Professional Documents
Culture Documents
Operating Instructions
1996 ABB Power Automation Ltd
Baden/Switzerland
4th Edition
All rights with respect to this document, including applications for patent and
registration of other industrial property rights, are reserved. Unauthorised use, in
particular reproduction or making available to third parties, is prohibited.
This document has been carefully prepared and reviewed. Should in spite of this
the reader find an error, he is requested to inform us at his earliest convenience.
The data contained herein purport solely to describe the product and are not a
warranty of performance or characteristic. It is with the best interest of our
customers in mind that we constantly strive to improve our products and keep
them abreast of advances in technology. This may, however, lead to discrep-
ancies between a product and its “Technical Description” or “Operating Instructions”.
Version 6.0
1. Introduction A
2. Description of hardware B
5. Operation (MMI) C
8. Technical data A
11.
12. Appendices B
How to use these Operating Instructions RET316*4 V6.0
What do you wish to What precisely? Look in the following Indices (I) / Sections (S):
know about the device ...
* General theoretical Brief introduction I1 (Introduction)
familiarisation General overview I 1, S 2.1.-7.1. (all Section summaries)
Technical data I8 (Technical data: Data Sheet)
Hardware I2 (Description of hardware)
Software I3 (Setting the functions)
I4 (Description of function and application)
I6 (Self-testing and monitoring)
I 10 (Software changes)
* How to check, test Checking the connections S 7.2.3. to S 7.2.7.
and commission it Functional test S 5.9.
Commissioning checks S 7.3.6.