Crowbar Protection and Co-ordination for HVDC

Power Supply
Sumit K Rathor
PG student of Birla Vishvakarma Mahavidhyalaya
Gujarat Technological University
rathorsumit2006@gmail.com

Abstract— This paper presents the protection of system under II. TRANSFORMER RECTIFIER UNIT.
the faulty condition, and co-ordination of different protective Transformer rectifier unit is combination of transformer
devices. Generally the HVDC equipments are very costly so
unit input 11kV and rectifier unit which convert AC to 90kV
protection is primary need for HVDC systems. In HVDC
systems solid state devices are used which have very fast
DC output as shown in fig 2.
switching characteristic while on AC side conventional
protective devices VCB & relay unit is provided which has
higher time of operation for switching so meanwhile another
protection require to isolate the DC system within fraction of
time so crowbar protections is provided. Normally crowbar is
provided for HVDC load side protection here in this paper we
have taken various supply topology and protection of them, and
application in microwave tubes. Simulation is done for HVDC
supply with crowbar using PSCAD/EMTDC and ETAP
software.

Keywords— Crowbar protection, Relay Co-ordination, Fault


modelling, bolted fault, arc resistance.

I. INTRODUCTION Figure:2 Transformer Rectifier Unit.


As HVDC devices dealing with high voltage high current
For converter 12pulse topology is selected and then RC filter
transmission and devices associates with HVDC like
circuit is provided and by making series and parallel
converter, inverter, and loads are very costly and sensitive so
combination 45kV and 90kV output is obtained.
protection is basic need for these kinds of systems. Now a
day’s HVDC is applicable to number of area like one of them III. TWELVE PULSE TOPOLOGY
is application to plasma generation for which different HVDC
topology is selected and microwave tube as load is used. There two main advantages to use multi-pulse
transformer/rectifier topologies are a reduction in the ac input
line current harmonics and a reduction in the dc output
voltage ripple. The input current harmonics are reduced
Load
through the use of phase-shifting transformers. The
frequencies at which the harmonics will appear for an n-pulse
3 4 converter are computed by multiplying 1.1 by the
Crowbar fundamental frequency of the system. The magnitude of the
Ι>

harmonics is calculated by multiplying 1.2 by the amplitude


Transformer VCB
of the signal at the fundamental frequency. For example, if a
12-pulse transformer/rectifier system were to be
TRU
implemented, the first harmonics to contribute to the total
Figure:1 simple represtation of HVDC system harmonic distortion (THD) of the input line current would be
the 11th and 13th.
The simple representation of system shown in fig:1. This Harm = 6 kn ± 1 (1)
includes various stages starting transformer rectifier unit, 1
Mag =
microwave tube, protection (crowbar) etc. [1]. We will show 6 kn ± 1
each in detail and later and simulation is done for whole k= any positive integer
system on PSCAD/EMTDC (Power System CAD) software. n= number of six pulse converters.
As transformer Rectifier unit contains 2 transformer unit the protection requirement a crowbar circuit is provided that
(Delta-Delta, Start-Delta) and two 6pulse rectifier units so short-circuits the power supply DC output within 10microsec.
12pulse topology obtained

For Delta-Delta- 41.57*1.41


= 57.8 kV
Main : Graphs
Vdc12pY
70
60
50
40
30
y

20
10
0
-10
0.00 0.10 0.20 0.30 0.40 0.50 ...
...
...

