You are on page 1of 8

PT.

RADIANT UTAMA INTERINSCO, TBK

SUMMARY SITE SURVEY AND FINDING


PIPELINE RECERTIFICATION
Inspection Date : 23 May Up to 27 May 2017

No Subject Inspection Activity Inspection Result Finding and Recommendation


1. 12" BJ to BB  Site Survey Pig Launcher and Pig Receiver  Some spots of Pig Launcher and Pig  No major or minor finding,
on BJ Platform and BB Platform Receiver (Coating) was rusty fit for service
 CP reading and sea water resistant  Result of CP Reading Measurement
measurement on riser still good condition (more negative
 UT Thickness measurement on accessible than -800 mV)
straight pipe and elbow  Result of UT Measurement is
 Visual Inspection of pipeline safety device acceptable (minimum actual
thickness above thickness required)
 Good condition on Safety device

2. 6" BB to BP-1  Site Survey Pig Launcher and Pig Receiver  Some spots of Pig Launcher and Pig  No major or minor finding,
on BB Platform and BP-1 Platform Receiver (Coating) was rusty fit for service
 CP reading and sea water resistant  Result of CP Reading Measurement
measurement on riser still good condition (more negative
 UT Thickness measurement on accessible than -800 mV)
straight pipe and elbow  Result of UT Measurement is
 Visual Inspection of pipeline safety device acceptable (minimum actual
thickness above thickness required)
 Good condition on Safety device

3. 10" LP Oil Line HGA to CPA  Site Survey Pig Launcher and Pig Receiver  Pig Launcher and Pig Receiver are  The pipe riser at RC #39 M2
on HGA Platform and CPA portable side unprotected by CP
 CP reading and sea water resistant  Result of CP Reading Measurement
measurement on riser at RC #39 M2 side between -747
 UT Thickness measurement on accessible mV until -754 mV
straight pipe and elbow  Result of UT Measurement is
 Visual Inspection of pipeline safety device acceptable (minimum actual
thickness above thickness required)
 Good condition on Safety device
PT. RADIANT UTAMA INTERINSCO, TBK
4. 12" LP Oil Line HA to M2  Site Survey Pig Launcher and Pig Receiver  Pig Launcher and Pig Receiver are  The pipe riser at RC #39 M2
on HA Platform and M2bis Platform portable side unprotected by CP and
 CP reading and sea water resistant  Result of CP Reading Measurement anode cable was
measurement on riser at RC #39 M1 side between -653 disconnected
 UT Thickness measurement on accessible mV until -681 mV
straight pipe and elbow  Result of UT Measurement is
 Visual Inspection of pipeline safety device acceptable (minimum actual
thickness above thickness required)
 Good condition on Safety device

5. 12" LP Oil Line HV to CPA  Site Survey Pig Launcher and Pig Receiver  Pig Launcher and Pig Receiver are  The pipe riser at RC #39 M2
on HV Platform and CPA portable side unprotected by CP
 CP reading and sea water resistant  Result of CP Reading Measurement
measurement on riser at RC #39 M2 side between -757
 UT Thickness measurement on accessible mV until -781 mV
straight pipe and elbow  Result of UT Measurement is
 Visual Inspection of pipeline safety device acceptable (minimum actual
thickness above thickness required)
 Good condition on Safety device

6. 12" LP Oil Line HX to M2  Site survey line pipe on HX Platform and  Good Condition on Line Pipe and  The pipe riser at RC #39 M2
M2bis Platform Riser side unprotected by CP and
 CP reading and sea water resistant  Result of CP Reading Measurement anode cable was
measurement on riser at RC #39 M2 side between -733 mV disconnected
 UT Thickness measurement on accessible until -736 mV
straight pipe and elbow  Result of UT Measurement is
 Visual Inspection of pipeline safety device acceptable (minimum actual
thickness above thickness required)
 Good condition on Safety device

7. 12" LP Oil Line HZA to HJ  Site survey line pipe on HZA Platform and  Good Condition on Line Pipe  No major or minor finding,
HJ Platform  Result of UT Measurement is fit for service
 UT Thickness measurement on accessible acceptable (minimum actual
straight pipe and elbow thickness above thickness required)
 Visual Inspection of pipeline safety device  Good condition on Safety device
PT. RADIANT UTAMA INTERINSCO, TBK
8. 12" MP Gas Line M1 to M2  Site Survey Pig Launcher and Pig Receiver  Pig Launcher and Pig Receiver are  The pipe riser at RC #39
on M1 Platform and M2 Platform portable unprotected by CP
 CP reading and sea water resistant  Result of CP Reading Measurement
measurement on riser at RC #39 M2 side -759 mV until -792
 UT Thickness measurement on accessible mV
straight pipe and elbow  Result of UT Measurement is
 Visual Inspection of pipeline safety device acceptable (minimum actual
thickness above thickness required)
 Good condition on Safety device

