You are on page 1of 15

METHOD STATEMENT

SURVEY WORKS FOR BRIDGE – DZEMIN DO (Rev 3)

MS.010

ELABORATED REVIEWED APPROVED

Mr Manuel García Mr Manuel Barrera Mr Dragoljub Baletic Mr José María Cabañas


Site Quality Manager Quality Manager Construction Manager Project Manager
Controlled Copy
Revision: 3
Nº 05 – 2016
Survey works Dzemin Do Page 3 of 15
Method Statement MS.010 Rev. 3
May 2016

Revision Control
Date Rev. Description Paragraph
01-2016 1 Initial Issue.
05-2016 2 Add new benchmarks
05-2016 3 New benchmarks levelling for checking
Survey works Dzemin Do Page 4 of 15
Method Statement MS.010 Rev. 3
May 2016

INDEX
Contents
1. OBJECT..........................................................................................................................................4
2. SCOPE............................................................................................................................................4
3. REFERENCE DOCUMENTS.......................................................................................................4
4. DESCRIPTION OF ACTIVITITES...............................................................................................4
5. PRECAUTIONS.............................................................................................................................4
6. REGISTERS...................................................................................................................................4
7. HEALTH AND SAFETY AND ENVIRONMENTAL PROTECTION.........................................5
8. RESPONSABILITIES....................................................................................................................5
9. ANNEX 1.......................................................................................................................................6
Survey works Dzemin Do Page 5 of 15
Method Statement MS.010 Rev. 3
May 2016
1. OBJECT
This Method Statement describes the procedure of AZVI in order to ensure the proper survey works
in the structure Dzemin Do.

2. SCOPE
The scope of this methodology are execution of piers and deck for Dzemin Do concrete
works on Corridor X – Highway E 75; Section: Grdelica (Gornje Polje ) – Caricina Dolina;
LOT 6.

This Method Statement will describe the necessary steps of construction, preconditions
with respect to equipment and material for construction as well as the key requirements
as per Technical Specifications.

3. REFERENCE DOCUMENTS
All executed works will be executed according to the Technical specification of the
Contract.
Standards, normative and other regulations for the execution works are fully enlisted in
section 3.4 Construction of Embankments and this Method Statement. Other general
standards:

 Quality Plan
 HSE Plan
 ISO 14001:2004 - Environmental Protection
 ISO 9001:2008 – Quality

4. DESCRIPTION OF ACTIVITITES
The micro-triangulation network for bridge “Dzemin Do” (LOT 6) has seven foundations for
forced centering made in concrete and design for this specific task.
The concrete elements built will be only used for survey works.
For surveying is used a Total Station “LEICA TS 15” and for leveling is used Leica DNA03
The methodology used is base in back-front readings.
For the calculation and adjustment of the adjusted coordinates, “MicroSurvey StarNet V8”
was used. The results are given at the end of this document (ANNEX 1)

5. PRECAUTIONS
With seven foundations in concrete, if any of such foundations are destroyed could be replace
and the coordinates for the new one would be obtained according this method of statement.
Using these foundations the coordinates for works will keep without changes, will be able to
replace and, even, to keep them for maintenance by Client.

6. REGISTERS
Inspection reports
Non Conformity Reports
Surveying reports
Survey works Dzemin Do Page 6 of 15
Method Statement MS.010 Rev. 3
May 2016
7. HEALTH AND SAFETY AND ENVIRONMENTAL PROTECTION
This part of the procedure will apply the Health and Safety Plan and the annexes for different
activities including in the present document. Also will apply the Site Specific Implementation
Plan (SSIP).

8. RESPONSABILITIES
Contractor’s
Representative
FCO JAVIER
GARCÍA

Project Manager
JOSE MARIA
CABAÑAS

Engineering Construction
Department Manager
JOSE MIGUEL DRAGOLJUB
AUVRAY BALETIĆ

Chief of Health and Safety Quality Assurance Environmental


Site Manager
Surveying Manager Manager Manager
DRAGOLJUB
ENRIQUE DIAZ ŽELJKO MANUEL MANUEL
BALETIĆ
LIEBANAS KARAPANDŽIĆ GARCIA LOPEZ GARCIA LOPEZ

Project Manager
- To supervise that the work are performed according to the project
Surveyor
- Performs the work and its geometrical control.
- Carries out the topography works and checks the topographical equipment, in compliance with
the specific procedures.
- Performs the inspections set in the inspection program and issues the inspection reports.
- Informs the Project Manager about the non-conformances that occur.
Site Quality Manager
- To Check Quality Plan requirements are included in contracts with suppliers and subcontractors.
- To check the quality of the works and control of Quality documents.
- To train personnel of work in quality activities.
Survey works Dzemin Do Page 7 of 15
Method Statement MS.010 Rev. 3
May 2016

