Professional Documents
Culture Documents
Power Supply
Sumit K Rathor
PG student of Birla Vishvakarma Mahavidhyalaya
Gujarat Technological University
rathorsumit2006@gmail.com
Abstract— This paper presents the protection of system under II. TRANSFORMER RECTIFIER UNIT.
the faulty condition, and co-ordination of different protective Transformer rectifier unit is combination of transformer
devices. Generally the HVDC equipments are very costly so
unit input 11kV and rectifier unit which convert AC to 90kV
protection is primary need for HVDC systems. In HVDC
systems solid state devices are used which have very fast
DC output as shown in fig 2.
switching characteristic while on AC side conventional
protective devices VCB & relay unit is provided which has
higher time of operation for switching so meanwhile another
protection require to isolate the DC system within fraction of
time so crowbar protections is provided. Normally crowbar is
provided for HVDC load side protection here in this paper we
have taken various supply topology and protection of them, and
application in microwave tubes. Simulation is done for HVDC
supply with crowbar using PSCAD/EMTDC and ETAP
software.
20
10
0
-10
0.00 0.10 0.20 0.30 0.40 0.50 ...
...
...
Main : Graphs
Vdc12pY Vout
70
60
50
40
30
y
20
10
0
-10 Figure: 4 Test Wire, Crowbar & Over current Relay Co-ordination
0.00 0.10 0.20 0.30 0.40 0.50 ...
...
... The crowbar takes short-circuit current for 80msec till
Figure:3 Delta-Delta and total DC Output voltage the input circuit breaker opens as shown in co-ordination
curve figure:4 which is tested using ETAP software
It can be seen that by using a phase-shifting transformer simulation for co-ordination AC side protection and DC side
and adding an additional 6-pulse diode rectifier bridge, the well. In figure4 thick curve is for wire to be tested than
harmonic content in the supply current is attenuated up to the upside crowbar current than overcurrent relay operation as
11th harmonic as opposed to the 5th for the traditional 6- function of time. At DC side crowbar protection in first
pulse bridge rectifier. The inter-phase transformers absorb the activated such that load does not get damage than after AC
difference in the instantaneous voltage produced by the two side relay unit and VCB is activated.
6-pulse rectifiers. The inter-phase transformers prevent the
two bridges from interacting with each one another and allow V. CROWBAR PROTECTION
the conduction angle of the diode to remain at 120degree. For Crowbar system design and selection of switching
this particular topology, each bridge rectifier processes 50% element depends primarily on factors like peak voltage, total
of the load power. The cancellation of harmonics in the ac Coulombs to be switched, power supply follow through
input line current is achieved through the use of phase- etc[8]. Power supplies with fast switch off capabilities,
shifting transformers. For this example, the phase shift crowbar systems using ignitrons, thyratron etc. are preferred
employed by the transformer is 30degree. One of the issues and are in use worldwide[13]. The crowbar's speed of
associated with this topology is that the turn’s ratio in the response to an overload is a critical parameter. If the response
secondary must approximate an irrational number (root3). time is too slow, the output could rise to a level high enough
to damage the load. If the response is too fast, then spurious
IV. PROTECTION CO-ORDINATION noise can cause false tripping and create a nuisance condition.
These kinds of system in addition with over voltage, over In crowbar system, selection of switching element depends on
current, an arc fault protection are needed. In the event of an the factors like peak voltage, operation voltage range, peak
arc fault, for microwave tubes the supply output voltage must current, total coulombs to be switched etc [4].
be brought to zero within 10-20microsec and the energy
deposited into the fault also must be limited to 911Joules. VI. CROWBAR LOGIC
But as the supply is of conventional type with no solid-state The logic circuitry for the crowbar protection is shown
devices it takes approximately 80msec to switch off the input in figure 5 which is developed in PSCAD/EMTDC. The
to the power supply by relay & circuit breaker. So to provide common reference signal is predefined to the comparator.