9. 4" HP Gas Line HJ to HZA  Site survey line pipe on HJ Platform and  Good Condition on Line Pipe  The pipe riser at RC #36
HZA Platform  Result of CP Reading Measurement Well Side unprotected by CP
 CP reading and sea water resistant at RC #36 between -683 mV until -
measurement on riser 894 mV
 UT Thickness measurement on accessible  Result of UT Measurement is
straight pipe and elbow acceptable (minimum actual
 Visual Inspection of pipeline safety device thickness above thickness required)
 Good condition on Safety device

10. 4" HP Gas Line HK to HKA  Site survey line pipe on HK Platform and  Good Condition on Line Pipe  No major or minor finding,
HKA Platform  Result of UT Measurement is fit for service
 UT Thickness measurement on accessible acceptable (minimum actual
straight pipe and elbow thickness above thickness required)
 Visual Inspection of pipeline safety device  Good condition on Safety device

11. 4" HP Gas Line HP to HPA  Site survey line pipe on HP Platform and  Good Condition on Line Pipe  No major or minor finding,
HPA Platform  Result of UT Measurement is fit for service
 UT Thickness measurement on accessible acceptable (minimum actual
straight pipe and elbow thickness above thickness required)
 Visual Inspection of pipeline safety device  Good condition on Safety device

12. 6" HP Gas Line HDA to HAA  Site survey line pipe on HDA Platform and  Good Condition on Line Pipe  No major or minor finding,
HAA Platform  Result of UT Measurement is fit for service
 UT Thickness measurement on accessible acceptable (minimum actual
straight pipe and elbow thickness above thickness required)
 Visual Inspection of pipeline safety device  Good condition on Safety device
PT. RADIANT UTAMA INTERINSCO, TBK
13. 6" MP Oil Line HGA to M1  Site survey line pipe on HGA Platform and  Good Condition on Line Pipe  No major or minor finding,
M1 Platform  Result of UT Measurement is fit for service
 UT Thickness measurement on accessible acceptable (minimum actual
straight pipe and elbow thickness above thickness required)
 Visual Inspection of pipeline safety device  Good condition on Safety device

14. 6" MP Oil Line HK to M1  Site survey line pipe on HK Platform and  Good Condition on Line Pipe  No major or minor finding,
M1 Platform  Result of UT Measurement is fit for service
 UT Thickness measurement on accessible acceptable (minimum actual
straight pipe and elbow thickness above thickness required)
 Visual Inspection of pipeline safety device  Good condition on Safety device

15. 6" MP Oil Line HKA to HK  Site survey line pipe on HKA Platform and  Good Condition on Line Pipe  No major or minor finding,
HK Platform  Result of UT Measurement is fit for service
 UT Thickness measurement on accessible acceptable (minimum actual
straight pipe and elbow thickness above thickness required)
 Visual Inspection of pipeline safety device  Good condition on Safety device

16. 6" MP Oil Line HRB to HH  Site survey line pipe on HRB Platform and  Good Condition on Line Pipe  No major or minor finding,
HH Platform  Result of UT Measurement is fit for service
 UT Thickness measurement on accessible acceptable (minimum actual
straight pipe and elbow thickness above thickness required)
 Visual Inspection of pipeline safety device  Good condition on Safety device

17. 6" HP Gas Line M1 to HK  Site survey line pipe on M1 Platform and  Good Condition on Line Pipe  No major or minor finding,
HK Platform  Result of UT Measurement is fit for service
 UT Thickness measurement on accessible acceptable (minimum actual
straight pipe and elbow thickness above thickness required)
 Visual Inspection of pipeline safety device  Good condition on Safety device

18. 8" LP Oil Line HK to M1  Site survey line pipe on HK Platform and  Good Condition on Line Pipe  No major or minor finding,
M1 Platform  Result of UT Measurement is fit for service
 UT Thickness measurement on accessible acceptable (minimum actual
straight pipe and elbow thickness above thickness required)
 Visual Inspection of pipeline safety device  Good condition on Safety device
PT. RADIANT UTAMA INTERINSCO, TBK
19. 6" HP Gas Line HYB to HYA  Site survey line pipe on HYB Platform and  Good Condition on Line Pipe  No major or minor finding,
HYA Platform  Result of UT Measurement is fit for service
 UT Thickness measurement on accessible acceptable (minimum actual
straight pipe and elbow thickness above thickness required)
 Visual Inspection of pipeline safety device  Good condition on Safety device

