Total Km= 32
Available Km for PBM after excluding Urban Section=30.03 Km
Number of Section=1
Performance Based Road Contract Haripur - Beer - S-12 DWG. No. 01
Location Map
3
Locations are indicative only. On commencement of Works, the Contractor shall confirm and mark locations
Notes 1. Start chainage CH 0.00 - Haripur Bazar at Chapper Road
2. All chainages on this schedule measured by GPS odometer
3. All damage to be repaired in compliance with the Specifications
Section -1 Haripur to Beer
Total Length 32+000 Km
Urban Area 1+970 Km
Available Length for 30+030 KM
PBM
Chainage (KM) Pavem Pothol Wide Alligato Revall Loss Patch Ruttin Remarks and
ent es crack r ing/ of Work g (M) other defects
width total s Cracks Chip Pavem Required
(M) area total (SM) Loss ent(S /Defective
(SM) lengt (SM) M) Ptach
h (M) Work
(SM)
Total= Section -1 L=194 M=62 L=160 M=238 H=510 H=25765 L=210 Road section is
M=618 H=22 M=1340 M=55 Triple (TST)
H=44 H=218 Surface Treatment
Road constructed
in 2006-2007.
0 + 000 1 + 000 12.0 Haripur Bazar
area Excluding
from PBM
1 + 000 1+970 7.3 Haripur Bazar
area Excluding
from PBM
1+970 2 + 000 7.3 PBM SECTION
START
2 + 000 3 + 000 7.3 M=41 H=465 M=32
3 + 000 4 + 000 7.0 M=32 M=210 H=2640
13+000 14+000
14 + 000 15 + 000
15 + 000 16 + 000
16 + 000 17 + 000 143 1436 85 860 Paved Shoulder
718x2 m on both
side
17 + 000 18 + 000 520
18+ 000 19 + 000 Paved Shoulder
718x2 m on both
side
19+000 20+000
20 + 000 21 + 000
21+ 000 22 + 000 920 920 460 530 Paved Shoulder
460x2 m on both
side
22 + 000 23+000 1380 1380 289 690 624 Paved Shoulder
690x2 m on both
side
23+ 000 24 + 000 230 689
24 + 000 25 + 000 722 150
25+000 26+000 240 240 865 198 120 Paved Shoulder
120x2 m on both
side
26+000 27+000 440 440 780 220 155 Paved Shoulder
220x2 m on both
7
side
27+000 28+000 910
28+000 29+000 766
29+000 30+000 815
30+000 31+000 780 780 600 390 380 Paved Shoulder
390x2 m on both
side
31+000 32+000 330
8
including blockages
Notes
1. Start chainage CH 0.00 - Naripur Bazar- Chapper Road
2. All chainages on this schedule measured by GPS odometer
3. All road signs to be installed and reinstated as needed in compliance with the Specifications
Notes
1. Start chainage CH 0.00 -Haripur Bazar- Chapper Road
2. All chainages on this schedule measured by GPS odometer
3. All road signs to be installed and reinstated as needed in compliance with the Specifications
Section Section Name Works required Remarks
Paveme Pav Cente Zebra Cat Eyes
nt Edge eme r Line Crossi Number
-Left nt Marki ng
Side- Edg ng- Locati
Km e- Km ons -
Left Numb
Side er
-
Km
30 30 30 10 5400 Location , Type and
chainages of
pavement marking,
Total
Zebra crossing and
cat eyes are marked
in strip plans
Section-1 Haripur to Beer 30 30 30 10 5400
14
0 + 000 1 + 000
1 + 000 1 + 970
1 + 970 2 + 000
2 + 000 3 + 000
3 + 000 4 + 000 255 255 PW=3+630 to
3+860 on
both side
4 + 000 5 + 000
5+ 000 6 + 000 185 PW=5+08 to
5+270 on ls
6 + 000 7 + 000 329 329 PW=6+00 to
6+480 on
both side
7+ 000 8 + 000 85 88 PW=7+900 to
8+000 on
both side
8 + 000 9 + 000 398 255 PW=8+000 to
8+750 on
both side
9 + 000 10 + 000 150 185 PW=9+270 to
9+480 on
both side
10 + 000 11 + 000 260 100 785 328 130 PW=10+000
to10+800 on
both side
11 + 000 12 + 000 535 85 825 85 280 PW=11+100
to 12+000 on
both side
12+ 000 13 + 000 1250 285 765 PW=12+000t
16
o 13+000 on
ls
13+000 14+000 2015 250 880 310 PW= 13+000
to 14+000 ls
14 + 000 15 + 000 1885 200 300 Pw =14+000
to 14+700 ls
15 + 000 16 + 000 1355 462 Pw =15+700
to 16+000 ls
16 + 000 17+000 1015 88 PW 16+000 to
16+400 ls
17 + 000 18 + 000 215 142 325 PW=17+600
to 17+920 km
on ls
18 + 000 19 + 000 590 453 85 559 289 PW=18.000
to 19+000 km
on rs
19 + 000 20+ 000 160 155 692 202 PW=19+350
to 20+00 km
on ls
20 + 000 21 + 000 755 115 630 280 PW=20+270
to 21+00 on
ls side
21+ 000 22 + 000 650 168 PW=21+000
to 21+650 on
ls side
22 + 000 23 + 000 325 85 PW=22+900
to 23+00 on
ls