9. ANNEX 1
Data for concrete foundations:

FIELD DATA
Horiz. Vert. Horiz. Slope Prism. EDM
From To Face
angle angle dist dist. constant type
121.947
S3 86 I 115.2388 83.5267 126.1482 0 IR
8
S3 S4 I 15.5854 109.9025 63.8122 64.5919 0 IR
S3 S4 I 15.5838 109.9027 63.812 64.5918 0 IR
184.257
S3 S5 I 376.1857 105.7943 185.0232 0 IR
8
184.257
S3 S5 II 176.1873 294.2024 185.0234 0 IR
1
S4 S3 I 9.2793 90.0971 63.8123 64.5923 0 IR
S4 S3 II 209.2792 309.9011 63.8125 64.5922 0 IR
S4 S5 I 152.51 103.1537 137.362 137.5306 0 IR
137.362
S4 S5 II 352.5111 296.8474 137.5307 0 IR
3
137.361
S5 S4 I 28.1862 96.8488 137.5303 0 IR
7
137.361
S5 S4 II 228.1886 303.1527 137.5304 0 IR
7
184.257
S5 S3 I 45.5576 94.2079 185.0232 0 IR
5
S5 S3 II 245.5591 305.7909 184.258 185.0234 0 IR
288.909
S5 S2 I 34.8508 89.4287 292.9407 0 IR
1
288.908
S5 S2 II 234.8525 310.5729 292.9409 0 IR
2
283.794
S5 S1 I 23.7927 88.9719 288.1082 0 IR
1
283.793
S5 S1 II 223.7939 311.0291 288.1083 0 IR
4
S2 S1 I 161.1703 98.4246 49.9392 49.9545 0 IR
S2 S1 II 361.1704 301.5759 49.9391 49.9544 0 IR
S1 S2 I 395.4103 101.574 49.9396 49.9548 0 IR
S1 S2 II 195.411 298.4234 49.9392 49.9545 0 IR
283.795
S1 S5 I 96.3855 111.0315 288.1079 0 IR
3
283.794
S1 S5 II 296.3876 288.9678 288.1077 0 IR
5
S4 S5 I 64.1047 103.149 137.362 137.53 0 IR
137.361
S4 S5 II 264.1054 296.851 137.53 0 IR
9
121.946
86 S3 I 113.2679 116.472 126.1448 0 IR
4
Survey works Dzemin Do Page 8 of 15
Method Statement MS.010 Rev. 3
May 2016
121.947
86 S3 II 313.2707 283.5311 126.1447 0 IR
8
86 S1 I 395.8785 97.3126 13.6969 13.7091 0 IR
86 S1 II 195.8806 302.6885 13.6967 13.7089 0 IR
86 S2 I 40.2164 100.7014 59.6678 59.6714 0 IR
86 S2 II 240.2174 299.2999 59.6675 59.6711 0 IR
S1 86 I 366.6029 102.6896 13.6968 13.709 0 IR
S1 86 II 166.6052 297.3093 13.6969 13.7091 0 IR
283.796
S1 S5 I 323.1776 111.0308 288.1086 0 IR
5
283.797
S1 S5 II 123.1785 288.9694 288.1091 0 IR
2
S1 S2 I 222.2021 101.5768 49.9392 49.9545 0 IR
S1 S2 II 22.2027 298.4234 49.9391 49.9544 0 IR
S2 S5 I 213.2774 110.573 288.9114 292.9402 0 IR
288.912
S2 S5 II 13.2778 289.4277 292.9404 0 IR
2
S2 S1 I 301.2415 98.4236 49.9393 49.9547 0 IR
S2 S1 II 101.2424 301.5771 49.9393 49.9547 0 IR
S2 86 I 289.9808 99.2971 59.6671 59.6708 0 IR
S2 86 II 89.9817 300.7014 59.6674 59.671 0 IR
530.372
S7 86 I 372.5565 100.7605 530.4097 0 IR
3
530.372
S7 86 II 172.5576 299.2388 530.4095 0 IR
1
534.597
S7 S2 I 379.6762 100.8283 534.6419 0 IR
2
534.597
S7 S2 II 179.6777 299.1706 534.6419 0 IR
1
539.417
S7 S1 I 373.7818 100.6749 539.4474 0 IR
5
S7 S1 II 173.7823 299.3266 539.418 539.4477 0 IR
S7 S6 I 287.9536 104.8308 77.4523 77.6758 0 IR
S7 S6 II 87.9562 295.1683 77.4522 77.6758 0 IR
393.237
S7 S4 I 371.5527 107.8227 396.2225 0 IR
8
393.238
S7 S4 II 171.553 292.1781 396.2226 0 IR
5
S7 S3 I 380.3606 105.7839 423.1164 424.8663 0 IR
S7 S3 II 180.361 294.2135 423.1151 424.8665 0 IR
530.377
86 S7 I 393.6379 99.2527 530.4143 0 IR
3
530.377
86 S7 II 193.6369 300.7482 530.4144 0 IR
3
86 S3 I 365.745 116.4772 121.948 126.1492 0 IR
86 S3 II 165.7468 283.5226 121.948 126.1493 0 IR
86 S1 I 248.358 97.352 13.6978 13.7096 0 IR
86 S1 II 48.358 302.6435 13.698 13.7098 0 IR
86 S2 I 292.6958 100.7125 59.6679 59.6716 0 IR
86 S2 II 92.6949 299.2865 59.6678 59.6716 0 IR
Survey works Dzemin Do Page 9 of 15
Method Statement MS.010 Rev. 3
May 2016
539.418
S1 S7 I 120.3145 99.3297 539.4488 0 IR
5
539.418
S1 S7 II 320.3163 300.6663 539.4489 0 IR
9
S1 86 I 173.8136 102.6415 13.6981 13.7099 0 IR
S1 86 II 373.8164 297.3571 13.698 13.7098 0 IR
283.799
S1 S5 I 130.387 111.0308 288.1117 0 IR
6
283.797
S1 S5 II 330.388 288.9665 288.1118 0 IR
5
534.597
S2 S7 I 35.6277 99.1779 534.6425 0 IR
4
534.597
S2 S7 II 235.6307 300.8231 534.6424 0 IR
1
S2 86 I 127.5686 99.2865 59.6679 59.6716 0 IR
S2 86 II 327.5701 300.7135 59.6678 59.6716 0 IR
S2 S5 I 50.8635 110.5754 288.9119 292.9425 0 IR
288.913
S2 S5 II 250.865 289.4272 292.9425 0 IR
9
S2 S1 I 138.8299 98.4189 49.9382 49.9536 0 IR
S2 S1 II 338.8306 301.5805 49.9383 49.9537 0 IR
S6 S7 I 16.4384 95.1715 77.4531 77.6764 0 IR
S6 S7 II 216.4381 304.8281 77.4532 77.6766 0 IR
266.235
S6 89 I 127.5294 97.2765 266.4802 0 IR
9
266.235
S6 89 II 327.5304 302.7258 266.4802 0 IR
5
788.324
89 S1 I 197.217 100.9106 788.4042 0 IR
8
788.325
89 S1 II 397.2181 299.0889 788.4047 0 IR
3
794.146
89 S2 I 201.2073 101.0044 794.2443 0 IR
9
794.147
89 S2 II 1.2083 298.9969 794.2445 0 IR
4
266.230
89 S6 I 207.9378 102.7288 266.475 0 IR
7
266.230
89 S6 II 7.9415 297.2706 266.4752 0 IR
7

