REQUIRED DOCUMENT FROM BUYER FOR DESIGN
Add: No.2304 Tianhe Building, No.163 Yingchun Street, Laishan District, Yantai, China
Mobile: +86-18754545952, 13336382899 Tel: +86-535-6722230
E-mail: ythuize@vip.sina.com
1
烟台慧泽矿山工程技术有限公司
YANTAI HUIZE MINING ENGINEERING CO., LTD.
BUSINESS DOCUMENT PROPOSAL S/N:2017018
1 CIVIL CONSTRUCTION
1.1 Topographical features of the site
1.2 Hydrological geology data, and the 《geotechnical survey report》necessary for design
1.3 Local architectural style, structural style and the usual practice of waterproof and heat
preservation.
1.4 Local construction material supply including transportation, price etc, such as gravel, brick
block, plank, steel and cement etc.
2 ELECTRIC POWER
2.1 Power supply around the mine, including:
--Transformer substation available power supply or power supply line that can be connected
according to T type
3 MINERAL PROCESSING
Add: No.2304 Tianhe Building, No.163 Yingchun Street, Laishan District, Yantai, China
Mobile: +86-18754545952, 13336382899 Tel: +86-535-6722230
E-mail: ythuize@vip.sina.com
2
烟台慧泽矿山工程技术有限公司
YANTAI HUIZE MINING ENGINEERING CO., LTD.
BUSINESS DOCUMENT PROPOSAL S/N:2017018
3.1 Topographic map of the plant 1:500, 1:1000
3.2 Water, electricity, tailings reservoir, environmental protection around the site
4.2 Drainage system: drainage mode and discharge outlet selection of living and production
wastewater
4.3 The largest altitude difference and the transmission distance between Water sources and water
points, and whether dual pipes are necessary or not.
--Topographic map: 1:10000,1:2000 (Used for site location selection and plans comparison);
--Name of villages near the site,No. of homes, number of people and labors
Add: No.2304 Tianhe Building, No.163 Yingchun Street, Laishan District, Yantai, China
Mobile: +86-18754545952, 13336382899 Tel: +86-535-6722230
E-mail: ythuize@vip.sina.com
3
烟台慧泽矿山工程技术有限公司
YANTAI HUIZE MINING ENGINEERING CO., LTD.
BUSINESS DOCUMENT PROPOSAL S/N:2017018
-- Agricultural production and local land utilization conditions
-- Local water supply and drainage, power supply and possibility cooperating with adjacent
enterprises
5.3 Meteorology
-- Frequency of wind direction, wind rose map, maximum and average wind speed
5.4 Flood
-- Maximum,minimum flow, catchments area of the river near the site near the site
-- Water loss and soil erosion, water and soil protection and planning conditions of the upper
reaches of the site
-- Unfavorable geological conditions affecting stability of geologic structure and stratum and the
site stability such as fault age, landslide, collapse and debris flow
-- soil type, soil property and allowable bearing capacity of foundation soil
Add: No.2304 Tianhe Building, No.163 Yingchun Street, Laishan District, Yantai, China
Mobile: +86-18754545952, 13336382899 Tel: +86-535-6722230
E-mail: ythuize@vip.sina.com
4
烟台慧泽矿山工程技术有限公司
YANTAI HUIZE MINING ENGINEERING CO., LTD.
BUSINESS DOCUMENT PROPOSAL S/N:2017018
5.6 Traffic condition
Existing road and railway conditions near the site such as transport capacity, equipment
configurations, engineering factors, limit grade and repair and maintenance of bridge and tunnel,
loading and unloading facilities and transportation cost etc.