PRODUCT
APPLICATION
SPECIAL FEATURES
FINEHARD™ – 986
Characteristic Test Method Unit Specification
Consistency Visual Thin liquid
Viscosity at 25oC ASTM-D1652 mPas <5
Flash Point ASTM-D 93 C > 40
Density at 25oC ASTM-D 4052 g/cc 1.00 – 1.10
Storage temperature o
C 2 – 25
Storage life Months 6
ACCELERATOR – 062
Mix Ratio
Epofine®-6071A80:Finecure – 197:Finecure–190:Finehard–986:Accelerator–062
= 100:50:17:68 : 0.50
o
Mix Viscosity at 50 C = 2000 – 4000 mPas
Gel time at 130oC = 10 – 30 minutes
Pre-pregging temperature = 5 – 8 minutes at 80 – 90oC
Pre-preg shelf life = > 40days at < -4oC
Curing achedule = 130oC/6h + 140oC/2h
Glass transition temperature = 130 – 140oC
o
Break down voltage at 25 C = 40kV/mm
PROCESS
Resin, toughener, tackifier and hardener components are weighed accurately in a clean dry
steel container and mix at an RPM of 20 – 60. Ensure that the entire quantity is mixed
uniformly, particularly from the sides and bottom. After getting uniformity of the mix, add
accelerator and continue mixing for another 10 minutes. After mixing, transfer the resin mix to
the fabric either by a doctor blade or any other appropriate arrangement.
After coating the fabric with the resin, pass it through an air circulated oven at 60 – 80oC for 5
– 8 minutes. Pre-pregging time has to be carefully established, taking in to consideration the
heat transfer rate to the fabric. Excessive heat transfer will tend to reduce the life of the pre-
preg. Inadequate heat transfer will make the pre-preg too tacky to handle.
After pre-drying the laminate pre-preg is protected with release film and quickly cooled to
temperatures below 10oC. For fabricating the components, the pre-pregs are brought to room
temperature without exposing to humidity and then cut in to required dimensions and shaped in
to components by hot pressing.
Electrical Properties
SAFETY INFORMATION
Though we have taken adequate care to give you reliable information as above, as exact
conditions of use are beyond our control, we advise that a trial must be done on actual
operation, before starting any large scale production process with our products.
If this document is stamped as “Controlled Copy”, you will automatically receive all future revisions of this.