New field data for the new benchmarks S30 and S8:

Horiz. Vert. Horiz. Slope Prism. EDM


From To Face
angle angle dist dist. constant type
463.332 463.463
S8 S1 I 65.9776 98.489 6 9 0 IR
S8 S1 II 265.9777 301.5099 463.332 463.463 0 IR
Survey works Dzemin Do Page 10 of 15
Method Statement MS.010 Rev. 3
May 2016
5 6
454.675 454.791
S8 86 II 264.508 301.4355 5 8 0 IR
457.181
S8 S2 II 272.8375 301.357 5 457.286 0 IR
457.181 457.286
S8 S2 I 72.8362 98.6419 6 3 0 IR
318.032 319.621
S8 S4 I 62.215 106.3537 6 6 0 IR
319.621
S8 S4 II 262.2152 293.644 318.0311 3 0 IR
318.030 319.621
S8 S4 II 262.2155 293.6429 6 4 0 IR
192.597 196.437
S8 S5 II 247.7828 287.3905 8 4 0 IR
192.596 196.437
S8 S5 I 47.7818 112.6112 8 5 0 IR
108.964 109.499
S8 S6 I 331.5594 93.7017 1 7 0 IR
109.499
S8 S6 II 131.5609 306.2972 108.964 4 0 IR
S8 S7 II 81.2337 313.4309 77.9889 79.7575 0 IR
S8 S7 I 281.2323 86.5719 77.9899 79.7578 0 IR
S7 S8 II 198.923 286.5638 77.9903 79.76 0 IR
S7 S8 I 398.9204 113.4348 77.9906 79.7599 0 IR
108.964
S6 S8 II 302.6438 293.696 8 109.501 0 IR
108.965
S6 S8 I 102.6426 106.3027 1 109.5011 0 IR