Main : Graphs
Vdc12pY Vout
70
60

50
40
30
y

20
10
0
-10 Figure: 4 Test Wire, Crowbar & Over current Relay Co-ordination
0.00 0.10 0.20 0.30 0.40 0.50 ...
...
... The crowbar takes short-circuit current for 80msec till
Figure:3 Delta-Delta and total DC Output voltage the input circuit breaker opens as shown in co-ordination
curve figure:4 which is tested using ETAP software
It can be seen that by using a phase-shifting transformer simulation for co-ordination AC side protection and DC side
and adding an additional 6-pulse diode rectifier bridge, the well. In figure4 thick curve is for wire to be tested than
harmonic content in the supply current is attenuated up to the upside crowbar current than overcurrent relay operation as
11th harmonic as opposed to the 5th for the traditional 6- function of time. At DC side crowbar protection in first
pulse bridge rectifier. The inter-phase transformers absorb the activated such that load does not get damage than after AC
difference in the instantaneous voltage produced by the two side relay unit and VCB is activated.
6-pulse rectifiers. The inter-phase transformers prevent the
two bridges from interacting with each one another and allow V. CROWBAR PROTECTION
the conduction angle of the diode to remain at 120degree. For Crowbar system design and selection of switching
this particular topology, each bridge rectifier processes 50% element depends primarily on factors like peak voltage, total
of the load power. The cancellation of harmonics in the ac Coulombs to be switched, power supply follow through
input line current is achieved through the use of phase- etc[8]. Power supplies with fast switch off capabilities,
shifting transformers. For this example, the phase shift crowbar systems using ignitrons, thyratron etc. are preferred
employed by the transformer is 30degree. One of the issues and are in use worldwide[13]. The crowbar's speed of
associated with this topology is that the turn’s ratio in the response to an overload is a critical parameter. If the response
secondary must approximate an irrational number (root3). time is too slow, the output could rise to a level high enough
to damage the load. If the response is too fast, then spurious
IV. PROTECTION CO-ORDINATION noise can cause false tripping and create a nuisance condition.
These kinds of system in addition with over voltage, over In crowbar system, selection of switching element depends on
current, an arc fault protection are needed. In the event of an the factors like peak voltage, operation voltage range, peak
arc fault, for microwave tubes the supply output voltage must current, total coulombs to be switched etc [4].
be brought to zero within 10-20microsec and the energy
deposited into the fault also must be limited to 911Joules. VI. CROWBAR LOGIC
But as the supply is of conventional type with no solid-state The logic circuitry for the crowbar protection is shown
devices it takes approximately 80msec to switch off the input in figure 5 which is developed in PSCAD/EMTDC. The
to the power supply by relay & circuit breaker. So to provide common reference signal is predefined to the comparator.
The actual value of current is use with the e same comparator isolated. If the fault energy dumped in the wire is greater than
if it is higher than the reference provides 1(on to OR gate) or recommended energy, wire fuses, which implies failure of the
provide zero signal. protection system. The wire burn test is considered successful
if the wire remains intact with the crowbar firing and
successful fault current diversion. Due to any fault condition
Iz

in load such as over voltage because of reflected power, short


circuit because of internal arc crowbar unit creates a short
A circuit path. So, that stored energy can be diverted to the
ground and amplifier tube (Load) can be protected. Any
change in the system configuration warrants repetition of the
B Compar- Mono-
wire burn test for new configuration [4].
ator 0.5[ohm] 2.4[ohm]
stable
T1
block block T

R=0
Figure:5 Crowbar Logic Crowbar Test Wire

0.225 [uF]
Than after it goes to monostable mode & activated for
the time period of some milli seconds so the fault current is
diverted from intended path to another during fault period 90kV DC
meanwhile fault should be cleared and another protection get
activated [5].

VII. CROWBAR INTERLOCK


Figure:6 Crowbar Test setup
In our circuit topology requirement is to protect the
load against damage due to overcurrent, or overvoltage The crowbar unit also generates a positive trigger signal
condition. As the load is microwave tube kind which is very at once after occurrence of any faults in load and a negative
sensitive and costly equipment so require isolation of source trigger signal after vanish of that fault, which are feed to
in case of the external or internal arc fault occurs. In case of control unit of solid state relay, so that it can remove and
arc fault within the tube source must isolated from load feed input power respectively. This power supply facilitated
within 10micro second and energy dumped to fault should be with local/remote operation, fully interlocked, over voltage
critically limited otherwise load may get damage. Here in AC and over current protection system.
side conventional power supply is used which has clearing
time of 80ms including (relay and circuit breaker opening IX. CROWBAR ENERGY DUMPING CAPACITY
time) so fast sensing and isolating circuit is need which is
The design for energy dumping capacity of crowbar
fulfilled by crowbar. So interlock is provide with crowbar and
system depends on the stored energy in system which is in
relay Vacuum circuit breaker at input side. As soon as
turn depends on energy storage element present in the
crowbar is activated another signal is send to relay unit than
system like filter, load capacitor, inductor. During the fault
VCB which isolate the source from load within 80-100ms [2].
condition they releases the energy and the load should
VIII. WIRE BURN TEST capable to sustain that much of energy so in protection
crowbar should activated such that energy path is diverted to
Wire burn test is done to test for effectiveness of crowbar. In our case energy in Joule [7].
protection scheme for load as well as system as in figure6 test
E = 0 . 5 CV 2 (2)
set up. In wire test microwave tube is replaced by wire of
effective dimension which has equivalent resistance of load = 0.5*(0.225uF)*(90kV)2
(microwave tube)[2]. Then by replacing microwave tube, by =911 Joule
wire, arc fault is simulated. For fault series switch is used.
Considering pre fault condition with normal load current then X. RESULTS & DISCUSSION
after as soon as fault is simulated current value get rises to Output voltage and current monitoring serves the
higher. In Crowbar logic value of fault current is compared purpose of status monitoring and protection in the event of
with reference value in comparator if it exceed protection is fault they are also fed to protection circuits that initiate
activated. Now the fault current path is through crowbar protection when the values exceed safe values. The limits to
circuit which have lower resistance & impedance path initiate protections can be varied over ~20 to 100% of power
compared to the fault path. At the load side higher value of supply’s output ratings to take care of several loads. In actual
resistance is provided, the value of resistance should be circuit implantation Hall effect DC Current Transducer is
chosen such that does not affect load current. Crowbar should used for the output DC current monitoring [3]. This signal is
withstand the fault current till the input to power supply is an isolated signal. This signal provides continuous current
monitoring and protection from sustained over current fault. XI. CONCLUSIONS
It may be noted that it is not suitable for arc fault protection. As soon as current rises crowbar circuit is activated
A Pulse current CT used for the detection of arc fault. It may and fault current path is diverted to another low resistance
be noted that for continuous DC current monitoring through and impedance path as at load side high value resistance is
pulse CT is not possible. This gives output for fast rising/ provided so current flows through crowbar side and fault
falling currents indicating arc fault. A comparator checks this energy is dumped to dumping resister next to crowbar. So the
signal and initiates crowbar in the event of arc fault. As the crowbar takes fault current 80-100ms and activated within
circuit has high charging current so crowbar current decays 10-20microsecond till the VCB get open and isolate the
slowly to zero but the crowbar circuit is in monostable mode source from load side this kind of topology may useful for the
for certain period of time and divert the path of fault HVDC transmission lines.
current[13].
REFERENCES
Main : Graphs
[1] “Development of 70kV 22A DC Power Supply for High Power RF
Iload
40.0 and Microwave Tubes” Y.S.S.Srinivas, Rajan Babu, Azad Makwana,
35.0
30.0 Kirit Parmar, S.V. Kulkarni, Institute for Plasma Research 23rd
25.0 National Symposium on Plasma Science & Technology (PLASMA-
20.0
2008)
y

