................................................... 25
6.4 Equipment Bus not responding – Available ........................................................................ 26
6.5 Transmission Buffer 75% full - Available ............................................................................ 27
6.6 Transmission Buffer 100% full - Available........................................................................... 27
6.7 Common Station Alarm 24VDC Fail ..................................................................................... 28
6.8 Common Station Alarm Station Control Local/Remote ...................................................... 29
6.9 Time synchronization with IEC 60870-5-104 protocol ........................................................ 31
7 Test for IEC 104 protocol via GPRS................................................................................. 32
7.1 Start up and operative connection check ............................................................................ 33
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 3 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 4 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
1 Introduction
The STCE RMU-Remote Terminal Unit (RTU) is manufactured and assembled by SELTA in
Italy, checked and commissioned by Siemens / Selta.
These notes define the guidelines and procedures governing the customer test and inspection.
The following documentation gives a description and checklist of features defined by the
specification.
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors
were found.
Signature: Signature: Signature: Date:
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 5 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
2 Test Tools
The following tools and test instruments are required:
2 Laptop PC, having the following software implemented
- Fink Test software WinPP104 and license dongle for IEC104 protocol
- SELTA RMU Monitor Maintenance tool
- SELTA RMU RTU Configurator Tool
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 6 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
Each module is to be checked and be in accordance with the Equipment Cubicle Layout.
O. K.
RTU Slno: ___________
Mac Address: O. K.
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors
were found.
Signature: Signature: Signature: Date:
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 7 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 8 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
The following light signaling are available, in this order, on the CPU3000 Central Unit:
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors
were found.
Signature: Signature: Signature: Date:
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 9 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 10 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
BL= Blocked
Control direction: Single Command O.K
Message type 45: ASDU: C_SC_NA_1
Control direction: Double Command O.K
Message type 46: ASDU: C_DC_NA_1
Control direction: Regulating Step Command O.K
Message type 47: ASDU: C_RC_NA_1
System information in monitoring direction: O.K
End of Initialization
Message type 70: ASDU: M_EI_NA_1
System information in Control direction: O.K
General Interrogation Command
Message type 100: ASDU: C_IC_NA_1
System information in Control direction: O.K
Clock synchronization command
Message type 103: ASDU: C_CS_NA_1
Cause of transmission values: O.K
6 = activation O.K
20 = Interrogated by GI O.K
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 11 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
t2= 5s O.K
t3 = 600s O.K
k = 12 O.K
w=8 O.K
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors
were found.
Signature: Signature: Signature: Date:
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 12 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
4.5 Check the RTU parameter after a restart caused by a 24V DC power loss
4.5.1 Configuration
The RMU-RTU shall be in operation and time synchronized. Remove one active communication IEC104
link to trigger respective “communication lost Center A/B/C” local alarm in RTU Diagnostic log.
Log into RTU via Ethernet maintenance port.
Check via Web server the Diagnostic log list for the new triggered events. Restart RTU by 24VDC power
down/up. After the restart the CPU maintains the same alarms having before and in addition the new
alarms for the restarting. The diagnostic buffer is of circular type. It can hold a maximum of 200 events
and is saved in non-volatile memory of the CPU.
The RTU shall be in operation and time synchronized. Trigger one indication and execute one time
dummy command.
Log into RTU Web server. Check via Web server the Events log list for the triggered events. Restart RTU
by 24VDC Power down/up. After the restart the CPU maintains the same events having before and in
addition the new alarms for the restarting. The event buffer is of circular type. It can hold maximum 6000
events per connected Center and is saved in non-volatile memory of the CPU.
The above item was successfully tested ok
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors
were found.
Signature: Signature: Signature: Date:
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 13 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors
were found.
Signature: Signature: Signature: Date:
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 14 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors
were found.
Signature: Signature: Signature: Date:
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 15 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 16 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
Remarks:
________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 17 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 18 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
Remarks:
________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors
were found.
Signature: Signature: Signature: Date:
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 19 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors
were found.
Signature: Signature: Signature: Date:
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 20 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 21 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
Remarks:
_______________________________________________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors
were found.
Signature: Signature: Signature: Date:
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 22 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors
were found.
Signature: Signature: Signature: Date:
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 23 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 24 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors
were found.
Signature: Signature: Signature: Date:
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 25 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 26 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors
were found.
Signature: Signature: Signature: Date:
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 27 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors
were found.
Signature: Signature: Signature: Date:
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 28 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors
were found.
Signature: Signature: Signature: Date:
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 29 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 30 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
Remarks:
___________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors
were found.
Signature: Signature: Signature: Date:
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 31 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors
were found.
Signature: Signature: Signature: Date:
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 32 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
Main route
Stand-by route
Application frames
Test frame
GPRS Network
IP address
assignment
GPRS
Modem
RS232 Mainten.
RTU PC
Figure 4
The test shall be carried out as mentioned below.
Start-up the SELTA RMU RTU to operation. GPRS modem is connected to Comport ___
The RTU shall establish the connection via the GPRS modem with the 2 Test PCs(FE)
Operative connection between PC1 (performing IEC 870-5-104 Master station simulation
program) and RTU is established. Application frames are exchanged.
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 33 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
Stand-by connection between PC2 (performing IEC 870-5-104 Master station simulation
program) and RTU is established. Test frames are exchanged.
The Test PC1 operates according to IEC 870-5-104 master protocols. The following
functions are performed:
a) General Interrogation
b) Events shall be received
c) Measurements shall be received
d) Commands will be sent
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors
were found.
Signature: Signature: Signature: Date:
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 34 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
Figure 2
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 35 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
The described test above has been carried out and passed the test O. K
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors
were found.
Signature: Signature: Signature: Date:
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V01 Page 36 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V011 Page 37 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
10 Random Test
Test description:
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors
were found.
Signature: Signature: Signature: Date:
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V011 Page 38 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
11 Hardware Configuration
The below mentioned Hardware configuration shows the Test system for the Functional test
described under item 5
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V011 Page 39 of 40
RTU FAT Procedure ADDC
N-656505 STCE-RMU-RTU DMS Project
EM DG SWS SELTA Contract No.: MBZ- H2 Project
12 Record of Remarks
In the summary list, items shall be entered that have been tested, but the test result is not in line
with the FAT Test book sheet.
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors
were found.
Signature: Signature: Signature: Date:
DMS656505-PRO-SAGH-RTU-FAT-ALL-0008-V011 Page 40 of 40