The actual value of current is use with the e same comparator isolated. If the fault energy dumped in the wire is greater than
if it is higher than the reference provides 1(on to OR gate) or recommended energy, wire fuses, which implies failure of the
provide zero signal. protection system. The wire burn test is considered successful
if the wire remains intact with the crowbar firing and
successful fault current diversion. Due to any fault condition
Iz
R=0
Figure:5 Crowbar Logic Crowbar Test Wire
0.225 [uF]
Than after it goes to monostable mode & activated for
the time period of some milli seconds so the fault current is
diverted from intended path to another during fault period 90kV DC
meanwhile fault should be cleared and another protection get
activated [5].
15.0
10.0 [2] “Results Of 10-Joule Wire-Burn Test Performed On 70 Kv Rail-Gap
5.0 Crowbar Protection System For High Power Klystrons And Gyrotron”
0.0
...
Y.S.S.Srinivas, M.Kushwah, S.V. Kulkarni, IPR 2009.
0.00 0.10 0.20 0.30 0.40 0.50
... [3] “Crowbar protection system for 350 MHz Tetrode Amplifer” Sandip
...
Main : Graphs
Shrotriya, Manjiri Pande and V. K.Handu Vacuum Physics and
60
Icrwbr Instrumentation Division, B.A.R.C., Mumbai.
50
[4] “Compact 200kj Pulse Power System With A Simple Crowbar Circuit”
Yun-Sik Jing, Hong-Sik Lee, Jong-Soo Kim, Young-Bae Kim, Geun-
40
Hie, Korea Electrotechnology Research Institute (KERI).
30
[5] “Design of the protection crowbar for the LHCD klystrons in JET”
y
20
Fusion Technology 1988, C.Christodoulopoulos et.al.
10
[6] “Heavy ion RF power amplifier, Accelerator division” Technica note
0 no.263, Brookahen national laboratory, Associated university, inc.
0.00 0.10 0.20 0.30 0.40 0.50 ...
... upton, New York 11973
...
[7] Y.S.Jin et al “Design and Performance of a 300 Kj Pulsed Power
Fig:7 Wave form for load-fault current, crowbar current. Module for ETC Application,” IEEE Trans. Magn., vol. 37, pp. 165-
168
The supply can have 911 Joules of stored energy (E = [8] C. Friedrichs, J.Lyles, J.M.Doub, “Development Of A High Speed
0.5 CV2). In the arc fault condition, the crowbar provides a Crowbar For Lansce” ,Particle Accelerator Conference,1997,
Vancouver, BC, Canada.
low impedance path to safely discharge the stored energy. It
[9] M.K.Badapanda, P. R.Hannurkar, “Klystron bias Power Supplies for
diverts the energy discharge of the supply through the
Indus-2 Synchrotron Radiation Source”, The Institute of Electronics
crowbar device instead of tetrode tube. A spark gap based and Telecommunication Engineers, Journal of Research.
crowbar protection system has been adopted for this purpose. [10] IEEE Std 551™-2006 “IEEE Recommended Practice for Calculating
The result from PsCAD simulation with step time of solution Short-Circuit Currents in Industrial and commercial power system” pp
50 micro second and channel plot step 250 micro second. 198-215.
From wave form we can conclude that in normal condition [11] A.M. Gole, O.B. Nayak. T.S. Sidhu, M.S. Sachdev, "A Graphical
load current is 25Amp as in case any arc fault occurs at load Electromagnetic Simulation Laboratory for Power Systems
side current rises to 38Amps [10]. Engineering Programs", IEEE PES 2008.
[12] EMTDC – “The Electromagnetic Transients & Controls Simulation
Engine”, User’s Guide, Manitoba HVDC Research Centre Inc., 2005.
[13] C. Friedrichs, J.Lyles, J.M.Doub, “Development Of A High Speed
Crowbar For Lansce,Particle Accelerator” Conference,1997,
Vancouver, BC, Canada,pg.3473-3475.