Professional Documents
Culture Documents
28th OCT
Company Profile
Continual Improvement
confidential
Confidential Slide
Slide 2
Company Profile
confidential
Confidential Slide
Slide 3
DTPS : Overview
Capacity 500
DTPS Journey….. BS EN
16001
1998 ISO 9001 IMS RBNQA
ISO Energy
1999 ISO 14001 27001 Management
1999 QIP/SIP/EMP 6σ-II SA8000
2000 RAMCO ERP Package implémentation 6σ-I OHSAS System
Mercer,
2001 ISO Up gradation CII 2005 Benchmarking CII
2003 SAP & ESS implementation BSC 2005 Six Sigma drive I
2004 British Safety Council Audit SAP 2005 Mercer HR study
ESS 2006 OHSAS 18001
ISO
Upgrade 2007 SA 8000
2008 Integrated Management
RAMCO system
ISO
14001 2008 ISO 27001
ISO
9001 2009 SAP in place of RAMCO
2010 BS EN 16001
confidential
Confidential Slide
Slide 5
System Approach – Guiding Aspects
Feedback Documentation
Review by top
Implementation
Management
Deviation/
Control
Correction
Monitoring &
Analysis
confidential
Confidential Slide
Slide 6
Energy Management System
confidential
Confidential Slide
Slide 7
Energy Management System
ISO 50001:2011
PCR-1 PCR-2
Compressor
Process parameter Process parameter Room
FGD
Process parameter
Process parameter
4-20 mA 4-20 mA
RS485
RS485
ELAN ELAN
VIEW SERVER
LAN
Continual Improvement
ELAN
VIEW RS485
RS485 Total 250 meters installed
Single Login
confidential
Confidential Slide
Slide 9
Monitoring Facilities At DTPS
100% digitalization
Energy Consumption Process
from E LAN Parameters
Reports from DCS
Control
Daily Energy
Deviation report
for review
Digital Logbooks SAP
confidential
Confidential Slide
Slide 10
Daily Energy Deviation Report
Operating BaseValue:
Operational Control:
Value:
Maintenance
It includes Control:
Itthe
Is Decided Based On Average
It Includes
This Effect
control OfValue
Coal Quality
includes Variation,
of 1 Condition,
Un-optimized Year Data
Condenser
Detail Analysis Vacuum
Of Problems
Operation Deviation,
Other In
Solution Seasonal Effects.
ValveTerms
/ DamperOfPassing,
New Alternative
Average Power Operators Have To Run Equipment In This
Technology
Preventive Maintenance Due,
Consumption Repair
Standardized
or Operating Range.
Replacement.
Set Points At Various Parameters
Rate As On Date
confidential
Confidential Slide
Slide 11
Monthly Building Energy Deviation Report
confidential
Confidential Slide
Slide 12
Performance Review System
?
Review
Monthly Operation
Daily Departmental Daily Plant Meeting
Meeting Review Team Meeting
Monthly Review Of
Departmental Plant Performance, Energy
Overall Plant
Meeting With All deviation review with all
Performance
Team Members Sectional Heads
&Energy deviation
confidential
Confidential Slide
Slide 13
Control system
Notification raised in
SAP
Discussed in Daily
plant meeting
Categorized Aux
power / Heat rate
Opportunities for continual improvement
No
New
Running
Requirement /
Defect
Modification
Yes
confidential
Confidential Slide
Slide 14
Continual Improvement
Continual Improvement
confidential
Confidential Slide
Slide 15
O&M process at DTPS
Safe
Reliable Sustainable
Efficient Economical Clean
O
M C
P R
O O
T E
N N
I V
I T
M I
T R
I E
O O
S W
R L
E
confidential
Confidential Slide
Slide 16
O/M Approach
I “PROMT” T
N Modular Priority on Managing E
N Maintenance concept Performance Trends C
O maintenance H
V N
A O
Approach
T L
I O
O G
N Process Optimisation Y
confidential
Confidential Slide
Slide 18
PROMT Maintenance Concept
confidential
Confidential Slide
Slide 19
Process Optimisation
Investment - NIL
confidential
Confidential Slide
Slide 20
Approach for optimization
Brainstorming
D-logbooks
Event analysis
MIS reports
Technical
From EM MIS
Validation
Validation &
Data conversion GAP Probable
Pilot testing Monitor
Collection in reportable Analysis solutions
format
OEM data
Benchmarking
Other plant visit
Other site inputs
Process Optimization
Periodic Review of
Rationalization Optimization
SOPs
In case of Stand by
1. Cooling water
equipments Higher 1. SOP for back down
System
efficiency period prepared to
2. Soot blower
equipments are kept minimize the losses.
operations etc
in service
0.19% Reduction in
Aux power potential
confidential
Confidential Slide
Slide 22
Energy Conservation Projects
Energy Conservation projects
Sr.
Description Savings
No.
confidential
Confidential Slide
Slide 24
Energy Conservation projects
Sr.
Description Savings
No.
confidential
Confidential Slide
Slide 25
Technology - Installation of VFD
Energy Saving
Total 12 Nos. Of VFD Are Installed for Different Application 622 KW/Hr
confidential
Confidential Slide
Slide 26
BFP Cartridge Replacement
Boiler Feed
Pump
confidential
Confidential Slide
Slide 27
Replacement of Liner In Coal Mill
Replacement of Manganese Liner By Hi-Crome Liner
Mill Liner
Coal Mill
Totalstreet
Solar 14 nos.
lighting Total
2 HP1100
SolarLPD
Water Pump
confidential
Confidential Slide
Slide 29
Awards & Recognitions
confidential
Confidential Slide
Slide 31