15.0
10.0 [2] “Results Of 10-Joule Wire-Burn Test Performed On 70 Kv Rail-Gap
5.0 Crowbar Protection System For High Power Klystrons And Gyrotron”
0.0
...
Y.S.S.Srinivas, M.Kushwah, S.V. Kulkarni, IPR 2009.
0.00 0.10 0.20 0.30 0.40 0.50
... [3] “Crowbar protection system for 350 MHz Tetrode Amplifer” Sandip
...
Main : Graphs
Shrotriya, Manjiri Pande and V. K.Handu Vacuum Physics and
60
Icrwbr Instrumentation Division, B.A.R.C., Mumbai.
50
[4] “Compact 200kj Pulse Power System With A Simple Crowbar Circuit”
Yun-Sik Jing, Hong-Sik Lee, Jong-Soo Kim, Young-Bae Kim, Geun-
40
Hie, Korea Electrotechnology Research Institute (KERI).
30
[5] “Design of the protection crowbar for the LHCD klystrons in JET”
y

20
Fusion Technology 1988, C.Christodoulopoulos et.al.
10
[6] “Heavy ion RF power amplifier, Accelerator division” Technica note
0 no.263, Brookahen national laboratory, Associated university, inc.
0.00 0.10 0.20 0.30 0.40 0.50 ...
... upton, New York 11973
...
[7] Y.S.Jin et al “Design and Performance of a 300 Kj Pulsed Power
Fig:7 Wave form for load-fault current, crowbar current. Module for ETC Application,” IEEE Trans. Magn., vol. 37, pp. 165-
168
The supply can have 911 Joules of stored energy (E = [8] C. Friedrichs, J.Lyles, J.M.Doub, “Development Of A High Speed
0.5 CV2). In the arc fault condition, the crowbar provides a Crowbar For Lansce” ,Particle Accelerator Conference,1997,
Vancouver, BC, Canada.
low impedance path to safely discharge the stored energy. It
[9] M.K.Badapanda, P. R.Hannurkar, “Klystron bias Power Supplies for
diverts the energy discharge of the supply through the
Indus-2 Synchrotron Radiation Source”, The Institute of Electronics
crowbar device instead of tetrode tube. A spark gap based and Telecommunication Engineers, Journal of Research.
crowbar protection system has been adopted for this purpose. [10] IEEE Std 551™-2006 “IEEE Recommended Practice for Calculating
The result from PsCAD simulation with step time of solution Short-Circuit Currents in Industrial and commercial power system” pp
50 micro second and channel plot step 250 micro second. 198-215.
From wave form we can conclude that in normal condition [11] A.M. Gole, O.B. Nayak. T.S. Sidhu, M.S. Sachdev, "A Graphical
load current is 25Amp as in case any arc fault occurs at load Electromagnetic Simulation Laboratory for Power Systems
side current rises to 38Amps [10]. Engineering Programs", IEEE PES 2008.
[12] EMTDC – “The Electromagnetic Transients & Controls Simulation
Engine”, User’s Guide, Manitoba HVDC Research Centre Inc., 2005.
[13] C. Friedrichs, J.Lyles, J.M.Doub, “Development Of A High Speed
Crowbar For Lansce,Particle Accelerator” Conference,1997,
Vancouver, BC, Canada,pg.3473-3475.

Fig 8: Load and Crowbar current with fault condition