Scheme : DESIGNMC00
Date : Sunday, Sep 30 2012 Road Name: Neelagoundapudur Road
Time : 12:17:44
Curvature Correction ON
METRIC UNITS
EXISTING TO SUBGRADE Chainage End Area Cut (m2) End Area Fill (m2) Volume Cut (m3) Volume Fill (m3)
0 6.563 0 0 0
Cut Factor = 1.00 25 0.091 0.622 42.538 4.711
Fill Factor = 1.00 50 0.003 1.011 1.015 20.301
Cut Cost = 0.00 75 0 1.367 0.05 28.279
Fill Cost = 0.00 100 0.563 0.803 2.418 27.678
125 0.449 0.486 11.334 16.846
150 0.044 0.843 7.971 13.595
175 0 2.726 0.144 43.773
200 0 3.174 538.246 69.444
225 0 3.65 0 92.276
250 0 1.634 0 68.478
275 0.016 1.086 0.504 30
300 0 1.71 0.042 34.751
325 0 2.33 0 53.16
350 0 4.186 1.789 61.952
375 0 4.36 0 111.298
400 0 3.212 0 84.718
425 0.091 1.081 1.265 49.705
450 0 1.573 1.115 31.078
475 0 1.583 0 45.738
500 0 2.013 0.094 40.168
525 1.101 0.407 4.082 37.515
550 0.002 1.633 16.004 19.924
575 0 3.005 0.013 64.581
600 0.164 1.316 1.372 49.241
625 0.704 1.587 23.381 38.887
650 0 2.193 3.264 42.24
675 0 3.354 0 67.017
700 0 3.707 0 91.13
725 0 2.973 0 85.012
750 0 2.69 0 67.639
775 0.084 1.769 0.789 55.621
800 0.05 1.756 1.845 43.526
825 0.015 2.274 0.717 46.974
850 0 2.612 0.058 63.653
875 0 2.096 0 60.841
900 0 1.613 0 43.073
925 0.006 1.962 0.017 45.133
950 0 1.292 0.578 44.391
975 0 3 0 50.27
1000 0 3.695 0 86.487
1025 0 2.405 0 74.87
1050 0.059 0.836 0.21 42.39
1075 0.725 0.887 7.471 21.152
1100 1.731 0.362 22.745 17.412
1125 1.183 0.393 23.848 17.857
30-09-2012 12:17:44
Costing Report
30-09-2012 12:17:44