20. 6" LP Oil Line HKA to HK  Site survey line pipe on HKA Platform and  Good Condition on Line Pipe  No major or minor finding,
HK Platform  Result of UT Measurement is fit for service
 UT Thickness measurement on accessible acceptable (minimum actual
straight pipe and elbow thickness above thickness required)
 Visual Inspection of pipeline safety device  Good condition on Safety device

21. 6" MP Oil Line HC to CPA  Site survey line pipe on HC Platform and  Good Condition on Line Pipe  No major or minor finding,
CPA  Result of UT Measurement is fit for service
 UT Thickness measurement on accessible acceptable (minimum actual
straight pipe and elbow thickness above thickness required)
 Visual Inspection of pipeline safety device  Good condition on Safety device

22. 6" TM-11/TM-53 to GTS-1  Site survey line pipe on TM-11/TM-53  Good Condition on Line Pipe  No painting on line pipe at
Platform and GTS-1 Platform  Result of UT Measurement is aerial section (Minor)
 UT Thickness measurement on accessible acceptable (minimum actual Recommendation :
straight pipe and elbow thickness above thickness required) repainting of line pipe to
 Visual Inspection of pipeline  Good condition on Safety device prevent the corrosion
safety device
PT. RADIANT UTAMA INTERINSCO, TBK
23. 6" TM-57/TM-77/TM-83 to GTS-1  Site survey line pipe on TM-57/TM-  Good Condition on Line Pipe  The riser pipe at RC #36
77/TM-83 Platform and GTS-1 Platform  Result of CP Reading Measurement unprotected by CP
 CP reading and sea water resistant at RC #36 between -624 mV until -  No painting on line pipe at
measurement on riser 708 mV aerial section (Minor)
 UT Thickness measurement on accessible  Result of UT Measurement is Recommendation :
straight pipe and elbow acceptable (minimum actual repainting of line pipe to
 Visual Inspection of pipeline safety device thickness above thickness required) prevent the corrosion
 Good condition on Safety device

24. 6" TM-43 to GTS-1  Site survey line pipe and riser on TM-  Good Condition on line pipe  No painting on line pipe at
43 Platform and GTS-1 Platform  Result of UT Measurement is aerial section (Minor)
 UT Thickness measurement on acceptable (minimum actual Recommendation :
accessible straight pipe and elbow thickness above thickness repainting of line pipe to
 Visual Inspection of pipeline safety required) prevent the corrosion
device  Good condition on Safety device
PT. RADIANT UTAMA INTERINSCO, TBK
25. 8" TM-36/TM-37 to GTS-2  Site survey line pipe on TM-36/TM-37  Good Condition on line pipe  Pointer of Pressure
Platform and GTS-2 Platform  Result of UT Measurement is Indicator at GTS-2
 UT Thickness measurement on acceptable (minimum actual Platform was broken
accessible straight pipe and elbow thickness above thickness (Minor)
 Visual Inspection of pipeline safety required) Recommendation :
device  Good condition on Safety device Pressure Indicator should
be repair

26. 8" TM-58/TM-82 to GTS-1  Site survey line pipe on TM-58/TM-82  Good Condition on line pipe  No major or minor finding,
Platform and GTS-1 Platform  Result of UT Measurement is fit for service
 UT Thickness measurement on accessible acceptable (minimum actual
straight pipe and elbow thickness above thickness required)
 Visual Inspection of pipeline safety device  Good condition on Safety device

27. 12" MP Gas Line CPA to M2  Site Survey Pig Launcher and Pig Receiver  Pig Launcher and Pig Receiver are  No major or minor finding,
on CPA and M2 Platform portable fit for service
 CP reading and sea water resistant  Result of UT Measurement is
measurement on riser acceptable (minimum actual
 UT Thickness measurement on accessible thickness above thickness required)
straight pipe and elbow  Good condition on Safety device
 Visual Inspection of pipeline safety device

28. 6" HP Gas Line HL to HLB  Site survey line pipe on HL Platform and  Good Condition on Line Pipe  The riser pipe at RC #86
HLB Platform  Result of CP Reading Measurement unprotected by CP
 CP reading and sea water resistant at RC #86 between -750 mV until -
measurement on riser 760 mV
 UT Thickness measurement on accessible  Result of UT Measurement is
straight pipe and elbow acceptable (minimum actual
 Visual Inspection of pipeline safety device thickness above thickness required)
 Good condition on Safety device
PT. RADIANT UTAMA INTERINSCO, TBK
29. 6" HP Oil Line HC to HCA  Site survey line pipe on HC PLatform and  Good Condition on line pipe  No major or minor finding,
HCA Platform  Result of UT Measurement is fit for service
 UT Thickness measurement on accessible acceptable (minimum actual
straight pipe and elbow thickness above thickness required)
 Visual Inspection of pipeline safety device  Good condition on Safety device