Professional Documents
Culture Documents
Key responsibilities:
Manage pre-shutdown, shutdown and post shutdown day or night aspects of an integrity static scope of
works at Qatargas North side, ensuring safe, efficient and profitable delivery of the scope goals.
Implement and drive ASME PCC-1 & 2 standards compliance while reviewing and approving flange/joint
bolt integrity documents and plans developed by Shutdown Contractor or his Sub-contractor.
Ensure Shutdown Contractor or his Sub-contractor fully comply with Joint Integrity Management
procedures and philosophy that is reviewed and approved.
Represent Qatargas as a technical authority in shutdown related meetings from concept to completion
Represent Qatargas in meetings and presentations on Joint Integrity issues.
Manage, interpret and approve procedures, reporting systems and the delivery of Qatargas shutdown
requirements including the worked asset Flawless Start-Up Initiative.
Liaise with various different work groups/companies/disciplines including Vendors, Leak Testing, and
Commissioning, Fabrication etc. as and when required.
Cooperate with The Hydratight Project Manager in identifying resource required for the project.
Identify opportunities within the project to generate further profitable revenue.
Manage, develop and coach Shutdown Contractor or his Sub-contractor personnel in the requirements
of successful deployment of Flange Joint Integrity on the shutdown.
Organize inspection and implement it at site to optimize performance and quality of service to Qatargas
requirement.
Line walking, understanding of physical limitations and proposing for safe and right solutions
Drawings review, correction/updating
Marking up drawings review and approve
Work Pack review and approval
Method of Statement and JSA review and approval
Database population review and ensure accuracy/correctness
Tagging inspection and ensuring compliance
Progress reporting
Inspection of Joints, faultfinding and identification of remedial work.
Identification, supervision and monitoring of quality aspects of contractor’s In-situ Machining activities
Adheres to all Company policies and procedures
Inspection of mechanical flange, and piping equipment against the specifications of the scope of works
Inspection of flange related spool fabrication, erection, flange assembly and tightening against the
specifications of the scope of works
Updates Joint/Flange Management master list under direction of Qatargas Shutdown Coordinator, who
you will work closely with across various tasks in the role.
Should adhere strictly to SHE&Q policies & procedures such as;
• The health and safety precautions at the work site
• Safety precautions when handling, removing and reinstallation of gaskets
• Hot bolting and live plant procedures and risk assessment
• Pressure, temperature and hostile environmental factors (such as corrosion and vibration) on
the degradation of the bolted assembly
Should adhere to factors which result in bolt load variation such as;
• Applied and residual load
• The effect of different lubricants on friction losses
• The relative accuracy of different methods of tightening
• The technique for application of tensioned bolt loading
• Joint assembly methods and tightening procedures
• The need to check gaskets, nuts and stud bolts against specification
• The requirement to tag and complete records for assembled joints
• The need to check the compatibility of selected Torque tools and equipment capacity prior to
use.
Should have sufficient knowledge and experience on;
• The principles of joint component sealing action
• The principles of bolt elongation and tensile stress
• The function of gasket or seal types
• The importance of correct bolt loading
• The effect on bolt load and seal compression using different methods of tightening
• The importance of using correct lubricant
• The importance of correct selection of joint components to comply with the design
specification
• The correct sequence and number of tightening passes required for toque and tensioned bolts
• The principles and techniques used for direct bolt length measurement
• The need for and using reporting procedures when defects or faults in bolt tightening
equipment or its assembly are identified
• The principles of preparing bolted joint connections for assembly
• The need for seal face cleanliness and for nuts to be free running
• The effect of joint alignment and gap uniformity on residual bolt loading
• The importance of gasket storage, handling, preparation and installation
• Good installation practice for bolting, washers and nut orientation for tightening method and
equipment to be used
• The need to report variance from design specifications and tightening procedures
• The principles and requirement for the safe selection, calibration, installation and use of
hydraulic torque and bolt tensioning equipment
• Principles of carrying out bolt de-tensioning and joint breakout safely and correctly
• The important of attending product specific training and following manufacturer’s procedures
for proprietary joint types.
• Why mixing components from different equipment manufacturer is prohibited
• The principles of inspection after tightening and the procedure and the techniques to be used
such as “break loose” tests (Check passes) and bolt tightness Tap-test
• The requirements for the storage, preparation, maintenance and calibration of torque tools
and bolt tensioning equipment for its safe use
Ability to,
- Recognize and guide in rectifying the faults with torque or tensioning equipment
- Interpret joint or flange manufacturer identifying marks
- Identify defects, distortion and surface irregularities on flange sealing faces and threads
Demonstrate ability in;
• Preparation of all joint components
• Correct selection and assembly joint components
• Diagnosis and rectification of problems with hydraulic equipment
• Selection and correct installation of hydraulic torque or tensioning equipment
• Correct application of various tightening techniques
• Carrying out specified tightening sequence and subsequent tightening passes to ensure axial
alignment and squareness of the joint assembly
• Carrying out joint breakout safely and correctly
• Carrying bolt ‘break loose’ tests (check passes) to check integrity of assembled tensioned
assembly
• Completion of a joint record sheet
• Integrity and inspection checks of completed joint assembly
• Maintaining a personnel portfolio of joint assembly
Candidates wishing to be considering for this position should possess the following qualifications /
experience:
Good educational background preferably a degree in Mechanical Engineering. Candidates with lower
qualification also can be considered provided they have specific work experience and skills that exactly
meets Qatargas requirements.
A safety qualification to NEBOSH General Certificate or IOSH Managing safely Standard or equivalent is
desirable.
Experience of working on, supervising or managing major shutdowns or construction projects.
Good understanding of bolt load calculation theory and knowledge of bolted joint technology.
Good understanding of the principles of in situ machining is desirable.
Capable of interpreting work scope, work/test packs, piping specifications, P&IDs, Isometrics and other
engineering drawings
Capable of operating as part of a multi-cultural team and as a Qatargas representative on a shutdown,
working under minimum supervision.
Positive attitude – consistent willingness to develop and adapt-overcome problems and create
opportunities.
Good interpersonal skills, communication and organizational skills.
Ability to work under extreme pressure, tight deadlines and constantly shifting priorities due to changes
to the original schedule.
The ability to manage multiple discipline relationships and develop win - win outcomes with Qatargas.
Knowledge of Flange Joint Integrity software(s), Flange Break Registers or equivalent is desirable.
Use of Microsoft Office Packages including Outlook, Word, Excel and PowerPoint
Team and goal orientated, results driven
Awareness of the full range of tools & accessories and its functions using for flange management.