Planimetric corrections and accuracy

Semi-
Station StDv E StDv N Semi-Minor
Major
S1 0.000540 0.000691 0.002090 0.000491
Survey works Dzemin Do Page 11 of 15
Method Statement MS.010 Rev. 3
May 2016
S2 0.001765 0.000861 0.004418 0.001894
S3 0.001764 0.002190 0.005652 0.003927
S4 0.002379 0.002378 0.006054 0.005580
S5 0.003612 0.002360 0.008863 0.005744
S6 0.003308 0.002789 0.008289 0.006593
S7 0.004583 0.002957 0.011621 0.006572
S8 0.001420 0.000598 0.003559 0.001250

Adjusted Coordinates (Meters)

S1 7588514.5707 4731668.4649 R1 399.7170

S2 7588564.3526 4731672.4268 R2 398.4932

S3 7588583.2753 4731562.4486 R3 366.8668

S4 7588533.4226 4731522.6140 R4 356.8522

S5 7588532.7468 4731385.2524 R5 350.0487

S6 7588556.0271 4731142.3558 R6 399.5283

S7 7588633.4839 4731142.3288 R7 405.4280

S8 7588632.159 4731220.297 R8 388.747

S30 7588588.999 4731561.933 R30 366.870

measured difference - measured difference -


Height difference between basements ΔH
front back
P86 S1 -0.799 0.7994 0.0004
S1 S2 1.2218 -1.2242 0.0024
S2 S3 31.6238 -31.6257 0.0019
S3 S4 10.0117 -10.0156 0.0039
S4 S5 6.8025 -6.8004 0.0021
Survey works Dzemin Do Page 12 of 15
Method Statement MS.010 Rev. 3
May 2016
S5 S6 -49.4829 49.4835 0.0006
S6 S7 -5.9 5.9017 0.0017
S7 P89 -5.4271 5.4254 0.0017
S8 S6 -10.7812 10.7803 0.0009
S30 S4 10.0180 -10.0176 0.0004
Benchmarks levelling

In this second Review, we have added two new benchmarks more.


First one because has been destroyed by the fundation axe 3 excavation of Dzemin do, the new
one is called S30.
For calculate, the new coordinates of S30, the following method has been a inverse intersection
to diferents benchmarks, ajustment previusly in the first micropolygon.
And the second one is the S8, for make much better the calculations of this micropolygon .

All these calculations, has been conected with the coordinates projects of the benchmarks P86
and P89

In this third review , we have made a new benchmark levelling for checking the old levels.
The result of levelling, shows that the foundations have not changed in its values so much.

Benchmarks levelling (Rev 03)

Desnivel between basements FRONT BACK differences

P86 R1 -0,7990 0,7988 -0,0002


R1 R2 1,2233 -1,2230 0,0003
Survey works Dzemin Do Page 13 of 15
Method Statement MS.010 Rev. 3
May 2016
R2 R30 31,5957 -31,5949 0,0008
R30 R4 10,0158 -10,0152 0,0006
R4 R5 6,8018 -6,8000 0,0018
R5 R8 -38,6684 38,6675 -0,0009
R8 R6 -10,7790 10,7787 -0,0003
R6 R7 -5,9004 5,9001 -0,0003

Final Adjusted Coordinates (Meters)

S1 7588514.5707 4731668.4649 R1 399.7169

S2 7588564.3526 4731672.4268 R2 398.4938

S3 7588583.2753 4731562.4486 R3 366.8668

S4 7588533.4226 4731522.6140 R4 356.8830

S5 7588532.7468 4731385.2524 R5 350.0821

S6 7588556.0271 4731142.3558 R6 399.5289

S7 7588633.4839 4731142.3288 R7 405.4291

S8 7588632.159 4731220.297 R8 388.7500

S30 7588588.999 4731561.933 R30 366.8985


Survey works Dzemin Do Page 14 of 15
Method Statement MS.010 Rev. 3
May 2016

Picture 1: New foundations – bridge Dzemin Do


Survey works Dzemin Do Page 15 of 15
Method Statement MS.010 Rev. 3
May 2016